Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CLOSURES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Structure-Based Design of a Periplasmic Binding Protein Antagonist that Prevents Domain Closure

Many receptors undergo ligand-induced conformational changes to initiate signal transduction. Periplasmic binding proteins (PBPs) are bacterial receptors that exhibit dramatic conformational changes upon ligand binding. These proteins mediate a wide variety of fundamental processes including transport, chemotaxis, and quorum sensing. Despite the importance of these receptors, no PBP antagonists have been identified and characterized. In this study, we identify 3-O-methyl-D-glucose as an antagonist of glucose/galactose-binding protein and demonstrate that it inhibits glucose chemotaxis in E. coli. Using small-angle X-ray scattering and X-ray crystallography, we show that this antagonist acts as a wedge. It prevents the large-scale domain closure that gives rise to the active signaling state. Guided by these results and the structures of open and closed glucose/galactose-binding protein, we designed and synthesized an antagonist composed of two linked glucose residues. These findings provide a blueprint for the design of new bacterial PBP inhibitors. Given the key role of PBPs in microbial physiology, we anticipate that PBP antagonists will have widespread uses as probes and antimicrobial agents.

59 BASIC BIOLOGICAL SCIENCES↗

Closure measures for coarse-graining of the tent map

We quantify the relationship between the dynamics of a time-discrete dynamical system, the tent map T and its iterations T{sup m}, and the induced dynamics at a symbolical level in information theoretical terms. The symbol dynamics, given by a binary string s of length m, is obtained by choosing a partition point α∈[0,1] and lumping together the points x∈[0,1] s.t. T{sup i}(x) concurs with the i − 1th digit of s—i.e., we apply a so called threshold crossing technique. Interpreting the original dynamics and the symbolic one as different levels, this allows us to quantitatively evaluate and compare various closure measures that have been proposed for identifying emergent macro-levels of a dynamical system. In particular, we can see how these measures depend on the choice of the partition point α. As main benefit of this new information theoretical approach, we get all Markov partitions with full support of the time-discrete dynamical system induced by the tent map. Furthermore, we could derive an example of a Markovian symbol dynamics whose underlying partition is not Markovian at all, and even a whole hierarchy of Markovian symbol dynamics.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Direct observation of closure domain wall mediated spin waves

The generation and guiding of spin waves from and by magnetic domain walls are demonstrated. The spin waves radiate from pinned and oscillating magnetic closure domain walls and propagate linearly along a narrow path formed by the surrounding 180° asymmetric Bloch domain walls. The propagating spin wave modes are directly visualized by time-resolved magneto-optical Kerr microscopy with picosecond temporal resolution. A linear relationship between excitation frequency, wavelength, and number of spin waves per domain exists. Independent of the field excitation frequency, a constant phase velocity of spin waves propagation is obtained. Spin waves characteristics can be tuned by varying the magnetic domain dynamics, allowing for variable spin wave characteristics with magnetic field characteristics and histories.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Progress Toward Simulating Departure from Nucleate Boiling at High-Pressure Applications with Selected Wall Boiling Closures

Recently, a Eulerian-based two-fluid computational fluid dynamics (CFD) framework with a wall heat flux partitioning approach has been intensively investigated for departure from nucleate boiling (DNB) simulation under the U.S. Department of Energy–funded Consortium for Advanced Simulation of Light Water Reactors (CASL) program. Understanding of the DNB characteristics over a range of pressurized water reactor–like operating conditions and accurate prediction of boiling crisis in the nuclear power system have been grand challenges because of the large impact of DNB on reactor safety and operational economics. The ultimate goal of this task in the CASL program is to introduce a robust multiphase CFD–based DNB modeling framework that is capable of characterizing an entire boiling history in which the wall boiling mode experiences the following through multiple stages of heat transfer mode: (1) single-phase convective heat transfer, (2) nucleate boiling heat transfer, and (3) identification of the departure of nucleate boiling. To validate the CASL boiling model, we have benchmarked simulated DNB over three different flow channel configurations (pipe flow, 5 × 5 fuel bundle with mixing vane tests, and 5 × 5 fuel bundle without mixing vane tests) against experimental measurements, and the validation result with open literature is reported. The DNB detection criteria in the simulation are checked by monitoring the peak wall temperature, wall dryout factor, and net energy balance. In addition to the DNB performance test, some preliminary sensitivity results on closure model selection are reported to address the prediction capability of local void profile against measurements. The boiling simulation tested in this study exhibits a maximum deviation of 24% from the measured DNB value in a high-pressure (i.e., 138 bars) subcooled pipe flow test. The ranges of operating conditions are as follows: 1650 to 2650 kg/m 2 ·s for mass flux and 8.5 to 96 K for subcooled inlet temperature. The deviation is even reduced to 7% when the subcooled temperature is less than 40 K. Besides accuracy, base practice guidelines for DNB detection criteria are tested by monitoring three simulation variables: (1) maximum wall temperature, (2) wall dryout factor (i.e., K-value), and (3) energy balance. Numerical robustness of DNB simulation is largely achieved in most of the validation test except for a few high subcooled test cases.

42 ENGINEERING↗

Single-neutron energies near N=28 and the absence of the N=34 subshell closure in the Ti isotopes

The surprising absence of the N=34 subshell closure in the exotic nucleus {sup 56}Ti is highlighted by examining the experimental single neutron energies along the N=28 isotopes, which are extracted from previously existing data on single-neutron transfer reactions on stable isotones and nuclear masses. The results point out the role of the monopole effect of the tensor force on the f{sub 7/2}-f{sub 5/2} splitting and confirm the prediction of the reduction of this splitting in the Z>20 isotones. In addition, the importance of making similar measurements of the distribution of single neutron and single neutron hole strength in the exotic Z<20 N=28 isotones is discussed. Measurements of the (d,p) reaction and the neutron knockout reaction on the exotic nucleus {sup 46}Ar have provided proof of principle for the necessary reactions, and advances presently taking place in detector technology will soon provide the tools necessary for reliably mapping the distribution of neutron strength in detail.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Systematics of {alpha}-decay half-lives around shell closures

We present a systematic calculation of {alpha}-decay half-lives of even-even heavy and superheavy nuclei in the framework of the preformed {alpha} model. The microscopic {alpha}-daughter nuclear interaction potential is calculated by double-folding the density distributions of both {alpha} and daughter nuclei with a realistic effective Michigan three-Yukawa nucleon-nucleon interaction, and the microscopic Coulomb potential is calculated by folding the charge density distributions of the two interacting nuclei. The half-lives are found to be sensitive to the density dependence of the nucleon-nucleon interaction and the implementation of the Bohr-Sommerfeld quantization condition inherent in the Wentzel-Kramers-Brillouin approach. The {alpha}-decay half-lives obtained agree reasonably well with the available experimental data. Moreover, the study has been extended to the newly observed superheavy nuclei. The interplay of closed-shell effects in {alpha}-decay calculations is investigated. The {alpha}-decay calculations give the closed-shell effects of known spherical magicities, Z=82 and N=126, and further predict enhanced stabilities at N=152,162, and 184 for Z=100,108, and 114, owing to the stability of parent nuclei against {alpha} decays. It is worth noting that the aim of this work is not only to reproduce the experimental data better, but also to extend our understanding of {alpha}-decay half-lives around shell closures.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Improving Boundary-layer Turbulence and Cloud Processes in CAM with a Higher-order Turbulence Closure Scheme and ASR Measurement

In this study, a simplified intermediately prognostic higher-order turbulence closure (IPHOC) is implemented in the Community Atmosphere Model, version 5 (CAM5), to provide a consistent treatment of subgrid-scale cloud processes, except for deep convection. The planetary boundary layer (PBL) height is prognosticated to better resolve the discontinuity of temperature and moisture above the PBL top. Singlecolumn model tests show that fluxes of liquid water potential temperature and total water, cloud fraction, and liquid water content are improved with this approach. The simplified IPHOC package replaces the boundary layer dry and moist turbulence parameterizations, the shallow convection parameterization, and the liquid-phase part of the cloud macrophysics parameterization in CAM5. CAM5-IPHOC improves the simulation of the low-level clouds off the west coasts of continents and the storm track region in the Southern Hemisphere (SH). The transition from stratocumulus to cumulus clouds is more gradual. There are also improvements on the cloud radiative forcing, especially shortwave, in the subsidence regime. The improvements in the relationships among low cloud amount, surface relative humidity, lower tropospheric stability, and PBL depth are seen in some stratocumulus regions. CAM5-IPHOC, however, produces weaker precipitation at the South Pacific convergence zone than CAM5 because of less energy flux into the SH atmosphere. The more downward surface shortwave radiative cooling and the less top-of-theatmosphere longwave cloud radiative heating in the SH relative to the Northern Hemisphere explains the anomalous cooling and the lesser energy flux into the SH, which is related to the underestimate of extratropical middle/high clouds in the SH.

58 GEOSCIENCES↗

Utah FORGE 5-2615: Laboratory Data for Insights on Hydraulic Fracture Closure and Stress Measurement

This dataset includes data from injection/fall-off experiments conducted in controlled laboratory settings. The aim is to investigate the physics governing fracture closure and the associated stress measurements during hydraulic fracturing. These time series data include flow rate, pressure, and volume measurements. These experiments were conducted as part of Utah FORGE Project 5-2615: Thermo-poromechanical Response of Fractured Rock.

15 GEOTHERMAL ENERGY↗

Addendum to the Closure Report for Corrective Action Unit 113: Area 25 R-MAD Facility, Nevada National Security Site, Nevada

This addendum to the Closure Report for Corrective Action Unit 113: Area 25, Reactor Maintenance, Assembly, and Disassembly Facility, Building 3110, Nevada Test Site, Nevada, DOE/NV--891-VOL I-Rev. 1, dated July 2003, provides details of demolition, waste disposal, and use restriction (UR) modification for Corrective Action Unit 113, Area 25 R-MAD Facility. Demolition was completed on July 15, 2010, when the last of the building debris was disposed. Final field activities were concluded on August 30, 2010, after all equipment was demobilized and UR signs were posted. This work was funded by the American Recovery and Reinvestment Act.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2010

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2010 and includes inspection and repair activities completed at the following seven CAUs: · CAU 400: Bomblet Pit and Five Points Landfill (TTR) · CAU 407: Roller Coaster RadSafe Area (TTR) · CAU 424: Area 3 Landfill Complexes (TTR) · CAU 426: Cactus Spring Waste Trenches (TTR) · CAU 453: Area 9 UXO Landfill (TTR) · CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR) · CAU 487: Thunderwell Site (TTR)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Evaluation of the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site in Support of the Site-Wide Environmental Impact Statement

The post-closure performance of the Area 3 Radioactive Waste Management Site (RWMS) and Area 5 RWMS are evaluated for the Site-Wide Environmental Impact Statement using current performance assessment and composite analysis methods and models. Two alternatives with different future waste volumes and inventories are evaluated. The No Action Alternative evaluates the inventory disposed through fiscal year (FY) 2010 plus an additional 4.5E5 cubic meters (m3) (1.59E7 cubic feet [ft3]) of waste disposed at the Area 5 RWMS. The Expanded Operations Alternative evaluates the FY 2010 inventory plus an additional 1.42E6 m3 (5.03E7 ft3) of waste disposed at the Area 5 RWMS and 4.93E4 m3 (1.74E6 ft3) disposed at the Area 3 RWMS. Both the No Action and Expanded Operations Alternatives have a reasonable expectation of meeting all performance objectives of U.S. Department of Energy Order DOE O 435.1, “Radioactive Waste Management.” No significant difference between the two alternatives was found because the waste concentrations are similar. The performance assessment model assesses radiological risk for residents at the RWMS boundary where risk is more closely related to waste concentration than total waste inventory. Results for the composite analysis also indicate that the dose constraint and dose limit can be met for both alternatives.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2010 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report

This report documents eh status of revegetation projects and natural resources mitigation efforts conducted for remediated waste sites and other activities associated with CERLA cleanup of National Priorities List waste sites at Hanford. This report contains vegetation monitoring data that were collected in the spring and summer of 2010 from the River Corridor Closure Contract’s revegetation and mitigation areas on the Hanford Site.

54 ENVIRONMENTAL SCIENCES↗

Cultural Resources Review for Closure of the nonradioactive Dangerous Waste Landfill and Solid Waste Landfill in the 600 Area, Hanford Site, Benton County, Washington, HCRC# 2010-600-018R

The U.S. Department of Energy Richland Operations Office is proposing to close the Nonradioactive Dangerous Waste Landfill (NRDWL) and Solid Waste Landfill (SWL) located in the 600 Area of the Hanford Site. The closure of the NRDWL/SWL entails the construction of an evapotranspiration cover over the landfill. This cover would consist of a 3-foot (1-meter) engineered layer of fine-grained soil, modified with 15 percent by weight pea gravel to form an erosion-resistant topsoil that will sustain native vegetation. The area targeted for silt-loam borrow soil sits in Area C, located in the northern central portion of the Fitzner/Eberhardt Arid Lands Ecology (ALE) Reserve Unit. The pea gravel used for the mixture will be obtained from both off-site commercial sources and an active gravel pit (Pit #6) located just west of the 300 Area of the Hanford Site. Materials for the cover will be transported along Army Loop Road, which runs from Beloit Avenue (near the Rattlesnake Barricade) east-northeast to the NRDWL/SWL, ending at State Route 4. Upgrades to Army Loop Road are necessary to facilitate safe bidirectional hauling traffic. This report documents a cultural resources review of the proposed activity, conducted according to Section 106 of the National Historic Preservation Act of 1966.

54 ENVIRONMENTAL SCIENCES↗

Cloud Droplet Number Closure Study based on ISDAC Observational Data

Aerosol-cloud droplet closure analysis was conducted for five cases from the Indirect and Semi-Direct Aerosol Campaign (ISDAC). All cases corresponded to clouds dominated by liquid droplets, with two in relatively clean conditions, and the remaining three in more polluted conditions. This analysis entailed adiabatic cloud parcel model simulations to link the observed properties of aerosols, cloud droplets, and atmospheric dynamics with theoretical predictions. The extent of agreement between observed and modelled droplet number concentrations allowed for the assessment of representations of the physical and chemical properties of aerosols and of the vertical velocity involved in cloud droplet formation. Finally the list of journal publications and conferences are given which corresponds to the research for this DOE grant.

54 ENVIRONMENTAL SCIENCES↗

Interim Closure Activities at Corrective Action Unit 114: Area 25 EMAD Facility, Nevada National Security Site, Nevada

This letter report documents interim activities that have been completed at CAU 114 to support ongoing access and generate information necessary to plan future closure activities. General housekeeping and cleanup of debris was conducted in the EMAD yard, cold bays, support areas of Building 3900, and postmortem cell tunnel area of the hot bay. All non-asbestos ceiling tiles and loose and broken non-friable asbestos floor tiles were removed from support galleries and office areas. Non-radiologically contaminated piping and equipment in the cold areas of the building and in the two 120-ton locomotives in the yard were tapped, characterized, drained, and verified free of contents.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗