Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “tasking”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Hardware assisted fine-grained data movement

A processor includes a task scheduling unit and a compute unit coupled to the task scheduling unit. The task scheduling unit performs a task dependency assessment of a task dependency graph and task data requirements that correspond to each task of the plurality of tasks. Based on the task dependency assessment, the task scheduling unit schedules a first task of the plurality of tasks and a second proxy object of a plurality of proxy objects specified by the task data requirements such that a memory transfer of the second proxy object of the plurality of proxy objects occurs while the first task is being executed.

Hassaan, Muhammad Amber↗

Hardware assisted fine-grained data movement

A processor includes a task scheduling unit and a compute unit coupled to the task scheduling unit. The task scheduling unit performs a task dependency assessment of a task dependency graph and task data requirements that correspond to each task of the plurality of tasks. Based on the task dependency assessment, the task scheduling unit schedules a first task of the plurality of tasks and a second proxy object of a plurality of proxy objects specified by the task data requirements such that a memory transfer of the second proxy object of the plurality of proxy objects occurs while the first task is being executed.

Hassaan, Muhammad Amber↗

Rapid AI-based Dissection of Ashes using Raman and XRF Spectroscopy (RADAR-X)

Waste-to-energy (WTE) facilities incinerate ~35 million tons of municipal solid waste annually in the United States. The incineration process reduces the mass and the volume of the waste fraction by over 75 and 95%, respectively. The fraction left after incineration remains as ash residues and is referred to as WTE ash, compromising of bottom and fly ash. In the United States, ~10 million tons of WTE ashes are generated annually and predominantly landfilled because of the lack of secondary end-use pathways. This incurs a significant financial burden (landfilling costs) on U.S. WTE facilities and also results in the loss of materials to the landfill. The primary objective of this research is to understand better the elemental and mineralogical composition of WTE ashes from diverse origins and find composition dependent upcycling pathways for diverting these ashes from landfills. This primary objective was addressed through three research tasks –(Task I) An AI-led Multi-Modal Approach for Compositional Analysis, (Task II) Developing a Dissolution-Based Test for Real Time Analysis, and (Task III) Establishing composition-dependent end uses. The chemical composition of WTE ash is dependent on two factors, i.e., the input waste composition and the operational parameters of a WTE facility (combustion conditions). Amongst these two factors, the input waste composition will likely show spatial and temporal variation. As a result, the chemical composition of WTE ash will also fluctuate. To understand the spatial and temporal variation in WTE ash composition, in Task I, we collected 128 ash samples (62 bottom ash and 66 fly ash samples) from 11 WTE facilities located in 11 U.S. states and characterized them via X-ray Fluorescence, powder X-ray Diffraction, and Raman Spectroscopy. The findings from this extensive characterization work indicated that the key elements in WTE fly ashes are Ca, Cl (greater than 10 wt. %), Si, S, K, Zn ( between 1 and 10 wt. %), Mg, Al, P, Ti, Fe, Cu, Br, and Pb (between 0.1 and 1 wt. %). Similarly, the key elements in WTE bottom ash fraction finer than 45μm are Ca (greater than 10 wt. %), Mg, Al, Si, S, Cl, K, Ti, Fe, Zn (between 1 and 10 wt. %), P, V, Cr, Mn, Cu, Br, and Pb (between 0.1 and 1 wt. %). Here, we note that the dominant fraction of WTE bottom ash is the coarse fraction. The coarse WTE bottom ash fraction (rich in silicon) was not characterized in this study because of excessive grinding requirements and their unsuitability as a supplementary cementitious material due to their coarse nature. The elements in WTE bottom ashes are present as calcite, anhydrite, vaterite, hydroxyapatite, quartz, bassanite, gehlenite, akermanite, hydrocalumite, and portlandite. Similarly, the mineralogical species present in WTE fly ashes are calcium chloride hydroxide, halite, calcite, anhydrite, sylvite, hydrocalumite, vaterite, hannebachite, quartz, and bassanite. Temporal variation in ash composition may also result in significant fluctuations in chemical compositions. Therefore, a WTE facility may need to monitor the ash composition (elemental and mineralogical composition) in real time. In Task I, we evaluated the possibility of using a portable X-ray fluorescence (XRF) spectrometer to monitor the elemental composition in real-time. Specifically, we collected XRF data on identical specimens via a portable XRF spectrometer (low-end) and a lab-based benchtop XRF spectrometer (high-end). The collected data was used to train an A.I. algorithm (portable XRF data as an input and benchtop XRF data as an output) to predict accurate elemental composition using portable XRF data. Finally, we developed a 2-minute photobleaching protocol to monitor the mineralogical characteristics of WTE ashes via Raman spectroscopy. Overall, the activities in Task I improved our understanding of ash composition and developed techniques to monitor elemental and mineralogical composition in near real-time. Based on the findings of Task I, we find that WTE ashes exhibit wide variability in mineralogy. For ICP-based elemental analysis, all the mineralogical species in WTE ashes must be brought into solution. This is traditionally accomplished with acid digestion using a combination of multiple acids. However, acid digestion with multiple acids is time-consuming and often fails to ensure complete digestion of the ash matrix. To address this limitation, in Task II, we developed an alkali-fusion-based digestion protocol using a combination of lithium tetraborate, lithium metaborate, and their combinations as possible alkali fluxes for digesting WTE ashes entirely and rapidly. The validity of the developed method was evaluated on two standard ash specimens, i.e., SRM 1633c coal fly ash and BCR-176R incineration fly ash specimen. The findings suggest that the developed protocol can ensure complete digestion of elements such as Al, Ba, Ca, Cr, Cu, Mg, Mn, P, Sr, V, Zn, Be, K, and rare earth elements. The recent changes in the energy market towards renewables and increased metal recycling have resulted in reduced supplies of supplementary cementitious materials (coal fly ash and slag). Therefore, in Task III, we evaluated the possibility of employing WTE ashes as SCMs. As the chemical composition of WTE ashes varies temporally (on an hourly basis), there was also a need to develop tests that can evaluate the suitability of material to act as supplementary cementitious material rapidly, i.e., in a few minutes. Therefore, in Task II, we also developed a rapid test to assess the suitability of a material to act as an SCM in 5 minutes. This represents a significant advance over the state-of-the-art R 3 test, which takes ~144 hours. This test was initially validated on amorphous aluminosilicates, such as calcined clays, and could be extended to evaluate other industrial by-products, such as WTE ashes. In Task III, we evaluated the possibility of employing WTE ashes for two applications, i.e., as an SCM and a lime substitute for clay stabilization. The findings from Task I indicated that WTE ashes are enriched in chlorine and, therefore, cannot be used directly as an SCM due to corrosion-related risks and altered hydration kinetics. Accordingly, we developed an ash treatment protocol to reduce the solubility of chlorine-containing species in WTE ashes. The developed treatment protocol also immobilized lead in certain mineral forms. As a result of the treatment, WTE ashes can be used as SCMs without any corrosion or heavy metal leaching concerns. The second application examined in this study was clay stabilization. WTE ashes are calcium-rich and can be an adequate lime replacement for clay stabilization. Our findings reveal that the sum of the concentrations of Ca(OH) 2 and CaClOH controls the clay stabilization capability of WTE ashes. In summary, in this work, we evaluated the elemental and mineralogical characteristics of U.S. WTE ashes from diverse origins and developed tests to evaluate the chemical characteristics of these ashes in real time through a portable XRF and a benchtop Raman spectrometer. Based on the chemical characteristics of these ashes, we developed an ash treatment process to enable the use of WTE ashes as an SCM and also evaluated the possibility of employing these ashes for clay stabilization. Overall, the findings from this work enables the diversion of WTE ashes from landfills for multiple end-uses, i.e., as an SCM or a lime substitute for clay stabilization.

36 MATERIALS SCIENCE↗

Low-Cost Recyclable Oxygen Carrier and Novel Process for Chemical Looping Combustion

The University of North Dakota, through its Institute for Energy Studies and Energy & Environmental Research Center, partnered with Envergex LLC, Barr Engineering and Microbeam Technologies to develop a transformational enabling technology for advancement of Chemical Looping Combustion technology. Industrial support was provided by Carbontec Energy Corporation. The project targeted the two biggest challenges to chemical looping combustion: (1) High costs of oxygen carrier replacement/loss due to expensive manufacturing and high replacement rates from physical attrition and/or decrease in reactivity, and (2) Inherently slow fuel char conversion which represents the rate-limiting step for chemical looping combustion and results in very large equipment sizes, and overall lower carbon dioxide capture efficiency. The project activities were addressed in a series of seven tasks. Task 1 extended throughout the entire project and oversaw project management and execution. Task 2 and 3 focused on development and evaluation of the novel oxygen carrier. Task 4 to 7 focused on design of the novel reactor, testing with the novel oxygen carrier and a techno-economic assessment of the process. The list of tasks are: Task 1 – Project management and planning, Task 2 – Laboratory scale oxygen carrier manufacturing and assessment, Task 3 – Modeling and laboratory-scale evaluation of oxygen carrier performance with coal, Task 4 – 10-kilowatt thermal integrated system installation, Task 5 – Scaled-up oxygen carrier manufacturing, Task 6 – 10-kilowatt testing, and Task 7 – Process design and techno-economic analysis.

01 COAL, LIGNITE, AND PEAT↗

Engineering Scale Testing of Transformational Non-Aqueous Solvent-Based CO 2 Capture Process at Technology Center Mongstad

Progress is reported for the period from August 8, 2018 to June 30, 2023. This final report involves work performed under ten tasks spanning two budget periods. The tasks are Task 1 Project Management, Task 2 TCM EH&S Risk Evaluation and Permitting, Task 3 Solvent Qualification, Task 4 Preliminary Design of NAS Optimized System, Task 5 TCM Amine Plant Equipment Procurement, Modification and Commissioning, Task 6 Solvent Production, Task 7 NAS Modified Amine Plant Test Plan Development, Testing, and Data Analysis, Task 8 Decommissioning and Waste Handling, Task 9 Final Techno-Economic Assessment and EH&S Risk Assessment, and Task 10 Cost Benefit Analysis and Technology Maturation Planning.

01 COAL, LIGNITE, AND PEAT↗

Advanced Perovskite Solar Cells and Modules

The “Advanced perovskite Cells and Modules” research project was the final agreement focused on enhancing perovskite solar cell (PSC) technologies funded by the US Department of Energy's Solar Energy Technologies Office. The project was designed to address three crucial areas in PSC development: stability, manufacturability, and efficiency. The project was then structured around three main tasks, each targeting one of these strategic goals. The team of experienced researchers in these materials worked collaboratively to address the targets outlined in the technical work plan. building on existing PSC research while also exploring promising new concepts arising in the field. An overview of each primary task is summarized below: Task 1 Stability: This first task, aims to identify material characteristics and metrics that can help predict the primary degradation mechanisms impacting PSC stability. This involved developing specific device tests based on hypotheses regarding mechanisms impacting stability, including fast failure procedures to speed up PSC development and improvement. Various strategies to enhance stability, like incorporating additives, post-treatments, novel contact materials etc. were developed using this fast feedback approach. The relationships between indoor and outdoor stresses were also validated. Task 2 Manufacturability: This second task, focused on creating a scalable production process for PSCs. Initially the objective is to establish a best-known method for a 182 cm2 minimodule. However, given resource limitations, these metrics were modified to focus on the other goal of outlined in the TWP. Specifically, this task worked to demonstrate the transferability of this best-known method to another research institution. Work scope in this area was expanded to material purity and understanding of reagent/process relationships. Examination of other difficulties in PSC production and potential solutions for large-scale production were also evaluated. Given challenges observed in process transfer, work to develop data infrastructure and recording tools for processing of material and devices was then also prioritized in this task. Task 3 Efficiency: This task was focused on improvements to PCE, while still considering Task 1 and Task 2 goal. The efforts targeted a PCE greater than 22% with a T95 exceeding 1000 hours at 25°C in a nitrogen environment for lab-scale devices (approximately 0.1 cm2 devices) across a range of solar-relevant perovskite compositions, including wide-gap (around 1.7 eV) and low-gap (around 1.3 eV) materials, using standard metal contacts. This work then provides a foundation for MHP-based tandem efforts undertaken in other projects and the All-MHP tandem efforts outlined in this projects TWP. Work in this project emphasized disseminating its findings through peer-reviewed publications (PRP), conference presentations, and industrial collaborations. Significant products were produced in all these areas, over 53 peer reviewed publications, 32 conference presentations and industrial investment based on NLR assistance on precompetitive challenges. The team also developed significant intellectual property and awards for their technical excellence, innovations and leadership. The team also leveraged traditional and social media platforms to engage with stakeholders and the public.

14 SOLAR ENERGY↗

Soil Water Retention and Hydraulic Conductivity Data and Model at Pump House in East River Watershed, Colorado 2019-2024

This data package includes soil water retention and hydraulic conductivity data and model fitting results from measurements of ex-situ soil samples and in-situ soil sensors near Pump House at Mount Crested Butte in the East River Watershed. Soil water retention curves (SWRC) characterize soil water content as a function of soil water potential. SWRC depends on soil texture and pore structure and can be used to describe the constraints on biogeochemical processes in terms of soil water availability. In this data package, the sample identification follows the format ER-X-Y, where ER refers to East River, X is the location identifier, and Y is the depth identifier at the same X (shallow Y=1). Specifically, ER-PHS, ER-LMC, ER-LMF, and ER-SMN are associated with ecohydrology sites under the East-Taylor Watershed Community Observatory Sites directory, and ER-RBTn (upslope n=1) are sampling transects during the 2019 Rootball Campaign. The sample and location information can be found in metadata.csv. Sampling and Measurements Each sample falls into one of the three sampling methods – (1) intact cores, (2) repacked samples, or (3) soil sensors – and one of the two measurement methods – (a) laboratory or (b) in-situ. Both intact cores and repacked samples were measured using the laboratory methods, which include measurements of soil water potential (HYPROP & WP4C, METER), saturated (KSAT, METER) and unsaturated hydraulic conductivity (HYPROP). The in-situ method uses a pair of co-located soil sensors to measure volumetric water content (TEROS12, METER) and soil water potential (TEROS21, METER), and the hydraulic conductivity was not measured. In comparison, the laboratory methods progress from full saturation to dry conditions, and the in-situ method includes both dry-to-wet and wet-to-dry cycles. The sampling and measurement methods for each sample can be found in metadata.csv, and more information about the measurements is detailed in the Methods section below. Models Retention and hydraulic conductivity data were fitted with four van-Genuchten-type models (specified by “model_name” column in the files): (1) traditional constrained van Genuchten model (“vG_constrained”), (2) traditional unconstrained van Genuchten model (“vG_unconstrained”), (3) PDI-variant of the constrained van Genuchten model (“vG_constrained_PDI”), and (4) PDI-variant of the unconstrained van Genuchten model (“vG_unconstrained_PDI”). The difference between the constrained (1: n) and the unconstrained (2: n, m) van Genuchten models is the number of pore-size distribution parameters in the model equations, giving the unconstrained model more degrees of freedom when fitting the data. Between the traditional and the PDI-variant models, model fitting differs the most at the dry end of the measurements. The traditional models allow infinite suction at the residual water content (water content does not drop below residual water content), and the PDI-variant models enforce a soil water potential value of pF=6.8 (~ -630 MPa) at oven-dryness (water content reaches 0). The inclusion of the van-Genuchten-type models is due to their common application. If other retention models are required, users can access the data in data.csv for further data fitting. More information about the models can be found in the Methods section below. Fitting Tasks The model fitting can be categorized into three levels of tasks (specified by “fitting_task” column in the files). Level 1 (“fit_retention”) only includes retention data fitting (the only level available for the in-situ method). Level 2 (“fit_retention_conductivity”) includes both retention and hydraulic conductivity data fitting, and the saturated hydraulic conductivity (Ks, a parameter of the hydraulic conductivity functions) is fixed by the measurements from KSAT. Level 3 (“fit_retention_conductivity_Ks”) also includes both retention and hydraulic conductivity data fitting, but Ks is a fitted parameter without the constraints from KSAT measurements. Among the same retention models (e.g. vG_constrained models of the same sample), level 1 should produce the best retention data fitting. Level 2 should have the highest misfit of the retention and hydraulic conductivity data, because the retention and hydraulic conductivity functions share common model parameters, and the unsaturated hydraulic conductivity (HYPROP) data fitting is subject to Ks measured independently by KSAT. Level 3 should have mid-level misfits of the retention and hydraulic conductivity data. While level 3 fits the hydraulic conductivity data better than level 2, the fitted Ks value might be unreasonable due to the lack of constraints at the wet end of the measurements. General recommendation when using this data package: (1) Choice of sampling methods: Intact cores and in-situ soil sensors could be prioritized because these sampling methods are less destructive. While the repacked samples were packed to the target bulk density (estimated post-sampling, when sample volume was known), these samples had altered pore structures. Nevertheless, intact cores might suffer from sample gaps that would lead to overestimation of Ks (sample gaps can be inferred from the “soil_sample_volume” column in metadata.csv when the value is < 249). In-situ method also has higher uncertainty in characterizing the wet end of the SWRC because of sensor limitations and the difficulty in reaching full saturation under natural conditions. (2) Choice of fitting tasks: When only retention data is needed, level 1 (“fit_retention”) should be prioritized. When both retention and hydraulic conductivity data are needed, level 2 (“fit_retention_conductivity”) could be prioritized. (3) Choice of models: This could depend on what the downstream models call for. If no specific model is required, model misfit could be used as a ranking criterion. Model misfit values in terms of RMSE can be found in model_parameters.csv. The following files are included in this data package: (1) metadata.csv – This file includes the general information of each sample, including location (description, geocoordinates, elevation), sampling and measurements details (method, depth, time or period, volume, instruments), and soil physical properties (bulk density, saturated hydraulic conductivity, only applicable to physical soil samples). (2) data.csv – This file includes soil water potential, volumetric water content, and unsaturated hydraulic conductivity data of each sample. Column “instrument” specifies the instrument (HYPROP, WP4C, or TEROS) used to perform the measurements. (3) model_fit.csv – This file includes soil water potential, volumetric water content, and unsaturated hydraulic conductivity fitted from the four models and three fitting tasks. Column “model_name” specifies the retention model used, and “fitting_task” specifies the level of data fitting. Missing values indicate that the variable does not apply to that fitting task. (4) model_parameters.csv – This file includes the fitted model parameters, model misfits, and conventional water content thresholds (field capacity and wilting point) from the four models and three fitting tasks. Column “model_name” specifies the retention model used, and “fitting_task” specifies the level of data fitting. Missing values indicate that the parameter does not apply to that model and/or that fitting task. (5) data_Ks.csv – This file includes the saturated hydraulic conductivity measurements from KSAT. (6) /figure/*.png – This folder includes three quick visualizations of the data, retention model fitting results and misfits, and hydraulic conductivity model fitting results, misfits, and parameters. The model fitting results are separated by samples and fitting tasks and colored by models. Zoom-in required. (7) /hyprop/*.bdhx – This folder includes proprietary hyprop files that require the free Labros SoilView-Analysis (METER) to open. Users can explore data fitting using other retention models (i.e. Brooks-Corey, Fredlund-Xing, Kosugi, bimodal models). Be aware that Ks value is pre-entered under “Fitting tab, Conductivity functions parameters” for level 2 fitting. If the value is lost, please refer to metadata.csv under “Ks” column. (8) Six file-level metadata that summarize file, header, column, and variable information of all files. This work was supported by the Watershed Function Science Focus Area at Lawrence Berkeley National Laboratory funded by the US Department of Energy, Office of Science, Biological and Environmental Research under Contract No. DE-AC02-05CH11231.

EARTH SCIENCE > LAND SURFACE > SOILS↗

Soil Water Retention and Hydraulic Conductivity Data and Model at Trail Creek in Taylor River Watershed, Colorado 2024-2025

This data package includes soil water retention and hydraulic conductivity data and model fitting results from measurements of ex-situ soil samples and in-situ soil sensors near Trail Creek. Soil water retention curves (SWRC) characterize soil water content as a function of soil water potential. SWRC depends on soil texture and pore structure and can be used to describe the constraints on biogeochemical processes in terms of soil water availability. In this data package, the sample identification follows the format TR-X-Y, where TR refers to Trail Creek, X is the treatment block identifier, and Y is the location identifier. Specifically, TR-ASCC1 is the control treatment block under the Adaptive Silviculture for Climate Change (ASCC) project, and TR-ASCC2 is the clear-cut treatment block. TR-ASCC-EHSn is associated with ecohydrology sites under the East-Taylor Watershed Community Observatory Sites directory, and TR-ASCC-ERTn (upslope n=1) are ecohydrology sites along the electrical resistivity tomography transects. The sample and location information can be found in metadata.csv, and the data from the soil sensors will be included in a future data version when the observation period becomes sufficiently long for data analysis. Sampling and Measurements Each sample falls into one of the two sampling methods – (1) intact cores or (2) soil sensors – and one of the two measurement methods – (a) laboratory or (b) in-situ. The intact cores were measured using the laboratory methods, which include measurements of soil water potential (HYPROP & WP4C, METER), saturated (KSAT, METER) and unsaturated hydraulic conductivity (HYPROP). The in-situ method uses a pair of co-located soil sensors to measure volumetric water content (TEROS12, METER) and soil water potential (TEROS21, METER), and the hydraulic conductivity was not measured. In comparison, the laboratory methods progress from full saturation to dry conditions, and the in-situ method includes both dry-to-wet and wet-to-dry cycles. The sampling and measurement methods for each sample can be found in metadata.csv, and more information about the measurements is detailed in the Methods section below. Models Retention and hydraulic conductivity data were fitted with four van-Genuchten-type models (specified by “model_name” column in the files): (1) traditional constrained van Genuchten model (“vG_constrained”), (2) traditional unconstrained van Genuchten model (“vG_unconstrained”), (3) PDI-variant of the constrained van Genuchten model (“vG_constrained_PDI”), and (4) PDI-variant of the unconstrained van Genuchten model (“vG_unconstrained_PDI”). The difference between the constrained (1: n) and the unconstrained (2: n, m) van Genuchten models is the number of pore-size distribution parameters in the model equations, giving the unconstrained model more degrees of freedom when fitting the data. Between the traditional and the PDI-variant models, model fitting differs the most at the dry end of the measurements. The traditional models allow infinite suction at the residual water content (water content does not drop below residual water content), and the PDI-variant models enforce a soil water potential value of pF=6.8 (~ -630 MPa) at oven-dryness (water content reaches 0). The inclusion of the van-Genuchten-type models is due to their common application. If other retention models are required, users can access the data in data.csv for further data fitting. More information about the models can be found in the Methods section below. Fitting Tasks The model fitting can be categorized into three levels of tasks (specified by “fitting_task” column in the files). Level 1 (“fit_retention”) only includes retention data fitting (the only level available for the in-situ method). Level 2 (“fit_retention_conductivity”) includes both retention and hydraulic conductivity data fitting, and the saturated hydraulic conductivity (Ks, a parameter of the hydraulic conductivity functions) is fixed by the measurements from KSAT. Level 3 (“fit_retention_conductivity_Ks”) also includes both retention and hydraulic conductivity data fitting, but Ks is a fitted parameter without the constraints from KSAT measurements. Among the same retention models (e.g. vG_constrained models of the same sample), level 1 should produce the best retention data fitting. Level 2 should have the highest misfit of the retention and hydraulic conductivity data, because the retention and hydraulic conductivity functions share common model parameters, and the unsaturated hydraulic conductivity (HYPROP) data fitting is subject to Ks measured independently by KSAT. Level 3 should have mid-level misfits of the retention and hydraulic conductivity data. While level 3 fits the hydraulic conductivity data better than level 2, the fitted Ks value might be unreasonable due to the lack of constraints at the wet end of the measurements. General recommendation when using this data package: (1) Choice of sampling methods: Intact cores might suffer from sample gaps that would lead to overestimation of Ks (sample gaps can be inferred from the “soil_sample_volume” column in metadata.csv when the value is < 249). In-situ method has higher uncertainty in characterizing the wet end of the SWRC because of sensor limitations and the difficulty in reaching full saturation under natural conditions. (2) Choice of fitting tasks: When only retention data is needed, level 1 (“fit_retention”) should be prioritized. When both retention and hydraulic conductivity data are needed, level 2 (“fit_retention_conductivity”) could be prioritized. (3) Choice of models: This could depend on what the downstream models call for. If no specific model is required, model misfit could be used as a ranking criterion. Model misfit values in terms of RMSE can be found in model_parameters.csv. The following files are included in this data package: (1) metadata.csv – This file includes the general information of each sample, including location (description, geocoordinates, elevation), sampling and measurements details (method, depth, time or period, volume, instruments), and soil physical properties (bulk density, saturated hydraulic conductivity, only applicable to physical soil samples). (2) data.csv – This file includes soil water potential, volumetric water content, and unsaturated hydraulic conductivity data of each sample. Column “instrument” specifies the instrument (HYPROP, WP4C, or TEROS) used to perform the measurements. (3) model_fit.csv – This file includes soil water potential, volumetric water content, and unsaturated hydraulic conductivity fitted from the four models and three fitting tasks. Column “model_name” specifies the retention model used, and “fitting_task” specifies the level of data fitting. Missing values indicate that the variable does not apply to that fitting task. (4) model_parameters.csv – This file includes the fitted model parameters, model misfits, and conventional water content thresholds (field capacity and wilting point) from the four models and three fitting tasks. Column “model_name” specifies the retention model used, and “fitting_task” specifies the level of data fitting. Missing values indicate that the parameter does not apply to that model and/or that fitting task. (5) data_Ks.csv – This file includes the saturated hydraulic conductivity measurements from KSAT. (6) /figure/*.png – This folder includes three quick visualizations of the data, retention model fitting results and misfits, and hydraulic conductivity model fitting results, misfits, and parameters. The model fitting results are separated by samples and fitting tasks and colored by models. Zoom-in required. (7) /hyprop/*.bdhx – This folder includes proprietary hyprop files that require the free Labros SoilView-Analysis (METER) to open. Users can explore data fitting using other retention models (i.e. Brooks-Corey, Fredlund-Xing, Kosugi, bimodal models). Be aware that Ks value is pre-entered under “Fitting tab, Conductivity functions parameters” for level 2 fitting. If the value is lost, please refer to metadata.csv under “Ks” column. (8) Six file-level metadata that summarize file, header, column, and variable information of all files. This work was supported by the Watershed Function Science Focus Area at Lawrence Berkeley National Laboratory funded by the US Department of Energy, Office of Science, Biological and Environmental Research under Contract No. DE-AC02-05CH11231.

EARTH SCIENCE > LAND SURFACE > SOILS↗

Soil Water Retention and Hydraulic Conductivity Data and Model at Snodgrass Mountain in East River Watershed, Colorado 2020-2025

This data package includes soil water retention and hydraulic conductivity data and model fitting results from measurements of ex-situ soil samples and in-situ soil sensors at Snodgrass Mountain. Soil water retention curves (SWRC) characterize soil water content as a function of soil water potential. SWRC depends on soil texture and pore structure and can be used to describe the constraints on biogeochemical processes in terms of soil water availability. In this data package, the sample identification follows the format SG-X-Y, where SG refers to Snodgrass Mountain, X is the location identifier, and Y is the depth identifier at the same X (shallow Y=1). Specifically, SG-EHS is associated with ecohydrology sites under the East-Taylor Watershed Community Observatory Sites directory, and SG-ERTn (upslope n=1) are points along the Snodgrass electrical resistivity tomography transect not associated with the existing site names in the directory. The sample and location information can be found in metadata.csv. Sampling and Measurements Each sample falls into one of the three sampling methods – (1) intact cores, (2) repacked samples, or (3) soil sensors – and one of the two measurement methods – (a) laboratory or (b) in-situ. Both intact cores and repacked samples were measured using the laboratory methods, which include measurements of soil water potential (HYPROP & WP4C, METER), saturated (KSAT, METER) and unsaturated hydraulic conductivity (HYPROP). The in-situ method uses a pair of co-located soil sensors to measure volumetric water content (TEROS12, METER) and soil water potential (TEROS21, METER), and the hydraulic conductivity was not measured. In comparison, the laboratory methods progress from full saturation to dry conditions, and the in-situ method includes both dry-to-wet and wet-to-dry cycles. The sampling and measurement methods for each sample can be found in metadata.csv, and more information about the measurements is detailed in the Methods section below. Models Retention and hydraulic conductivity data were fitted with four van-Genuchten-type models (specified by “model_name” column in the files): (1) traditional constrained van Genuchten model (“vG_constrained”), (2) traditional unconstrained van Genuchten model (“vG_unconstrained”), (3) PDI-variant of the constrained van Genuchten model (“vG_constrained_PDI”), and (4) PDI-variant of the unconstrained van Genuchten model (“vG_unconstrained_PDI”). The difference between the constrained (1: n) and the unconstrained (2: n, m) van Genuchten models is the number of pore-size distribution parameters in the model equations, giving the unconstrained model more degrees of freedom when fitting the data. Between the traditional and the PDI-variant models, model fitting differs the most at the dry end of the measurements. The traditional models allow infinite suction at the residual water content (water content does not drop below residual water content), and the PDI-variant models enforce a soil water potential value of pF=6.8 (~ -630 MPa) at oven-dryness (water content reaches 0). The inclusion of the van-Genuchten-type models is due to their common application. If other retention models are required, users can access the data in data.csv for further data fitting. More information about the models can be found in the Methods section below. Fitting Tasks The model fitting can be categorized into three levels of tasks (specified by “fitting_task” column in the files). Level 1 (“fit_retention”) only includes retention data fitting (the only level available for the in-situ method). Level 2 (“fit_retention_conductivity”) includes both retention and hydraulic conductivity data fitting, and the saturated hydraulic conductivity (Ks, a parameter of the hydraulic conductivity functions) is fixed by the measurements from KSAT. Level 3 (“fit_retention_conductivity_Ks”) also includes both retention and hydraulic conductivity data fitting, but Ks is a fitted parameter without the constraints from KSAT measurements. Among the same retention models (e.g. vG_constrained models of the same sample), level 1 should produce the best retention data fitting. Level 2 should have the highest misfit of the retention and hydraulic conductivity data, because the retention and hydraulic conductivity functions share common model parameters, and the unsaturated hydraulic conductivity (HYPROP) data fitting is subject to Ks measured independently by KSAT. Level 3 should have mid-level misfits of the retention and hydraulic conductivity data. While level 3 fits the hydraulic conductivity data better than level 2, the fitted Ks value might be unreasonable due to the lack of constraints at the wet end of the measurements. General recommendation when using this data package: (1) Choice of sampling methods: Intact cores and in-situ soil sensors could be prioritized because these sampling methods are less destructive. While the repacked samples were packed to the target bulk density (estimated post-sampling, when sample volume was known), these samples had altered pore structures. Nevertheless, intact cores might suffer from sample gaps that would lead to overestimation of Ks (sample gaps can be inferred from the “soil_sample_volume” column in metadata.csv when the value is < 249). In-situ method also has higher uncertainty in characterizing the wet end of the SWRC because of sensor limitations and the difficulty in reaching full saturation under natural conditions. (2) Choice of fitting tasks: When only retention data is needed, level 1 (“fit_retention”) should be prioritized. When both retention and hydraulic conductivity data are needed, level 2 (“fit_retention_conductivity”) could be prioritized. (3) Choice of models: This could depend on what the downstream models call for. If no specific model is required, model misfit could be used as a ranking criterion. Model misfit values in terms of RMSE can be found in model_parameters.csv. The following files are included in this data package: (1) metadata.csv – This file includes the general information of each sample, including location (description, geocoordinates, elevation), sampling and measurements details (method, depth, time or period, volume, instruments), and soil physical properties (bulk density, saturated hydraulic conductivity, only applicable to physical soil samples). (2) data.csv – This file includes soil water potential, volumetric water content, and unsaturated hydraulic conductivity data of each sample. Column “instrument” specifies the instrument (HYPROP, WP4C, or TEROS) used to perform the measurements. (3) model_fit.csv – This file includes soil water potential, volumetric water content, and unsaturated hydraulic conductivity fitted from the four models and three fitting tasks. Column “model_name” specifies the retention model used, and “fitting_task” specifies the level of data fitting. Missing values indicate that the variable does not apply to that fitting task. (4) model_parameters.csv – This file includes the fitted model parameters, model misfits, and conventional water content thresholds (field capacity and wilting point) from the four models and three fitting tasks. Column “model_name” specifies the retention model used, and “fitting_task” specifies the level of data fitting. Missing values indicate that the parameter does not apply to that model and/or that fitting task. (5) data_Ks.csv – This file includes the saturated hydraulic conductivity measurements from KSAT. (6) /figure/*.png – This folder includes three quick visualizations of the data, retention model fitting results and misfits, and hydraulic conductivity model fitting results, misfits, and parameters. The model fitting results are separated by samples and fitting tasks and colored by models. Zoom-in required. (7) /hyprop/*.bdhx – This folder includes proprietary hyprop files that require the free Labros SoilView-Analysis (METER) to open. Users can explore data fitting using other retention models (i.e. Brooks-Corey, Fredlund-Xing, Kosugi, bimodal models). Be aware that Ks value is pre-entered under “Fitting tab, Conductivity functions parameters” for level 2 fitting. If the value is lost, please refer to metadata.csv under “Ks” column. (8) Six file-level metadata that summarize file, header, column, and variable information of all files. This work was supported by the Watershed Function Science Focus Area at Lawrence Berkeley National Laboratory funded by the US Department of Energy, Office of Science, Biological and Environmental Research under Contract No. DE-AC02-05CH11231.

EARTH SCIENCE > LAND SURFACE > SOILS↗

Big Adaptive Rotor Phase I (Final Report)

The Big Adaptive Rotor (BAR) project was initiate by DOE in 2018 with the goal of identifying novel technologies that can enable large (>100m) blades for low specific power (SP) turbines. Five distinct tasks were completed to achieve this goal: 1. Assess trends, impacts, and value of low-SP turbines, 2. Wind turbine blade cost reduction roadmap study, 3. Research and Development (R&D) opportunity screening, 4. Detailed design and analysis, and 5. Low-cost carbon fiber. These tasks were completed by the national lab team consisting of Sandia National Laboratories (SNL), the National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (LBNL). The objective of Task 1 was to assess the historical trends of low-SP of onshore deployments, and to assess the impact and value of low-SP turbines. Analysis under this task showed that there is significant value for low-SP turbines, especially in markets where there is a higher saturation of wind energy on the grid. This has to do with the fact that low-SP turbines have increased capacity factors, and can contribute more reliable energy to the grid, even in lower wind conditions. This bodes well as higher renewable scenarios are likely in the coming years. Task 2 was a detailed analysis on the logistical challenges of deploying very large (>100m) onshore blade. This work was completed by experts at DNV-GL. The report looked at various ways to get around the current transportation constraints which are estimated to be around 75m in length. The report concluded that there are viable solutions to this issue including: segmented blades (which the industry is already pursuing), lighter than air (LTA) transportation, on-site manufacturing, and controlled bending of blades on rail. The final option was recommended for further analysis and study by DOE and the national labs because keeping a single piece blade reduces manufacturing and operations and maintenance (O&M) costs. Task 3 focused on identifying novel concepts that are capable of enabling a cost effective 5MW 206m rotor for onshore deployment. The findings from the first two tasks were considered in the analysis, in that the concepts identified must be able to overcome the transportation logistics challenges. Around 20 concepts were identified and evaluated by experts within the industry. Additionally, science and engineering challenges were identified for each concept. Based on these evaluations six concepts were deemed the most impactful and were selected for further analysis in Task 4. The concepts were: highly flexible rail transportable blades, downwind rotors, distributed aerodynamic control (DAC) devices, inflatable blade, bi-wing blade, and 4/5 bladed rotors. Task 4 conducted detailed design, optimization, and analysis on the selected BAR concepts. A modeling gaps analysis was conducted, and modeling improvements were implemented that allowed for the study and design of the novel concepts. The BAR team established a set of baseline designs by which to compare the selected designs through a technoeconomic analysis. It was found that the highly flexible rail transportable blade, the downwind rotor, and the DAC devices have the most promise to deliver the BAR targets. A Phase II for BAR has been proposed to further mature these concepts and address the open science and engineering challenges identified in Task 3. Task 5 conducted research on optimized carbon fiber materials that were used throughout the BAR Phase I project. Overall, the BAR project has identified low-SP turbines as important to continued LCOE reductions for onshore turbines. Furthermore, the project has identified viable solutions to the technical and logistical challenges to realizing these goals. The most promising technologies that were identified in Phase I of the project will be further matured and de-risked in Phase II of the BAR project.

17 WIND ENERGY↗

WHOLESCALE - Water & Hole Observations Leverage Effective Stress Calculations And Lessen Expenses (Final Technical Report 2020 - 2024)

The WHOLESCALE acronym stands for Water & Hole Observations Leverage Effective Stress Calculations and Lessen Expenses. The goal of the WHOLESCALE project is to simulate the spatial distribution and temporal evolution of stress in the geothermal system at San Emidio in Nevada, United States. To reach this goal, the WHOLESCALE team has developed a methodology to incorporate and interpret data from four methods of measurement into a multi-physics model that couples thermal, hydrological, and mechanical (T H-M) processes. The WHOLESCALE team has applied this methodology at the San Emidio geothermal field, located ~100 km north of Reno, Nevada in the northwestern Basin and Range province. The WHOLESCALE team includes 30 individuals working at two universities, two national laboratories, and one industry partner. Two master-degree students and five post-doctoral researchers have gained professional experience and earned partial financial support via the WHOLESCALE project. The WHOLESCALE team has taken advantage of the perturbations created by changes in pumping operations during planned shutdowns in 2016, 2021, and 2022 to infer temporal changes in the state of stress in the geothermal system at San Emidio, Nevada, U.S. The WHOLESCALE results support the working hypothesis that increasing pore-fluid pressure reduces the effective normal stress acting across fault zones. During normal operations, pumping in deep production wells decreases fluid pressures and thus increases the effective normal stresses on faults, reducing microseismicity. During planned shutdowns, the cessation of production increases pore-fluid pressure and reduces effective normal stress. The WHOLESCALE products generated during the 4-year period between 2020 and 2024 include: three articles published in the open-access, peer-reviewed scientific literature, two master’s theses, 20 presentations or papers at scientific conferences, and 17 data sets available on public repositories. The WHOLESCALE project has been completed in two phases that included three performance periods separated by two Go/No-go Stage Gate Reviews. Tasks were classified by data type (i.e., Geologic Structure, Borehole, Geodesy, Hydrology, Seismology, and Modeling). The first phase of the project started July 31, 2020 and included ongoing project coordination (Task 1), a project kickoff (Task 2), analysis of existing data (Task 3), development of the initial stress model & deployment design (Task 4), and Go/No-go Decision Point #1 (Task 5). Phase II began with implementing the 2022 deployment (Task 6), followed by Go/No-go Decision Point #2 (Task 7) The remainder of Phase II consisted of analyzing data collected during deployment (Task 8), calibration of the stress model on all observations (Task 9), and the Final Review (August 23, 2024) & Reporting (Task 10).

15 GEOTHERMAL ENERGY↗

Generative memory for lifelong machine learning

Techniques are disclosed for training machine learning systems. An input device receives training data comprising pairs of training inputs and training labels. A generative memory assigns training inputs to each archetype task of a plurality of archetype tasks, each archetype task representative of a cluster of related tasks within a task space and assigns a skill to each archetype task. The generative memory generates, from each archetype task, auxiliary data comprising pairs of auxiliary inputs and auxiliary labels. A machine learning system trains a machine learning model to apply a skill assigned to an archetype task to training and auxiliary inputs assigned to the archetype task to obtain output labels corresponding to the training and auxiliary labels associated with the training and auxiliary inputs assigned to the archetype task to enable scalable learning to obtain labels for new tasks for which the machine learning model has not previously been trained.

Nadamuni Raghavan, Aswin↗

ASME Design Code Rule Changes for Nuclear Graphite

The American Society of Mechanical Engineers Boiler Pressure and Vessel Code (ASME BPVC) Section III, Division 5, Article HHA-3000 outlines graphite core component and graphite core assembly design guidelines. Graphite core components are defined as ?components manufactured from graphite that are installed to form a graphite core assembly within the reactor pressure vessel of a high temperature, graphite moderated fission reactor.? (p. 413) Graphites? inherent defect distributions do not allow for deterministic material reliability. Rather, graphite has variable strength distributions which change by grade. Article HHA-3000 outlines two semi-probabilistic methods, the full and simplified assessments, which set design load limit targets for each of three component structural reliability classes. The Design Task Group was officially recognized as a specialized task group within ASME November of 2023, though we?ve been collaborating since 2022. The purpose of the Design Task Group is to correct, clarify, and make HHA-3000 function as intended. The Design Task Group will sunset once we?ve achieved our objectives. The Design Task Group was specifically told to not write new Code. While there may be more precise and more accurate methods to determine reliability targets, the current methods are conservative, relatively simple to implement, and have thus far been considered satisfactory for setting design reliability targets. Much of the ground-work to write proposal files and background documents for records to make the changes needed to achieve our objective have been completed. The Design Task Group has documented much of their work through papers, presentations, and memorandums. Three memorandums in which INL team members had substantial contributions are found in the Appendices: FEA Modeling for the Baseline Program, Evaluating the Effects on Margin of Updating the Threshold and Shape Parameters in the Full Assessment, and Interpretations of the Full and Simplified Assessments in ASME BPVC. Most of the on-going work to achieve the Design Task Group?s objective will be addressing comments on existing records and moving records through the balloting process. The Design Task Group met bi-weekly mostly through the end of FY2023. Since February 2024, the Design Task Group has mostly been completed with solving and documenting the technical issues associated with the assessments. Unless new tasks are identified, the remaining work of the Design Task Group will be political and editorial.

97 MATHEMATICS AND COMPUTING↗

Magnetic Gears: The Key to Robust, Cost-Effective Hydropower Drivetrains

Based on previous demonstrated success at fabricating 5 and 10 kW scale magnetic gearbox (MGB) prototypes, Emrgy and its partners (the project team) proposed to design and construct a 100 kW scale MGB with a 30:1 gear ratio for the low-head hydro applications. The Statement of Project Objectives included tasks covering: 1) Market Applicability; 2) Technical Metrics; 3) Design (initial); 4) Electromagnetic (EM) Load and Structural Analysis; 5) Modal Analysis; 6) Sealing Design and 7) Final Design during Budget Period 1. Budget Period 2 included tasks covering: 1) Materials Procurement and Test Plan Development; 2) Assembly; and 3) Testing. The Market Applicability study (Task 1) led to a clear conclusion and recommendation toward “Low Head” technologies for maximum market share of both New Stream Reach development as well as powering Non-Powered Dams. The findings of this study also identified the opportunity for a larger scale magnetic gearbox-based drive train as a function of increased torque, as opposed to increased speed. The Technical Metrics Study (Task 2) concluded a horizontal orientation was preferred, examined potential loss mechanisms, concluded that a Halbach Array magnetic design was preferred, established a 30:1 gear ratio as optimal, and established a power rating of 100 kW as optimal. The subsequent initial and final detailed design process included electro-magnetic (EM) load and structural analysis (Task 4), a Modal analysis (for vibration) (Task 5), and a sealing design (Task 6) to assure water impermeability. The final design package (Task 7) included 729 individual parts, 117 unique part numbers, and 15 assemblies. In order to facilitate procurement, the full bill of materials was broken down into several sub-components: 1) custom magnetic parts; 2) custom machined parts; 3) custom casted parts; and 4) commercial off the shelf (COTS) parts. The casted parts were fabricated by Oak Ridge National Laboratory (ORNL) via a Cooperative Research and Development Agreement (CRADA) with Emrgy and funded by the Advanced Manufacturing Office (AMO). The procurement effort (Task 8) ultimately covered three time periods based on challenges encountered in meeting the budgeted cost for the prototype. Following the first effort in the early stages of Budget Period 2 in 2017, a no-cost time extension was granted to seek alternative fabrication and procurement options. The project was re-booted in 2020 based on the new ORNL CRADA that would focus on five (5) of the more difficult and expensive parts using their advanced manufacturing expertise. Procurement efforts for the other custom machined parts resulted in quotations that still exceeded the budget by more than $\$$100k. This was, in part, also due to the concurrent COVID-19 pandemic that caused both supply chain disruptions and labor shortages. As the project continued, pricing and availability degraded further. In Q2 FY’22, it was decided to not proceed with the fabrication of the prototype (Task 9) based on budgetary limitations. Outcomes included a full and detailed design of a 100 kW magnetic gearbox and associated indented bill of materials (BOM) and CAD drawings, a full assembly instruction manual with an associated BOM for materials necessary to support assembly, the fabrication of the double Halbach magnetic array for the rotor/stator system, fabrication of five (5) sand-casted/machined parts (via CRADA with ORNL) and an initial draft of a comprehensive testing plan. The most significant non-outcome was the actual fabrication and testing of the prototype gearbox based on budget limitations. Lessons learned included the need for an Application / Design / Cost trade analysis to better elucidate the cost potential of the MGB in the projected volumes anticipated for future demand. This would better establish the efficacy of the original cost target ($\$$0.80/Watt) and/or the need for reconsideration of designs and applications. Likewise, additional consideration of the prototype nature of the gearbox – single use, short lifetime, etc. - either as a separate exercise or in place of the design process completed, to reduce the cost of the demonstration prototype device. Additionally, project continuity was cited as a significant risk based on the loss of the primary design engineering firm after Budget Period 1. A design analysis exercise was conducted at the conclusion of the project to identify potential areas for cost reduction. One concept considered was the removal of the inner ring of magnets (with associated changes in the outer ring magnets) to enable a horizontal collapse of the design. It was estimated this could reduce cost by 10-25% without impacting performance.

13 HYDRO ENERGY↗

Predictive Indicators of the Performance of Large Language Models

In several mission contexts, it is desirable to estimate the performance of large language models (LLMs) on tasks that we cannot run directly. In light of published “scaling laws” our hypothesis is that some tasks should be consistently more challenging than others based on characteristics of the task. The goal of this project was to begin quantifying how much information about LLM performance can be gained from the features of a model and a task. Two of our statistical models struggled to converge. Pass/fail test results may provide limited information for inference beyond model quality and task difficulty, but we see no evidence at this time for significant feature interaction effect sizes, arguing for simple models. Future work extending the models to capitalize on perplexity of ground truth answers is suggested. This project also introduces “Depth of Knowledge Variant Testing” as a strategy for more finely assessing language models on open domain question and answer tasks. We developed sets of questions that ask a language model to produce similar information while demonstrating increasing depth of knowledge, and also relabeled existing Q&A test questions with their depth of knowledge. Our results suggest further consideration of Bloom’s taxonomy and further refinement of prompts to properly elicit information at varying depths. In the course of this work, we set up a basic infrastructure for standardizing tasks and testing many language models on these tasks. In addition to testing the predictive quality of model features and performance across test suites, with this project we have introduced two new task features to contextualize each test question: the Dewey Classification main category of information covered, and the Bloom’s taxonomy level that corresponds to the depth of knowledge probed by the question. Splits across these and other features produced over five hundred task subtypes with distinct feature vectors, which we tested on half a dozen models.

97 MATHEMATICS AND COMPUTING↗

IRIS: Exploring Performance Scaling of the Intelligent Runtime System and its Dynamic Scheduling Policies

High-Performance Computing is becoming increasingly heterogeneous, relying on a diverse mix of hardware to achieve good performance. Paradoxically, current drivers and frameworks for these devices typically require separate languages and implementations for each vendor. Furthermore, there are few tools and little support to schedule codes between these devices in a truly heterogeneous manner-partly because of this fragmentation between vendors and the languages each supports. To overcome both limitations, the Intelligent Runtime System (IRIS) was developed. It allows a common task abstraction to automatically be shared among contemporary vendors and is run from a single host-side API. At runtime, IRIS queries the host system and registers which frameworks and drivers are available, these determine which kernels can be used by the scheduler-CPUs via OpenMP, Nvidia GPUs (CUDA), AMD GPUs (HIP), and Intel and Xilinx FPGAs with OpenCL. IRIS enables tasks to be scheduled to any heterogeneous device and resolves to the appropriate kernel binary at runtimeit only uses the devices supported by the system on which it is run. IRIS supports single-task and graph-based expressions of dependencies of tasks. Additionally, IRIS features a range of dynamic scheduling policies, allowing complex chains of tasks and interactions to be executed, relieving the programmer/user from considering the system to assign tasks to devices optimally. This paper presents the peak performance attainable by IRIS over a range of systems-each with different numbers and types of accelerator devices, it highlights the flexibility of IRIS since these devices are truly heterogeneous, relying on different backends (drivers, frameworks, and languages) which historically required unique implementations to utilize them. We then use this peak performance as a baseline to compare increasingly complex chains of tasks (with increasingly complex task dependencies) and evaluate how IRIS copes. Finally, we consider the performance of different IRIS scheduling policies on this range of task graphs.

Johnston, Beau↗

NNSA-IAEC Science Area V Environmental ISR: Waste Management and Subsurface Science (Final Report FY18-FY20)

In August 2017, the U.S. National Nuclear Security Administration (NNSA) and the Israel Atomic Energy Commission (IAEC) launched a joint waste management program to evaluate the feasibility of siting a radioactive waste repository at intermediate depths in Israel. The bilateral collaboration involves three National Laboratories (LLNL, LANL, and Sandia), and the Nuclear Research Center, Negev, Geological Survey of Israel, and Ben Gurion University in Israel. This research is designed to assist with the evaluation of locations for an intermediate nuclear waste repository in Israel. This final report is a high-level summary of the results from the past three years by the team that worked on the WM-2: Radionuclide colloid-facilitated transport in fractured carbonate rock project for Science Area V, Environmental ISR: Subsurface Science and Waste Management. We have completed all of our tasks and met all of our milestones. MW-2 had three integrated tasks. Task 1 was laboratory experiments investigating colloid transport of radionuclides in natural fractured carbonate rocks from the Avdat formation, Israel. Task 2 was field experiments injecting radionuclide analogues pre-sorbed to clay colloids into fractured carbonate rock, and task 3 was numerical modeling of laboratory and field experimental results to assess the importance of colloids in the migration of relevant radionuclides. This task was incorporated into tasks 1 and 2. A 4 th task was initiated in FY20, to investigate the role of organics in facilitating radionuclide transport under the same conditions explored in task 1 due to the high organic content of the rocks being investigated for the immediate borehole locations. Preliminary results will be summarized here and the work will continue in FY21-23. The overall objective of this research is to evaluate the role of colloids (naturally occurring < 1 micron particles) in facilitating the transport of long-lived radionuclides from a nuclear waste repository situated in fractured carbonate rocks. Currently little data exists on radionuclide transport in carbonate rocks, but this is the main rock type available for siting a repository in Israel. Laboratory experiments were carried out in both Israel and the U.S., field experiments have taken place in Israel, and reactive transport modeling involved LLNL, LANL and Israel partner institutions. LLNL hosted a graduate student, Emily Tran, from Ben Gurion University in FY18 and FY19 and much of the work presented here was part of her PhD research.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effects of Mineral Impurities and Heat on Uranium(VI) Sorption onto Bentonite (Final Report)

Most nuclear waste disposal options include compacted bentonite, consisting of montmorillonite clay, as part of a barrier system to minimize contaminant mobility. Uranium (U) is the primary element in spent nuclear fuel, and from an environmental perspective, a potential contaminant of water resources. Furthermore, uranium may control nuclear fuel degradation rates and the consequent release of other radioactive contaminants based on its diffusive transport away from waste canisters. Uranium sorption onto clay and other mineral surfaces is expected to limit U(VI) mobility in these systems. However, at this point a prediction of U(VI) sorption and transport behavior in performance assessment (PA) models is complicated by a series of factors, such as: (1) the presence of various U(VI) solution species with different charges and sorption characteristics; (2) the complex microstructure of montmorillonite clay resulting in two types of clay porosities and multiple sorption sites; (3) the largely unknown effects of bentonite mineral impurities on pore water chemistry, U(VI) sorption and diffusion behavior; and (4) the potential impacts of heat, generated by the decay of spent fuel, on mineralogical and microstructural transformations, and any subsequent effects on radionuclide sorption and mobility. In this project, we investigated the effects of calcite impurities on U(VI) sorption and diffusion onto montmorillonite before and after mineral exposure to heat. Overall, our main goals were to: 1. Gain a mechanistic understanding of the effects of calcite impurities on U(VI) sorption and diffusion in montmorillonite/bentonite at variable chemical conditions, and before and after mineral exposure to heat; and to 2. Work towards the development of new surface complexation and diffusion models to predict U(VI) sorption and mobility in montmorillonite/bentonite while accounting for the impacts of calcite impurities and heat. In order to achieve these goals, we pursued the following research objectives and tasks: 1. Characterize the effects of calcite impurities on U(VI) sorption onto Na-montmorillonite, and evaluate if and how these effects change due to solids’ exposure to heat (Task 1). 2. Characterize U(VI) surface speciation in solid samples from Task 1, with a particular focus on U(VI) precipitates and co-precipitates (Task 2). 3. Test the relevance of observed changes in U(VI) sorption characteristics for U(VI) diffusive transport behavior in bentonite barriers (Task 3). 4. Evaluate the exclusion of anionic U(VI) solution complexes from clay nanopores (Task 4). 5. Building on Tasks 1-4, start the development of new surface complexation and reactive transport models that can simulate and predict U(VI) sorption and diffusion in complex bentonite systems (Task 5). A detailed description of all tasks, and their specific results and conclusions is provided in this report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗