At least 505 records · Page 28

Radioactive Waste Minimization - Clearance for Reuse, Recycling and Disposal - 19598

Virtually all activities related to radioactive materials and to the utilization of nuclear energy generate radioactive waste. Due to limited storage facilities and waning public acceptance for long-term disposal of radioactive waste as well as the associated cost, implementation of strategies and methods for its effective reduction are mandatory. Clearance of materials is one possible concept to reach this goal. The International Atomic Energy Agency (IAEA) defines the process of clearance as 'the removal of radioactive materials or radioactive objects within authorized practices from any further regulatory control by the regulatory body.' Thus, these materials are no further treated as radioactive waste and may be recycled or disposed of conventionally. In quantitative terms, clearance is generally related to the '10 μSv-Concept' This means that the effective dose expected to be incurred by any member of the public due to cleared materials is of the order of 10 μSv or less in a year. A combination of appropriate clearance concepts, methods and measurement techniques, following an integrated clearance strategy for a project, allows the return of up to 97 % of the mass of a decommissioned NPP to the conventional waste cycle. This includes the concept of clearance for a specific purpose, often referred to as 'conditional clearance', i.e. the case where a certain condition has to be fulfilled before the act of clearance has been completed. As a technical expert organization, TUV NORD EnSys accompanied the development, implementation and execution of clearance procedures in more than 13 nuclear power-plants and installations, either operational or in various states of decommissioning. Thus, TUV Nord EnSys has abundant experience in and a comprehensive overview on the implementation of different clearance strategies and procedures. Considering the increased waste-volumes and additional waste-streams to be handled during decommissioning, the transition to a decommission-focused clearance system is of vital importance for successful waste-minimization. This paper provides a view on the perspective of a technical support organisation (TSO) towards implementation of a holistic clearance strategy into the decommissioning concept for radioactive waste minimization. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Regulatory Strategy for Post Operational Clean Out Activities at Sellafield Limited Nuclear Licensed Site - 20273

The Thermal Oxide Reprocessing Plant (THORP) at the Sellafield nuclear licensed site carried out its final commercial shear of spent nuclear fuel in November 2018, since when the facility has undergone rundown prior to cessation of operations. The Magnox Reprocessing Facility (MRF) is also due to cease operating, around the end of 2020. Following the cessation of spent fuel reprocessing, the facilities and supporting infrastructure will transition into Post Operational Clean Out (POCO), which will become an increasingly significant portion of Sellafield Limited's (SL) activities. POCO is defined as the set of activities undertaken directly after a nuclear facility comes to the end of its operational life, in order to place the plant in a suitable state for the subsequent decommissioning steps. The decommissioning strategy at SL is for deferred dismantling of these facilities, which will be subject to a period of Surveillance and Maintenance (S and M) following completion of POCO. This paper outlines the development and implementation of a regulatory strategy for POCO activities at the Sellafield site by the Office for Nuclear Regulation (ONR), the independent nuclear safety, transport and security regulator in the United Kingdom. The paper also describes how this regulatory strategy is applied to nuclear installations undergoing transition into POCO and subsequent decommissioning. ONR works jointly with the Environment Agency, as the environmental regulators in England, to ensure that matters relevant to them have been duly considered. In developing a regulatory strategy, ONR has taken a site-wide approach, moving away from regulation on a facility-by-facility basis, to promote consistency, as well as maximising efficiency and effectiveness. The aim of this integrated approach was to prevent complications during future decommissioning and dismantling that have been experienced previously at similar facilities in France. The strategy recognised that once reprocessing operations are concluded, the hazard present will be reduced significantly, which provides the opportunity for ONR to consider how best to deliver a proportionate approach to regulatory interventions. Once POCO has been completed and the facility has transitioned into a period of S and M, the scale and frequency of ONR's interventions will reduce, commensurate with the safety case covering the remaining hazard and activities associated with maintaining the facility prior to final decommissioning. This approach allows ONR to consider risks holistically, considering the full life cycle of the facility and by taking due account of the interdependencies between facilities across the site. The strategy also aligns with existing regulation of high hazard and risk reduction activities, which remain ONR's top priority. As SL progresses with POCO activities in THORP and across the rest of the site, ONR will review its regulatory strategy to ensure that the intended safety benefits are realised. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Evaluation of Chemical Decontamination for Contaminated Carbon Steel Scrap by Multiphase Treatment Process - 20249

There is a significant growth in the field of decommissioning of nuclear facilities due the fact that for a lot of them their end of life is nearing. In Taiwan, the government plans to steadily reduce the dependence on nuclear power and moves gradually towards a nuclear-free homeland. Therefore, the development of decommissioning technology becomes the significant issue for the next coming years. The decommissioning of a nuclear power plant is a long process and practical work including radiological surveys, decontamination, dismantling, and the subsequent waste management. Chemical decontamination is an important task in the decommissioning of nuclear power plants and is usually performed by circulating the chemical solution in selected systems or full systems in order to reduce dose levels. However, the decontamination of segmented metal parts is also considered to reduce the contamination to such levels that they may be disposed of at a lower classification or be unconditionally released, and it helps to achieve the goal of waste minimization and provide a more economical cost for disposal management. Chemical decontamination technology is used to remove the contaminated oxides deposited on the surface of metals by dissolving them with chemical mechanisms, such as chelation, acidic or alkaline dissolution, redox reaction and so on. Carbon steel is the major material used in systems and pipelines in the nuclear power plant, thus it is also commonly selected as the target to be decontaminated in the decommissioning process. In this study, the effectiveness of chemical decontamination is evaluated by using multiphase treatment process including the reduction and the oxidation steps. In the step of redox reaction, the oxidation state of the substance is very important. Especially metals of some oxidation states show solubility in water, which has a decisive influence on the chemical decontamination. The experiment of decontamination of metal scraps is carried out by the immersion method within a chemical solution. The relative operation parameters such as temperature, pH, and concentration of the chemical solution are recorded to demonstrate the effect of the decontamination process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Induced Radioactivity Analysis for the NSRL Linac in China Using Monte Carlo Simulations and Gamma Spectroscopy - Paper 141

The Synchrotron Radiation Facility of the National Synchrotron Radiation Laboratory (NSRL) located in Hefei, China consists of a 200-MeV electron linear accelerator and an 800-MeV electronic storage ring. Constructed in 1989, the 200-MeV Electron linac is one of the earliest high-energy electron linear accelerators in China. The NSRL is a large-scale experiment device, having been operated more than twenty years, so it is hard to give a historical recount about the injection of NSRL Linac. Lower-energy electrons emitted from the accelerator electron gun are progressively accelerated to about 200 MeV in five acceleration tubes, and then are injected into the electron storage ring, reaching the final energy of 800 MeV. The linear accelerator is a traveling wave linear accelerator, consisting of pre-injection, four 6-m acceleration segment, some beam sensing elements, and focusing inserts. The electrons are accelerated in the acceleration tubes to 32 MeV, 74 MeV, 116 MeV, 158 MeV, respectively, and the electronic energy reaches 200 MeV at the end of the acceleration trip. A scraper is used for beam collimation and is located at the end of each acceleration tube, with a length that increases with the energy to provide sufficient collimation. The NSRL Linac was retired in 2012 due to a plan to upgrade the facility. The decommissioning produced many real challenges related to the methods to handle the large size of the device and the time required to store structural materials until the radioactivity is reduced in the waste repository. These problems should be solved as soon as possible in order for the upgrade to proceed smoothly. At present, no prior decommissioning experience existed in China on such a high-energy electron linear accelerator. Therefore, the decommission project provided an opportunity to study and evaluate the challenges, in particular, involving the induced radioactivity for the purposes of radiation protection. For a well-shielded accelerator facility, the induced radioactivity is an important source of radiation for people who perform the decommissioning. In addition, information on the level of induced radioactivity is needed for disposing of the retired accelerator materials. Therefore it is significant to predict such radioactivity level accurately. However, the induced radioactivity study for such type high-energy electron linear accelerator is very seldom. Particle accelerators that operate at energy greater than 10 MeV will produce induced radioactivity due to well-known photonuclear interactions. However, the assessment of such as induced radioactivity of large-scale installations is a time-consuming process. Experimental methods are time-consuming and require special radiation safety measures to protection the investigators. On the other hand, empirical formula cannot yield sufficiently accurate results. Therefore, Monte Carlo simulation method is the primary means to study such problems. In the decommissioning process of the NSRL Linac, the induced radioactivity assessment will be based on Monte Carlo simulation method as the main auxiliary means to expand a series of studies. (authors)

43 PARTICLE ACCELERATORS↗

Criticality safety control of fuel debris produced by the accident of Fukushima Daiichi nuclear power plants - technical development in Japan from 2012 and the future

Full text of publication follows: On 11 March 2011, Japan was attacked by the '2011 off the Pacific coast of Tohoku Earthquake'. It was the greatest earthquake ever recorded around Japan. It caused big tsunami and it also attacked Tohoku sea coast area severely and violently. Approximately 16,000 people passed away and still about 2,600 people are lost by the earthquake and the tsunami. This extraordinary natural disaster affected the society of Japan deeply. But more serious problem is the severe accident occurred in Fukushima Daiichi Nuclear Power Plants (1FNPP) after the earthquake and tsunami attack. By the tsunami after the earthquake, because of loss of ultimate heat sink (LUHS), three reactors of 1FNPP were damaged and the intact fuel became fuel debris. After the accident, Government of Japan setup the council for the decommissioning of TEPCO's Fukushima Daiichi Nuclear Power Plant and it released the general plan for countermeasure of the severe accident occurred in Japan, i.e. 'Mid-and-long-Term Road map towards the Decommissioning of Fukushima Daiichi Nuclear Power Units 1-4'. According to the road map, nuclear power reactor vendors and research institutes in Japan have started the national project to carry out the decommissioning activity. International Research Institute for Nuclear Decommissioning (IRID) is the association for technical development for Fukushima site decommissioning. Under this umbrella, nuclear power reactor vendors in Japan, i.e. Toshiba, Hitachi and Mitsubishi, and Japan Atomic Energy Agency (JAEA) have carried out the technical development required for the criticality safety control of the Fukushima fuel debris. Furthermore, JAEA has a plan to use the criticality assembly STACY for obtaining the neutronics characteristics of the fuel debris by modifying STACY from the solution system to heterogeneous system. This program is conducted by entrustment of Nuclear Regulation Authority of Japan, independently from IRID framework. It is expected that it will reach first criticality in FY2018. Researchers in universities in Japan also have own research program to control reactivity of fuel debris. This presentation will summarize the on-going research programs in Japan for the criticality safety control in order to remove and store the fuel debris from Fukushima site. (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of wind turbine blade recycling baselines in the United States

Over the past several years, the wind energy industry has received scrutiny regarding wind turbine blade (WTB) recycling due to the landfilling of WTBs caused by a lack of industrially viable recycling solutions. The amount of WTBs that will need to be recycled is set to increase in the United States as the deployment of wind energy is expected to rapidly grow to meet the nation's energy goals by 2035. While significant progress has been made worldwide, it is still unclear which WTB recycling solutions would be the most cost and energy effective within the United States for the existing fleet of wind turbines. To guide researchers and industry with a clear path forward, a range of options for WTB recycling in the United States are modeled through development of baseline scenarios and the use of formal life cycle assessment (LCA). Model data have been collected through literature review, industry engagement, and expert opinion regarding current end of life practices and considerations surrounding equipment, labor, and logistics. A detailed baseline for WTB decommissioning processes has been developed and used to assess alternative approaches, such as on-site shredding to compare the impacts on greenhouse gas (GHG) emissions. The developed LCA model and baseline scenarios for WTB recycling is used to assess the current WTB decommissioning practices in the United States along with emerging recycling pathways, including cement kiln co-processing and pyrolysis. Initial findings indicate that there are different approaches to decommissioning WTBs in the United States, each of which has unique implications for recycling. In light of this finding, additional results from the modeling will be used to better understand decommissioning practices and assist in making educated decisions on recycling pathways for the future. Throughout the analysis, focus was given to where international efforts might differ from the United States. WTB recycling is occurring worldwide, and different countries have different drivers for creating markets for recycled WTB materials. The contrasts and similarities between the United States and other countries offer insight to areas of opportunity that the United States could investigate and areas that can be readily transferred from existing solutions. By modeling and characterizing the current decommissioning practices and potential recycling solutions for the United States, a clearer vision will be created for pathways forward as to how to handle end of life WTBs to enable more efficient and cost-effective opportunities for material recovery from end-of-life WTBs.

Korey, Matt↗

Recommendations for an Applicant to Calculate Activity Data for Greenhouse Gases Estimates

In 2009, the U.S. Nuclear Regulatory Commission (NRC) directed the NRC staff to address climate change issues and consider the impacts of the emissions of carbon dioxide (CO 2 ) and other greenhouse gases (GHGs) in its environmental reviews for major licensing actions (NRC 2009b). To implement this direction from the Commission, the staff issued guidance in 2011 and updated guidance in 2014 in Attachment 1 to Interim Staff Guidance COL/ESP-ISG-026 (NRC 2011; NRC 2014). This guidance provides a simpler method than the method described in RG 4.2 Rev. 3, that an applicant can use to meet the plant parameter envelope (PPE) value from the Generic Environmental Impact Statement for Licensing of New Nuclear Reactors (NR GEIS). NRC staff estimated the 97-year lifecycle GHG emissions from a reference 1000 megawatt electrical (MWe) light-water reactor (LWR) for various activities associated with construction, operation (including uranium fuel cycle), and decommissioning of nuclear power plants and presented the results in Appendix H of the NR GEIS. Appendix H of the NR GEIS includes estimates of direct emissions from construction equipment and emergency diesel engines in a nuclear facility and indirect emissions from workforce vehicular traffic, fuel transportation and the uranium fuel cycle. The NR GEIS Section 3.3 extended the estimates in Appendix H for the installation of two 1000 MWe nuclear reactors on the same site. Scaling factors were used to extrapolate the GHG emissions of a reference 1000 MWe reactor to a two-unit nuclear reactor plant (each reactor unit generating 1000 MWe). GHG emission estimates for building, operation, decommissioning and safe storage (SAFSTOR) for a two-unit nuclear reactor plant would be based on the plant’s physical size, and therefore estimates for these source categories were assumed to be twice the value of the reference 1000 MWe reactor. However, GHG emissions from the fuel cycle (including fuel transportation) were scaled upward by a factor of 3, based on plant efficiencies greater than the 80 percent assumption in Appendix H. Table 1 below shows the PPE emissions for two 1000 MWe nuclear reactors as provided in NR GEIS. The total GHG emissions for two 1000 MWe reactors were calculated as 2,534,000 metric tons (MT) of CO 2 equivalent (CO 2 (e)) based on a 97 year GHG life cycle period. The GHG emissions lifetime of 97 years for a reference nuclear reactor includes a 7-year building phase, 40 years of operation, 10 years of active decommissioning, and 40 years of SAFSTOR operations (NRC 2024). Construction equipment and vehicular traffic from workers commute would contribute to the GHG emissions during a 7-year building phase. Uranium fuel cycle, vehicular traffic, fuel and waste transportation, and testing of standby diesel generators would contribute to GHG emissions during the 40-year operations phase. While NRC’s regulations allow up to 60 years of reactor facility decommissioning, Appendix H estimated that most of the GHGs would occur over an estimated 10-year period during which to the licensee would engage in significant demolition and earth-moving activities, as discussed in Supplement 1 to NUREG-0586 (NRC 2002). Vehicular traffic by the workforce during a 40-year SAFSTOR period would additionally contribute GHG emissions. The carbon footprint for a 40-year SAFSTOR period was separately analyzed from the decommissioning activities as provided in Table YYYY-2 of the staff issued guidance in 2011 (NRC 2011).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Feasibility Study on the Enlargement of the Surface Repository for LILW at Mochovce, Slovak Republic

In the Slovak Republic the sources of radioactive waste include the operation of the Mochovce and Bohunice nuclear power plants, decommissioning activities currently carried out and/or planned at Bohunice and elsewhere, as well as the use of radioactive sources in research, industry, and medicine. Pursuant to the Slovak policy low and intermediate level radioactive waste (LILW) containing predominantly short-lived radionuclides (LILW-SL), which is amenable for surface disposal, shall be disposed of at the National Radioactive Waste Repository (NRR) at Mochovce, which was designed to take all Slovak LILW-SL and which currently is in routine operation. The NRR site covers approximately 11 ha, currently only some 20 % of this area is used with two double rows of 20 reinforced concrete vaults each. The dimensions of a vault are 17.4 x 5.4 x 5.5 m, with an effective volume of 510 m{sup 3}. The total capacity of the two existing double rows (80 vaults) is enough to accommodate a net volume of radioactive waste of 22,320 m{sup 3}. Until the end of 2006 some 17 % of that capacity had already been used up. The NRR can receive in addition to the waste resulting from decommissioning the Bohunice A1 NPP pilot power reactor (under decommissioning since 1979) all the routinely produced Slovak waste until approximately 2020. However, the early shutdown of the Bohunice V1 Unit 1 end of 2006 and the planned shutdown of Unit 2 in 2008 with their following decommissioning will require additional disposal capacity well ahead of the initial time schedule. In this context it appears meaningful, to analyze anew the regulatory boundary conditions, existing disposal options and the corresponding waste categories. The main purpose of the feasibility study is to analyze alternatives for optimization of LILW management in the Slovak Republic as well as for the enlargement of the NRR at Mochovce, which will allow to dispose of the waste generated by the decommissioning of the nuclear power plants Bohunice A1 and V1 as well as waste arising from the operation of the Mochovce and Bohunice V2 NPPs and institutional waste. This paper describes the situation in the field of waste disposal in the Slovak Republic, the reasons leading to the decision of enlarging the NRR, the approach developed to select the optimum solution out of eight different enlargement variants, and first proposals and concepts for the enlargement of the NRR developed in the course of the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comparing Legacy Waste Management to Advanced Reactor Waste Management

The Nuclear Energy Agency (NEA) and Natural Resources Canada (NRCan) are organizing an international workshop on the implementation of radioactive waste management and decommissioning strategies in small modular reactors (SMRs) and advance reactor technologies. The event will take place in Ottawa, Canada on 7-10 November 2022. The workshop will convene participants from various fields of expertise in the areas of radioactive waste management, decommissioning, nuclear science and development, transportation, as well as young professionals, communication experts and researchers. The goal of the workshop is to devise a guideline document that will serve implementers in understanding key issues in decommissioning and waste management of new reactors from the design perspective, aiding in the licensing process and in future decommissioning and waste management activities. DOE has invested considerably in the innovation of advanced reactors. Interaction in this workshop allows INL and DOE to articulate the importance of looking at the back-end of the fuel cycle for advanced reactors. The back-end of the fuel cycle is important to the success of advanced reactors, and DOE may need to manage this material in the future after it is discharged from reactors. I have been asked to present at the track titled "Operational and Design Optimization Consideration Related to Decommissioning and Radioactive Waste Management for SMRs/Advanced Reactors".

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

How an integrated change programme has accelerated the reduction in high hazard nuclear facilities at Sellafield

For over five decades the Sellafield Site has been central to the UK's nuclear programme. Now operated by Sellafield Ltd, under the management of Parent Body Organisation Nuclear Management Partners (NMP), a consortium of URS Washington Division, AMEC and AREVA is focussed on the decommissioning of historical facilities. When Decommissioning commenced in the late 1980's the site focus at that time was on commercial reprocessing and waste management. Now through the implementation of a company change programme, emphasis has shifted towards accelerated risk and hazard reduction of degraded legacy plants with nuclear inventory whilst ensuring value for money for the customer, the Nuclear Decommissioning Authority. This paper will describe the management success by the Site owners in delivering a successful change programme. The paper will explain how the site has transitioned to the INPO Standard Nuclear Performance Model (SNPM) and how through the use of a change maturity matrix has contributed to the accelerated reduction in high risk high hazard nuclear facilities. The paper will explain in detail how the Decommissioning Programme Office has facilitated and coordinated the Governance and assured delivery of the change plan and how successful application of visual management has aided the communication of its progress. Finally, the paper will discuss how the Delivery Schedules have proved critical for presenting the change plan to Key Stakeholders, Government Owners and Powerful Regulators. Overall, this paper provides an insight into how a massive change programme is being managed within one of the world's highest regulated industries. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Phase 1 Characterization sampling and analysis plan West Valley demonstration project.

The Phase 1 Characterization Sampling and Analysis Plan (CSAP) provides details about environmental data collection that will be taking place to support Phase 1 decommissioning activities described in the Phase 1 Decommissioning Plan for the West Valley Demonstration Project, Revision 2 (Phase I DP; DOE 2009). The four primary purposes of CSAP data collection are: (1) pre-design data collection, (2) remedial support, (3) post-remediation status documentation, and (4) Phase 2 decision-making support. Data collection to support these four main objectives is organized into two distinct data collection efforts. The first is data collection that will take place prior to the initiation of significant Phase 1 decommissioning activities (e.g., the Waste Management Area [WMA] 1 and WMA 2 excavations). The second is data collection that will occur during and immediately after environmental remediation in support of remediation activities. Both data collection efforts have a set of well-defined objectives that encompass the data needs of the four main CSAP data collection purposes detailed in the CSAP. The main body of the CSAP describes the overall data collection strategies that will be used to satisfy data collection objectives. The details of pre-remediation data collection are organized by WMA. The CSAP contains an appendix for each WMA that describes the details of WMA-specific pre-remediation data collection activities. The CSAP is intended to expand upon the data collection requirements identified in the Phase 1 Decommissioning Plan. The CSAP is intended to tightly integrate with the Phase 1 Final Status Survey Plan (FSSP). Data collection described by the CSAP is consistent with the FSSP where appropriate and to the extent possible.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Circular Economy for Solar Photovoltaic System Materials: Drivers, Barriers, Enablers, and U.S. Policy Considerations

As PV capacity increases, owners are also decommissioning older system assets. Estimates based on a 30-year lifetime assumption found that cumulative U.S. end-of-life (EoL) PV modules could total one million metric tons (Mt) by 2030 and up to 10 million Mt by 2050 (Weckend, Wade, and Heath 2016). Beyond maintenance replacements, early retirements that are due to efficiency upgrades and extreme weather, as well as PV deployment beyond earlier expectations, would increase these projections. PV system owners must evaluate equipment management options for used modules and system components retired during maintenance activities, refurbishment, repowering and system decommissioning. PV manufacturers must also evaluate material management options from customer returns, defects, and scrap. Management options for early retired and EoL PV system material include reuse, repair for reuse, recycling-based resource recovery, storage, and disposal. Disposal of PV system material increases the burden on landfill capacity, while reuse, repair for reuse, and recycling-based resource recovery (reuse/repair/recovery) options salvage valuable materials and provide secondary market opportunities and ancillary benefits (Weckend, Wade, and Heath 2016; EPA 2019c; SWEEP 2019). PV system owners may also decide store used modules and components as spares, or in the interim before a reuse or EoL management decision is made. Despite potential secondary market opportunities and the potential benefits associated with the repair/reuse/recovery of PV system material, anecdotal evidence suggests that in the United States decommissioned PV modules are stored, landfilled or otherwise disposed of (Salim et al. 2019; CPUC 2019b; DTSC 2019b; NREL 2019a). Some modules are being disposed of in municipal nonhazardous landfills and federally regulated hazardous treatment, storage, and disposal facilities, and others are being stored in warehouses until economically viable repair/reuse/recycling becomes available (CPUC 2019b; DTSC 2019b; NREL 2019a; Libby and Shaw 2018). As awareness of current practices grows, and the demand for critical PV module material increases, U.S. industry stakeholders, regulators, and policymakers are starting to (1) consider solutions to drive and enable environmentally sustainable materials management decisions and behaviors and (2) identify barriers to a circular economy for PV system materials. Circular economy principles attempt to transition from a "take-make-consume-dispose" linear economic system to a circular system that allows for the long life, and the reuse/repair/recovery of products and materials (Ellen MacArthur Foundation 2020). We begin this report by summarizing the drivers, barriers, and enablers to a circular economy for PV system materials in the United States. We then report on our analysis of federal and state regulatory considerations that may impact the repair/reuse/recovery of PV materials, and potential civil and criminal liabilities associated with noncompliance. We then discuss state policies and initiatives in the United States that expressly address PV system decommissioning and repair/reuse/recovery of PV materials. We conclude by providing case studies of U.S. business models for the repair/reuse/recovery of PV system materials. Our results are based on legal and literature-based research and interviews with solar industry stakeholders, regulators, and policymakers.

14 SOLAR ENERGY↗

Memorandum of Understanding Between U.S. EPA Superfund and U.S. NRC

The Environmental Protection Agency (EPA) Office of Superfund Remediation and Technology Innovation (OSRTI) and the Nuclear Regulatory Commission (NRC) are responsible for implementing the 'Memorandum of Understanding Between the Environmental Protection Agency and the Nuclear Regulatory Commission: Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites'. This paper provides a brief overview of the origin of the Memorandum of Understanding (MOU), the major features of the MOU, and how the MOU has been implemented site specifically. EPA and NRC developed the MOU in response to direction from the House Committee on Appropriations to EPA and NRC to work together to address the potential for dual regulation. The MOU was signed by EPA on September 30, 2002 and NRC on October 9, 2002. The two agencies had worked on the MOU since March 2000. While both EPA and NRC have statutory authority to clean up these sites, the MOU provides consultation procedures between EPA and NRC to eliminate dual regulation. Under the MOU, EPA and NRC identified the interactions of the two agencies for the decommissioning and decontamination of NRC-licensed sites and the ways in which those responsibilities will be exercised. Except for Section VI, which addresses corrective action under the Resource Conservation and Recovery Act (RCRA), this MOU is limited to the coordination between EPA, when acting under its CERCLA authority, and NRC, when a facility licensed by the NRC is undergoing decommissioning, or when a facility has completed decommissioning, and the NRC has terminated its license. EPA believes that implementation of the MOU between the two agencies will ensure that future confusion about dual regulation does not occur regarding the cleanup and reuse of NRC-licensed sites. NRC and EPA have so far exchanged MOU consultation letters on eight NRC-licensed sites. EPA has responded to each consultation request with a letter expressing its views on actions that NRC should consider that address the site-specific matter that triggered consultation. Over the course of consultations on the eight sites, there have been some reoccurring themes to EPA's views. Primarily, these are EPA: 1. Recommending that NRC consider selecting institutional controls to ensure that NRC's assumptions about future human exposure at the site are not exceeded. 2. Recommending that NRC consider using more site-specific information when conducting dose assessment modeling. 3. Recommending that NRC consider a flexible approach to groundwater protection that still ensures the public is not exposed to contamination levels over drinking water limits. 4. Recommending that NRC consider an approach similar to how EPA implements supplemental standards under 40 CFR 192 as an ARAR when the UMTRCA soil standard of 5 pCi/g is not being met.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Daddy, What's a Nuclear Reactor?

No matter what we think of the nuclear industry, it is part of mankind's heritage. The decommissioning process is slowly making facilities associated with this industry disappear and not enough is being done to preserve the information for future generations. This paper provides some food for thought and provides a possible way forward. Industrial archaeology is an ever expanding branch of archaeology that is dedicated to preserving, interpreting and documenting our industrial past and heritage. Normally it begins with analyzing an old building or ruins and trying to determine what was done, how it was done and what changes might have occurred during its operation. We have a unique opportunity to document all of these issues and provide them before the nuclear facility disappears. Entombment is an acceptable decommissioning strategy; however we would have to change our concept of entombment. It is proposed that a number of nuclear facilities be entombed or preserved for future generations to appreciate. This would include a number of different types of facilities such as different types of nuclear power and research reactors, a reprocessing plant, part of an enrichment plant and a fuel manufacturing plant. One of the main issues that would require resolution would be that of maintaining information of the location of the buried facility and the information about its operation and structure, and passing this information on to future generations. This can be done, but a system would have to be established prior to burial of the facility so that no information would be lost. In general, our current set of requirements and laws may need to be re-examined and modified to take into account these new situations. As an alternative, and to compliment the above proposal, it is recommended that a study and documentation of the nuclear industry be considered as part of twentieth century industrial archaeology. This study should not only include the power and fuel cycle facilities, but also the nuclear weapons complex and the industrial and research sectors. This would be a large chore due to the considerable number of different types of facilities that have been used in these industries, but it would be a worthwhile endeavor. This study would gather information that would normally be lost due to the decommissioning process and allow future generations to appreciate these industries. Because of the volume and varying types of facilities, it might be more beneficial to produce a set of studies relating to different aspects of the industry. A logical division would be the separation of the commercial nuclear industry and the nuclear weapons complex. The separation of the fuel cycle facilities may also be considered. If done properly, this could result in a set of documents of interest to a wide audience. The current nuclear industry is slowly disappearing through the decommissioning process. This industry is unique and is part of mankind's heritage. It must not be forgotten and the information should be made available for future generations. The U.S. Department of Energy and the National Park Service are doing some limited preservation of information, but I do not believe its enough. It is not being done in a manner that will preserve the true activities that were performed. It is recommended that the American Nuclear Society, along with other organizations, evaluate this proposal and possibly provide funds for a set of studies to be prepared and ensure that this valuable part of our heritage is not lost.

99 GENERAL AND MISCELLANEOUS↗

Early Regulatory Engagement for Successful Site Remediation: the UK Experience - 13173

The Office for Nuclear Regulation (ONR) is an independent safety, security and transport regulator of the UK nuclear industry. ONR regulates all civil nuclear reactor power stations, fuel manufacture, enrichment, spent fuel reprocessing, most defence sites and installations that store and process legacy spent fuel and radioactive waste. The responsibility for funding and strategic direction of decommissioning and radioactive waste management of state owned legacy sites has rested solely with the Nuclear Decommissioning Authority (NDA) since 2005. A key component of NDA's mandate was to encourage new strategic approaches and innovation to dealing with the UK's waste legacy and which deliver value-for-money to the UK taxpayer. ONR, as an agency of the Health and Safety Executive, is entirely independent of NDA and regulates all prescribed activities on NDA's sites. NDA's competition of site management and closure contracts has attracted significant international interest and the formation of consortia comprised of major British, US, French and Swedish organizations bidding for those contracts. The prominence of US organizations in each of those consortia reflects the scale and breadth of existing waste management and D and D projects in the US. This paper will articulate, in broad terms, the challenges faced by international organizations seeking to employ 'off-the-shelf' technology and D and D techniques, successfully employed elsewhere, into the UK regulatory context. The predominantly 'goal-setting' regulatory framework in the UK does not generally prescribe a minimum standard to which a licensee must adhere. The legal onus on licensees in the UK is to demonstrate, whatever technology is selected, that in its applications, risks are reduced 'So Far As Is Reasonably Practicable' or 'SFAIRP'. By the nature of its role, ONR adopts a conservative approach to regulation; however ONR also recognises that in the decommissioning (and ultimately the site closure) domain, it is often necessary to consider and support novel approaches to achieve the nationally desired end-state. Crucial to successful and compliant operation in this regulatory environment is early and sustained engagement of the contractor with the regulator. There must be a 'no-surprises' culture to engender regulatory confidence early in a project. The paper considers some of the challenges facing international prime and lower tier contractors when undertaking D and D contracts in the UK, and emphasizes the importance of constructive and transparent dialogue with all regulators to sustain confidence at all stages of a major decommissioning project. The paper will also articulate ONR's strategy to increase collaboration with the US Department of Energy in light of increasing UK-US synergy in the area of waste management and to benchmark respective regulatory approaches. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Rinsing Effluent Evaporator for Dismantling Operations - 13271

Between 1958 and 1997, the UP1 plant at Marcoule - located in the south of France - reprocessed and recycled nearly 20,000 MT of used fuel from special defense applications reactors, as well as fuel from the first generation of electricity generating reactors in France (natural uranium fuel, CO{sub 2}-cooled, graphite-moderated). Decommissioning and Dismantling of the UP1 plant and its associated units started in 1998. Since 2005, the UP1 facility has been operated by AREVA as the Marcoule Management and Operation contractor for French Atomic Energy Commission (CEA). An important part of this decommissioning program deals with the vitrification facility of Marcoule. This facility includes 20 tanks devoted to interim storage of highly active solutions, prior to vitrification. In 2006, a rinsing program was defined as part of the tank cleanup strategy. The main objective of the rinsing phases was to decrease activity in order to limit the volume of 'long-life active' waste produced during the decommissioning operations, so the tanks can be dismantled without the need of remote operations. To enable this rinsing program, and anticipating large volumes of generated effluent, the construction of an evaporation unit proved to be essential. The main objective of this unit was to concentrate the effluent produced during tank rinsing operations by a factor of approximately 10, prior to it being treated by vitrification. The evaporator design phase was launched in September 2006. The main challenge for the Project team was the installation of this new unit within a nuclear facility still in operation and in existing compartments not initially designed for this purpose. Cold operating tests were completed in 2008, and in May 2009, the final connections to the process were activated to start the hot test phase. During the first hot test operations performed on the first batches of clean-up effluent, the evaporator had a major operating problem. Extremely large quantities of foam were produced, affecting the evaporator operation, and creating the risk of a reduction in its capacity and throughput performance. A task force of AREVA process, operations, and safety experts from Marcoule and the La Hague reprocessing complex was assembled. New operating parameters were defined and tested to improve the process. Since then, the evaporator has performed very satisfactorily. The foam buildup phenomenon has been brought under complete control. All the different types of effluents produced during cleanup operations have been concentrated, and the results obtained in terms of quality and throughput, have ensured a consistent supply to the vitrification unit. The evaporator was operated until the end of April 2012, and enabled the production of 500 cubic meters of very high activity effluent, concentrating the fission products rinsed from the storage tanks. The evaporator will now be deactivated and decommissioned, with the first rinsing and cleanup operations scheduled to begin in 2014. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The New International Project on Irradiated Graphite Processing Approaches (GRAPA) - 16559

Developing of strategies and methods for the management of spent nuclear (irradiated) graphite is one of the major task in decommissioning internationally. More than 250.000 Mg of i-graphite have been accumulated worldwide. Having completed in 2014 a comprehensive collaborative research programme on the treatment options for the disposal of i-graphite wastes to meet disposal criteria, the IAEA decided to maintain an active group of international specialists in this area as part of the International Decommissioning Network (IDN). To foster further development in R and D and steps towards industrial applications in i-graphite management this group was requested to propose the terms of reference and work programme for a new IAEA project. The basic concept for this future programme has been formulated by the German Forschungszentrum (Research Centre) Juelich, Institute IEK-6. The initiative has expanded to include representation from UK, USA, France, Italy, Russia, Ukraine and Lithuania. Additional Member States of the IAEA are expected to join the project. The concept presented by the IEK-6 was discussed among the experts and extended on an international meeting at IAEA in Vienna in February 2015. In addition to the development of the terms of reference a number of individual tasks have been identified. The project will combine a comprehensive state-of-the-art study with concerted actions as well as cross-cutting sub-projects. This will include a practical demonstration of the removal, treatment and disposal of highly-irradiated graphite from a decommissioned reactor. Prior to official implementation of this project preparatory work has been started on topic areas where weaknesses in the scientific knowledge or the technology have been identified. The scope of the international project ('Irradiated Graphite Processing Approaches, GRAPA') and its expected development as well as the possible impact of GRAPA on the future international i-graphite research activities will be described in this presentation. The project will be performed jointly by both the IAEA International Decommissioning Network and the new IAEA Pretreatment Network (IMM, under development). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Magnox Clean-Up Programme - Integrating and Making Best Use of the Supply Chain - 16603

In 2010, the UK Nuclear Decommissioning Authority (NDA) secured a funding settlement of British Pounds 2.5 Bn from the Government for the period to 2015 for the Magnox Care and Maintenance programme. This settlement was a reflection of the importance placed on discharging the decommissioning liability associated with the UK's first generation Magnox reactors. It also reflected the NDA's confidence in the Magnox Optimised Decommissioning Plan (MODP), which aimed to accelerate entry into Care and Maintenance and reduce the Magnox decommissioning liability by British Pounds 1.2 Bn. Despite the settlement, huge challenges remained if the MODP was to be delivered within the funding envelope. Essentially, the supply chain had to be able to participate in the delivery of the MODP and make the investment in skills and techniques required to minimise the threats and uncertainties remaining in the Programme. The Magnox Commercial and Supply Chain Strategy was, therefore, an integral part of the MODP. At the highest level, the Strategy involved: - Classifying and segregating procurements by risk and value - Moving the contracting philosophy from risk transfer to risk management - Focusing on relationships and results rather than activities and processes By aligning the supply chain to the MODP, Magnox was able to better organise itself to deliver against the MODP, to act on feedback from suppliers and enable a culture of 'Lead and Learn' to take root. Using feedback and learning from other organisations and applying these to contract management approaches improved project outcomes. In particular, learning from previous experience of dealing with Programme 'unknowns' increased the company's ability to control and improve on the overall Programme cost and schedule. The impact of the MODP was to reduce the Magnox baseline by over British Pounds 1.5 Bn and remove 34 reactor-years from the Care and Maintenance preparations period. This huge gain resulted from a range of technical, process and commercial improvements across the organisation. Perhaps the greatest achievement of the MODP and its supply chain strategy was to quantify and stabilise the Magnox Life-cycle scope and cost and enable the successful competition and transfer of the Management and Operating (M and O) contract in 2014 and lay the foundations for further cost-savings to the UK taxpayer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗