Note: Space qualified photon counting detector for laser time transfer with picosecond precision and stability

The laser time transfer link is under construction for the European Space Agency in the frame of Atomic Clock Ensemble in Space. We have developed and tested the flying unit of the photon counting detector optimized for this space mission. The results are summarized in this Note. An extreme challenge was to build a detector package, which is rugged, small and which provides long term detection delay stability on picosecond level. The device passed successfully all the tests required for space missions on the low Earth orbits. The detector is extremely rugged and compact. Its long term detection delay stability is excellent, it is better than ±1 ps/day, in a sense of time deviation it is better than 0.5 ps for averaging times of 2000 s to several hours. The device is capable to operate in a temperature range of −55 °C up to +60 °C, the change of the detection delay with temperature is +0.5 ps/K. The device is ready for integration into the space structure now.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Operation Castle

On February 28, 1954, Bravo, the first of six thermonuclear devices tested during Operation Castle, burst into the sky over Bikini Atoll. 1 In an instant, and unexpectedly, Bravo became the highest yield device tested by the United States. Romeo, Koon, Union, Yankee, and Nectar followed. Each, with the exception of Koon, performed better than predicted, providing the United States with stable, deliverable thermonuclear weapons, albeit ones still very large and cumbersome. 2 The overall success of Castle, however, had a downside. Bravo’s fallout injured Marshallese natives and contaminated a Japanese fishing trawler. The international uproar that followed ultimately led to the cessation of atmospheric testing.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Slug Test Characterization Results for Multi-Test/Depth Intervals Conducted During the Drilling of CERCLA Operable Unit OU ZP-1 Wells 299-W11-43, 299-W15-50, and 299-W18-16

The following report presents test descriptions and analysis results for multiple, stress level slug tests that were performed at selected test/depth intervals within three Operable Unit (OU) ZP-1 wells: 299-W11-43 (C4694/Well H), 299-W15-50 (C4302/Well E), and 299-W18-16 (C4303/Well D). These wells are located within south-central region of the Hanford Site 200-West Area (Figure 1.1). The test intervals were characterized as the individual boreholes were advanced to their final drill depths. The primary objective of the hydrologic tests was to provide information pertaining to the areal variability and vertical distribution of hydraulic conductivity with depth at these locations within the OU ZP-1 area. This type of characterization information is important for predicting/simulating contaminant migration (i.e., numerical flow/transport modeling) and designing proper monitor well strategies for OU and Waste Management Area locations.

54 ENVIRONMENTAL SCIENCES↗

Slug Test Characterization Results for Multi-Test/Depth Intervals Conducted During the Drilling of CERCLA Operable Unit OU UP-1 Wells 299-W19-48, 699-30-66, and 699-36-70B

This report presents test descriptions and analysis results for multiple, stress-level slug tests that were performed at selected test/depth intervals within three Operable Unit (OU) UP-1 wells: 299-W19-48 (C4300/Well K), 699-30-66 (C4298/Well R), and 699-36-70B (C4299/Well P). These wells are located within, adjacent to, and to the southeast of the Hanford Site 200-West Area. The test intervals were characterized as the individual boreholes were advanced to their final drill depths. The primary objective of the hydrologic tests was to provide information pertaining to the areal variability and vertical distribution of hydraulic conductivity with depth at these locations within the OU UP-1 area. This type of characterization information is important for predicting/simulating contaminant migration (i.e., numerical flow/transport modeling) and designing proper monitor well strategies for OU and Waste Management Area locations.

54 ENVIRONMENTAL SCIENCES↗

Preliminary Analysis of the General Performance and Mechanical Behavior of Irradiated FeCrAl Base Alloys and Weldments

The iron-based, iron-chromium-aluminum (FeCrAl) alloys are promising, robust materials for deployment in current and future nuclear power plants. This class of alloys demonstrates excellent performance in a range of environments and conditions, including high-temperature steam (>1000°C). Furthermore, these alloys have the potential to have prolonged survival under loss-of-coolant accident (LOCA) conditions compared to the more traditional cladding materials that are either Zr-based alloys or austenitic steels. However, one of the issues associated with FeCrAl alloys is cracking during welding. The present project investigates the possibility of mitigating welding-induced cracking via alloying and precise structure control of the weldments; in the frame work of the project, several advanced alloys were developed and are being investigated prior to and after neutron irradiation to provide insight into the radiation tolerance and mechanical performance of the weldments. The present report provides preliminary results on the post-irradiation characterization and mechanical tests performed during United States Fiscal Year (FY) 2016. Chapter 1 provides a general introduction, and Chapter 2 describes the alloy compositions, welding procedure, specimen geometry and manufacturing parameters. Also, a brief discussion of the irradiation at the High Flux Isotope Reactor (HFIR) is provided. Chapter 3 is devoted to the analysis of mechanical tests performed at the hot cell facility; tensile curves and mechanical properties are discussed in detail focusing on the irradiation temperature. Limited fractography results are also presented and analyzed. The discussion highlights the limitations of the testing within a hot cell. Chapter 4 underlines the advantages of in-situ testing and discusses the preliminary results obtained with newly developed miniature specimens. Specimens were moved to the Low Activation Materials Development and Analysis (LAMDA) laboratory and prepared for mechanical tests. Tensile tests were conducted at LAMDA using a modern digital image correlation approach allowing for strain distribution analysis. Plastic strain initiation and necking are discussed in detail; a concept of strain rate maps is also introduced and discussed. Follow-on SEM-EBSD and FIBTEM analysis is planned.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Industrial Scale Demonstration of Smart Manufacturing, Achieving Transformational Energy Productivity Gains

While many U.S. manufacturing operations utilize optimization for individual unit processes, smart manufacturing (SM) systems that integrate manufacturing intelligence in real time across an entire production operation are rare in large companies and virtually nonexistent in smaller organizations. One example of an area where SM systems can be applied is in the management of waste heat. A smart system that not only seeks to recover waste heat, but also to use energy more efficiently, is a more cost-effective approach because energy use, waste energy loss and product output are optimized together. The overall objective of this project was to develop an industry-accepted SM Platform that enables smart systems by accelerating and lowering the cost of development and implementation scales for use in diverse sets of manufacturing industry sectors, manufacturing operations and company sizes. Specifically, the project (1) designed and demonstrated the application of a prototype SM Platform for two diverse commercial test beds, (2) demonstrated at one and estimated for the other test bed the potential reduction in waste heat generation, and (3) worked with leading automation vendors to catalyze low-cost commercialization of the technology developed. The Smart Manufacturing Application and Data Platform (SM Platform) developed during this project is an innovative approach that marries IT virtualization technologies with operational data and modeling system requirements to construct a ready-to-go platform for enabling sensor – data – modeling – actuation systems, driven by real-time plant data and performance metrics. This SM Platform allows manufacturing organizations, regardless of their industry or size, to assemble new operational systems at a much lower cost, optimizing process knowledge and improving energy productivity by integrating with existing process control and automation systems. Also developed during this project is a methodology for developing energy productivity metrics that use real-time process information and provide comparisons for potential, practical, and actual performance, as well as examples and the methodology for provisioning of an Energy Dashboard that displays alternatives to optimize energy use within specific business contexts aimed at helping improve energy productivity and reduce emissions in U.S. manufacturing. The SM Platform designed utilizes current manufacturing, operational and IT industry standards. The platform can be used to expedite sensor – data – model – actuation system development and deployment in a cloud-based environment using a novel end-to-end workflow as a service capability that is already integrated with data connection, ingestion, and contextualization services. In addition, the methodology for development of energy productivity metrics and reusable application templates called Toolkits have been defined so that they can be tailored to a specific business situation. The project’s two test beds, one in a hydrogen production plant and the other in a forging, heat treatment, and machining operation, utilize sensor-driven modeling, measurement, and simulation systems. In these two test beds, the implementation of these as a comprehensive system has made it possible for energy productivity to be managed in real-time throughout the plant and enterprise using an energy dashboard. The development pathway to direct machine actuation was articulated. During the first year, the project team developed the most highly instrumented steam-methane reformer (SMR) in the U.S. using infrared cameras and thermocouples. Real-time data are streamed to high fidelity and reduced-order models for analysis. A high fidelity CFD model, parallelized in the SM Platform cloud environment, was demonstrated for operational use. This is the first real-time operational productivity system of a steam methane reformer using both high fidelity and data-driven models together in a real time situation to balance natural gas flow to the reformer tubes. An infrared camera system was developed and shown to outperform thermocouples in coverage, accuracy, reliability, and cost effectiveness for use in a high temperature, harsh environment. A forging, heat-treating, machining line operation test bed includes new instrumentation for data capture analysis, modeling, and simulation and will be integrated into SM Platform workflows so that business performance can be managed in real-time. Composable metrics were developed using the SM Platform to drive improvements in energy productivity, environmental performance, safety, asset management, costs, and overall operations. A major focus of the SM systems developed was optimization of energy productivity at the enterprise level, which resulted in reductions in waste heat generation for the two project test beds. Reductions in the waste heat generated will result in greater energy savings than will waste heat recovery due to inefficiencies in the heat transfer process. For the SMR test bed an efficiency improvement of 1 – 2% with a corresponding waste heat reduction of 5% were demonstrated. It should be noted that the test bed SMR unit had an efficiency of more than 90% as compared to 70 to 80% efficiencies of most SMR units. So implementation of similar SM systems at typical SMR units could yield more than 15 to 25% waste heat reductions. Similarly the forging, heat-treating, machining line operation test bed is a DOE AMO Platinum Level Superior Energy Performance plant with a much higher than typical overall operating efficiency. For this test bed heat integration using recuperators is estimated to result in fuel savings of 15.9% due to waste heat recovery compared to the base case without recuperators with negligible changes in part exit conditions. This results in an 18.9% energy efficiency improvement. The project team estimates that broad multi-sector adoption of the developed technology could reduce waste heat generation by an amount equivalent to 1.3% of total U.S. energy use. This waste heat reduction is associated with 69 million tons reduction in annual carbon dioxide emissions. Other potential benefits include reducing process times, solid and liquid wastes, environmental impacts, and water use. It is estimated that this investment has an anticipated payback period of less than one year in energy-intensive applications. The SM Platform could also reduce the costs of deploying SM systems by 50% in manufacturing operations. Commercialization of the SM Platform will require significant cross-industry collaboration and technology provider market changes. Steps taken toward commercialization included 1) analyzing savings from deployment of the SM Platform and 2) holding SM Platform workshops, webinars, and conferences with targeted individual industry segments, with a focus on small and medium-sized organizations. An upgraded community website has been established as a portal for accessing and distributing information. Most importantly, the SM platform enabling technology developed during this project and its commercialization will continue, evolve and expand under the Clean Energy Smart Manufacturing Innovation Institute (CESMII).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Application of pH-dependent environmental protection agency test method 1313 to low-activity nuclear waste glass

Here, in this study, we present results of a room temperature, pH-dependent leach test established by United States Environmental Protection Agency (EPA) Leaching Environmental Assessment Framework (LEAF) (EPA Method 1313 and further abbreviated EPA 1313) to study the alteration behavior of low-activity nuclear waste (LAW) glasses. Implementation of EPA 1313, which is closer to LAW disposal temperatures, could allow for more flexibility in the formulation of Hanford LAW glasses, specifically in terms of increased waste loading. A set of 48 LAW glasses were selected to test with EPA 1313. Briefly, the test method consists of adding glass to a number of solutions at different initial pH values and at a fixed mass-to-solution-volume ratio. The glass is then allowed to corrode for two days and the final solution pH and concentration of different glass elements in solution is measured. The test was modified from the published procedure to constrain particle size to provide more reproducible results, reduce the studied pH range to a more applicable range, and to reduce solution volume to reduce costs associated with material preparation. Compositional modeling was used to predict the measured elemental releases at various pH. The model predictions improved in tests where there was a relatively small difference between initial and final solution pH indicating that pH controls would result in better predictive models.

Accelerated aging↗

Special Considerations for the Removal and Disposal of Micro-Reactor Experiments

Idaho National Laboratory (INL) is preparing to host several microreactor experiments through 2030 and beyond. Two new test beds currently under development will operate as microreactor or nuclear system experiment user facilities. Test bed experiments will be performed in series, with each nuclear experiment installed, operated, and removed before installation of the subsequent experiment. The necessarily brief transition period between experiments introduces unique equipment removal and radioactive waste disposal challenges. This paper evaluates equipment removal and radioactive waste management topics associated with tight sequencing of nuclear experiments and presents some of the solutions and approaches currently planned to meet these special considerations for one such experiment, the Molten Chloride Reactor Experiment (MCRE), slated for operation at INL’s Laboratory for Operation and Testing in the United States (LOTUS). The MCRE project is a collaboration between Southern Company Services, TerraPower, and INL, among others, to provide integral nuclear data that will advance molten salt fast reactor technology. MCRE will be the first critical fast-spectrum circulating fuel system ever operated and the first experiment operated in the LOTUS test bed. The experiment will nominally operate at zero power with planned low power excursions as part of operational planning for MCRE has been to minimize at-power operations to limit fission product formation while still achieving experimental objectives. After the experiment is complete, MCRE will be allowed to radioactively decay for a short period (nominally 90 days) prior to system defueling, flushing, removal, and disposal of all MCRE equipment, readying the test bed for the next nuclear experiment. Equipment removal and radioactive waste disposal have been integral to MCRE project planning since the Cooperative Research and Development Agreement was formalized in 2021. Due to requirements for future use of the test bed, the MCRE system, of necessity, must be removed in a much shorter time frame than typical for historic reactor decommissioning projects at INL. This results in minimal time for radioactive decay, resulting in not only elevated radiation dose rates but also the presence of short-to-medium-lived isotopes not typically encountered in the reactor decommissioning and radioactive waste management space. Additional unique constraints placed on the project include lack of intrinsic remote-operations capabilities in the test bed, space constraints in the test bed once MCRE has been installed, and contamination minimization requirements to return the test bed to as-found conditions to enable future use. This paper discusses planned solutions to these challenges. Approaches for implementing remote or semi-remote technologies in a non-hot cell environment with limited space availability are discussed. The paper also summarizes the systems engineering approach for concept development and design of equipment removal systems, which are being implemented concurrent with the MCRE design phase, providing feedback to system designers to incorporate features enabling efficient and safe equipment removal approaches. The timing of this paper at a relatively early phase of the project is meant to highlight the importance of early planning for nuclear system decommissioning while reactor design is ongoing to allow design feedback on componentry driven from decommissioning system needs. As new, innovative nuclear reactor technologies enter the nuclear market sector, reactor experiments are crucial for providing new integral nuclear data that establish safe operational margins for technology advancement. Microreactor experiments at INL will require safe, effective, and timely decommissioning approaches, which in turn require nuclear systems designed to expedite decommissioning. In addition to the advancement of nuclear reactor technologies, these nuclear experiments provide an opportunity to demonstrate, deploy, and test new removal and disposal capabilities to support the next generation of nuclear reactor technology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Calibration of the Falcon Solid-state Energetic Electron Detector (SEED)

The Falcon Solid-state Energetic Electron Detector (FalconSEED) is an energetic charged particle sensor that has been developed and tested at the United States Air Force Academy in an effort to monitor electron flux across the energy range of 14 to 145 keV in geosynchronous orbit. This sensor has been developed to complement ongoing efforts by the Air Force Research Laboratory to advance a comprehensive space environment sensor suite, Compact Environmental Anomaly Sensor (CEASE3), for anomaly resolution. In addition, FalconSEED is intended to demonstrate the ability to operate a radiation sensor based on predominantly commercial off the shelf components in the geosynchronous environment. This paper describes the design, development, and calibration of FalconSEED. The electron energy spectrum of interest for the FalconSEED sensor is 14 to 145 keV, and is intended to supplement data acquired from the CEASE3 instrument for anomaly resolution. The calibrations at the Space Atmospheric Research Center at the United States Air Force Academy and Kirtland Air Force Base were used to first establish the conversion between histogram bin number and deposited energy in the sensor, and second have been used to determine the geometric factor as a function of energy. The FalconSEED will be integrated as a science payload on the Space Test Program Satellite-6 which also includes the first flight of the CEASE3 instrument and is scheduled to launch in 2021.

47 OTHER INSTRUMENTATION↗

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 544: Cellars, Mud Pits, and Oil Spills, Nevada Test Site, Nevada, Revision 0

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 544, Cellars, Mud Pits, and Oil Spills, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 544 comprises the following 20 corrective action sites (CASs) located in Areas 2, 7, 9, 10, 12, 19, and 20 of the Nevada Test Site (NTS): • 02-37-08, Cellar & Mud Pit • 02-37-09, Cellar & Mud Pit • 07-09-01, Mud Pit • 09-09-46, U-9itsx20 PS #1A Mud Pit • 10-09-01, Mud Pit • 12-09-03, Mud Pit • 19-09-01, Mud Pits (2) • 19-09-03, Mud Pit • 19-09-04, Mud Pit • 19-25-01, Oil Spill • 19-99-06, Waste Spill • 20-09-01, Mud Pits (2) • 20-09-02, Mud Pit • 20-09-03, Mud Pit • 20-09-04, Mud Pits (2) • 20-09-06, Mud Pit • 20-09-07, Mud Pit • 20-09-10, Mud Pit • 20-25-04, Oil Spills • 20-25-05, Oil Spills This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 544 using the SAFER process. Using the approach approved for previous mud pit investigations (CAUs 530–535), 14 mud pits have been identified that • are either a single mud pit or a system of mud pits, • are not located in a radiologically posted area, and • have no evident biasing factors based on visual inspections. These 14 mud pits are recommended for no further action (NFA), and further field investigations will not be conducted. For the sites that do not meet the previously approved closure criteria, additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible recommendation for closure of the remaining CASs in CAU 544. This will be presented in a closure report (CR) that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The sites will be investigated based on the data quality objectives (DQOs) developed on April 27, 2010, by representatives of NDEP and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for each CAS in CAU 544. The DQO process developed for this CAU identified the following expected closure options: (1) investigation and confirmation that no contamination exists above the final action levels (FALs) leading to an NFA declaration, (2) characterization of the nature and extent of contamination leading to closure in place with use restrictions, (3) clean closure by remediation and verification, (4) closure in place with use restrictions with no investigation if CASs are in crater areas that have been determined to be unsafe to enter, or (5) NFA if the mud pit CAS meets the criteria established during the CAUs 530–535 SAFER investigation. The following summarizes the SAFER activities that will support the closure of CAU 544: • Perform visual inspection of all CASs. • Perform site preparation activities (e.g., utilities clearances, construction of temporary site exclusion zones). • Removal of easily managed, nonhazardous, and nonradioactive debris, including vegetation (e.g., tumbleweeds), at various CASs that interfere with sampling, if required to inspect soil surface or collect soil sample. • Collect environmental samples from designated target populations (e.g., mud pits, cellars, stained soil) to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information. • If no COCs are present at a CAS, establish NFA as the corrective action. • If COCs exist, collect environmental samples from designated target populations (e.g., clean soil adjacent to contaminated soil) and submit for laboratory analyses to define the extent of COC contamination. • If a COC is present at a CAS, either - Establish clean closure as the corrective action. The material to be remediated will be removed, disposed of as waste, and verification samples will be collected from remaining soil, or - Establish closure in place as the corrective action and implement the appropriate use restrictions. • Confirm the preferred closure option is sufficient to protect human health and the environment.

01 COAL, LIGNITE, AND PEAT↗

Monitoring the Prototype Hanford Barrier – Fiscal Year 2018 Report

After a decade of development activities from 1983 to 1993, the 2.5-ha (6.2-acre) Prototype Hanford Barrier (PHB) was constructed between late 1993 and 1994 over the 216-B-57 Crib in the 200 East Area (46°34’01.23”N, 119°32’28.43”W) at the Hanford Site in southeastern Washington State. The PHB construction was part of a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) treatability test of barrier performance for the 200-BP-1 Operable Unit. The CERCLA treatability test was an enhanced precipitation stress test from water year 1995 (WY95) to WY97 to determine barrier response to extreme precipitation events. A controlled fire test was conducted in 2008 to examine the recovery of vegetation under the natural condition and the performance of the barrier with limited vegetation

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Monitoring the Prototype Hanford Barrier – Fiscal Year 2017 Report

After a decade of development activities from 1983 to 1993, the 2.5-ha (6.2-acre) Prototype Hanford Barrier (PHB) was constructed between late 1993 and 1994 over the 216-B-57 Crib in the 200 East Area (46°34’01.23”N, 119°32’28.43”W) at the Hanford Site in southeastern Washington State. The PHB construction was part of a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) treatability test of barrier performance for the 200-BP-1 Operable Unit. The CERCLA treatability test was an enhanced precipitation stress test during water year 1995 (WY95) to WY97 to determine barrier response to extreme precipitation events. A controlled fire test was conducted in 2008 to examine the recovery of vegetation under the natural condition and the performance of the barrier with limited vegetation.

54 ENVIRONMENTAL SCIENCES↗

Monitoring the Prototype Hanford Barrier – Fiscal Year 2017 Report

After a decade of development activities from 1983 to 1993, the 2.5-ha (6.2 acres) Prototype Hanford Barrier (PHB) was constructed between late 1993 and 1994 over the 216-B-57 Crib in the 200 East Area (46°34’01.23”N, 119°32’28.43”W) at the Hanford Site in southeastern Washington State as part of a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) treatability test of barrier performance for the 200-BP-1 Operable Unit. The CERCLA treatability test included an enhanced precipitation stress test during the water years 1995 to 1997 to determine barrier response to extreme precipitation events and a controlled fire test in 2008 to examine the recovery of vegetation under the natural condition and the performance of the barrier with limited vegetation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Section 110 Evaluation of the Project 57 Rad-Safe Area Personnel Decontamination Building, Nye County, Nevada

Project 57 was an open-air, plutonium-dispersal safety test conducted by the United States in 1957 on a portion of the Nevada Test and Training Range (NTTR) (formerly the Las Vegas Bombing and Gunnery Range). The Project 57 test area, once known as Area 13, was a block of land abutting the northeastern boundary of the Nevada Test Site (NTS). The NTS was renamed the Nevada National Security Site (NNSS) in 2010. In keeping with the historical Cold War period designation, NTS will be used when discussing historic period events, while NNSS will be applied for contemporary activities. During Project 57, the high explosives of a nuclear weapon were triggered asymmetrically to simulate an accidental detonation. The test was conducted to study the extent of plutonium contamination from a nonnuclear yield accident, as well as assess the biological and environmental hazards such an event could create. Following the conclusion of the experiment, the contaminated area surrounding the ground zero (GZ) was fenced off and some of the contaminated equipment was buried in place. The Project 57 Rad-Safe area was abandoned. In 1981, the U.S. Department of Energy (DOE) decontaminated and decommissioned the Project 57 site. This Section 110 documentation was prompted by recognition that more than five decades have passed since the abandonment of the Project 57 Rad-Safe area, particularly the personnel decontamination building, which leaves the temporary structure vulnerable to natural forces of weathering and decay. However, these temporary facilities remain partially standing, allowing for a condition assessment and recommendations regarding the Rad-Safe area’s historical significance. The National Nuclear Security Administration, Nevada Field Office (NNSA/NFO) determined there was no area of potential effect (APE) (direct, indirect, or visual) because there is no planned undertaking and the Project 57 Rad-Safe area will continue to remain unused. Instead, a 4.5-acre study area was established to facilitate recording the Project 57 personnel decontamination building and the remaining accessory resources. The study area is bounded on the east by Valley Road and it extends to the east far enough to encompass the former Project 57 Rad-Safe area (Figure A-2). The Section 110 study area is located in the northwest quarter of Section 35, Township 07S Range 54E Mount Diablo Base and Meridian. It is on the 1962 Groom Mine SW USGS 7.5-minute series topographic quadrangle. Desert Research Institute (DRI) surveyed the Section 110 study area, resulting in the recording and evaluation of the Project 57 Rad-Safe area personnel decontamination building and four accessory resources (AR-1 through AR-4). Copies of the building form and report are on file at DRI and with the NNSA/NFO in Las Vegas, Nevada.

54 ENVIRONMENTAL SCIENCES↗

Comparative experimental study of heat transfer processes in accumulation energy recovery exchangers

In this study, an experimental comparison between three different energy accumulating ceramic heat exchangers for energy recovery in ventilation systems was presented. The units were selected to represent three different approaches on the energy recovery process: honeycomb structure with more accumulation mass (more energy can be stored in one unit)- Unit 1.1, honeycomb structure with lower accumulation mass- Unit 1.2, and a rectangular structure with expanded heat transfer surface- Unit 1.3. The achieved results are useful for the future application of such units in ventilation systems. It was established that all evaluated units demonstrated an acceptable effectiveness of thermal energy recovery from the exhaust air. Their average energy recovery efficiency ranged between 70 % and 80 %, aligning with expected performance benchmarks for regenerative heat exchangers employed in contemporary mechanical ventilation systems. It was also established that the factor which has the highest impact on thermal effectiveness is the heat transfer surface available in the tested heat exchangers. Units with the highest number of channels (i.e., with the highest amount of single channel walls, which can be used for heat transfer) achieve the highest thermal effectiveness. However, higher thermal effectiveness can negatively affect the ventilation potential of the units. Unit 1.3, which was characterized by the highest thermal efficiency, was also characterized by the lowest achievable flow rate. It was also found that the important technical aspect that should be taken into account when analyzing accumulation energy recovery units is also the fluctuation of the supply air temperature. The ability to ensure minimal temperature fluctuations is a significant operational advantage, as it ensures a higher level of safety at lower outside temperatures.

Energy recovery↗

Development of a Novel Gas Pressurized Stripping Process-Based Technology for CO₂ Capture from Post-Combustion Flue Gases

A novel Gas Pressurized Stripping (GPS) post-combustion carbon capture (PCC) process has been developed by Carbon Capture Scientific, LLC, CONSOL Energy Inc., Nexant Inc., and Western Kentucky University in this bench-scale project. The GPS-based process presents a unique approach that uses a gas pressurized technology for CO₂ stripping at an elevated pressure to overcome the energy use and other disadvantages associated with the benchmark monoethanolamine (MEA) process. The project was aimed at performing laboratory- and bench-scale experiments to prove its technical feasibility and generate process engineering and scale-up data, and conducting a techno-economic analysis (TEA) to demonstrate its energy use and cost competitiveness over the MEA process. To meet project goals and objectives, a combination of experimental work, process simulation, and technical and economic analysis studies were applied. The project conducted individual unit lab-scale tests for major process components, including a first absorption column, a GPS column, a second absorption column, and a flasher. Computer simulations were carried out to study the GPS column behavior under different operating conditions, to optimize the column design and operation, and to optimize the GPS process for an existing and a new power plant. The vapor-liquid equilibrium data under high loading and high temperature for the selected amines were also measured. The thermal and oxidative stability of the selected solvents were also tested experimentally and presented. A bench-scale column-based unit capable of achieving at least 90% CO₂ capture from a nominal 500 SLPM coal-derived flue gas slipstream was designed and built. This integrated, continuous, skid-mounted GPS system was tested using real flue gas from a coal-fired boiler at the National Carbon Capture Center (NCCC). The technical challenges of the GPS technology in stability, corrosion, and foaming of selected solvents, and environmental, health and safety risks have been addressed through experimental tests, consultation with vendors and engineering analysis. Multiple rounds of TEA were performed to improve the GPS-based PCC process design and operation, and to compare the energy use and cost performance of a nominal 550-MWe supercritical pulverized coal (PC) plant among the DOE/NETL report Case 11 (the PC plant without CO₂ capture), the DOE/NETL report Case 12 (the PC plant with benchmark MEA-based PCC), and the PC plant using GPS-based PCC. The results reveal that the net power produced in the PC plant with GPS-based PCC is 647 MWe, greater than that of the Case 12 (550 MWe). The 20-year LCOE for the PC plant with GPS-based PCC is 97.4 mills/kWh, or 152% of that of the Case 11, which is also 23% less than that of the Case 12. These results demonstrate that the GPS-based PCC process is energy-efficient and cost-effective compared with the benchmark MEA process.

Chen, Shiaoguo↗

Eltron Research & Development

This topical report covers technical work conducted under contract DE-FC26-05NT42469 between FY06 Q1 through FY14 Q2. The project evolved through several budget periods, budget revisions and continuation applications. This report covers work performed under the “base” program. In 2010 ARRA funding was added to the project. A separate report covering the ARRA portion of the project was submitted to DOE. The original project was focused on research and development for scale-up of hydrogen separation membrane for a FutureGen type power plant. The work included membrane testing and evaluation of metal alloy flat plates vs. tubes and metal membranes vs. cermet membranes. In addition, economic analysis and process modeling was performed. The original project team included CoorsTek, NORAM, and Praxair. In FY10Q2 a continuation application was filed for conducting a scale-up test at Eastman Chemical. In this part of the project a Subscale Engineering Prototype (SEP) membrane skid was designed, fabricated, and operated on a gasified coal slip-stream on Eastman’s site in Kingsport, TN. Following operation, the project was reorganized and a second continuation application with a new statement of work was initiated in FY12Q1. Finally, based on DOE’s decision not to proceed with a Process Development Unit (PDU) field test, a third continuation application and statement of work was initiated in FY13Q1 to close out the project.

08 HYDROGEN↗

Trip Report-Produced-Water Field Testing

Los Alamos National Laboratory (LANL) conducted field testing of a produced-water pretreatment apparatus with assistance from faculty at the Texas A&M University (TAMU) protein separation sciences laboratory located on the TAMU main campus. The following report details all of the logistics surrounding the testing. The purpose of the test was to use a new, commercially-available filter media housing containing modified zeolite (surfactant-modified zeolite or SMZ) porous medium for use in pretreatment of oil and gas produced water (PW) and frac-flowback waters. The SMZ was tested previously in October, 2010 in a lab-constructed configuration ('old multicolumn system'), and performed well for removal of benzene, toluene, ethylbenzene, and xylenes (BTEX) from PW. However, a less-expensive, modular configuration is needed for field use. A modular system will allow the field operator to add or subtract SMZ filters as needed to accommodate site specific conditions, and to swap out used filters easily in a multi-unit system. This test demonstrated the use of a commercial filter housing with a simple flow modification and packed with SMZ for removing BTEX from a PW source in College Station, Texas. The system will be tested in June 2012 at a field site in Pennsylvania for treating frac-flowback waters. The goals of this test are: (1) to determine sorption efficiency of BTEX in the new configuration; and (2) to observe the range of flow rates, backpressures, and total volume treated at a given flow rate.