Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DECISION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Using the Decision Tree (DT) to Help Scientists Navigate the Access to Space (ATS) Options

Abstract – The Decision Tree (DT) is a tool that uses a tree-like model of decisions and their possible consequences, including outcomes, costs, schedule, risks, and performance. The paper applies the decision tree tool to the Access To Space (ATS) options to help scientists and small sat teams select the best approach that meets their ATS requirements. The ATS DT has three primary branches: rideshare, hosted payloads, and dedicated launch vehicles. Each of these branches has multiple sub-branches of ATS options. This paper describes the ATS options and provides industry contacts for each ATS option.

Rideshare↗

Lunar Instrument Data Integration Into the Virtual Reality Mission Simulation System for Decision Communication and Situational Awareness

In situ resource utilization (ISRU) technologies are a key advancement required to make human habitation on the Moon and Mars viable. The upcoming Volatiles Investigating Polar Exploration Rover (VIPER) mission will provide crucial correlations between volatiles and lunar geology to understand the water content available for ISRU on the moon. The mission will require the coordination of multi-disciplinary teams across the country making real time decisions based on rover instrument data. The virtual reality Mission Simulation System (vMSS) is a virtual reality platform designed at MIT by the Resource Exploration and Science of our Cosmic Environment (RESOURCE) team to provide teams with a collaboration interface for planetary missions like VIPER. Herein we determine the integration pathway for analog based datasets that are examples of VIPER's two main instruments, the near-infrared volatile spectrometer subsystem (NIRVSS) and the neutron spectrometer subsystem (NSS), into vMSS to provide the most valuable visualization tools. Focusing on improving situational awareness, decision making, reducing task load and incorporating comments from scientists working previous analogs and on the current VIPER mission, we recommend critical elements to implement into vMSS and the best approaches for data visualization. We present a review of relevant analogs and state of the art mission software. We have developed a design concept and path to flight of analysed instrument data integrated with data maps that allow for virtual manipulation and annotation between non-co-located team members. We focus on pre-mission mapping of a priori data for improved situational awareness, layering of analysed instrument data, correlative mapping and interactive capabilities for in-mission decision making, as well as archiving and annotation tools for post-mission analysis. Finally, we lay out the roadmap for the future development of immersive sample site visualization capabilities and the use of integrated instrument data in vMSS with automated temporal and geospatial planning.

Cody Alison Paige↗

Design, Formalization, and Verification of Decision Making for Intelligent Systems

The development of autonomous systems requires a rigorous process that can guarantee a system’s reliability in critical applications. At its core, an autonomous system bases its behavior on a well-defined decision making system. In this paper, we present a methodological basis for the design, formalization and formal verification of Decision Making systems for autonomous agents. The approach is generally applicable to operational objectives that can be functionally decomposed and subsequently represented as Hierarchical Finite State Machines. As a case study, we present the application of this method to implement a Decision Making model in Simulink. Furthermore, we present how we use NASA’s FRET tool to write requirements in structured natural language and generate formal specifications that can be automatically digested by NASA’s CoCoSim tool. Finally, we present how, by leveraging CoCoSim, we perform formal verification against the Simulink model and present analysis results.

Model-based development↗

Design, Formalization, and Verification of Decision Making for Intelligent Systems

The development of autonomous systems requires a rigorous process that can guarantee a system’s reliability in critical applications. At its core, an autonomous system bases its behavior on a well-defined decision making system. In this paper, we present a methodological basis for the design, formalization and formal verification of Decision Making systems for autonomous agents. The approach is generally applicable to operational objectives that can be functionally decomposed and subsequently represented as Hierarchical Finite State Machines. As a case study, we present the application of this method to implement a Decision Making model in Simulink. Furthermore, we present how we use NASA’s FRET tool to write requirements in structured natural language and generate formal specifications that can be automatically digested by NASA’s CoCoSim tool. Finally, we present how, by leveraging CoCoSim, we perform formal verification against the Simulink model and present analysis results.

Model-based development↗

Decision Aid for Conjunction Risk Mitigation by Differential Drag

In the previous five years, the rate of conjunctions that the NASA Conjunction Assessment Risk Analysis (CARA) team processed and analyzed has more than tripled. (NASA CARA, 2024) New missions in the early development phases are now required to plan for dealing with conjunctions under the present space environment, and also projecting forward into a future likely with even further increased utilization of the space environment. Some missions are investigating the possibility of using differential drag to remediate conjunctions without expending limited fuel or for missions without propulsive capabilities. The NASA CARA team studied the historical record of conjunctions to evaluate the circumstances under which differential drag may be successfully applied and have developed a series of tables to use as a decision aid for missions considering differential drag. CARA records all conjunctions of their protected payloads, with historical records starting in 2005 (with significant conjunction events starting to occur on or after 2013). From this record, approximately 7,300 had a probability of collision (Pc) greater than 1 in 10,000, the nominal requirement for a risk mitigation maneuver (RMM) to be made per NASA Procedural Requirements (NPR) 8079.1 (NASA, 2023), at 3 days prior to the time of closest approach, the time analyzed for differential drag efficacy. CARA’s maneuver trade space tool (MTS) was used to prop-agate the primary satellite forward from that decision point with varying degrees of increase to ballistic coefficient (BC), and then recalculate the Pc to evaluate whether or not the conjunction was mitigated (Pc < 3E-6). These results were then binned and sorted along several axes, including altitude, amount of delta-BC, and (pre-maneuver) rate of energy dissipation, to identify underlying patterns. The altitude plot is shown in Figure 1. We found that differential drag was most successful for satellites with perigees below 560 km, and which could adopt an average delta-BC of 2 or greater (that is, increasing their ballistic coefficient by a factor of 3). However, this is a difficult threshold for a mission to clear; very few spacecraft are capable of adopting a high-drag configuration for 72 hours continuously. Planet’s Dove spacecraft use differential drag to remediate conjunctions (Griffith, et al., 2021), and they have a maximum delta-BC factor of 9, but in practice (with mission and charging constraints) they achieve a time-averaged delta-BC that is closer to 2 (Foster, et al., 2017). In contrast, a NASA mission in development reached out to CARA to evaluate the utility of differential drag to remediate potential conjunctions for a spacecraft which is capable of a similar high delta-BC, but with operational constraints that limit their time-averaged delta-BC to less than 1. CARA has developed tables that can be used as decision aids to advise missions-in-development about the best way to utilize their differential drag capabilities. For missions below 560 km with the operational flexibility to devote multiple days to holding a high-drag configuration (or a sufficiently high drag ratio to compensate for limitations on that time), they are able to successfully remediate high-risk conjunctions. Conversely, missions that do not meet these ex-acting criteria – most missions – can instead be advised to use on-board propulsion systems to perform RMMs or to turn their minimum-area face towards the approach vector, thereby reducing Pc at the moment of conjunction. (NASA, 2023)

risk mitigation↗

A Computational Framework for Making Early Design Decisions in Deep Space Habitats

The dynamics of systems of systems often involve complex interactions among the individual systems, making the implications of design choices challenging to predict. Design features in such systems may trigger unexpected behaviors or result in large variations in safety, performance or resilience. To provide a means of simulating such systems for aiding in these decisions, we have developed a prototype tool, the control-oriented dynamic computational modeling tool (CDCM). The CDCM provides rapid simulation capabilities to perform trade studies in systems of systems. The general class of systems of systems that we aim to examine involve multiple hazards, damage, cascading consequences, repair and recovery. We especially focus on systems-of-systems that incorporate a health management system (HMS) that can monitor the state of the habitat and make decisions about actions to take. In this paper we describe the features of the CDCM, the architecture we devised for simulation of systems-of-systems, the unique functionalities of this tool, and we provide a demonstration of the capabilities by performing two illustrative examples. We articulate the use of this tool for making early design decisions and demonstrate its use for trade studies that consider a model of a deep space habitat. We also share some experiences and lessons that may be useful for others seeking to address similar problems.

Amir Behjat↗

Decision Aid for Conjunction Risk Mitigation by Differential Drag

In the previous five years, the rate of conjunctions that the NASA Conjunction Assessment Risk Analysis (CARA) team processed and analyzed has more than tripled. (NASA CARA, 2024) New missions in the early development phases are now required to plan for dealing with conjunctions under the present space environment, and also projecting forward into a future likely with even further increased utilization of the space environment. Some missions are investigating the possibility of using differential drag to remediate conjunctions without expending limited fuel or for missions without propulsive capabilities. The NASA CARA team studied the historical record of conjunctions to evaluate the circumstances under which differential drag may be successfully applied and have developed a series of tables to use as a decision aid for missions considering differential drag. Currently, if a CARA-protected mission with maneuvering capabilities is predicted to have a conjunction with probability of collision (Pc) greater than 7E-5 (the default value of the ‘yellow threshold’, which may have some other value agreed by CARA and the mission during the Orbital Collison Avoidance Planning (OCAP) process), CARA will use its Maneuver Trade Space (MTS) tool to evaluate and recommend options for the timing and magnitude of a risk mitigation maneuver (RMM), based on the mission’s capabilities. If the conjunction’s Pc is greater than 1E-4, the ‘red threshold’, then an RMM must be executed per NASA Procedural Requirements (NPR) 8079.1 (NASA, 2023), although missions may execute an RMM even if the Pc is lower. The magnitude of the maneuver is typically a few cm/s, and CARA estimates how many will be required for the mission’s nominal lifetime – typically a few per year – during the OCAP process, to inform the mission’s delta-V requirement. For traditional satellites, this is usually smaller than other requirements for orbit insertion, maintenance, and disposal, but for CubeSats or other small satellite missions, a propulsion system may not provide much more than a few cm/s of delta-V or may not fit at all within the available budget of money, time, size, weight, and/or power (SWaP). Conversely, CubeSats often have deployable solar panels, which offer the capacity to have much higher areas facing some directions than others. Such a mission can instead use ‘differential drag’ to remediate a conjunction -- in other words, change its drag area (usually increasing) to deviate from the predicted collision course. This is how Planet’s Dove spacecraft maintain their formations and remediate conjunction risks without having on-board propulsion (Foster, et al., 2017) (Griffith, et al., 2021). CARA has been developing improvements to MTS to support differential-drag for NASA's missions -- where it is effective. CARA records all conjunctions of their protected payloads, with historical records starting in 2005 (with significant conjunction events starting to occur on or after 2013). From this record, approximately 7,300 had a Pc greater than 1E-4 at 3 days prior to the time of closest approach, the time analyzed for differential drag efficacy. Of those, approximately 4,300 had fully-defined covariance matrices stored for both the primary and secondary objects; this set of conjunctions is the basis for the analysis of this work. CARA’s MTS tool was used to propagate the primary satellite forward from that decision point with varying degrees of increase to ballistic coefficient (BC). Because these conjunctions came from multiple missions, the nondimensional ‘delta-BC’ factor was used to quantify and normalize the increase in ballistic coefficient, defined as follows: Delta-BC = BC_new / BC_old - 1 Positive delta-BC factors represent an increase in drag compared to the nominal attitude, while negative delta-BC factors (to a minimum of -1) represent a decrease in drag. At the conclusion of the differential-drag ‘maneuver’, the Pc was recalculated to evaluate whether or not the conjunction was mitigated (Pc < 3E-6). These results were then binned and sorted along several axes, including altitude, amount of delta-BC, and (pre-maneuver) rate of energy dissipation (EDR), to identify underlying patterns. The altitude plot is shown in Figure 1. To validate this analysis, we consulted the record of a NASA mission which uses differential drag to maintain its orbit and remediate conjunction risk. CARA’s empirical record of the mission’s orbit history suggests it achieves a delta-BC of 2.2. Of the twenty-one RMM plans that were submitted by this mission, eighteen were matched with conjunctions in the historical record; of those, twelve were successfully remediated (final measured Pc < 3E-6), and six were not. This is consistent with the expected efficacy for missions orbiting at that altitude. We are presently simulating this mission’s RMMs with MTS; this work is ongoing, but so far, the MTS results are qualitatively in agreement with the empirical results -- correctly predicting that a maneuver would or would not remediate a conjunction, if not exactly matching the final post-remediation Pc value. We found that differential drag was most successful for satellites with perigees below 560 km, and which could adopt an average delta-BC of 2 or greater (that is, increasing their ballistic coefficient by a factor of 3). However, this is a difficult threshold for a mission to clear; very few spacecraft are capable of adopting a high-drag configuration for 72 hours continuously. Planet’s Dove spacecraft use differential drag to remediate conjunctions (Griffith, et al., 2021), and they have a maximum delta-BC factor of 9, but in practice (with mission and charging constraints) they achieve a time-averaged delta-BC that is closer to 2 (Foster, et al., 2017). A mission’s differential drag utility strongly depends on the operational constraints that has the capacity to limit the time-averaged delta-BC. A mission with a high maximum delta-BC of 5 or more can have an effective delta-BC of less than 1 due to operational constraints such as instrument and solar panel pointing, especially if this constraint results in holding an intermediate drag value for most of its orbit. CARA has developed tables that can be used as decision aids to advise missions-in-development about the best way to utilize their differential drag capabilities. For missions below 560 km with the operational flexibility to devote multiple days to holding a high-drag configuration (or a sufficiently high drag ratio to compensate for limitations on that time), they are -- more likely than not -- able to successfully remediate high-risk conjunctions. Conversely, missions that do not meet these exacting criteria -- most missions -- can instead be advised to use on-board propulsion systems to perform RMMs, or to turn their minimum-area face towards the approach vector, thereby reducing Pc at the moment of conjunction due to the decreased Hard-Body Radius (HBR), that is a strongly correlated variable in the Pc calculations. (NASA, 2023)

conjunction assessment↗

Use of the SPoRT Stoplight Product to Support NWS Decision Support Services

The National Weather Service Forecast Offices (NWSFOs) use many weather tools and observational datasets to provide support for critical decision-making by core partners such as public safety officials, emergency managers, and first responders. These core partners who need weather decision support services (DSS) for outdoor events require up-to-the-minute weather information to ensure the safety and protection of attendees and workers. Storms and lightning, potentially deadly, pose a significant threat during outdoor events and are among the weather phenomena frequently cited as a DSS requirement. According to the National Lightning Safety Council, from 2014 up to August 2024, lightning resulted in 222 fatalities in the U.S. For outdoor events with hundreds to thousands of attendees, having the right tools to detect and monitor lightning activity is of utmost importance to protect lives. Common guidelines for lightning safety include moving inside a substantial structure at the first sight of threatening skies or the first sound of thunder, and waiting 30 minutes after the last lightning flash or thunder before returning outside. Using this guidance as a framework, scientists at the NASA Short-term Prediction Research and Transition (SPoRT) center have developed the Geostationary Lightning Mapper (GLM) Stoplight tool. This experimental tool uses the GLM Flash Extent Density imagery to display the location and recency of lightning flashes. To simplify interpretation, these lightning pixels are color-coded in 10-minute bins, ranging from red (lightning detected 0 to 10 minutes ago) to yellow (10 to 20 minutes ago) to green (20 to 30 minutes ago). The Stoplight tool also allows users to place markers at the location of outdoor events with range rings around the location to help in assessing the location and relative age of lightning flashes near and upstream of the event. The goal is to help NWS forecasters provide core partners with the necessary information to make the best decisions possible. While the Stoplight tool is experimental, forecasters at NWSFO Raleigh, NC, have periodically used the Stoplight guidance to evaluate its utility within NWS DSS. This presentation will discuss how the Stoplight tool was successfully used for DSS for four outdoor events in central NC in 2023 and 2024. Future improvements to this tool, including the addition of AI applications and the merging of ground-based lightning data with GLM data, will be reviewed.

Gail Hartfield↗

Informatics and Decision Support Technology Roadmap

The purpose is to identify shortfalls/gaps, shortfall/gap closure strategies, and candidate investments to mature Informatics and Decision Support technologies in support of M2M Program risk mitigation activities, enable and enhance crew insight to system performance, decision making, and computer-human interaction. In this first publication, scope of the Informatics and Decision Support Roadmap is limited to Deep Space Crew Displays and Audio Systems. Future publications will expand scope to other capabilities.

Geraldo Cisneros↗

Integrated Decision-Making Tool to Develop Spent Fuel Strategies for Research Reactors

IAEA Member States operating or having previously operated a Research Reactor are responsible for the safe and sustainable management and disposal of associated radioactive waste, including research reactor spent nuclear fuel (RRSNF). This includes the safe disposal of RRSNF or the corresponding equivalent waste returned after spent fuel reprocessing. One key challenge to developing general recommendations lies in the diversity of spent fuel types, locations and national/regional circumstances rather than mass or volume alone. This is especially true given that RRSNF inventories are relatively small, and research reactors are rarely operated at a high power level or duration typical of commercial power plants. Presently, many countries lack an effective long-term policy for managing RRSNF. This paper presents results of the International Atomic Energy Agency (IAEA) Coordinated Research Project (CRP) #T33001 on Options and Technologies for Managing the Back End of the Research Reactor Nuclear Fuel Cycle which includes an Integrated Decision Making Tool called BRIDE (Back-end Research reactor Integrated Decision Evaluation). This is a multi-attribute decision-making tool that combines the Total Estimated Cost of each life-cycle scenario with Non-economic factors such as public acceptance, technical maturity etc and ranks optional back-end scenarios specific to member states situations in order to develop a specific member state strategic plan with a preferred or recommended option for managing spent fuel from Research Reactors.

Beatty, Randy L.↗

Dynamic, risk informed decision support systems and methods

The present disclosure is directed to a decision support system or tool based on a Bayesian Network (BN) framework. The diagnostic support tool is created by using advanced Probabilistic Risk Assessment (PRA) method(s) to construct Bayesian Networks (BNs) that form a Bayesian Decision Support Process (BDSP) to provide science-based decision support for understanding and managing events in complex systems. In an embodiment, the PRA method(s) may include Discrete Dynamic Event Trees (DDETs) and simulations.

Groth, Katrina↗

Uniformly Ordered Binary Decision Algorithm for Benchmark Experiment Correlations in Whisper Validation

When performing a validation exercise for determining the upper subcritical limit of a nuclear criticality safety application, an analyst should select and perform a statistical analysis on a population of benchmark experiments that are neutronically similar to the application. The size of this population should be sufficiently large such that the statistical analysis has a high degree of confidence that the bias plus bias uncertainty (calculational margin) has been accurately quantified. A complication arises because many benchmark experiments share common components, leading to correlations in their measured effective multiplication factors. Correlations between benchmark experiments within the population reduces its predictive power. This motivates the need for methods that consider benchmark experiment correlations and ensure adequate statistical significance of results. The Whisper code is a statistical analysis pack- age that incorporates nuclear data sensitivity coefficients from MCNP to assess benchmark experiment similarity and then performs an extreme-value analysis to estimate the bias plus bias uncertainty. The original methodology in Whisper does not consider the effect of benchmark experiment correlations when making this estimation, and this summary proposes the uniformly ordered binary decision algorithm to address this shortcoming. The original methodology in Whisper computes similarity coefficients ck for an application compared to all benchmark experiments in its library and develops weighting factors for a selected population proportional to the ck values. The methodology can be interpreted as statistically emulating a validation exercise for a particular application where the weighting factors may be viewed as the likelihood that an analyst would include a particular benchmark experiment within the population. The effective sample size of the population is the expected or mean number of benchmark experiments in the population. The uniformly ordered binary decision algorithm identifies clusters of correlated benchmark experiments within the population and then computes adjusted weighting factors based on the magnitude of the correlation coefficients within the cluster to compute a reduced effective sample size accounting for the lower information content because of correlations. Benchmark experiments within the cluster are ordered randomly with equal probability and probabilistic decisions are made as to whether a benchmark. experiment within the cluster should treated as redundant with a previous one; if two redundant benchmark experiments are included, then the conservative worst case bias plus bias uncertainty is used and the pair is counted as a single benchmark experiment in the population. Results are provided for HEU solutions in a research version of the Whisper software using benchmark experiment correlations provided by DICE, the Database for the International Criticality Safety Benchmark Evaluation Project (ICSBEP). These show that there can be a significant increase in the bias plus bias uncertainty because the effective sample size is reduced, and therefore the algorithm, needing to meet sample size requirements, expands the benchmark experiment population by accepting less similar benchmark experiments that would have otherwise not been included.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Decision-Making Framework to Evaluate Opportunities for Recovery of Rare Earth Elements and Critical Minerals in Produced Water Networks

Oil and gas development activities require a significant amount of water. Given the environmental impacts associated with high consumption and subsequent disposal of this water, there is a need for strategies to support effective reuse of, treatment of, and/or resource recovery from this produced water. These streams can contain appreciable concentrations of rare earth elements (REE) and critical minerals (CM) (e.g., Lithium), which are critical for many important applications in electronics, technology, manufacturing, energy, and medicine [1]. Along with REE/CM present in produced water, other waste streams such as fly ash from coal-fired power plants and acid mine discharge present other potential sources for recovery of REE/CM [2-4]. And with increases in demand for REE/CM, the need for recovery from wastewater streams is becoming even more important. There is a need to develop effective decision-making tools to evaluate the economic and environmental potential for REE/CM recovery from produced water networks while supporting the needs of drilling and hydraulic fracturing activities. In this work, we present our progress in developing a decision-making framework to efficiently design and operate produced water networks for REE/CM recovery. Our approach considers REE/CM recovery from produced water streams alongside other potential wastewater sources. The models consider the location and capacity of storage and decentralized treatment processes as well as the design and operation of pipeline and transportation networks to connect different sources and effectively schedule inventories, reuse, and recovery opportunities. We focus on the evaluation of opportunities for REE/CM recovery with treatment constraints on composition and flow. We demonstrate this framework with an illustrative case study that features diverse production sites, storage facilities, transportation, and treatment sites. This proposed framework will be deployed in an open-source software package that is compatible with the PARETO framework to deliver analysis and decision-making tools that allow stakeholders to quantitatively evaluate potential opportunities for REE/CM recovery in produced water networks.

Pulsipher, Joshua↗

A Decision-Based Iterative Modeling Framework for Probabilistic Performance Assessments - 18441

Radiological probabilistic performance assessments (PPAs) employ highly complex computer models to simulate the release of radionuclides from wastes in an engineered disposal facility, migration of these radionuclides over time, and resulting radiological dose to potentially exposed individuals. An iterative approach to PPA modeling is described to help define the appropriate complexity of the computer model. An initial model is developed that addresses all relevant processes and media, but that employs preliminary statistical parameter distributions to minimize the initial effort expended. Where appropriate, transport and exposure submodels with simplifying assumptions are also used in the initial model. Different assumptions and boundaries may be explored with the initial model to assess their importance in constraining model results. Exploration of the results of the initial model are used to determine the benefits of model refinements, and to guide such refinements to focus on specific areas of the model that most influence the model outputs of interest. This approach promotes efficiency and model parsimony, but does not compromise defensibility when performed in a transparent manner. Key model boundaries for a PPA include the time frame of the modeling (temporal boundaries), where future human receptors may be located (spatial boundaries), and what types of land uses and activities may exist in the future (exposure scenarios). Simplified transport and exposure models can be useful in helping decision makers and stakeholders establish such boundaries by analyzing the consequences of selecting different bounds and understanding which assumptions and boundaries have the greatest influence on the magnitude and distribution of model results. Pathway analysis and parameter sensitivity analysis performed on PPA model results are key components of the iterative modeling approach. The objective of pathway analysis is to identify the critical radionuclides and pathways contributing to radiation dose during the modeling performance period. An environmental 'pathway' is described by the connections from a waste package or cell in the disposal facility to a future human exposure event. These connections are commonly visualized using graphical means. A simple example of a potentially complete pathway for radon-222 is: radium-containing waste → radon emanation → upwards diffusion in cap material → diffusion/advection into a future building → inhalation exposure to a building occupant Parameter sensitivity analysis is conducted on the results of a PPA to identify those specific model input parameters whose distribution of values contributes the most to the distribution of target model output, such as annual radiation dose. Pathway and sensitivity analyses on initial modeling results provide information for guiding subsequent model development, and possibly interim decisions, by informing questions tied to the modeling objectives and performance criteria. For example, questions related to radiological doses from existing disposals may include: 1. Is radiation dose from radiological exposures either obviously negligible or obviously unacceptable based on initial modeling results? 2. If dose is not obviously negligible or unacceptable relative to applicable performance criteria, what model refinements would reduce uncertainty in the results to better inform decisions? (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Status Update on IAEA MODARIA II Working Group 1 (Assessment and Decision Making) - 19391

During WM2018, the work being done under the International Atomic Energy Agency (IAEA)'s Modelling and Data for Radiological Impact Assessments (MODARIA) II Programme (https://wwwns.iaea.org/projects/modaria/modaria2.asp?s=8 and l=129) was introduced. The Programme comprises seven working groups covering a wide range of topics. Amongst them, Working Group 1 (WG1) is focused on dose assessment and decision aiding tools to address existing exposure situations due to past practices involving naturally occurring radioactive material (NORM) and nuclear legacy sites. Specifically, this covers the development of methods and toolsets for risk-informed decision-making for such complex sites, and includes practical demonstration of decision-making processes and tools through case studies. During 2018 WG1 participants met twice to discuss the status and plans of work being conducted by the WG. The group held its Second Interim Meeting from 7 to 11 May 2018 at the Jozef Stefan Institute (JSI) in Ljubljana, Slovenia. The objectives of the meeting were to: (1) Discuss the status of WG1 work; (2) Start preparation of the interim draft version of the MODARIA II WG1 Report (herein referred to as the 'Interim Report'); (3) Review the progress of planned data analyses, model-model comparisons, and model-data comparisons being conducted through case studies for the Tessenderlo Chemie Site in Belgium, the Zapadnoe Uranium Mill Tailings Site in Ukraine, and a Former Tin Processing Facility Site in Brazil; (4) Discuss calculations conducted for a NORM Site in China for potential addition to the WG1 case studies; (5) Report on progress on topical studies and other assignments performed to support the preparation of several sections of the Interim Report; and (6) Discuss plans for incorporating some preliminary case studies considered by MODARIA I WG1 and MODARIA I WG3. During the meeting in Slovenia, WG1 participants also visited the Zirovski vrh (RZV) Uranium Mine and Mill Tailings Site near Ljubljana. From 22 to 25 October 2018, WG1 members also participated in the MODARIA II Third Technical Meeting in Vienna, Austria. The meeting facilitated analysis of the progress made so far by the seven working groups, as well as exploration of the dissemination of the results of the MODARIA II Programme through publication in scientific journals dealing with the various subject areas covered by the Programme. WG1 participants focused on the preparation of its Interim Report, and engaged in technical exchanges with the IAEA Le Trench Project on characterization, assessment, remediation and management of buried waste at legacy trench sites, as well as the To Enhance uncertainties Reduction and stakeholders Involvement Towards integrated and graded Risk management of humans and wildlife In long-lasting radiological Exposure Situations (TERRITORIES) project (https://territories.eu/). Currently, WG1 is in the process of preparing a draft report to document the results of its various case studies and special topics, and is preparing for the final Interim Meeting in May 2019 and the final Technical Meeting in October 2019, before the conclusion of the MODARIA II Program at the end of 2019. This paper will provide a status update of these activities, along with preliminary information on the WG1 report, including potential recommendations for future activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sources of Conservatism in Making Corrective Action Decisions at the NNSS - 20477

During the course of closing nuclear testing release sites at the Nevada National Security Site (NNSS) under the Federal Facility Agreement and Consent Order (FFACO) using the Risk-Based Corrective Action (RBCA) evaluation process, conservative assumptions and estimates were used in many phases of the work. These assumptions and estimates were agreed to during Data Quality Objective (DQO) meetings and published in the FFACO documents. However, the potential cumulative effect of these multiple sources of conservatism was not evaluated. The RBCA process ensures that corrective action decisions minimize the risk of making Type I errors (not applying corrective action to areas that exceed action levels) at the expense of making Type II errors (applying corrective action to areas that do not exceed action levels). Rather than fully characterizing the spatial distribution of contaminants throughout each site, the RBCA process uses a bounding methodology that conservatively estimates spatial boundaries beyond which contamination is not present that exceed corrective action levels. This process accepts that these boundaries may encompass areas that do not exceed corrective action levels and, therefore, may be somewhat larger than for fully characterized sites. This is justified at sites where the reduction in investigation costs are more than any potential increase in corrective action costs. To minimize the risk of making Type I errors, conservatism was used throughout the process. This study documents the many sources of conservatism used in the RBCA process. Conservatism was used in the RBCA process in determining potential receptors, determining action levels, collecting samples, converting sample results into receptor dose, and accounting for uncertainty. This provides decision-makers with a high level of confidence that unacceptable risk to receptors will not result from exposure to residual contamination outside the corrective action boundaries. However, it does not provide an estimate of the actual extent of areas exceeding action levels. This study provides an evaluation of the effects of compounding conservatism on RBCA process decisions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bridging Equipment Reliability Data and Risk Informed Decisions in a Plant Operation Context

Industry equipment reliability and asset management programs are essential elements that help ensure the safe and economical operation of nuclear power plants. The effectiveness of these programs is addressed in several industry-developed and regulatory programs. The Risk-Informed Asset Management (RIAM) project is tasked to develop tools in support of the equipment reliability and asset management programs at nuclear power plants. These tools are designed to create a direct bridge between component health/lifecycle data and decision making (e.g., maintenance scheduling and project prioritization). The goal of this article is to provide a guide for specific use cases that the RIAM project is targeting. We have grouped uses cases into three main areas. The first area focuses on the analysis of equipment reliability data with a particular emphasis on condition-based data, such as test/surveillance reports and component monitoring data. The second area focuses on the integration of equipment reliability into system/plant reliability models to determine system/plant health and identify the components that are critical to maintain an operational system. Lastly, the third area manages plant resources, such as maintenance activities and replacement scheduling using optimization methods. Here the primary focus is on supporting typical system engineer decisions regarding maintenance activity scheduling and component aging management. This is performed in a risk-informed context where the term “risk” is broadly constructed to include both plant reliability and economics. This framework combines data analytics tools to analyze equipment reliability data with risk-informed methods designed to support system engineer decisions (e.g., maintenance and replacement schedules, optimal maintenance posture) in a customizable workflow.

97 - MATHEMATICS AND COMPUTING↗

A Stochastic Multi-Criteria Decision-Making Algorithm for Dynamic Load Prioritization in Grid-Interactive Efficient Buildings

Increasing deployment of advanced sensing, controls, and communication infrastructure enables buildings to provide services to the power grid, leading to the concept of grid-interactive efficient buildings. Since occupant activities and preferences primarily drive the availability and operational flexibility of building devices, there is a critical need to develop occupant-centric approaches that prioritize devices for providing grid services, while maintaining the desired end-use quality of service. In this paper, we present a decision-making framework that facilitates a building owner/operator to effectively prioritize loads for curtailment service under uncertainties, while minimizing any adverse impact on the occupants. The proposed framework uses a stochastic (Markov) model to represent the probabilistic behavior of device usage from power consumption data, and a load prioritization algorithm that dynamically ranks building loads using a stochastic multi-criteria decision-making algorithm. The proposed load prioritization framework is illustrated via numerical simulations in a residential building use-case, including plug-loads, air-conditioners, and plug-in electric vehicle chargers, in the context of load curtailment as a grid service. Suitable metrics are proposed to evaluate the closed-loop performance of the proposed prioritization algorithm under various scenarios and design choices. Scalability of the proposed algorithm is established via computational analysis, while time-series plots are used for intuitive explanation of the ranking choices.

24 POWER TRANSMISSION AND DISTRIBUTION↗