Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “schedules”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Production Agency Quality Assurance Management Execution Strategy [Thesis]

There are multiple federal directives that Los Alamos National Laboratory (LANL) must follow for the proper implementation of quality assurance, strategic planning, and execution of manufacturing and surveillance operations. Recent assessments identified that manufacturing in all processing areas is dynamic due to influencing scope changes, design modifications, funding adjustments, and staff attrition. In response, this project was started to develop a comprehensive PAQ execution strategy to support the success of LANL’s manufacturing mission. This project’s method for developing an updated architecture was to create an integrated, flexible, reliable, and agile strategic process. The execution plan has five deliverables: 1) an integrated schedule view of PAQ work scope, 2) a resource management plan that aligns with the required scope, 3) a metrics monitoring dashboard, 4) a project management plan for sustaining NAP 401.1A implementation, and 5) a risk management plan. The research design is a mixed-method approach focused on data collection for each deliverable. The methodology entails qualitative and quantitative research, metrics monitoring, data analysis, and the creation of a dashboard. The qualitative methods used include literature reviews and interviews. The quantitative methods include resource, financial, schedule and survey data analysis. Preliminary and final results were peer reviewed by subject matter experts both within the ALDWP organization and deployed support.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cost-Efficient Construction at Los Alamos National Laboratory

The construction industry can be fraught with cost, schedule, and scope overruns. Los Alamos National Laboratory (LANL), a Department of Energy (DOE) / National Nuclear Security Administration (NNSA) facility located in Northern New Mexico, seems to be particularly vulnerable to cost and schedule overruns. Since Triad National Security, LLC acquired the management and operating (M&O) contract for LANL in 2018, the group has been striving to reduce the cost of construction across the forty square-mile campus.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

An Adaptable and Comprehensive Project Assessment Tool

Most companies, agencies, and other real property owners require capital asset projects to pass some type of scrutiny before budgets and authority to expend funds for the design, construction and eventual operations are approved. This process typically involves management approval of key/critical decision(s) or a project’s passage through gates (or critical decisions). Cost, functionality, safety, and risk are just some of the factors typically considered during project assessment processes. This paper describes a tool that was developed and is used by the Department of Energy to facilitate this project assessment process. There are three versions of this tool for construction, decontamination and decommissioning (D&D), and environmental restoration/cleanup project types. The tool’s elements and associated criteria are tailored for each project type; although some elements, such as cost estimating and scheduling, are used in common. The tool is easy to use, requiring little or no training. It provides a common assessment tool for project self-appraisals and independent project reviews. It promotes efficiency and reduces disagreements and unnecessary effort. A comprehensive array of elements covers the gamut of cost, schedule, scope/technical, and safety/security ensuring that no important project attributes are overlooked. The tool is adaptable for use by any organization.

97 MATHEMATICS AND COMPUTING↗

Prototype College Building Energy Model: Building Characteristics and Energy Simulation Results

The US Department of Energy supports the development of commercial building energy codes and standards. To support commercial building energy research activities and the development of commercial building energy codes and standards, continuous efforts have been made to convert 16 prototype building models, which cover 80% of US commercial building floor space, to OpenStudio prototype buildings. Additionally, the suite of prototype building models was expanded to include the addition of new building prototype models (e.g., courthouse, college building). Multiple sources, including databases, documented projects, and personal communications, were used to define the prototype college building, and a 4-story with 69,063 ft 2 building was considered as the prototype college building to represent an average-sized college building in the United States. To represent realistic occupancy schedules and increase the granularity of information, actual class reservation schedules were collected and used. This report documents the building and system characteristics of the prototype college building model combined with climate-specific and construction vintage–specific requirements for the building envelope and systems from ASHRAE Standard 90.1. The energy simulation results are presented for 4 construction vintages (2004, 2007, 2010, and 2013) and 15 ASHRAE climate zones. The site energy use intensity of the college building was compared with 2012 Commercial Building Energy Consumption Survey (CBECS) and ENERGY STAR data to verify the simulation results. The site energy use intensity of the college building ranged from 60 to 202.4 kBtu/ft 2 , and compared with the energy use intensities of Commercial Building Energy Consumption Survey (122.9 kBtu/ft 2 ) and ENERGY STAR (84.3 kBtu/ft 2 ) data, the prototype college building results are in a reasonable range.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cyber-Physical Dynamic System (CPDS) Modeling for Frequency Regulation and AGC Services of Distributed Energy Resources

The substantial integration of renewable energy brings significant challenges to balance the system in real time because of the variability and intermittency of renewable power. For the reliable system operation, the frequency regulation service is used to stabilize the system frequency through automatically balancing the system generation and load. On one hand, with the substantially increasing deployment of renewable energy in electricity system, the requirement of frequency regulation (FR) services increases significantly. On the other hand, the current main resource of FR services, the controllable conventional generation, is continuously decreasing in the system generation mix. This means that in the future high renewable penetration power system, additional and alternative reliable FR services providers such as distributed energy storage (DES) resources should be explored. Although the capability of utility-scale energy storage to provide FR services has been demonstrated, the integrated control and dynamic modeling of distributed energy resource (DER) providing frequency regulation grid services has been rarely explored. There are several challenges to adopt DERs to provide reliable grid services as illustrated in FERC 755. First, the distributed installation of DES requires a comprehensive cyber-physical dynamic system (CPDS) modeling to fully consider the impacts of the communication latency variability on its real time FR provision capability. Unlike the conventional generators, there are two-layer communication between DERs and system operators which increase the communication delay. Second, unlike the conventional generators whose dynamic models have been comprehensively studied, the difference among individual DER components' power-dynamic characteristic brings challenges in the accurate dynamic AGC modeling of its power-frequency relationship. Third, the temporal dependent state of charge uncertainty of DERs challenges DERs' power and frequency regulation capacities scheduling in the look-ahead generation scheduling. Therefore, the aggregator should optimize the frequency regulation provision from individual DER in real time. To overcome these challenges, this project proposes a cyber-physical dynamic system (CPDS) model to handle the uncertainty of DERs two-layer communication latency and power dynamics. The variability of DERs' communication delay and dynamic constraints will be comprehensively modeled. The DERs' AGC model with communication delay is designed to validate DESs' frequency regulation services. Like current performance-based frequency regulation evaluation, the delivery of DERs' frequency regulation will be assessed through post-analysis of the actual AGC response with respect to the AGC control signal from system operators. Consequently, the reliability improvement with DERs providing reliable frequency regulation services can be evaluated from a comprehensive perspective considering all the dynamics of communication and power.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Operational Probabilistic Tools for Solar Uncertainty (OPTSUN) (Final Project Report for DOE Solar Forecasting II Project)

Increasing levels of solar PV can challenge system operations and may require novel methods to operate the power system reliably and efficiently. Power system operating plans generally use deterministic forecasts, in which the variable energy resources are represented by the expected value for each interval of the decision horizon. Probabilistic forecasts are relatively new but have the potential to address the shortfalls of deterministic forecasts. However, understanding how best to use such forecasts is still a key gap in industry and was the focus of this project. The project had three workstreams. In a forecasting workstream, improvements were made to baseline probabilistic forecasts using a number of new approaches such as machine learning methods and improved input data. In a design workstream, advanced simulation tools used these forecasts to investigate newly proposed reserve determination methods. Lastly, in a demonstration workstream a scheduling management platform (SMP) was developed to leverage probabilistic forecasts in a modular and customizable manner. In order to study the benefits that could be accrued, the project team collaborated with three utility partners (Duke Energy, Southern Company and Hawaiian Electric) to deliver improved probabilistic forecasts for each region and to model each region in case studies using advanced production cost modeling tools. Different methods to determine operating reserve requirements from probabilistic forecasts were developed, simulated, and tested across each region. The benefits of using these newly proposed methods varied by utility, but, in general, using probabilistic forecasts as well as historical data to set the reserve requirements seems to improve reliability related results, with less risk of reserve or supply shortfalls. The cost implications were not always straightforward; in some cases the new methods could show a reduction in expected operating costs, but often the increase in reserves associated with better risk mitigation using probabilistic forecasts could result in an increase in operating costs in the simulations. The SMP tool was developed to process probabilistic forecasts from their initial receipt through to scheduling decisions. This open-source tool consists of several modules for scenario development, reserve requirements calculation, and visualization. The SMP tool was demonstrated to a wide range of operators and stakeholders at all three utilities and further improved based on their feedback. The tool will be available on www.epri.com/optsun. The proposed probabilistic information-based reserve determination approaches have the potential to be implemented by different regions to ensure an economic and reliable power system operation on power systems integrating increasing levels of variable renewable resources. The innovative yet practical methods developed in this project demonstrated tangible benefits from using probabilistic forecasts beyond just study-based assessments to include three unique balancing areas. The demonstrated benefits across the multiple utility environments, are expected to provide system operators in all regions the confidence required and a platform to adopt the new forecasting and operating methods.

14 SOLAR ENERGY↗

Electric Vehicle Managed Charging: Forward-Looking Estimates of Bulk Power System Value

When and where electric vehicle charging occurs has significant implications for power systems supporting widespread electric vehicle deployment with high shares of wind and solar generation. Numerous studies have estimated the value of scheduling or otherwise managing electric vehicle charging in such power systems. This study improves on those earlier works by leveraging detailed simulation models for electric vehicle adoption, electric vehicle use, electric vehicle charging, and bulk power system operations; and linking them with methods for describing charging flexibility at both the individual vehicle and aggregate levels. This study closely analyzes electric vehicle managed charging (EVMC) performance along the dimensions of flexibility type (within-charging session or within-week scheduling), dispatch mechanism (direct load control or one of several price-based mechanisms), and participation rate, under the assumptions of ubiquitous chargers and all trips completed on time. The study is located in a passenger light-duty vehicle adoption scenario with 100% electric vehicle sales by 2035, and in an envisioned 2038 New England power system for which within-region generation is 84% clean.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Initiating Event Rates at U.S. Nuclear Power Plants, 2021 Update

Analyzing initiating event rates is important because it indicates trends and patterns of plant performance and provides inputs to several U.S. Nuclear Regulatory Commission (NRC) risk-informed regulatory activities. This report presents an analysis of initiating event frequencies at U.S. commercial nuclear power plants from calendar year 1988 through 2021, as reported in licensee event reports. Engineers with nuclear power plant experience reviewed each event report since the last update to this report to categorize and characterize reactor trips. To be included in this study, an event had to meet all of the following criteria: (1) the event included an unplanned reactor trip (not a scheduled reactor trip on the daily operations schedule), (2) the sequence of events started when the reactor was critical and at or above the point of adding heat, (3) the event occurred at a U.S. commercial nuclear power plant (excluding Fort St. Vrain and LaCrosse), and (4) the event was reported by a licensee event report. Sixteen initiating event groupings are trended and displayed. For some of the categories, relevant events are plotted separately for boiling-water reactors (BWR) and pressurized-water reactors (PWR). P-values are given for the possible presence of a trend over the most recent 10 years. The following trends were identified for the most recent 10 years (2012–2021): • A highly statistically significant decreasing trend was identified for Loss of Offsite Power (p-value = 0.002) • A statistically significant decreasing trend was identified for BWR general transients (p-value = 0.025) • A statistically significant decreasing trend was identified for PWR general transients for the second year in a row (p-value = 0.038).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Economic Risk-Informed Maintenance Planning and Asset Management (Final Report)

The proposed work will provide a holistic framework for cost-minimizing risk-informed maintenance planning, including inspection, in light water reactors (LWRs). Specifically, we develop a two-tier framework that (a) coarsely minimizes the total maintenance cost during the remaining normal operating cycle of the plant prior to the next scheduled outage (long-term), subject to safety requirements, and (b) uses the outputs of the first model to develop a secondary optimization model to finely schedule maintenance activities to maximize the financial impact of these activities in the next week (short-term).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Well-Controlled Hydro-thermo-chemical Stimulation of a Coso Geothermal Well to Enhance Productivity

The goal of this project was to demonstrate controlled fracturing and permeability increase to enhance resource production and power generation at Coso. It was planned to stimulate at least two intervals in the Well 73-18RD with zonal isolation using advanced high-temperature packer technology. The anticipation was that a hydraulic fracture would form in one zone and in the second zone natural fractures would reopen, shear and extend, thereby increasing fluid communication in the field. In both cases, the intent was to carefully design the stimulation to take advantage of the relative roles of hydraulic pressure, thermal stress and chemical (“hydro-thermo-chemical”) dissolution. The project had planned to use the Welltec Annular Barrier (WAB) system developed as part of another DOE-funded project which was on schedule to be ready for field deployment. If successful, the Coso Operating Company would incorporate this approach into their ongoing well maintenance in other wells increasing the total MWs produced. The project had multiple tasks and the objective of Task 1 was to develop a workover plan, to build a geologic model, to design a stimulation program, and to work with the operating and services companies to develop a detailed budget and obtain the necessary permits and sundry notices. In Phase 2 the workover plan would be implemented, the designed stimulation would be carried out, and subsequently the well would logged and tested to measure the impact of stimulation. Per sponsor request, a Pre-Task 1 activity with a Go/No Go decision point was scheduled in Task 1.

02 PETROLEUM↗

Verification of Spent Fuel Inside Dry Storage Casks by Cask Top Fast Neutron Mapping (FY2023 Mid-Year Report)

This project is developing a prototype scanner array verification system for detection of missing fuel assemblies in spent-fuel storage casks. The prototype consists of six fast-neutron scintillator detectors mounted to a linear actuator frame that is placed on the top of a spent fuel cask to scan across all fuel assembly positions. The scanner array was assembled and tested at LLNL in FY2022. A field test schedule has been requested at the Idaho National Laboratory (INL) Cask Farm site for FY2023. Note that the Cask Farm contractor determines this scheduling and not INL directly. Further system automation will be designed and implemented with the goal of obtaining a level of system operation that meets IAEA needs. This includes integration of the scanner array and data-acquisition control software into a single interface for operator use. In addition, commercial operators and the IAEA may have special requirements for portability, shipping, lifting, and installation. Prior to the Field Test at INL, the system will be operated at LLNL to exercise lifting procedure and linear actuators, monitor stability of detector energy and pulse-shape discrimination calibration, and test system software integration efforts. Following the Field Test, we will present results and discuss the technology with the IAEA. We will incorporate additional improvements to the system based on lessons learned from the field test and feedback from the IAEA. If successful, the technology can be transferred to the IAEA or other stakeholders for assessment.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Analysis of Air-Purifying Respirator (APR) Cartridge Performance Testing on Hanford Tanks SX-101 and SX-104: Volume 2 - Raw Analytical Data

As the Tank Operations Contractor for U.S. Department of Energy operations at the Hanford site in Washington State, Washington River Protection Solutions (WRPS) is responsible for managing highly radioactive wastes stored in tanks at Hanford. To protect workers at Hanford Tank Farms, WRPS tests air-purifying respirator (APR) and powered air-purifying respirator (PAPR) chemical cartridges commonly used at the tank farms. The tests were conducted to determine the period of time the cartridges would provide adequate performance for APRs and PAPRs when workers are exposed to a mixture of Chemicals of Potential Concern (COPC) from any vapors exiting headspaces in the storage tanks. Occupational Safety and Health Administration (OSHA) Standard 29 Code of the Federal Regulations (CFR) 1910.134(d)(3)(iii)(b)(2) specifies that for protection against gases and vapors, employers shall implement a schedule for cartridges to ensure that change-outs occur before the end of service life. The change schedule can be based on objective information or data that ensures cartridge change-outs occur before the end of their service life. The primary function of the WRPS Cartridge Test Program is to obtain objective data to determine service lives for the APR and PAPR cartridges used at Hanford Tank Farms. WRPS contracted with Pacific Northwest National Laboratory to analyze the test data and offer an independent analysis and any recommendations. This report summarizes data analysis of APR cartridge testing on headspace vapors from Hanford SX-101 and SX-104 single-shell tanks. Volume 1 of this report documents the testing, data analysis, results, conclusions, and recommendations resulting from the APR testing on SX-101 and SX-104 headspace vapors. Volume 2 provides an introduction to the raw data, including analytical laboratory analysis results that supported the analysis and conclusions documented in Volume 1.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Air-Purifying Respirator (APR) and Powered Air-Purifying Respirator (PAPR) Cartridge Performance Testing on Hanford Tanks BY-108 and BY-110 Volume 2: Raw Analytical Data

As the Tank Operations Contractor for U.S. Department of Energy operations at the Hanford site in Washington State, Washington River Protection Solutions (WRPS) is responsible for managing highly radioactive wastes stored in tanks at Hanford. WRPS tests air-purifying respirator (APR) and powered air-purifying respirator (PAPR) chemical cartridges commonly used by workers at Hanford Tank Farms to determine the period of time that the cartridges would provide adequate performance for APRs and PAPRs used to protect workers when exposed to a mixture of Chemicals of Potential Concern (COPC) from any vapors exiting headspaces in the storage tanks. The Occupational Safety and Health Administration (OSHA) Standard promulgated in Title 29 of the Code of the Federal Regulations (CFR) 1910.134(d)(3)(iii)(b)(2) specifies that for protection against gases and vapors, employers shall implement a schedule for cartridges to ensure that change-outs occur before the end of service life. The change schedule can be based on objective information or data that ensures cartridge change-outs occur before the end of their service life. The primary function of the WRPS Cartridge Test Program is to obtain objective data to determine service lives for the APR and PAPR cartridges used at Hanford Tank Farms. WRPS contracted with Pacific Northwest National Laboratory to analyze the test data and offer an independent analysis and any recommendations. This report summarizes data analysis of APR and PAPR cartridge testing on BY-110 and BY-108 headspace vapors, respectively. Two different APR cartridges from SCOTT Safety (Monroe, North Carolina) were assessed for the BY-110 headspace vapors, and two different PAPR cartridges—one from MSA Safety Inc. (Pittsburgh, Pennsylvania) and another from 3M (Maplewood, Minnesota)—were assessed for the BY-108 headspace vapors. Volume 1 of this report documents the testing, data analysis, results, conclusions, and recommendations resulting from the cartridge testing of vapors from the BY-110 and BY-108 headspaces. Volume 2 provides an introduction to the raw data, including analytical laboratory analysis results that supported the analysis and conclusions documented in Volume 1.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Air-Purifying Respirator (APR) and Powered Air-Purifying Respirator (PAPR) Cartridge Performance Testing on a Hanford AX Tank Farm Exhauster Slipstream Volume 2: Raw Analytical Data

As the Tank Operations Contractor for U.S. Department of Energy operations at the Hanford site in Washington State, Washington River Protection Solutions (WRPS) is responsible for managing highly radioactive wastes stored in tanks at Hanford. To protect workers at Hanford Tank Farms, WRPS tests air-purifying respirator (APR) and powered air-purifying respirator (PAPR) chemical cartridges commonly used at the tank farms. The tests were conducted to determine the period of time the cartridges would provide adequate performance for APRs and PAPRs when workers are exposed to a mixture of Chemicals of Potential Concern (COPC) from any vapors exiting headspaces in the storage tanks. Occupational Safety and Health Administration (OSHA) Standard 29 Code of the Federal Regulations (CFR) 1910.134(d)(3)(iii)(b)(2) specifies that for protection against gases and vapors, employers shall implement a schedule for cartridges to ensure that change-outs occur before the end of service life. The change schedule can be based on objective information or data that ensures cartridge change-outs occur before the end of their service life. The primary function of the WRPS Cartridge Test Program is to obtain objective data to determine service lives for the APR and PAPR cartridges used at Hanford Tank Farms. WRPS contracted with Pacific Northwest National Laboratory to analyze the test data and offer an independent analysis and any recommendations. This report summarizes data analysis of APR and PAPR cartridge testing on a vapor slipstream from the Hanford AX tank farm exhauster. Volume 1 of this report documents the testing, data analysis, results, conclusions, and recommendations resulting from the cartridge testing on AX exhauster slipstream vapors. Volume 2 provides an introduction to the raw data, including analytical laboratory analysis results that supported the analysis and conclusions documented in Volume 1.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Powered Air-Purifying Respirator (PAPR) Cartridge Performance Testing on Hanford Tanks SX-101 and SX-104: Volume 2 Raw Analytical Data

As the Tank Operations Contractor for U.S. Department of Energy operations at the Hanford site in Washington State, Washington River Protection Solutions (WRPS) is responsible for managing highly radioactive wastes stored in tanks at Hanford. WRPS tests of cartridges used in air-purifying respirators (APR) and powered air-purifying respirators (PAPR) commonly used at Hanford Tank Farms. The tests are conducted to determine the period of time the cartridges would provide adequate performance for APRs and PAPRs used to protect workers when exposed to a mixture of Chemicals of Potential Concern (COPC) from any vapors exiting headspaces in the storage tanks. Occupational Safety and Health Administration (OSHA) Standard 29 Code of the Federal Regulations (CFR) 1910.134(d)(3)(iii)(b)(2) specifies that for protection against gases and vapors, employers shall implement a schedule for cartridges to ensure that change-outs occur before the end of service life. The change schedule can be based on objective information or data that ensures cartridge change-outs occur before the end of their service life. The primary function of the WRPS Cartridge Test Program is to obtain objective data to determine service lives for the APR and PAPR cartridges used at Hanford Tank Farms. WRPS contracted with Pacific Northwest National Laboratory to analyze the test data and offer an independent analysis and any recommendations. This report summarizes data analysis of PAPR cartridge testing on headspace vapors from Hanford SX-101 and SX-104 single-shell tanks. Two different PAPR cartridges—one from MSA Safety Inc. (Pittsburgh, Pennsylvania) and another from 3M (Maplewood, Minnesota)—were assessed on each tank headspace source on separate days. These data represent the first PAPR cartridge testing under the recent WRPS program, as testing to date had been focused on APR cartridges. Volume 1 of this report documents the testing, data analysis, results, conclusions, and recommendations resulting from the PAPR testing on SX-101 and SX-104 headspace vapors. Volume 2 provides an introduction to the raw data, including analytical laboratory analysis results that supported the analysis and conclusions documented in Volume 1.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Complete Documentation of Applicable Regulations and Regulatory Authority for Transportation

This report fulfills the M4 milestone M4MR-20PN0303023, “Complete Documentation of Applicable Regulations and Regulatory Authority for Transportation. Microreactors are very small nuclear reactors with a power output of 20MWe or less and are designed to be factory-built, modular in nature, and highly portable. The objective of this report is to identify and document applicable regulations, the appropriate regulatory authority, and the associated framework for microreactor transport. Sections 2 and 3 of this report summarize U.S. Department of Transportation (DOT) and NRC regulations related to the transportation of Class 7 (radioactive) materials. These sections concentrate on the transport of fissile material packages and Type B packages, which would be most applicable to the transport of a microreactor before and after irradiation. Section 4 summarizes DOE hazardous and radioactive material transportation regulations. Section 5 summarizes U.S. Coast Guard regulations related to the transport of radioactive material. Section 6 discusses state requirements for the permitting of oversize and/or overweight truck shipments. Section 7 presents detailed schedules of requirements for transporting fissile material packages and Type B packages based on NRC and DOT regulations. The schedules are presented in a two-column format, the right column is the regulatory requirement and the left column is the citation of the regulation in which the requirement is found.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Uniform Methods Project: Smart Thermostat Evaluation Protocol

A smart thermostat is an internet-connected device that controls home heating, ventilation, and air-conditioning (HVAC) equipment and can automatically adjust temperature set points to optimize performance and achieve energy savings. Smart thermostat features often include two way communication, occupancy detection (such as geofencing and occupancy sensors), schedule learning, and seasonal optimization algorithms. Smart thermostats can control most conventional HVAC systems, including central air conditioners, heat pumps, and forced air furnaces. Several types of residential utility programs offer smart thermostats as replacements measures. Working with smart thermostat vendors, utilities can offer separate optimization programs to produce energy savings beyond those achieved by installing a smart thermostat. From an evaluation perspective, smart thermostat programs have several noteworthy features. First, the energy savings from a smart thermostat may change over the life of the device. As a smart thermostat is connected to the internet, original equipment manufacturers can update the thermostat software to improve the thermostat's energy efficiency. Likewise, users can adjust the thermostat settings and schedules over time in response to changes in weather, thermal comfort, energy prices, or preferences for energy efficiency. Additionally, many thermostat manufacturers offer seasonal optimization programs that recommend changes or make minor, automated adjustments to the thermostat settings to improve energy efficiency. These opt-in programs are now standard offerings for many smart thermostat manufacturers and provided at no additional cost to users. The potential for software updates and continuous optimization and the evolving nature of user interactions mean future energy savings may differ from first-year savings and the energy savings of smart thermostats may need to be evaluated more than once. Second, smart thermostats often have small unit energy savings relative to a home's total energy consumption, especially in comparison to whole- home retrofit programs. This can make it difficult to detect the smart thermostat savings in billing or advanced metering infrastructure (AMI) meter consumption data. For example, as cooling loads in many regions average about 20% of annual electricity consumption, smart thermostat savings of 10% of cooling energy use would equate to a 2% reduction in home electricity consumption. Evaluators should use regression analysis of whole-home billing consumption or advanced metering infrastructure (AMI) meter consumption data to evaluate smart thermostat savings because, as explained at greater length below , these data are usually available to evaluators and regression can control for the impacts of weather and other potentially confounding factors on a home's energy consumption. Finally, as with other energy efficiency programs, participation in smart thermostat programs is self-selective. As discussed at greater length below , smart thermostat participants tend to be, among other things, younger, higher-income, and more likely to adopt electric vehicles (EVs) and internet connected devices than nonparticipants. These differences are often unobservable to the evaluator and correlated with a home's energy consumption, creating the potential for bias in estimating savings. Due to the small unit savings of thermostats, errors and biases from self-selection that may not be very consequential when evaluating a whole- home retrofits (e.g., ±2% of home electricity consumption) can have a major impact when evaluating the savings and cost-effectiveness of smart thermostat programs. A percentage point change in the estimated savings could affect the cost-effectiveness of a program. This means it is important for evaluators to assess and to minimize the potential for error from selection bias in estimating smart thermostat program savings. The Uniform Methods Project provides model protocols for determining energy savings and demand reductions that result from specific energy efficiency measures implemented through state and utility programs. In most cases, the measure protocols are based on a particular option identified by the International Performance Verification and Measurement Protocol ; however, this work provides a more detailed approach to implementing that option. Each chapter is written by technical experts in collaboration with their peers, reviewed by industry experts, and subject to public review and comment. The UMP protocols can be used by utilities, program administrators, public utility commissions, evaluators, and other stakeholders for both program planning and evaluation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗