At least 505 records · Page 28

Waste Management Processing Projects in the PRC - 16551

EnergySolutions continues to provide waste treatment solutions in the Peoples Republic of China (PRC). In 2015 ES had completed installation of systems at two different Nuclear power sites (Haiyang, an AP-1000{sup TM} site and Yangjiang, a CPR1000 site). This paper discusses progress on these two projects, and provides new information regarding the operation of the systems. The Yangjiang project became operational in the fall of 2015 while the Haiyang project will be done is nearly done with commissioning and is waiting for reactor operations. Haiyang Project: In the Shandong Province on China's northeast coast, EnergySolutions, as part of a consortium with China Power Investment (CPI) and Yuanda Environmental Protection Engineering Company (a PRC state-owned company), has designed and constructed the site's Site Rad Waste Treatment Facility (SRTF). The SRTF provides solid waste processing services for up to 8 AP-1000s{sup TM}. The SRTF performs the following functions: 1. Five year storage for HICs containing spent resin and filters from the nuclear power plants' waste liquid systems (WLS); 2. Sorting and Compaction System for solid waste generated from Nuclear Power Plant (NPP) operations. This system implements: a) Real time radiography to screen 200 liter waste drums for prohibited items, b) Pre-compaction, c) High Resolution Gamma Spectrophotometry (HRGS) for waste characterization, d) Supercompaction, e) Solidification of compacted drums inside overpack drums which are filled with 60 MPa compressive strength grout, and f) Automatic drum lidding which crimps the drum lid to the drum body. 3. Laundry services for NPP anti-contamination clothing. 4. At the nuclear islands, EnergySolutions is providing mobile liquid waste processing systems that utilize EnergySolutions Advanced Liquid Processing System ALPS{sup TM}/Advanced Injection Method System AIM{sup TM} processing systems to supplement the NPP's WLS system when radionuclide concentrations exceed release criteria. The spent resins and filters from the nuclear power plants are placed in EnergySolutions supplied HICs, dewatered using EnergySolutions Self Engaging Dewatering System (SEDS{sup TM}), and then placed in EnergySolutions 8-120B Type B cask for the transport of the HIC between the NPP and the SRTF and, ultimately, to a disposal site once it is ready for operations Yangjiang Project: EnergySolutions is providing liquid waste treatment system (TEU) and solid waste treatment system (TES) for Yangjiang units 3 and 4 for the China Nuclear Power Engineering Company (CNPEC). The Yangjiang site is located approximately 300 kilometers west of Hong Kong. The TEU system processes floor drain, chemical drain, and process drain tanks liquids to achieve a release concentration less than 37 Bq/l. The TES system receives spent resin and filters into HIC containers which are dewatered and subsequently transported to the Yangjiang sites QT building where they are stored for a period of up to 5 years or until a disposal site are available. TEU (Liquid waste treatment) consists of the following unit operations: - ALPS{sup TM}/AIM{sup TM} system, which includes two separate 8 vessel water treatment systems that consist of granular activated carbon (GAC), cation, anion ion and mixed bed media ion exchange (IX) columns; and: - A reverse osmosis system for final polishing, - TES (solid waste system), - SEDS (Self Engaging Dewatering System), - Shielding for the loading and storage of HICs, - Shielded transport container for the transfer of HIC to the QT building for storage, - Shielded transfer bell for the transport of spent filters from the NPP operating area to HIC. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Direct Feed Low Activity Waste Program Integration - 16638

The mission of Program Integration is to champion and steer the development and implementation of common and consistent programs between the Tank Operating Contract (TOC) contractor and the Waste Treatment Plant (WTP) contractor. TOC is managed by Washington River Protection Solutions LLC (WRPS) and WTP is managed by Bechtel National, Inc. (BNI). The DOE Office of River Protection (DOE ORP) is the Program Owner. WRPS has been actively managing the TOC at the Hanford Site Tank Farms (TF) since 2008. Programs are already developed, verified, and in use for the TOC, whereas WTP is still in the construction phase. WTP Programs are established for construction only, but not developed for commissioning and future operations. An extensive effort is underway at WTP to develop commissioning programs. In order to drive consistency and minimize differences in program requirements between TF, which will feed the tank waste, and WTP, which will receive and treat the tank waste, DOE-ORP requires the two contractors to integrate and collaborate in program development. Advantages of integration are: - Achieves cost and time savings as WTP is able to review existing TOC programs as starting points in development of its programs. - Promotes interfaces with industry counterparts to share experiences, issues, and lessons learned. ? Minimizes difference in program requirements between the companies. - Helps prepare for and ultimately succeed in Operational Readiness Reviews (ORR). Program Integration is a priority for TOC and WTP, and in order to maintain the focus and drive to this effort, a unified One System Program Integration Council (OSPIC) was created in 2012. Membership of the OSPIC consists of senior managers from both companies and the OSPIC chair's report directly to their respective President. Thirty (30) programs are subject to integration, including but not limited to Conduct of Operations, Worker Safety and Health, Quality Assurance, Contractor Assurance, and Environmental Management. Progress of program development and integration efforts are tracked and monitored, and barriers to integration are resolved in a collaborative fashion within both companies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Evolution of Chemical Waste Treatment in the Nuclear Industry Simple Solutions for Complex Problems - 16694

The U.S. nuclear waste treatment industry was born in the 1980s and early 1990s with the end of the Cold War, the peak of commercial nuclear power, and after implementation of federal regulations that drove new disposal requirements for radioactive waste generators. New regulations resulted in soaring costs for radioactive waste disposal, and thus an industry was born that focused on recycling, volume reduction, and waste form improvement. New treatment facilities and technologies were started that primarily dealt with low-level radioactive wastes; however, there was little to no treatment capacity for wastes commingled with hazardous chemicals. Large volumes of 'mixed wastes', of which many became known as 'orphan wastes', were being stored on U.S. Department of Energy (DOE) sites with no path for disposal and thus posed a risk to workers, the public, and the environment. Perma-fix Environmental Services, Inc. (Perma-Fix), which started in the hazardous waste industry in 1990 and had developed facilities and technologies to treat hazardous wastes, evolved in the late 90's to meet this mixed waste market opportunity. By adapting our technologies and collaborating with waste generators to understand their needs, we successfully developed treatment and disposition solutions for some of the most challenging mixed wastes in the U.S. By establishing a pathway for treatment and disposal of orphan wastes, Perma-Fix played an important role in the safe treatment and disposition of orphan wastes, which facilitated closure of DOE sites such as Rocky Flats, Mound, and Fernald. We found that understanding chemistry and having experience in managing the hazardous constituents of mixed wastes allowed us to apply solutions that were not overly complex and expensive. Further, by adapting proven hazardous waste treatment solutions to wastes commingled with contaminants such as polychlorinated biphenyls (PCBs), mercury, and organics we were able to safely manage even more problematic mixed wastes. During the 1980's, commercial low-level radioactive waste treatment and disposal solutions were being developed. At the same time, the federal government began dealing with increasing stakeholder demands for permanent solutions of more complex radioactive wastes such as high-level waste (HLW) and transuranic (TRU) wastes. HLW and TRU waste disposal became a contentious political issue between the federal government, regulatory agencies, and the public. As a result, DOE was mandated to develop treatment and disposal methodologies to address these wastes. DOE's Waste Isolation Pilot Plant (WIPP) facility solved most issues with disposition of TRU wastes; however, for HLW (for example tank wastes at Hanford, Savannah River, and Idaho) the complexity of the wastes and the fact that government entities were developing political solutions for waste treatment resulted in a variety of complex and expensive solutions. Decades later we still do not have a permanent solution for HLW. Whether some simple commercial approaches are possible, what regulatory changes should occur, and what the implications may be if we do not change our current path, will be discussed. After two decades, we see the low-level nuclear waste industry maturing and replicating the path of the hazardous waste industry. When new hazardous waste federal regulations were enacted in the 1970's and 1980's, the hazardous waste industry began to boom with new company start-ups and construction of numerous treatment and disposal facilities. Initially, this was a good business to be in, managing dangerous wastes in an environmentally safe and responsible manner, and it was profitable. However, over-capacity and fierce competition drove down pricing, and companies failed. This ultimately led to a major consolidation within the hazardous waste industry. Similarly and more recently in the nuclear industry, over-capacity and competition has driven down profitability, companies have failed, and there is a major consolidation occurring within sectors of the industry. For consolidation to be successful and healthy for either industry, a leader must emerge to set the direction for the others and establish a sustainable path that is acceptable for waste generators, stakeholders, and investors. This was the case for the hazardous waste industry. This paper will examine the parallels between the hazardous and nuclear waste industries as they have matured and evolved, and what discuss the long term implications of consolidation within the nuclear industry. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Management of Metals from Decommissioning of Nuclear Facilities - 18411

The EDF group companies within the Cyclife platform have for decades performed treatment and recycling of metals. With different approaches but all considered international Good Practice, as valuable materials are recovered for safe recycling and volumes in the repositories for radioactive waste are saved. For an efficient decommissioning project, a well-defined waste management process is one of the critical paths, not least when it comes to routes for clearance and recycling of materials. It is easy to underestimate the complexity and bottlenecks caused by shortage of logistic space. In order to mitigate these risks, activities such as strengthening categorization, quantification and adopting different routes based on the material properties should be implemented. By categorization of the of waste and materials considered/classified as contaminated or potentially contaminated it is obvious that the management of the metals is a key parameter in nuclear decommissioning. Analyses performed by the EDF companies shows that a majority of the materials, classified as contaminated, from a BWR/PWR plant are metals. Experience gives that a high percentage of these metals from decommissioning can be subject to recycling either directly upon completion of the clearance process or after certain treatment. Non-technical key parameters like the regulatory requirements on applying the waste hierarchy, the impact on repository programs as well as, not at least, the regulatory and public acceptance of recycling of materials from the nuclear industry are, together with costs essential factors when forming the routing of metals and other waste materials from a decommissioning project. Today the EDF group companies are positioned to provide a wide range of services for management of the contaminated metals from decommissioning projects, spanning from industrial management of metals which directly will be subject general clearance after verification measurements up to decontamination and melting of selected reactor internals for recycling to public domain or within the nuclear industry. In this paper the typical waste material composition for BWR and PWR plants, the different ways to treat/manage the radioactive and potentially radioactive metals including a comparison of the different approach commonly used in a technical, logistical and economical perspectives. A few success stories will be resented as well as lessons learned. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transition From Operation to Decommissioning with a Sudden Decision to Permanent Shutdown and with Parallel Operation On-site - 18559

In a short time the Swedish nuclear operator OKG have to shift from a operator of three nuclear power plants at one site to a company where both decommissioning and operation will take place in parallel for numerous of years as a result of a decision to permanently shut down two of the three reactors. The paper will be focusing on the challenges to change organization and mind-set from operations to decommissioning within parts of a company while still maintaining and developing the highest standard for the plant still in operation, and this in the combination with a decision of permanent shutdown earlier than expected. The paper will also address how OKG managed to create and maintain momentum in essential processes like permits, defueling and project planning before, during and short after the organization was changed and some of the employees had to leave the company. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Study on the Comparison of International WTS for Integrated Management of Radioactive Waste - 19034

Domestic radioactive waste is generated by nuclear power plants, the Korea Atomic Energy Research Institute and KEPCO Nuclear Fuel Company. These nuclear energy agencies have their own waste tracking system. To track waste more efficiently, it is necessary to build an integrated tracking system from the viewpoint of the final disposer. As for the korea Atomic Energy Research Institute, the decommissioning waste due to the decommissioning of research reactors No. 1 and 2, and the low and intermediate-level radioactive waste, generated by the operation of the High Flux Advanced Neutron Application Reactor(HANARO), account for the most. The solid waste from each facility and laboratory is sorted and collected according to radiation levels and the contents. For starters, according to the contents, the waste is divided into combustible, noncombustible compressible and non-compressible waste. The combustible waste, generated by the Korea Atomic Energy Research Institute, is treated according to the low and intermediate-level radioactive waste delivery regulation of the Nuclear Safety and Security Commission and the acceptance criteria of the disposal facility. KEPCO Nuclear Fuel Company is making the nuclear fuel used in nuclear power plants. Radioactive waste is generated in the nuclear fuel manufacturing process, and it is classified into 8 types of waste according to the solid waste management procedure. Most of the radioactive waste, generated while KEPCO Nuclear Fuel Company processes the light-water reactor and heavy-water reactor nuclear fuel, is classified as low and intermediate-level radioactive waste. The radioactive liquid waste, generated in the radiation controlled area in nuclear fuel processing facilities, is divided into low-concentration liquid waste and high-concentration liquid waste. The miscellaneous solids, generated in the Hanbit NPP of Korea Hydro and Nuclear Power Co., Ltd., are classified in consideration of the physical properties, density and amount of the waste, and substances subject to restricted disposal. This paper investigated information on the structure, functions and maintenance of the systems implemented and operated by individual countries and IAEA, and the types of managed data, and analyzed the detailed configuration of the system and the characteristics of DBMS (Data Base Management System), and discovered during the analysis process the information on the waste management in each country or institution. This paper investigated the classification standards and treatment methods according to the characteristics of the radioactive substances handled by each agency. These classification and treatment methods can be applied to the database when the radioactive waste tracking system is implemented in the future. Also, this paper analyzed the radioactive waste tracking system of each country. Most overseas waste tracking systems are configured based on the ORACLE DBMS. The ORACLE DBMS is highly secure, and can manage large-scale databases. Also, Germany's ReVK and US IWTS are using the Bar-Code system that can track and manage all waste data, generated during decommissioning or transportation, in real time, and the real-time tracking system of web-based US CID can simply create and output reports quickly. If the advantages of overseas waste tracking systems are added to the domestic integrated waste tracking system, more efficient and safer management of radioactive waste will be possible.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Readiness Process and Transition to Operation for a Remote-Handled Transuranic Packaging Facility at Hanford - 19298

CH2M Hill Plateau Remediation Company manages the Sludge Retrieval Project, which has the mission to develop and deploy technologies to safely retrieve and package remote-handled transuranic sludge that is currently stored in the 105K West Reactor Fuel Storage Basin located in the 100-K Area of the U.S. Department of Energy's Hanford Site near Richland, Washington. In 2017, CH2M Hill Plateau Remediation Company installed and commissioned a process for removal of the sludge. A contractor Operational Readiness Review was completed in March 2018, and a U.S. Department of Energy, Richland Operations Office Operational Readiness Review was completed in May. The first sludge transfer was successfully completed on June 12, 2018, proving that the Engineered Container Retrieval and Transfer System process equipment worked as intended. This paper will describe the issues and successes along the path of readiness and startup, as well as the challenges that remain and CH2M Hill Plateau Remediation Company's plan to overcome them. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of the Mobile Systems for Conditioning of Disused Sealed Radioactive Sources in Serbia - 20105

Sealed radioactive sources (SRS) are being used worldwide in the field of medicine, agriculture, industry and research. They can be found in mobile as well as stationary devices. SRS contains radioactive material that is (a) permanently sealed in a capsule or (b) closely bounded and in a solid form. The capsule or material of an SRS should be strong enough to maintain leak tightness under the conditions of use and purpose for which the source was designed, also in case of accidents. In this case only emitted radiation is utilized. Firstly, the hazard from external radiation has to be considered, but the possibility of contamination due to fracture of the capsule should not be disregarded. The radioactive sources are composed of the radiating isotope contained in the filling medium, the single or double isotope holder that partially or totally surrounds the filling medium, the outer cover that contains the parts mentioned above and the capsule closed airtightly by welding or using some other method. The capsule must be tested for leakage periodically. If the SRS is no longer needed (e.g. replaced by a different technique) or it becomes useless for the intended application (e.g. the activity becomes too weak, the equipment containing the source works poorly or becomes obsolete, the source is damaged or leaking) it is considered disused. Disused sealed radioactive sources (DSRS) are typically conditioned and disposed if a facility is available. If the disposal option is not available, conditioned DSRS should be stored under proper conditions. In some cases, the radionuclide(s) in DSRS can be recovered/recycled or the DSRS can be repurposed for other applications. Conditioning of DSRS ensures containment of the radioactive material, provides confinement for leaking sources, provides sufficient radiation shielding, reduces storage/disposal volume by allowing consolidation of multiple sources into a single storage/disposal container, facilitates transport operations and contributes to safety and security as well. Typically, conditioning technologies are deployed either as permanently installed stationary systems in centralized or mobile on-site waste processing facilities, or in a mobile configuration. Centralized stationary facilities provide a single processing location for multiple users that requires transport of the waste to the facility. On the other hand, mobile systems may be provided for the selection and application of the optimum technology for a specific waste stream (such as DSRS) by bringing the process to the point where the waste is generated. In addition, mobile systems could offer additional flexibility by sharing equipment among multiple waste generating sites for processing campaigns that vary in duration, from very short periods to several years. The term 'mobile processing system' refers to any radioactive waste processing system or component which is designed to be transportable and which is not considered permanently installed. Two mobile system for conditioning of disused sealed radioactive sources are developed in the Public Company Nuclear Facilities of Serbia. Development of these mobile systems was supported by SRB9005 national project via Technical Cooperation of the IAEA. The first mobile system, built inside the 20 feet ISO container, will be used for conditioning of DSRS category 3 to 5. The second mobile system, built inside the 7 m long vehicle (Iveco Daily Van), will be used for dismantling of ionizing smoke detectors mostly with Am-241 sources. Designs of the mobile systems were defined in cooperation with two companies from Belgium (Belgoprocess and Leniko) and a Croatian company Ekoteh as well as with the support of the IAEA experts. The generic safety assessment and operational procedures for the mobile systems are developed. Based on safety assessment the acceptance criteria and operational limits and conditions are established. Operational procedures include: (a) equipment and material requirements, (b) assembling procedure of the mobile unit, (c) procedure for acceptance of devices for dismantling and conditioning, (d) dismantling procedure for devices to recover the DSRS, (e) characterization of DSRS, (f) encapsulation procedure of DSRS, (g) disassembling procedure of the mobile unit, and (h) keeping records, identification and traceability. In addition, radiation safety, health safety, security and emergency preparedness plans are prepared. The generic safety assessment and operational procedures could be updated with site specific requirements, DSRS inventory, and different needs for future customers. Developed mobile systems could be used in all situations when it is feasible to perform conditioning of DSRS on the spot in the county and worldwide. Development of these mobile units was just the first step to create the Reference Center for Radioactive Waste Treatment and Disused Radioactive Sources Conditioning for Small Facilities which can become a regional training center in the future, and/or as a tool for comprehensive national search and secure programmes. In the next phases development of e-learning platforms and blended learning packages as well as application for the IAEA Qualified Technical Centre (QTC) for the management of DSRS is foreseen. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Opportunities to Implement Solutions to Achieve Remedial Action Objectives in Consideration of Stakeholder Interests - 20365

A case study in the implementation of a soils excavation and removal project conducted at a Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) vicinity property; an active commercial business, in a densely populated area, with significant operational, technical and, logistical constraints that were expected to limit areas that could be remediated. The United States Army Corps of Engineers-led (USACE) team successfully navigated complex overlapping stakeholder interests to achieve a more efficient and complete removal of contaminated soils and debris while minimizing unnecessary excess costs to the Government. This paper centers on FUSRAP activities at the FMSS vicinity property located at 149-151 Maywood Avenue, Maywood, Bergen County, New Jersey. For most of its FUSRAP history, this ∼109,000 square meter (27-acre) property housed a now-demolished ∼26,000 square meter (6.5-acre) warehouse operated by Sears Logistics Services, a unit of the Sears Roebuck Company (Figure 2). Sears ended its property lease and vacated the warehouse in December 2016. Given that long history and for the purposes of this paper, the property will be referred to as the 'Sears property' or simply 'the property.' The Sears property is approximately 109,000 square meters (27-acres) and is currently zoned for commercial use. The property is bound to the north and northwest by 100 West Hunter Avenue (the Stepan Company), to the northeast by 205 Maywood Avenue, to the east by Maywood Avenue, to the south by 23 West Howcroft Road, and to the west by businesses on NJ Route 17 and the NJ Route 17 roadway. Until December 2016, the property housed a warehouse and distribution center operated by Sears Logistical Services. On-site structures were demolished by the property owner in 2017. The warehouse covered the north section of the property along the Stepan Company property line. A railroad spur from the adjacent property now known as the Maywood Interim Storage Site (MISS) ended at the northeast corner of the warehouse. Wetlands were located east of the warehouse; the rest of the property was covered with paved parking lots and grassed areas. During remediation at the property, opportunities frequently arose where the project team was able to coordinate effectively with stakeholders to sequence remediation activities to facilitate removal of otherwise inaccessible soils and identify opportunities for materials reuse when supported by residual radiological and chemical levels. Some specific opportunities include: - remediating individual truck loading dock bays to maintain tenant operations; - working along a busy highway and in a utility corridor containing a 30-inch high pressure gas main; - remediating Lodi Brook and associated wetlands requiring bypass pumping and other diversionary structures to maintain local community stormwater drainage; - protecting during remediation and supporting access to facilitate tenant/owner maintenance of critical fire protection and water supply system service lines buried in contaminated soils and necessary for safe warehouse operations; and - coordinating with stakeholders to ensure non-radiological contaminants of concern for the site (unaffiliated with FUSRAP) were addressed by the responsible party in a manner that maximized benefit to all parties while supporting an efficient overall site remediation program. Once the property was vacant and the warehouse structure and radiologically non-impacted above-grade structures were demolished, the project identified an opportunity to significantly reduce the volume of waste associated with the foundation of the former warehouse, a foundation suspected of being partially constructed in radiologically contaminated soils. The project developed and implemented supplemental radiological verification survey and sampling strategies based on radiological cross-contamination risk potential with process flow-charts and screening-level based decision points; a program that classified saw-cut sections of concrete based on observed residual surface radioactivity conditions using a combination of gamma sensitive sodium-iodide scans and beta sensitive Geiger-Muller direct measurements. The proposed approach was reviewed with stakeholders with feedback, including consideration of applicable State of New Jersey Site Remediation Program criteria and guidance before implementation. Once classified, additional sampling was performed at frequencies driven by screening. The sampling methods, stockpile sampling frequencies, criteria and, approach to data evaluation were developed in consideration of existing site cleanup standards, regional background ranges, State of New Jersey radiological remediation program guidance, and specific stakeholder input With the property remediation and survey efforts nearly completed, it is relevant to examine retrospectively the objectives, assumptions and limitations in the remedial design (i.e., what was planned) versus what was able to be accomplished through effective teaming. Benefits to other environmental remediation site programs include better understanding of how to work effectively with stakeholders to achieve win-win outcomes, and approaches to site remediation, waste minimization and materials reuse that were successful in their overall outcomes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Better Climate Challenge Working Groups Non-Energy Benefits of Energy Projects-Improving Financial Payback

Energy efficiency is a key strategy recently identified by the United States Department of Energy as a pillar of industrial decarbonization. For manufacturing companies, improving energy efficiency will reduce money spent on energy utilities such as gas, electricity, and oil. Energy improvement projects also provide valuable benefits outside of simple operating cost reductions, such as reducing the carbon footprint, improving safety metrics and even enhancing quality and productivity. Unfortunately, energy efficiency projects have typically faced an adoption gap, even when they meet criteria such as payback period for capital projects. The inclusion and quantification of non-energy benefits (NEBs), also known as co-benefits, in the decision-making process for energy efficiency projects can improve the overall financial payback periods for those projects as well as potentially improve the company's key performance metrics aligned with business strategies. There are no readily available tools that facilitate this, however, and the most used tools for energy audits address NEBs in a perfunctory way if at all. We integrated research for finding and quantifying non-energy benefits of energy efficiency projects into a commonly recognized continuous improvement practice, the Define, Measure, Analyze, Improve and Control (DMAIC) Process. This process, along with software and supplemental materials, guides energy assessments to find and to quantify NEBs associated with energy conservation opportunities. Our aim is to deliver an easy to use and effective process and software tool and to maximize return on investment for energy efficiency projects as well as contribute to companies' strategic performance goals.

DMAIC↗

PSA 2025 DPRA for Cyber Optimization

Cyberattacks can have many different attack paths, durations, and goals. There are also many different mitigation options involving hardware, software, and/or humans. Evaluating defense options should include quantitative evaluation of overall effectiveness to make cost and risk-informed decisions. Typical cyberattack modeling methods only provide a qualitative evaluation and have difficulty with time dependent scenarios. The main areas of cybersecurity are confidentiality, integrity, and availability. For companies with cyber-physical systems such as advanced nuclear reactors, cyber-related integrity is a requirement set by the U.S. Nuclear Regulatory Commission. But companies are also concerned about availability or reliability as a business case. As cyber threats are evolving to a business-for-hire structure, more attacks focus on disrupting business success and reliability, causing financial and economic stability risk. Companies want reliability analysis while optimizing cost, which requires more than safety modeling methods. Dynamic-state-based and Markov-based modeling provides a method for better cyber scenario modeling with timing and conditional features not found in other numerical evaluation methods. EMRALD (Event Modeling Risk Assessment using Lined Diagrams) is a dynamic risk analysis modeling and simulation tool and has features that reduce modeling issues such as state-base explosion found in Markov-based tools. It has been used to model different time-dependent events including plant behavior and operator procedures. As a general modeling tool, EMRALD can also be used to model cyberattack scenarios with varying mitigation options and quantify effectiveness, producing numerical data for risk-informed decisions. This paper uses EMRALD to demonstrate that dynamic risk analysis can be used for cyber threat modeling to provide insights for design decision-making and optimize defense strategies.

97 - MATHEMATICS AND COMPUTING↗

Findings from Large Bench-Scale Testing of Denitration Electrolyzers for the EDCGe Project

This report highlights the key findings and outcomes relevant to the processability of waste supernatant at Hanford using a denitration electrolyzer. The Electrosynthesis Company issued a Phase 1 report to the Savannah River National Laboratory (SRNL), summarizing the evaluation of large bench-scale denitration electrolyzers to support the electrochemical denitration and caustic generation (EDCGe) project. The Electrosynthesis Company’s report (attached as Appendix A) provides insights into the initial steps required to implement an electrolyzer system at Hanford. Phase 1 experiments focused on validating the denitration electrolyzer’s performance, operating parameters, and reaction products. The robustness of the electrochemical denitration process was demonstrated by two electrolyzer flow cell systems (a 100 cm 2 ElectroCell MP and a 150 cm 2 NESI NS01 cell), both of which achieved significant nitrate and nitrite removal (>50%) with a current efficiency of ~95% for both systems. Higher current densities (500 mA cm –2 ) improved nitrate and nitrite removal rates compared to lower current densities (333 mA cm –2 ), while maintaining a current efficiency of ~94%. The NS01 cell achieved a nitrate species removal rate of ~0.41 mol h –1 at 5 kA m –2 (equiv. to 500 mA cm –2 ). The primary reaction product was ammonia (NH 3 ), constituting 78.3–91.6% of the products (excluding OH – formation). NH 3 was predominantly retained in the catholyte liquid phase rather than being off-gassed. Additionally, the NS01 cell reported an NH 3 generation rate of ~0.36 mol h –1 at 5 kA m –2 . Other gas formation included ~7% N 2 , ~7% H 2 , and trace amounts of N 2 O. The estimated power requirement (extrapolated from the 0.015 m 2 cell data) for a full-scale denitration electrolyzer is approximated to be ~1.6 MW (DC-only) to treat 50% of nitrate and nitrite in a waste stream and generates ~2.1 kmol h –1 of NH 3 with an initial concentration of 4 M NO 3 – /NO 2 – at 300 gal h –1 . Simulated waste containing aluminate, carbonate, oxalate, and halogens exhibited no adverse effects on denitration performance. A preliminary experiment comparing alkaline anolyte (5 M NaOH) with a nickel based anode to acidic media (2 M H 2 SO 4 ) with a DSA-O 2 anode showed a lower operating voltage and generated less H 2 than the acid media. Maintaining a stable 5 M OH – concentration in the anolyte through periodic additions of caustic did not significantly impact denitration performance. This operational mode will be required for long-term experiments. All the experiments demonstrated that electrochemical denitration is a promising approach for treating nitrate and nitrite in simulated waste streams, achieving significant conversion and robustness across varying experimental conditions and electrochemical cell configurations. Lastly, the ability to generate a nearly pure NH 3 stream may prove advantageous for processing at other locations within the Hanford site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Guide to Performance Contracting with ESCOs

An energy services company (ESCO) can identify energy improvements, provide the capital required and installs improvements, offers turn-key installation services, and guarantees energy savings. Companies pay the ESCO back over a period of years from the energy cost savings generated from the project. Hiring an ESCO is a proven strategy for identifying and implementing energy saving capital improvements, while managing risks inherent in such projects.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Turf Conversion Measurement and Verification Protocol

This measurement and verification (M and V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings as a result of water conservation measures (WCMs) in energy performance contracts associated with converting turfgrass or other water-intensive plantings to water-wise and sustainable landscapes. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M and V plan, and details the procedures to use to determine water savings.

13 HYDRO ENERGY↗

Turf Conversion Measurement and Verification Protocol

This measurement and verification (M and V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings as a result of water conservation measures (WCMs) in energy performance contracts associated with converting turfgrass or other water-intensive plantings to water-wise and sustainable landscapes. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M and V plan, and details the procedures to use to determine water savings.

13 HYDRO ENERGY↗

Outdoor Irrigation Measurement and Verification Protocol

This measurement and verification (M&V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings resulting from water conservation measures (WCMs) in energy performance contracts associated with outdoor irrigation efficiency projects. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M&V plan, and details the procedures to use to determine water savings.

13 HYDRO ENERGY↗

Outdoor Irrigation Measurement and Verification Protocol

This measurement and verification (M&V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings resulting from water conservation measures (WCMs) in energy performance contracts associated with outdoor irrigation efficiency projects. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M&V plan, and details the procedures to use to determine water savings.

13 HYDRO ENERGY↗

Cooling Tower (Evaporative Cooling System) Measurement and Verification Protocol

This measurement and verification (M and V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings resulting from water conservation measures (WCMs) in energy performance contracts associated with cooling tower efficiency projects. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M and V plan, and details the procedures to use to determine water savings.

13 HYDRO ENERGY↗