Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Disassembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Commuting again to work on-site? Lab’s first drivers faced their own challenges decades ago

After a long pause in commuting, more and more Lab staff are filling travel mugs, topping off their tanks, and heading up the hill for on-site work. As long as the Lab has existed, workers have snaked through tight mountain roads to get to their jobs. And, back in the early 1940s, drivers faced even more challenges. In the Lab’s earliest years, drivers likely worried about getting stuck in the mud, navigating intense switchbacks, or making sure important equipment, such as a disassembled power plant, didn’t fall off the back of the truck that was hauling it. Creative solutions could go a long way to get out of a jam. As many of us return onsite and get reacquainted with commuting, we look back at how transportation has changed since the Manhattan Project, the U.S. government’s top secret effort at Los Alamos to create the first atomic bombs to help end World War II. These stories and photos are part of the collections in the National Security Research Center, which is the Lab’s classified library and also houses unclassified artifacts from our past.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Increased Fissile Loading Flowsheet Review

A request was made by H-Canyon Process Engineering to assess the impact of blending dissolved, neutralized Spent Nuclear Fuel (SNF) with future sludge batches and their impact on downstream processing facilities including the Concentration, Storage and Transfer Facilities (CSTF), the Salt Waste Processing Facility (SWPF), the Defense Waste Processing Facility (DWPF), Saltstone, and the Effluent Treatment Facility (ETF). The purpose of this change is to accelerate the deinventory of SNF which is currently stored in the L-Area Disassembly Basin. The addition of SNF increases the mass of fissiles in each future sludge batch, due to their high enrichment. This high enrichment has the potential to complicate the programs to eliminate criticality events in the downstream processing facilities and will increase the number of canisters produced by DWPF because of the SNF mass increase. A separate report addressed the impacts to glass. The review and subsequent calculations were based on average predicted compositions of Accelerated Basin Deinventory (ABD) slurry, average compositions for predicted future sludge batches, average past salt batches and average past recycle batches to predict the feeds that will be processed in SWPF, DWPF, Saltstone, the 2H evaporator and ETF. Each of the processes was evaluated for potential issues.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Optimized Carbon Fiber Intermediate Development to Enable High-Volume Manufacturing of Lightweight Automotive Composites

The ongoing pursuit of improved fuel economy and reduced greenhouse gas emissions has resulted in sustained interest for lightweight materials technologies. In this context, carbon fiber composites have captured the imagination of automotive engineers due to the potential to achieve substantial mass reduction when compared to traditional steel construction. That stated, the use of carbon fiber composites in automotive has been limited for the most part to premium supercars and other derivative platforms. In these cases, manufacturing costs are less of an obstacle to implementation, and the performance benefits of carbon fiber have enabled production of structures offering more than 50% weight savings. In practice, translating these low-volume demonstrations onto high-volume vehicle platforms has remained challenging. This can be attributed to several factors, with the absence of suitable high throughput production methodologies being a key impediment. To date, structural, crash critical components have relied upon manufacturing techniques born out of the aerospace industry. This has created a disconnect between automotive production systems that are accustomed to manufacturing multiple parts per minute and the aerospace technologies that have cycle times in the order of hours. Consequently, the focus of this project is the development of manufacturing process technology for carbon fiber composites that can support a mainstream vehicle program at an assumed throughput of 100,000 vehicles per year. In practice, this translates to a part-to-part cycle time of less than 3 minutes. Project participation included contributions from a broad range of academic, industrial and national lab partners. The primary scope of work, being the development of new carbon fiber epoxy compounds that are stable at room temperature and suited to high throughput automated processing. For project management, the work streams were divided into six key areas, with the lead organization in parentheses. • Carbon fiber/epoxy materials formulation development and scale up (Dow) • Simulation of discontinuous near isotropic meso-structure intermediates (Purdue) • Simulation of mechanical performance of compression molded components (Purdue) • Meso-Scale morphological analysis and correlation with structural performance (UTK) • Paint and adhesion durability analysis (MSU) • Demonstrator part design, prototype production, and validation testing (Ford). The primary goal at the commencement of the project was development of a chopped carbon fiber sheet molding compound (SMC) that offered a three times improvement in tensile modulus over a comparable glass-based SMC. In addition to meeting mechanical performance targets, the resin kinetics were modified to achieve a processing cycle time of less than 3 minutes. Other critical-to-quality (CTQ) specifications were also stipulated to account for a broad range of materials and processing characteristics. To achieve the above, staff scientists at Dow Chemical created an extensive series of new epoxy blends for testing and validation. Throughout this development, a key challenge was attaining material performance goals without impacting processing behavior and paintability of finished components. The latter required a new internal mold release system being developed by Dow that was designed to complement the kinetics of the rapid cure epoxy. As a complement to work studies at the industrial partners, the teams from academia executed a series of analytical and experimental studies to investigate potential factors influencing CF-SMC performance. Unit cell models were developed to capture the meso-scale representations of the fiber matrix architecture. Results of this analysis and subsequent morphological investigations led to the design of a novel composite derivative comprising carbon fiber platelets embedded in an epoxy matrix; the platelet size and aspect ratio playing significant role in final composite properties. This approach was a departure from previous research in CF-SMC development whereby bulk filamentization or disassembly of the carbon fiber rovings had been considered the most effective means of achieving both fiber wet through and wet-out. As the course of the academia studies progressed, the aspect ratio of the fiber constituents was further optimized before finalizing material attributes and processing conditions. For the purposes of technology validation, the Ford team led a work stream devoted to the design, fabrication and testing of demonstration components. The carbon fiber SMC material has the potential to displace numerous stampings and castings on an automotive structure but ultimately vehicle closure applications were selected to showcase the abilities of the CF-SMC to achieve both mass reduction and business case for large complex structures. Using target properties established by the Dow staff scientists, the complete closure system for a full-size sedan decklid and a mid-size wagon liftgate were engineered. Prototypes for both applications were fabricated using production representative processing methods to allow for physical testing and performance validation of the CF-SMC structures. Following completion of a testing program that concluded with a FMVSS301 55 mph offset rear crash, the CF-SMC formulation was declared by the Ford team to have met all engineering requirements. To summarize, the joint development activities during this project led to significant technical breakthroughs and achievement of all milestones. The result was the development of a novel, tack-free carbon fiber molding compound that is suited to automated processing. This combined room temperature stability, fast cure kinetics, and internal mold release system facilitates cycle times that are conducive to high-volume production. The VORAFUSE M6400 successfully passed technology validation at Ford and is now eligible for consideration on future production commercial vehicle programs.

36 MATERIALS SCIENCE↗

LANL MLU TRUPACT Loading Survey Document

The following SNL document contains requested radiological survey information, as part of the documentation for the MLU shipment being performed by the LANL MLU team. The survey was performed in TA-5, on October 19th, 2021. This survey was for radiological coverage for the disassembly of two TRUPACTs, the assembly and loading of their payloads, and the reassembly of the TRUPACTs.

61 RADIATION PROTECTION AND DOSIMETRY↗

LANL MLU 20 October TRUPACT Loading Survey Document

This SNL document contains requested radiological survey information, as part of the documentation for the MLU shipment performed by the LANL MLU team on October 20th. The survey was performed in TA-5, on October 20th, 2021. This survey was for radiological coverage for the disassembly of two TRUPACTs, the assembly and loading of their payloads, and the reassembly of the TRUPACTs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Increased Fissile Loading Flowsheet Review

A request was made by H-Canyon Process Engineering to assess the impact of blending dissolved, neutralized Spent Nuclear Fuel (SNF) with future sludge batches and their impact on downstream processing facilities. The purpose of this change is to accelerate the deinventory of SNF which is currently stored in the L-Area Disassembly Basin.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ALDWP Operational Highlights 2021

The Weapons Pit production manufacturing team completed pit build 21-1 assembly operations on December 23, 2020. This build utilized all essential flow sheet steps and included the second -01 long tube cut off extension and welding activity. This is the best build produced in the MC4597-01 pit program to date. Final out-of-line operations, non-destructive evaluation, and radiography was completed during the week of January 4. Depending on the results from high energy radiography, this pit will be considered to be a candidate for CERT-02 and shipment to Lawrence Livermore National Laboratory in support of pit certification. It is notable that this build was completed while concurrently making Plutonium (Pu) metal, producing additional castings, machining Pu parts for Build 22, completing disassembly of two pits, supporting Nightshade B Pu target characterization, and precision machining of Jasper certification base plates.

42 ENGINEERING↗

CORRTEX Analysis Techniques

Continuous Reflectometry for Radius versus Time Experiments, or CORRTEX, is a diagnostic that was developed during nuclear testing to measure the distance at which rock walls were disrupted by an explosive device as a function of the time at which disruption occurred. Distances recorded are dynamic measurements of cable length as the shockwaves from an explosive event crush the experiment cables, reducing their usable length. Applications of the CORRTEX diagnostic have been expanded in recent times to include instrumentation of the explosive device itself, to record phenomena such as the speed of the detonation wave in the explosive charge and the crushing or disassembly of material in the charge housing. The diagnostic has likewise been used to monitor explosive performance in rock blasting and oil well hole-clearing activities.

42 ENGINEERING↗

Fabrication and Irradiation Behavior of Thulium Sesquioxide

The results of reactor irradiation of thulium sesquioxide are discussed, along with chemical and physical properties and wafer fabrication. Sintered densities up to 90% of theoretical were obtained in target wafers using oxide reprocessed to obtain readily sinterable powder. Irradiation to about 1.8 w/g did not change the microstructure of the wafers although some wafers broke, probably because of mechanical stresses in target and disassembly.

36 MATERIALS SCIENCE↗

Nondestructive Evaluation of Rexolite Insulators for the Purpose of Monitoring the Structural Health of Particle Accelerator

Rexolite is a cross-linked polystyrene plastic with stable electrical properties into the gigahertz frequency range. The ability to withstand high voltage makes Rexolite one of the most used materials as insulators for particle accelerators. Although, Rexolite’s poor outgassing performance relative to traditional vacuum materials such as stainless steel or aluminum deems the necessity to treat Rexolite prior to its use as insulators. Insulators are mandatory for an accelerator system because a uniform electric field is required to ensure the alignment of the accelerated particles. Furthermore, to operate properly, a particle accelerator is required to maintain a high vacuum or even an ultrahigh vacuum. Although, because outgassing is the major contributor to the gas load of a vacuum system, Rexolite insulators with uncontrolled outgassing characteristics can severely damage the particle accelerator. Disassembly and reassembly of a complex system like a particle accelerator is also time consuming.

36 MATERIALS SCIENCE↗

14 MeV Irradiation and Analysis of a 93% 239 Pu Target in Preparation for a F2019 FY22 Pu Campaign

In this work, we present the irradiation of a 93% 239 Pu with 14 MeV neutrons and subsequent analysis of the fission and activation products. The fully assembled target, a Pu metal bead encapsulated in Al, further encapsulated in welded stainless steel, was analyzed 22 times over more than 100 days using gamma emission analysis (GEA). Using the results from these analyses, R-values and fission yields for fission products were determined. To prepare for the FY22 Pu irradiation using the GODIVA critical assembly at NCERC, the irradiated Pu target was disassembled, dissolved, and separated using chemistry provided by LANL collaborators. This chemical separation was intended to remove the Pu from solution with little to no effect on the remaining elements. The chemistry was assessed to try to determine possible routes of fractionation of the sample and the fission products. The separation process used was successful for the bulk of the analyzed fission and activation products, as well as the added radiotracers. The final dissolved solution and separated fractions were analyzed by GEA looking at the remaining fission, activation and radiotracers and thermal ionization mass spectrometry analysis looking at the Pu isotopics.

14MeV↗

Rapidly Deployable Acoustic Monitoring and Localization System Based on a Low-Cost Wave Buoy Platform

The primary objective of this project is to develop a cost-effective, fit-for-purpose environmental monitoring system, “NoiseSpotter®,” that characterizes, classifies, and provides accurate location information for anthropogenic and natural sounds in near real-time. NoiseSpotter was developed to support the evaluation of potential acoustic effects of marine energy (ME) projects. By utilizing a compact array of three acoustic particle motion sensors, NoiseSpotter triangulates individual bearings to provide sound source localization to within 5% accuracy, allowing the ability to discern ME device sounds relative to other confounding sounds in the environment, while providing location estimates to nearby marine mammals for environmental mitigation purposes. The ME industry needs proven solutions to meet environmental impact assessment needs. The NoiseSpotter® includes off-the-shelf, modular components that are easy to assemble and disassemble. Its acoustic particle motion sensors are commercially available and the data logger and real-time telemetry system is designed to be plug-and-play. The entire system is relatively compact and can be deployed from small vessels. NoiseSpotter’s near real-time capability enables operational monitoring of ME sounds, particularly during early stages of technology adoption to facilitate mitigation of potential noise effects. Widespread adoption of the technology for acoustic monitoring of ME devices requires that it be cost effective; hence the anticipated commercial cost of system hardware is $35,000. This project contributes to reducing barriers to ME testing through support of scientific research focused on reducing or mitigating environmental risks and lowering costs and complexity of environmental monitoring. This project has developed an acoustic monitoring system, NoiseSpotter® (U.S. Patent No. 11,156,734 and U.S. Registered Trademark No. 6,442,313), to detect and characterize baseline noise and sounds from ME operations and support geolocation of detected sounds. The intended outcome of the project is to mitigate concerns about the potential for ME device noise to alter marine mammal or fish behavior. NoiseSpotter® enables cost-effective, near real-time acoustic monitoring of an operational ME device relative to ambient environmental noise and provides a technical basis for ME developers seeking to navigate the permitting process in an efficient manner.

16 TIDAL AND WAVE POWER↗

Record of Technical Change for Addendum to the Closure Report for Corrective Action Unit 113: Area 25 R-MAD Facility, Nevada National Security Site, Nevada

This addendum to the Closure Report for Corrective Action Unit 113: Area 25, Reactor Maintenance, Assembly, and Disassembly Facility, Building 3110, Nevada Test Site, Nevada, DOE/NV--891-VOL I-Rev. 1, dated July 2003, provides details of demolition, waste disposal, and use restriction (UR) modification for Corrective Action Unit 113, Area 25 R-MAD Facility. Demolition was completed on July 15, 2010, when the last of the building debris was disposed. Final field activities were concluded on August 30, 2010, after all equipment was demobilized and UR signs were posted. This work was funded by the American Recovery and Reinvestment Act.

54 ENVIRONMENTAL SCIENCES↗

Summary of Vendor Irradiation Capsule Workshop Hosted at Oak Ridge National Laboratory, October 3-4, 2022

The Department of Energy office of Nuclear Energy, Advanced Reactor Technology office tasked Idaho National Laboratory (INL), and Oak Ridge National Laboratory (ORNL) with hosting a set of two workshops. The primary purpose of these workshops was to convince the commercial high temperature reactor community, specifically the graphite and composite experts, to collaborate with the building and operation of a graphite/ceramic composite irradiation capsule(s). The workshops were designed to first instruct the attendees on the technical and scheduling challenges in conducting such an experiment by providing information on different technical areas in scheduling, designing, building, operating, and disassembling such irradiation capsules. A secondary purpose was to determine the individual irradiation requirements (including the desired irradiated material properties) to understand what the remaining technical needs for gas-cooled and salt-cooled advanced nuclear reactors. The first workshop was held at ORNL October 3-4, 2022. This report summarizes the discussions held during this workshop. The second workshop was hosted at INL April 4-6, 2023 and will have a separate summary report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Carbon Scaffold Architectures for Stable Lithium Metal Anodes

In light of the skyrocketing demand for electric vehicles and consequent need for high-performing lithium-ion batteries, there has been significant research into the creation of a battery with a lithium metal anode due to its high theoretical capacity and energy density. Unfortunately, nonuniform lithium deposition and consequent dendrite growth diminish performance and pose a safety risk. To combat this, lightweight carbon scaffolds are being developed to stabilize the electric field of these batteries and induce uniform deposition through rational design at the nano-, micro-, and meso- scales. However, there is a paucity of research on the impacts of macroscale scaffold topology on lithium cycling performance. Here, we report the creation of two graphite-based scaffolds with distinct 3D topologies: one a series of triangular prisms and one a series of rectangular prisms. Coin cells were made using these scaffolds and cycled at a current of 1mA/cm2 for 50 cycles to test the performance. The triangular topology was found to outperform the rectangular topology in terms of both potential magnitude and stability during cycling. Disassembling the cells revealed more even lithium deposition on the rectangular scaffold; however, some of the rectangular prisms were broken while all the triangular prisms remained intact. Last, future experiments are proposed regarding the scaffold spacing and mass of the cells in order to isolate the topological impact.

25 ENERGY STORAGE↗

UCO TRISO Minifuel FY23 NSUF-Kairos Power Post-Irradiation Examination Status Report

Irradiation of miniature tristructural isotropic (TRISO)–coated particle fuel compacts at high-power particle was performed in the Oak Ridge National Laboratory’s (ORNL’s) High Flux Isotope Reactor (HFIR) using the MiniFuel irradiation capability. Each compact comprised 20 TRISO particles with a low-enriched uranium carbide uranium oxide (UCO), natural UCO, or low-enriched UO 2 kernel within a graphitic matrix. After irradiation, the MiniFuel targets and subcapsules were disassembled to recover the irradiated fuel specimens and pursue post-irradiation examination (PIE) to inform Kairos Power on the fuel specimen performance. This report describes the PIE results collected to date, including dilatometry on the passive thermometry to confirm the irradiation temperature, fission gas release measurements, and gamma counting. This work was funded by the Nuclear Science User Facilities program.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SPC-70646 Specification for Reactor Supplemental Shielding for Use in DOME

NRIC is developing the Demonstration of Microreactor Experiments (DOME) test bed at the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC): to allow for testing of advanced reactors in support of future licensing and commercial operations. One such need is a neutron and photon radiation shielding system to protect personnel and equipment from harsh neutron and photon fluxes during reactor operations and post shut down operations, disassembly, and decommissioning.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Conversion of METL Diagnostic Flowmeters to Permanent Magnet Based Electromagnetic Flowmeters

The Mechanisms Engineering Test Loop (METL) uses three flowmeters to monitor sodium circulation through the main loop, the Cold Trap leg, and the Plugging Meter leg. When constructed, the Cold Trap flowmeter (CTFM) and Plugging Meter flowmeter (PMFM) were equipped with permanent magnets and Hall Sensors. By October of 2019, during normal operations, both the CTFM and PMFM failed, producing either erroneous or zero signals. Repairs to the flowmeters were attempted in January of 2020 but failed to resolve the issues. Therefore, starting in March of 2021, a plan was developed to convert the installed flowmeters to more robust permanent magnet based electromagnetic flowmeters (EMFMs). The Cold Trap EMFM (CT EMFM) and Plugging Meter EMFM (PM EMFM) were fully installed by August of 2021. Initial testing and commissioning were completed in November of 2021. Finally, the first calibration runs were finished in March of 2022. This report discusses the design, conversion, and calibration of the as-built CTFM and PMFM to robust permanent magnet based EMFMs. During the design phase, theoretical models were used to estimate the signal output and required magnet sizes. Then, the CTFM and PMFM were disassembled and converted to EMFMs. After commissioning, the CT EMFM and PM EMFM were calibrated using a ‘Time Transfer Procedure’ carried out with METL Expansion Vessels and Test Vessel Two. The accuracy of the calibration was estimated through an uncertainty analysis. Finally, the report describes some lessons learned for future flowmeter conversions and follow-up work. In total, both METL EMFM’s met the desired performance targets. Testing data showed that the METL EMFMs provide a output signal of roughly 2 mV at 1 GPM and 250 °C. During calibration, flowrates between 0.7 GPM and 2.4 GPM were achieved. In this flow range, calibration coefficients of 0.485 and 0.935 were measured as with errors ranging from 15-5% and 16-5% for the CT EMFM and PM EMFM, respectively. Above 1.5 GPM, the error was assumed to be about 5% for both METL EMFMs. Several points will be considered for future follow-up work on the METL EMFM’s. First, the signal noise issues in the PM EMFM will be addressed. It is likely the source of the noise is due to some stray EMF from a heater. Secondly, the NdFeB magnets will be replaced with a grade that has a Curie temperature above 80 °C. For example, a few grades of NeFeB magnets have Curie temperatures which exceed 150 °C and some SmCo magnets have Curie temperatures as high as 500 °C. Third, more calibration runs will be completed in the range of 0.5-2.5 GPM. This will further improve the accuracy of the calibration coefficient. Fourth, calibration runs will be completed up to 5 GPM. This requires a larger pressure relief valve to be installed on the Expansion Vessel and Test Vessel 2, as well as a revised calibration procedure. Lastly, calibration runs will be completed to account for cold spots in the system, which reduced the inlet temperature of the METL EMFMs. Overall, these points will improve the calibration coefficients derived in this work and also improve the performance of the METL EMFMs.

42 ENGINEERING↗