Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “schedule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Scheduling NASA's Deep Space Network: Priorities, Preferences, and Optimization

NASA's Deep Space Network (DSN) is the primary resource for communications and navigation for interplanetary space missions, for both NASA and partner agencies. Growth in mission demand, both in number of spacecraft and in data return, has led to increased loading levels on the network, and actual demand frequently exceeds network capacity. The DSN scheduling process involves peer-to-peer collaborative negotiation, which consumes significant time and resources in order to reach a baseline version of the schedule, and then to manage and agree to changes. Process delays are exacerbated by the high level of oversubscription experienced by the DSN: it is not unusual for the scheduling process to start with 20-40\% more requested time can be accommodated on the available antennas. The other NASA networks make use of a static mission priority list to address a similar problem: missions are ranked in priority order, then the schedule is populated by priority from highest to lowest. Such a mechanism would not work for DSN due to the heterogeneity of the mission set, and to the time-varying mission requirements with mission phase. This paper describes an alternative approach for the DSN that addresses key problems inherent in the current process --- oversubsubscription and how to "fairly'" reduce it to a manageable level. The main characteristics of the new approach are the use of loading-based limits based on balancing requested time, along with priorities and user preferences as the basis for optimization criteria that can be used by new algorithms.

Johnston, Mark D↗

Scheduling the Mapping of a planet under geometrical constraints

Scheduling the coverage of a planet by scientific instruments on board spacecrafts under observational constraints is central in a significant number of current and future missions for the exploration of the solar system. In this paper, we describe the components and algorithms of a software used to study early-phase mission design or to schedule daily operations of currently in-flight spacecraft. The scheduling problem at hand is usually a large combinatorial problem. A discretization process is described and several ordering algorithms are designed and compared. Experiments show that high-quality schedules can be produced by approaches combining reasoning about rolling, coverage and priorities.

Wells, Christopher↗

User Preference Optimization for Oversubscribed Scheduling of NASA’s Deep Space Network

NASA’s Deep Space Network (DSN) is the primary resource for communications and navigation for interplanetary space missions, for both NASA and partner agencies. Growth in mission demand, both in number of spacecraft and in data return, has led to increased loading levels on the network, and actual demand frequently exceeds network capacity. The DSN scheduling process involves peer-to-peer collaborative negotiation, which consumes significant time and resources in order to reach a baseline version of the schedule, and then to manage and agree to changes. Process delays are exacerbated by the high level of oversubscription experienced by the DSN: it is not unusual for the scheduling process to start with 20-40% more requested time can be accommodated on the available antennas. The other NASA networks make use of a static mission priority list to address a similar problem: missions are ranked in priority order, then the schedule is populated by priority from highest to lowest. Such a mechanism would not work for DSN due to the heterogeneity of the mission set, and to the time-varying mission requirements with mission phase. This paper describes an alternative approach for the DSN that addresses key problems inherent in the current process — oversubsubscription and how to “fairly” reduce it to a manageable level. The main characteristics of the new approach are the use of loading-based limits based on balancing requested time, along with priorities and user preferences as the basis for optimization criteria that can be used by new algorithms.

Johnston, Mark D↗

NICS (NASA Instrument Capabilities Study) Instrument Schedule and Cost Study

This paper summarizes work performed on the Flight Projects Directorate Planetary Science Projects Division (PSPD, Code 430) NICS (NASA Instrument Capabilities study) instrument schedule and cost study. Included are a short summary of the original NICS (NASA, 2008), and the design and approach, data collection, analysis, preliminary findings and recommendations from select areas of the current study. The NICS (2008) was chartered by then NASA Chief Engineer Michael Ryschkewitsch and chaired by Goddard Space Flight Center (GSFC) engineer, John Leon. The focus was to identify problem areas in instrument development and, if possible, to offer solutions. In the area of instrument developments, the NICS (2008) identified a lack of resources and authority to successfully manage to instrument cost and schedule requirements; and a lack of critical skills, expertise, and leadership to successfully implement unique (one-of-a-kind) high technology developments (NASA, 2008, pp. 51, 52). Additionally, the NICS (2008) found problems in requirements formulation, reviews and management; unrealistic caps and overly optimistic estimates; and externally directed changes which increased the likelihood of overrunning cost and schedule (NASA, 2008, pp.53, 54). It is noteworthy that NICS findings are consistent with previous studies at the mission level (Robbins, Schmidt & White, 2020). Five years later in 2013, the Instrument Projects Division (IPD) was established to implement and manage instrument projects greater than $20M. The IPD was known as Code 490. Its structure incorporated several of the NICS (2008) recommendations. To see if these incorporated recommendations made a difference, and to identify other potential challenges in instrument developments, two parallel studies were initiated. Originally led by the IPD, now led by the PSPD, and the Instrument and Payload Systems Engineering Branch (IPSE, Code 592), respectively, the instrument schedule and cost study and the instrument technical complexity study began in 2017. Data collection was initiated in 2020 and is on-going. This paper is limited to the IPD/PSPD study. Among other findings, preliminary data indicate IPD/PSPD project management support positively influenced instrument development as related to providing a dedicated level of support staff, including a deputy Instrument Project Manager (dIPM), reducing IPM leadership changes, and providing other project support. Next steps include continued data collection and analysis, and mapping to technical complexity data.

NICS implementation↗

A study of the impact of scheduling parameters in heterogeneous computing environments

This paper describes a tool for exploring system scheduler parameter settings in a heterogeneous computing environment. Through the coupling of simulation and optimization techniques, this work investigates optimal scheduling intervals, the impact of job arrival prediction on scheduling, as well as how to best apply fair use policies. The developed simulation framework is quick and modular, enabling decision makers to further explore decisions in real-time regarding scheduling policies or parameter changes.

Powers, Sarah S↗

Quantifying Scheduling Challenges for Exascale System Software

The move towards high-performance computing (HPC) ap- plications comprised of coupled codes and the need to dra- matically reduce data movement is leading to a reexami- nation of time-sharing vs. space-sharing in HPC systems. In this paper, we discuss and begin to quantify the perfor- mance impact of a move away from strict space-sharing of nodes for HPC applications. Specifically, we examine the po- tential performance cost of time-sharing nodes between ap- plication components, we determine whether a simple coor- dinated scheduling mechanism can address these problems, and we research how suitable simple constraint-based opti- mization techniques are for solving scheduling challenges in this regime. Our results demonstrate that current general- purpose HPC system software scheduling and resource al- location systems are subject to significant performance de- ciencies which we quantify for six representative applica- tions. Based on these results, we discuss areas in which ad- ditional research is needed to meet the scheduling challenges of next-generation HPC systems.

C.1.2 [Multiprocessors]: Parallel Processors↗

Sky Survey Scheduling Using Reinforcement Learning

Modern cosmic sky surveys (e.g., CMB S4, DES, LSST) collect a complex diversity of astronomical objects. Each of class objects presents different requirements for observation time and sensitivity. For determining the best sequence of exposures for mapping the sky systematically, conventional scheduling methods do not optimize the use of survey time and resources. Dynamic Sky survey scheduling is an np-hard problem that has been therefore treated primarily with heuristic methods. We present an alternative scheduling method based on reinforcement learning (RL) that aims to optimize the use of telescope resources for scheduling sky surveys.

79 ASTRONOMY AND ASTROPHYSICS↗

A Combined Day-ahead and Real-time approach for Scheduling Real and Reactive power dispatch of Battery Energy Storage System

A combined day-ahead (look-ahead) and real-time optimization approach is proposed to schedule BESS real and reactive power dispatch. The look ahead scheduling agent maximizes profit and essentially performs the function of energy arbitrage by looking at forecasted prices, network constraints and BESS operating conditions to generate real power dispatch schedule. While this schedule is followed, the real time optimization agent computes an optimum reactive power set-point (for a particular objective function) using optimal power flow framework. The concepts are implemented by co-simulating legacy tools and demonstrated on a large real world distribution system. In addition to the profits from energy arbitrage, optimum reactive power set point computation results in achieving desirable network attributes like flat voltage profiles and minimizing voltage deviations from desired value.

Bhatti, Bilal A.↗

Minimizing total tardiness and energy cost by considering layout and scheduling in a flexible job shop

Most sustainable manufacturing studies have discussed scheduling with energy consumption (EC), while the effect of layout on both scheduling and EC can be significant. This paper therefore investigates the interaction between layout and scheduling in a flexible job shop, and shows how considering them together affects EC (energy cost) and a conventional performance measure (tardiness cost). A mixed-integer nonlinear programming is proposed in this study to integrate layout with scheduling, and the objective function of the model is designed to minimize total tardiness and energy cost. The efficacy of the proposed model is evaluated by solving an illustrative case study. The results show that the objective function value can be in average improved by approximately 21% using the integrated model when compared to a non-integrated model.

Ebrahimi, Ahmad↗

Correlating and Simulating Socio-Demographically Driven Residential End-Use Activity Schedules

Incorporating socio-demographic and behavioral considerations into decision-support tools is crucial for identifying gaps and addressing consumer needs to ensure reliable and affordable energy solutions. In energy simulation models, the correlation between socio-demographics and time-use behavior is not well-captured. Thus, we developed a large-scale simulation workflow to generate schedules for 10 residential activities across 24 population segments defined by age, income, and employment status. Using pre-pandemic 2015-2019 American Time Use Survey (ATUS) data, we used ANOVA to confirm the correlation between demographic factors and time use. We explored three k-modes clustering methods-backward, forward, and a new hybrid approach-to delineate the occupancy patterns based on demographics. Using the probability of cluster membership for each population segment and a time inhomogeneous Markov chain to generate activity transition probabilities for each cluster, we simulated 50,000 schedules per segment and validated them against the ATUS data. The hybrid method produced the most socio-demographically differentiated clusters while demonstrating comparable performance to other approaches, with an overall root mean square error of 0.12 for both weekday and weekend schedules. Thus, the hybrid method, where each cluster is dominated by certain demographic segments and occupancy patterns, offers more modeling versatility in terms of scenario analysis. The new workflow improves the socio demographic differentiation of energy consumption by considering differences in time use. This approach enables future research on demographically segmented time of use (TOU) energy consumption, including impacts of TOU utility bills and rate analysis, long-run marginal emissions, and energy retrofits.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

An Approximation Algorithm for a Task Allocation, Sequencing and Scheduling Problem Involving a Human-Robot Team

Here we present an approximation algorithm for a Task Allocation, Sequencing and Scheduling Problem (TASSP) involving a team of human operators and robots. The robots have to travel to a given set of targets and collaboratively work on the tasks at the targets with the human operators. The problem aims to find a sequence of targets for each robot to visit and schedule the tasks at the targets with the human operators such that each target is visited exactly once by some robot, the scheduling constraints are satisfied and the maximum mission time of any robot is minimum. This problem is a generalization of the single Traveling Salesman Problem and is NP-Hard. Given k robots and m human operators, an algorithm is developed for solving the TASSP with an approximation ratio equal to 5/2- 1/k when m ≥ k and equal to 7/2 -1/k otherwise. Computational results are also presented to corroborate the performance of the proposed algorithm.

42 ENGINEERING↗

Lessons Learned from International Space Station Crew Autonomous Scheduling Test

In 2017, our team investigated and evaluated the novel concept of operations of astronaut self-scheduling (rescheduling their own timeline without creating violations) onboard International Space Station (ISS). Five test sessions were completed for this technology demonstration called Crew Autonomous Scheduling Test (CAST). For the first time in a spaceflight operational environment, an ISS crewmember planned, rescheduled, and executed their activities in real-time on a mobile device while abiding by flight and scheduling constraints. This paper discusses the lessons learned from deployment to execution.

planning and scheduling↗

COVID-19 impacts on residential occupancy schedules and activities in U.S. Homes in 2020 using ATUS

Many aspects of the daily lives of those living in the United States were substantially impacted by the COVID-19 pandemic in the year 2020. A broad diversity of measures was implemented to curb the spread of the virus, many of which included adjustments to where and how people worked, went to school, and otherwise conducted their daily lives compared to pre-pandemic times. This has impacted how residential buildings are used, how much time people spend in their homes, and as a result, how much energy these buildings consume. The main objective of this study is to analyze, at a national scale, the differences in the occupancy schedules and activities conducted in homes in the U.S., as compared to pre-pandemic. 15 years of American Time Use Survey and Current Population Survey data, from 2006 to 2020, was used in this study to analyze the occupancy schedules for both pandemic (2020) and pre-pandemic (2006–2019) times. These impacts were also analyzed with respect to variables including, weekday/weekend, month of the year, age of the occupants, household income, and household size. The impact of the pandemic on occupant schedules were most substantial in the initial months, whereas as the months progressed, these occupancy profiles slowly changed. Across 2020, people spent, on average, 8 % more time (1.9 h) in their home on weekdays, and 3–6 % (1.2 h) on weekend days. The percentage of time spent for different activities and locations within homes were also studied. For 1-member households, their time spent at home decreased whereas for 2-, 3-, and 4- member households, they spent more time at home. Overall, people spent around 45% more time doing office- and work-related activities at home compared to pre-pandemic, which is likely due to increased remote working and schooling. This research helps to improve the understanding of the occupancy presence and absence profiles in U.S. residential buildings due to the pandemic and provides new insights as to modified profiles for researchers, building designers, and policy makers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A data-driven linear formulation of the optimal demand response scheduling problem for an industrial air separation unit

Demand response (DR) has become a key element in balancing the power grid as the contribution of time-varying renewable power generation increases. Chemical plants are appealing candidates for DR programs as they offer large, concentrated and flexible loads. DR participation calls for frequent production rate changes over time scales that overlap with the dominant dynamics of the plant. Production scheduling should therefore consider the process dynamics explicitly. Here we present a data-driven approach for modelling the scheduling-relevant dynamics based on historical closed-loop operating data using autoregressive with extra inputs (ARX) models. We introduce a new, linear scheduling problem formulation based on the ARX representation, and demonstrate its implementation on an industrial air separation unit.

42 ENGINEERING↗

Multistage Stochastic optimization for mid-term integrated generation and maintenance scheduling of cascaded hydroelectric system with renewable energy uncertainty

The uncertainties resulting from the escalating penetration of renewable energy resources pose severe challenges to the efficient operation of modern power systems. Hydroelectricity is characterized by its flexibility, controllability, and reliability, and thus becomes one of the most ideal energy resources to hedge against such uncertainties. This paper studies the mid-term integrated generation and maintenance scheduling of a cascaded hydroelectric system (CHS) consisting of multiple cascaded reservoirs and hydroelectric units. To precisely describe the mid-term water regulation policies, the hydraulic coupling relationship and water-energy nexus of CHS are incorporated into the proposed optimization model. The uncertainties of natural water inflow and the power outputs of wind/solar energy generation are taken into consideration and captured via a stochastic process modeled by a scenario tree. A multistage stochastic optimization (MSO) approach is developed to coordinate the complementary operations of multiple energy resources, by optimizing the mid-term water resource management, generation scheduling, and maintenance scheduling of CHS. The proposed MSO model is formulated as a large-scale mixed-integer linear program that presents significant computational intractability. To address this issue, a tailored Benders decomposition algorithm is developed. Two real-world case studies are conducted to demonstrate the capability and characteristics of the proposed model and algorithm. The computational results show that the proposed MSO model can exploit the flexibility of hydroelectricity to efficiently respond to variable wind and solar power, and reserve water resources for the generation in peak months to reduce the consumption of fossil fuel. Furthermore, the proposed solution approach also exhibits promising computational efficiency when handling large-scale models.

13 HYDRO ENERGY↗

Microgrid Reliability Modeling and Battery Scheduling Using Stochastic Linear Programming

This paper describes the introduction of stochastic linear programming into Operations DER-CAM, a tool used to obtain optimal operating schedules for a given microgrid under local economic and environmental conditions. This application follows previous work on optimal scheduling of a lithium-iron-phosphate battery given the output uncertainty of a 1 MW molten carbonate fuel cell. Both are in the Santa Rita Jail microgrid, located in Dublin, California. This fuel cell has proven unreliable, partially justifying the consideration of storage options. Several stochastic DER-CAM runs are executed to compare different scenarios to values obtained by a deterministic approach. Results indicate that using a stochastic approach provides a conservative yet more lucrative battery schedule. Lower expected energy bills result, given fuel cell outages, in potential savings exceeding 6percent.

25 ENERGY STORAGE↗

Microgrid Optimal Scheduling With Chance-Constrained Islanding Capability

To facilitate the integration of variable renewable generation and improve the resilience of electricity sup-ply in a microgrid, this paper proposes an optimal scheduling strategy for microgrid operation considering constraints of islanding capability. A new concept, probability of successful islanding (PSI), indicating the probability that a microgrid maintains enough spinning reserve (both up and down) to meet local demand and accommodate local renewable generation after instantaneously islanding from the main grid, is developed. The PSI is formulated as mixed-integer linear program using multi-interval approximation taking into account the probability distributions of forecast errors of wind, PV and load. With the goal of minimizing the total operating cost while preserving user specified PSI, a chance-constrained optimization problem is formulated for the optimal scheduling of mirogrids and solved by mixed integer linear programming (MILP). Numerical simulations on a microgrid consisting of a wind turbine, a PV panel, a fuel cell, a micro-turbine, a diesel generator and a battery demonstrate the effectiveness of the proposed scheduling strategy. Lastly, we verify the relationship between PSI and various factors.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Effect of Biologically Effective Dose and Radiation Treatment Schedule on Overall Survival in Stage I Non-Small Cell Lung Cancer Patients Treated With Stereotactic Body Radiation Therapy

Purpose: To determine the effect of biologically effective dose (BED{sub 10}) and radiation treatment schedule on overall survival (OS) in patients with early-stage non-small cell lung cancer (NSCLC) undergoing stereotactic body radiation therapy (SBRT). Methods and Materials: Using data from 65 treatment centers in the United States, we retrospectively reviewed the records of T1-2 N0 NSCLC patients undergoing SBRT alone from 2006 to 2014. Biologically relevant covariates, including dose per fraction, number of fractions, and time between fractions, were used to quantify BED{sub 10} and radiation treatment schedule. The linear-quadratic equation was used to calculate BED{sub 10} and to generate a dichotomous dose variable of <105 Gy versus ≥105 Gy BED{sub 10}. The primary outcome was OS. We used the Kaplan-Meier method, the log–rank test, and Cox proportional hazards regression with propensity score matching to determine whether prescription BED{sub 10} was associated with OS. Results: We identified 747 patients who met inclusion criteria. The median BED{sub 10} was 132 Gy, and 59 (7.7%) had consecutive-day fractions. Median follow-up was 41 months, and 452 patients (60.5%) had died by the conclusion of the study. The 581 patients receiving ≥105 Gy BED{sub 10} had a median survival of 28 months, whereas the 166 patients receiving <105 Gy BED{sub 10} had a median survival of 22 months (log–rank, P=.01). Radiation treatment schedule was not a significant predictor of OS on univariable analysis. After adjusting for T stage, sex, tumor histology, and Eastern Cooperative Oncology Group performance status, BED{sub 10} ≥105 Gy versus <105 Gy remained significantly associated with improved OS (hazard ratio 0.78, 95% confidence interval 0.62-0.98, P=.03). Propensity score matching on imbalanced variables within high- and low-dose cohorts confirmed a survival benefit with higher prescription dose. Conclusions: We found that dose escalation to 105 Gy BED{sub 10} and beyond may improve survival in NSCLC patients treated with SBRT.

62 RADIOLOGY AND NUCLEAR MEDICINE↗