Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Control Centers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Forest Fire Observation

Conditions on the perimeter of a forest fire can be obtained by use of airborne remote sensing techniques demonstrated by Ames Research Center. An Ames U-2 high-altitude survey aircraft served as an aerial fire observation system. Equipped with two types of sensors, the U-2 produces real-time infrared images of fireground scenes. Information acquired by the U-2's scanners defines the fire boundary and aids fire management decisions by showing the size, shape and direction of burn and the locations of hot spots in the fire zone. U-2 sends sensor date in digital form to an antenna at Ames Research Center. There the data is computer processed into images which are overlaid on U.S. Geological Survey topographical maps of the fire area. Maps are then transmitted by telecopy machine directly to fire control center. Whole process takes less than 10 minutes and the U-2 can provide information for up to five hours. Ames antenna can pick up signals from the U-2 anywhere within a 300 mile radius from Ames.

Source record↗

Space Operations for a New Era of Exploration Launch Vehicles

NASA's Constellation Program is depending on the Ares Projects to deliver the crew and cargo launch capabilities needed to send human explorers to the Moon and beyond. Ares I and V will provide the core space launch capabilities needed to continue providing crew and cargo access to the International Space Station (ISS), and to build upon the U.S. history of human space exploration. Since 2005, Ares has made substantial progress on designing, developing, and testing the Ares I crew launch vehicle and has continued its in-depth studies of the Ares V cargo launch vehicles. The combined Ares I/Ares V architecture has been designed to reduce the complexity and labor intensity of ground operations for America's next journeys beyond low-Earth orbit (LEO). A deliberate effort is being made to ensure a high level of system operability to significantly increase safety and system availability as well as reduce recurring costs for this new launch vehicle. The Ares Projects goal is to instill operability as part of the vehicles requirements development, design, and operations. This simplicity will come from using simpler, proven engine designs, as in the case of the J-2X upper stage engine and RS-68 engine; improving existing hardware, as in the case of the Shuttle-heritage 5-segment solid rocket motor; and using common propulsion and instrument unit elements between Ares I and Ares V. Furthermore, lessons learned while developing Ares I will be applied directly to Ares V operations. In 2009, the Ares Projects plan to conduct the first flight test of Ares I, designated Ares I-X. Ares I-X preparations have already prompted changes to the vehicle stacking and launch infrastructure at Kennedy Space Center (KSC), including removing Shuttle-specific fixtures from the Vehicle Assembly Building (VAB) to accommodate Ares I-style stacking operations, new firing room computers and infrastructure in the VAB Launch Control Center, and new lightning protection system towers at Launch Complex 39B to accommodate the greater height of Ares I-X. In addition to lessons learned from the stacking of Ares I-X, the flight test itself promises to yield important data and operations lessons for assembling, launching, and flying Ares I.

Cook, Stephen A.↗

ISSLive!

The ISSLive! project is a JSC innovation award- winning, combined MOD/Education project to publish export control and PAO-approved ISS telemetry, and simplified and scrubbed crew timelines. The publication of this data will be real-time or near real time and will include links to the crew's social media feeds and existing streaming public video/audio feeds, via public-friendly website, mobile devices and tablet applications. Additionally, the project will offer interactive virtual 3D views of an ISS model based on real-time telemetry and a 3D virtual mission control center based on existing Front Room console positions in made for public displays. The ISSLive! project is MOD-managed and includes collaborations with subject-matter expertise from the ISS flight controllers regarding daily operations and planning, education program specialists from the JSC Office of Education, instructional designers, human computer interface experts, and software/hardware experts from MOD facility organization, and senior web designers. In support of the Agency s Strategic Goal #6 with respect to using the ISS National Laboratory for education activities, ISSLive! uses the Station itself as STEM education subject matter and provides data for STEM-based lessons plans using national standards. Specifically, ISSLive! supports and enables the National Laboratory Education (NLE) project to address the Agency s Strategic Goal #6. This goal mandates, sharing NASA with the public, educators, and students to provide opportunities to participate in our Mission, foster innovation .. ISSLive! satisfies the Agency s outcomes of Strategic Goal; that is, engages the public in NASA's missions by providing new pathways for participation (Outcome 6.3) and it informs, engages, and inspires the public by sharing NASA s missions, challenges, and results (Outcome 6.4). Additionally, ISSLive! enables MOD s support of JSC Outreach and NASA's Open Data and Open Government Initiatives. The audience for the ISSLive! website and its application(s) are: teachers, students, citizen scientists, and the general public who will be given new and interactive insights on how the ISS Operates.

Price, Jennifer B.↗

From Apollo to Cognac

Shell Oil Company started oil and gas production from a new offshore platform called Cognac located in the Gulf of Mexico. It is the world's tallest oil platform, slightly taller than the Empire State Building. The highly complex job of installing Cognac's support "jacket" under water more than a thousand feet deep was directed from a barge-based control center. To enable crews to practice in advance difficult tasks never before accomplished, Honeywell, adapting NASA's Apollo technology, developed a system for simulating the various underwater operations. In training sessions, displays and controls reacted exactly as they would in real operation.

Source record↗

Evidence-Based Recommendations for Optimizing Light in Day-to-Day Spaceflight Operations

NASA Behavioral Health and Performance Element (BHP) personnel have previously reported on efforts to transition evidence‐based recommendations for a flexible lighting system on the International Space Station (ISS). Based on these recommendations, beginning in 2016 the ISS will replace the current fluorescent‐based lights with an LED‐based system to optimize visual performance, facilitate circadian alignment, promote sleep, and hasten schedule shifting. Additional efforts related to lighting countermeasures in spaceflight operations have also been underway. As an example, a recent BHP research study led by investigators at Harvard Medical School and Brigham and Women's Hospital, evaluated the acceptability, feasibility, and effectiveness of blue‐enriched light exposure during exercise breaks for flight controllers working the overnight shift in the Mission Control Center (MCC) at NASA Johnson Space Center. This effort, along with published laboratory studies that have demonstrated the effectiveness of appropriately timed light for promoting alertness, served as an impetus for new light options, and educational protocols for flight controllers. In addition, a separate set of guidelines related to the light emitted from electronic devices, were provided to the Astronaut Office this past year. These guidelines were based on an assessment led by NASA's Lighting Environment Test Facility that included measuring the spectral power distribution, irradiance, and radiance of light emitted from ISS‐grade laptops and I‐Pads, as well as Android devices. Evaluations were conducted with and without the use of off‐the‐shelf screen filters as well as a software application that touts minimizing the short‐wave length of the visible light spectrum. This presentation will focus on the transition for operations process related to lighting countermeasures in the MCC, as well as the evidence to support recommendations for optimal use of laptops, I‐Pads, and Android devices during all phases of spaceflight operations.

Whitmire, Alexandra↗

Interfacing Space Communications and Navigation Network Simulation with Distributed System Integration Laboratories (DSIL)

NASA's planned Lunar missions will involve multiple NASA centers where each participating center has a specific role and specialization. In this vision, the Constellation program (CxP)'s Distributed System Integration Laboratories (DSIL) architecture consist of multiple System Integration Labs (SILs), with simulators, emulators, testlabs and control centers interacting with each other over a broadband network to perform test and verification for mission scenarios. To support the end-to-end simulation and emulation effort of NASA' exploration initiatives, different NASA centers are interconnected to participate in distributed simulations. Currently, DSIL has interconnections among the following NASA centers: Johnson Space Center (JSC), Kennedy Space Center (KSC), Marshall Space Flight Center (MSFC) and Jet Propulsion Laboratory (JPL). Through interconnections and interactions among different NASA centers, critical resources and data can be shared, while independent simulations can be performed simultaneously at different NASA locations, to effectively utilize the simulation and emulation capabilities at each center. Furthermore, the development of DSIL can maximally leverage the existing project simulation and testing plans. In this work, we describe the specific role and development activities at JPL for Space Communications and Navigation Network (SCaN) simulator using the Multi-mission Advanced Communications Hybrid Environment for Test and Evaluation (MACHETE) tool to simulate communications effects among mission assets. Using MACHETE, different space network configurations among spacecrafts and ground systems of various parameter sets can be simulated. Data that is necessary for tracking, navigation, and guidance of spacecrafts such as Crew Exploration Vehicle (CEV), Crew Launch Vehicle (CLV), and Lunar Relay Satellite (LRS) and orbit calculation data are disseminated to different NASA centers and updated periodically using the High Level Architecture (HLA). In addition, the performance of DSIL under different traffic loads with different mix of data and priorities are evaluated.

Traffic Measuring and Monitoring↗

Expert System Software Assistant for Payload Operations

The broad objective of this expert system software based application was to demonstrate the enhancements and cost savings that can be achieved through expert system software utilization in a spacecraft ground control center. Spacelab provided a valuable proving ground for this advanced software technology; a technology that will be exploited and expanded for future ISS operations. Our specific focus was on demonstrating payload cadre command and control efficiency improvements through the use of "smart" software which monitors flight telemetry, provides enhanced schematic-based data visualization, and performs advanced engineering data analysis.

Rogers, Mark N.↗

The Effects of the Uncertainty of Departures on Multi-Center Traffic Management Advisor (TMA) Scheduling

The Multi-center Traffic Management Advisor (McTMA) provides a platform for regional or national traffic flow management, by allowing long-range cooperative time-based metering to constrained resources, such as airports or air traffic control center boundaries. Part of the demand for resources is made up of proposed departures, whose actual departure time is difficult to predict. For this reason, McTMA does not schedule the departures in advance, but rather relies on traffic managers to input their requested departure time. Because this happens only a short while before the aircraft's actual departure, McTMA is unable to accurately predict the amount of delay airborne aircraft will need to take in order to accommodate the departures. The proportion of demand which is made up by such proposed departures increases as the horizon over which metering occurs gets larger. This study provides an initial analysis of the severity of this problem in a 400-500 nautical mile metering horizon and discusses potential solutions to accommodate these departures. The challenge is to smoothly incorporate departures with the airborne stream while not excessively delaying the departures.' In particular, three solutions are reviewed: (1) scheduling the departures at their proposed departure time; (2) not scheduling the departures in advance; and (3) scheduling the departures at some time in the future based on an estimated error in their proposed time. The first solution is to have McTMA to automatically schedule the departures at their proposed departure times. Since the proposed departure times are indicated in their flight times in advance, this method is the simplest, but studies have shown that these proposed times are often incorrect2 The second option is the current practice, which avoids these inaccuracies by only scheduling aircraft when a confirmed prediction of departure time is obtained from the tower of the departure airport. Lastly, McTMA can schedule the departures at a predicted departure time based on statistical data of past departure time performance. It has been found that departures usually have a wheels-up time after their indicated proposed departure time, as shown in Figure 1. Hence, the departures were scheduled at a time in the future based on the mean error in proposed departure times for their airport.

Thipphavong, Jane↗

ISPATOM: A Generic Real-Time Data Processing Tool Without Programming

Information Sharing Protocol Advanced Tool of Math (ISPATOM) is an application program allowing for the streamlined generation of comps, which subscribe to streams of incoming telemetry data, perform any necessary computations on the data, then send the data to other programs for display and/or further processing in NASA mission control centers. Heretofore, the development of comps was difficult, expensive, and time-consuming: Each comp was custom written manually, in a low-level computing language, by a programmer attempting to follow requirements of flight controllers. ISPATOM enables a flight controller who is not a programmer to write a comp by simply typing in one or more equation( s) at a command line or retrieving the equation(s) from a text file. ISPATOM then subscribes to the necessary input data, performs all of necessary computations, and sends out the results. It sends out new results whenever the input data change. The use of equations in ISPATOM is no more difficult than is entering equations in a spreadsheet. The time involved in developing a comp is thus limited to the time taken to decide on the necessary equations. Thus, ISPATOM is a real-time dynamic calculator.

Dershowitz, Adam↗

Use of Nack Oriented Reliable Multicast (NORM) Protocol for Transport of Spacecraft Telemetry in Ground Networks

Frequently it is necessary to distribute spacecraft telemetry to multiple destinations on Internet Protocol (IP) networks. There are various methods of delivering this data, but when the data is high rate and there are many destinations IP multicast provides the best solution from a network perspective. However, IP multicast only supports the User Datagram Protocol (UDP) which is connectionless and unreliable. This nature of UDP and by extension the low priority treatment of UDP packets by some network hardware creates a difficult environment for distribution of high rate telemetry to a number of recipients over IP networks. NACK (Negative ACKnowledgment) Oriented Reliable Multicast (NORM) is defined by IETF (Internet Engineering Task Force) RFC (Request for Comments) 5740 in 2009 by B. Adamson et al. NORM provides a mechanism of retransmission and or forward error correction for UDP packets, potentially overcoming the limits of UDP for the transmission of spacecraft telemetry. Marshall Space Flight Center’s (MSFC) Huntsville Operations Support Center (HOSC) manages the delivery of the International Space Station (ISS) payload science and health data. The ISS IP Ground Routed (IIGoR) network provides the delivery of the data from the ground stations to the control centers. HOSC personnel have been experimenting with the use of NORM on the link between the ground stations and the front end processor equipment in Huntsville, AL.

Baldwin, Patrick A.↗

Design and implementation of satellite formations and constellations

The direction to develop small low cost spacecraft has led many scientists to recognize the advantage of flying spacecraft in constellations and formations to achieve the correlated instrument measurements formerly possible only by flying many instruments on a single large platform. Yet, constellations and formation flying impose additional complications on orbit selection and orbit maintenance, especially when each spacecraft has its own orbit or science requirements. The purpose of this paper is to develop an operational control method for maintenance of these missions. Examples will be taken from the Earth Observing-1 (EO-1) spacecraft that is part of the New Millennium Program (NMP) and from proposed Earth System Science Program Office (ESSPO) constellations. Results can be used to determine the appropriateness of constellations and formation flying for a particular case as well as the operational impacts. Applications to the ESSPO and NMP are highly considered in analysis and applications. After constellation and formation analysis is completed, implementation of a maneuver maintenance strategy becomes the driver. Advances in technology and automation by GSFC's Guidance, Navigation, and Control Center allow more of the burden of the orbit selection and maneuver maintenance to be automated and ultimately placed onboard the spacecraft, mitigating most of the associated operational concerns. This paper presents the GSFC closed-loop control method to fly in either constellations or formations through the use of an autonomous closed loop three-axis navigation control and innovative orbit maintenance support. Simulation results using AutoCon(TM) and FreeFlyer(TM) with various fidelity levels of modeling and algorithms are presented.

Folta, David↗

Design and Implementation of Satellite Formations and Constellations

The direction to develop small low cost spacecraft has led many scientists to recognize the advantage of flying spacecraft in constellations and formations to achieve the correlated instrument measurements formerly possible only by flying many instruments on a single large platform. Yet, constellations and formation flying impose additional complications on orbit selection and orbit maintenance, especially when each spacecraft has its own orbit or science requirements. The purpose of this paper is to develop an operational control method for maintenance of these missions. Examples will be taken from the Earth Observing-1 (EO-1) spacecraft that is part of the New Millennium Program (NMP) and from proposed Earth System Science Program Office (ESSPO) constellations. Results can be used to determine the appropriateness of constellations and formation flying for a particular case as well as the operational impacts. Applications to the ESSPO and NMP are highly considered in analysis and applications. After constellation and formation analysis is completed, implementation of a maneuver maintenance strategy becomes the driver. Advances in technology and automation by GSFC's Guidance, Navigation, and Control Center allow more of the burden of the orbit selection and maneuver maintenance to be automated and ultimately placed onboard the spacecraft, mitigating most of the associated operational concerns. This paper presents the GSFC closed-loop control method to fly in either constellations or formations through the use of an autonomous closed loop three-axis navigation control and innovative orbit maintenance support. Simulation results using AutoCon(Trademark) and FreeFlyer(Trademark) with various fidelity levels of modeling and algorithms are presented.

Folta, David↗

A Heuristic Approach to Correlating ERAM Flight Data from Twenty Centers

Among its many other functions, the Federal Aviation Administration’s En Route Automation Modernization (ERAM) provides external systems with real-time air traffic data for flights in enroute airspace in the National Airspace System. It replaced the En Route Host computer and backup system used at 20 FAA Air Route Traffic Control Centers (Centers) nationwide. Among the new features of ERAM, its output data stream of flight plan and track data includes a unique identifier for a flight originating in any one of the 20 ERAM Centers. The unique identifier, called the Global Unique Flight Identifier (GUFI), is persistent across all the Centers that track the flight. However, certain factors make it difficult to correlate data using the GUFI. First, the value of the GUFI is only unique within a time window of seven days. Second, the GUFI is attached only to flight-plan related data messages. Finally, track positions reported by ERAM do not reference the GUFI. In order to correlate historical as well as real time flight-plan and position related ERAM data, an efficient, heuristic approach was developed, and a prototype was developed. The approach showed that the processing speed, through parallel processing, is sufficient to correlate ERAM data in real-time. As described in this paper, when there are multiple track positions reported from multiple Centers within a few seconds, each position is assigned with a weighted score to indicate the quality of the position relative to its last know position. The weighted score can be used to eliminate potentially duplicate track positions. The approach is database-agnostic, and can be implemented in a Big Data system such as an Apache Hadoop system, as well as in traditional database systems.

Correlating ERAM Flight Data↗

Apollo 11 Launch

This NASA Kennedy Space Center video release presents the countdown and liftoff of Apollo 11, the first manned journey to the Moon which began at Pad A, Launch Complex 39, Kennedy Space Center, Florida at 9:32 a.m. EDT on July 16, 1969. The crew of Apollo 11 included Commander Neil A. Armstrong, Command Module pilot Michael Collins, and Lunar Module pilot Edwin E. Aldrin, Jr. Several different camera viewpoints of the spacecraft as well as over-head shots of the Kennedy launch control center are presented prior to liftoff. Other footage includes shots of President Lyndon B. Johnson and his wife among the Florida audience viewing liftoff. During the countdown several audio updates from Kennedy launch control are presented as to the status of pre-launch testing and system readiness. Captivating footage from liftoff to the spacecraft nearing the outer Earth atmosphere is shown as the video ends with Neil Armstrong's confirmation of engine skirt separation and launch escape tower separation from the spacecraft.

Source record↗

Overview and evolution of the LeRC PMAD DC Testbed

Since the beginning of the Space Station Freedom Program (SSFP), the Lewis Research Center (LeRC) has been developed electrical power system test beds to support the overall design effort. Through this time, the SSFP has changed the design baseline numerous times, however, the test bed effort has endeavored to track these changes. Beginning in August 1989 with the baseline and an all DC system, a test bed was developed to support the design baseline. The LeRC power measurement and distribution (PMAD) DC test bed and the changes in the restructure are described. The changes includeed the size reduction of primary power channel and various power processing elements. A substantial reduction was also made in the amount of flight software with the subsequent migration of these functions to ground control centers. The impact of these changes on the design of the power hardware, the controller algorithms, the control software, and a description of their current status is presented. An overview of the testing using the test bed is described, which includes investigation of stability and source impedance, primary and secondary fault protection, and performance of a rotary utility transfer device. Finally, information is presented on the evolution of the test bed to support the verification and operational phases of the SSFP in light of these restructure scrubs.

Soeder, James F.↗

Overview and evolution of the LeRC PMAD DC test bed

Since the beginning of the Space Station Freedom Program (SSFP), the Lewis Research Center (LeRC) has been developed electrical power system test beds to support the overall design effort. Through this time, the SSFP has changed the design baseline numerous times, however, the test bed effort has endeavored to track these changes. Beginning in August 1989 with the baseline and an all DC system, a test bed was developed to support the design baseline. The LeRC power measurement and distribution (PMAD) DC test bed and the changes in the restructure are described. The changes included the size reduction of primary power channel and various power processing elements. A substantial reduction was also made in the amount of flight software with the subsequent migration of these functions to ground control centers. The impact of these changes on the design of the power hardware, the controller algorithms, the control software, and a description of their current status is presented. An overview of the testing using the test bed is described, which includes investigation of stability and source impedance, primary and secondary fault protection, and performance of a rotary utility transfer device. Finally, information is presented on the evolution of the test bed to support the verification and operational phases of the SSFP in light of these restructure scrubs.

Soeder, James F.↗

Ocular examination for trauma; clinical ultrasound aboard the International Space Station

BACKGROUND: Ultrasound imaging is a successful modality in a broad variety of diagnostic applications including trauma. Ultrasound has been shown to be accurate when performed by non-radiologist physicians; recent reports have suggested that non-physicians can perform limited ultrasound examinations. A multipurpose ultrasound system is installed on the International Space Station (ISS) as a component of the Human Research Facility (HRF). This report documents the first ocular ultrasound examination conducted in space, which demonstrated the capability to assess physiologic alterations or pathology including trauma during long-duration space flight. METHODS: An ISS crewmember with minimal sonography training was remotely guided by an imaging expert from Mission Control Center (MCC) through a comprehensive ultrasound examination of the eye. A multipurpose ultrasound imager was used in conjunction with a space-to-ground video downlink and two-way audio. Reference cards with topological reference points, hardware controls, and target images were used to facilitate the examination. Multiple views of the eye structures were obtained through a closed eyelid. Pupillary response to light was demonstrated by modifying the light exposure of the contralateral eye. RESULTS: A crewmember on the ISS was able to complete a comprehensive ocular examination using B- and M-mode ultrasonography with remote guidance from an expert in the MCC. Multiple anteroposterior, oblique, and coronal views of the eye clearly demonstrated the anatomic structures of both segments of the globe. The iris and pupil were readily visualized with probe manipulation. Pupillary diameter was assessed in real time in B- and M-mode displays. The anatomic detail and fidelity of ultrasound video were excellent and could be used to answer a variety of clinical and space physiologic questions. CONCLUSIONS: A comprehensive, high-quality ultrasound examination of the eye was performed with a multipurpose imager aboard the ISS by a non-expert operator using remote guidance. Ocular ultrasound images were of diagnostic quality despite the 2-second communication latency and the unconventional setting of a weightless spacecraft environment. The remote guidance techniques developed to facilitate this successful NASA research experiment will support wider applications of ultrasound for remote medicine on Earth including the assessment of pupillary reactions in patients with severe craniofacial trauma and swelling.

Clinical Trial↗

TSAFE Interface Control Document v 2.0

This document specifies the data interface for TSAFE, the Tactical Separation-Assured Flight Environment. TSAFE is a research prototype of a software application program for alerting air traffic controllers to imminent conflicts in enroute airspace. It is intended for Air Route Traffic Control Centers ("Centers") in the U.S. National Airspace System. It predicts trajectories for approximately 3 minutes into the future, searches for conflicts, and sends data about predicted conflicts to the client, which uses the data to alert an air traffic controller of conflicts. TSAFE itself does not provide a graphical user interface.

Paielli, Russell A.↗