Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “scan report”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

SU-F-I-27: Measurement of SAR and Temperature Elevation During MRI Scans

Purpose: The poor reliability and repeatability of the manufacturer-reported SAR values on clinical MRI systems have been acknowledged. The purpose of this study is to not only measure SAR values, but also RF-induced temperature elevation at 1.5 and 3T MRI systems. Methods: SAR measurement experiment was performed at 1.5 and 3T. Three MRI RF sequences (T1w TSE, T1w inversion recovery, and T2w TSE) with imaging parameters were selected. A hydroxyl-ethylcelluose (HEC) gelled saline phantom mimicking human body tissue was made. Human torso phantom were constructed, based on Korean adult standard anthropometric reference data (Fig.1). FDTD method was utilized to calculate the SAR distribution using Sim4Life software. Based on the results of the simulation, 4 electrical field (E-field) sensors were located inside the phantom. 55 Fiber Bragg Grating (FBG) temperature sensors (27 sensors in upper and lower cover lids, and one sensor located in the center as a reference) were located inside the phantom to measure temperature change during MRI scan (Fig.2). Results: Simulation shows that SAR value is 0.4 W/kg in the periphery and 0.001 W/kg in the center (Fig.2). One 1.5T and one of two 3T MRI systems represent that the measured SAR values were lower than MRI scanner-reported SAR values. However, the other 3T MRI scanner shows that the averaged SAR values measured by probe 2, 3, and 4 are 6.83, 7.59, and 6.01 W/kg, compared to MRI scanner-reported whole body SAR value (<1.5 W/kg) for T2w TSE (Table 1). The temperature elevation measured by FBG sensors is 5.2°C in the lateral shoulder, 5.1°C in the underarm, 4.7°C in the anterior axilla, 4.8°C in the posterior axilla, and 4.8°C in the lateral waist for T2w TSE (Fig.3). Conclusion: It is essential to assess the safety of MRI system for patient by measuring accurate SAR deposited in the body during clinical MRI.

60 APPLIED LIFE SCIENCES↗

Calculating the Velocity in the Moss

The velocity of the warm (1 MK) plasma in the footpoint of the hot coronal loops (commonly called moss) could help discriminate between different heating frequencies in the active region core. Strong velocities would indicated low-frequency heating, while velocities close to zero would indicate high-frequency heating. Previous results have found disparaging observations, with both strong velocities and velocities close to zero reported. Previous results are based on observations from Hinode/EIS. The wavelength arrays for EIS spectra are typically calculated by assuming quiet Sun velocities are zero. In this poster, we determine the velocity in the moss using observations with SoHO/SUMER. We rely on neutral or singly ionized spectral lines to determine accurately the wavelength array associated with the spectra. SUMER scanned the active region twice, so we also report the stability of the velocity.

Womebarger, Amy R.↗

Strain mapping at nanometer resolution using advanced nano-beam electron diffraction

In this work, we report on the development of a nanometer scale strain mapping technique by means of scanning nano-beam electron diffraction. Only recently possible due to fast acquisition with a direct electron detector, this technique allows for strain mapping with a high precision of 0.1% at a lateral resolution of 1 nm for a large field of view reaching up to 1 μm. We demonstrate its application to a technologically relevant strain-engineered GaAs/GaAsP hetero-structure and show that the method can even be applied to highly defected regions with substantial changes in local crystal orientation. Strain maps derived from atomically resolved scanning transmission electron microscopy images were used to validate the accuracy, precision and resolution of this versatile technique.

36 MATERIALS SCIENCE↗

Diagnostic imaging of hepatocellular carcinoma at community hospitals and their tertiary referral center in the era of LI-RADS: a quality assessment study

Purpose: To assess guideline compliance and quality of hepatocellular carcinoma, (HCC) diagnostic imaging within community hospitals (CH) and their Tertiary referral center (TRC) in a moderately high incidence region. Methods: Initial diagnostic workup CT/MRI scans of 251 patients (122 CH, 112 TRC, 17 Non-TRC academic) with HCC over a 15-month period were assessed for Liver reporting and Data System (LI-RADS) guideline compliance. 269 scans (182 CT, 87 MRI) were qualitatively evaluated by 2 independent blinded radiologists for arterial timing, overall image quality, noise and sharpness, with quantification of interobserver variability. The contrast enhancement ratio (CER) for the largest HCC on each scan was calculated using pre- and post-contrast images. Results: 103/104 (99%) of TRC and 44/78 (56%) of CH CTs adhered to LI–RADS imaging guidelines (P < 0.0001). Lack of delayed phase accounted for 32/34 (94%) of noncompliant CH CTs. Regarding MRI, 19/19 (100%) of TRC and 60/68 (88%) of CH scans were adherent (P = 0.12). For both modalities, overall image quality, noise and sharpness were rated significantly higher for TRC than CH. There was moderate interobserver agreement with intraclass correlation coefficient of 0.73, 0.70 and 0.63, respectively. Arterial-phase timing was rated adequate for CT in 75/104 TRC (72%) and 10/68 (14%) CH scans (P < 0.0001) and for MRI in 8/19 (42%) TRC and 23/68 (33%) CH scans (P = 0.17). The CER was significantly higher for TRC versus CH (2.9 vs. 1.9, P < 0.001) and MRI (0.9 vs. 0.7, P = 0.03). Conclusions: Community hospital HCC diagnostic scans significantly lag in critical quality parameters of tumor enhancement, arterial phase timing, perceived image quality, and LI-RADS CT technique compliance compared to a TRC.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Aerosol Microphysics and Chemical Measurements at Mt. Soledad and Scripps Pier during the Eastern Pacific Cloud Aerosol Precipitation Experiment (EPCAPE) from February 2023 to February 2024 UCSD Library Collection

This dataset includes guest instrument measurements and other PI products for aerosol microphysics and chemical measurements collected at Mt. Soledad and Scripps Pier during the Eastern Pacific Cloud Aerosol Precipitation Experiment (EPCAPE) from February 2023 to February 2024. The measurements include the following instruments at Mt. Soledad: High-Resolution Time-of-Flight Aerosol Mass Spectrometer (HR-ToF-AMS, Aerodyne), Scanning Electrical Mobility Spectrometer (SEMS, Brechtel Manufacturing Inc.), Aerodynamic Particle Sizer (APS, Droplet Measurements Technologies), Single Particle Soot Photometer (SP2, Drople Measurements Technologies), Meteorological Station (WXT520, Vaisala), Ozone (Teco), and trace gas proxies (Teledyne). In addition, the analyses of particle filters collected at Mt. Soledad for three dry-diameter size cuts (<1 micron, <0.5 micron, <0.18 micron) and at Scripps Pier for one dry-diameter size cut (<1 micron) by Fourier Transform Infrared (FTIR) and X-ray Fluorescence (XRF) are reported. A differential mobility analyzer operated as a scanning mobility particle sizer (SMPS, TSI Inc.), a printed particle optical spectrometer (POPS, Grimm), and a continuous flow diffusion cloud condensation nuclei (CCN, DMT) counter provide the mobility aerosol size distribution (30-360 nm), optical size distribution (150 - 6000 nm), size-resolved CCN distribution (30-360 nm) at 0.2, 0.4, 0.6, 0.8, and 1.0% supersaturation. Measurements are reported for both sampling from an isokinetic aerosol inlet and from a Counterflow Virtual Impactor (CVI, Brechtel Manufacturing Inc.). The data are available at the following link: https://library.ucsd.edu/dc/collection/bb0898306q

54 ENVIRONMENTAL SCIENCES↗

Handheld Raman Spectrometers: Assessment Report

In April 2022 the National Urban Security Technology Laboratory’s System Assessment and Validation for Emergency Responders program conducted an operational assessment of ten commercially available handheld Raman spectrometers. Additionally, prior to the operational assessment, the Pacific Northwest National Laboratory conducted laboratory testing of the devices, including scanning a number of samples in various containers. This report summarizes the results of the assessment.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

SU-F-T-163: Improve Proton Therapy Efficiency: Report of a Workshop

Purpose: The technology of proton therapy, especially the pencil beam scanning technique, is evolving very quickly. However, the efficiency of proton therapy seems to lag behind conventional photon therapy. The purpose of the abstract is to report on the findings of a workshop on improvement of QA, planning and treatment efficiency in proton therapy. Methods: A panel of physicists, clinicians, and vendor representatives from over 18 institutions in the United States and internationally were convened in Knoxville, Tennessee in November, 2015. The panel discussed several topics on how to improve proton therapy efficiency, including 1) lean principle and failure mode and effects analysis, 2) commissioning and machine QA, 3) treatment planning, optimization and evaluation, 4) patient positioning and IGRT, 5) vendor liaison and machine availability, and 6) staffing, education and training. Results: The relative time needed for machine QA, treatment planning & check in proton therapy was found to range from 1 to 2.5 times of that in photon therapy. Current status in proton QA, planning and treatment was assessed. Key areas for efficiency improvement, such as elimination of unnecessary QA items or steps and development of efficient software or hardware tools, were identified. A white paper to summarize our findings is being written. Conclusion: It is critical to improve efficiency by developing reliable proton beam lines, efficient software tools on treatment planning, optimization and evaluation, and dedicated proton QA device. Conscious efforts and collaborations from both industry leaders and proton therapy centers are needed to achieve this goal and further advance the technology of proton therapy.

60 APPLIED LIFE SCIENCES↗

Microstructural and Oxidation Effects of Nb Additions to U3Si2

U3Si2 is a long term, accident-tolerant nuclear fuel candidate for light-water reactors because of its superior thermal conductivity and increased uranium density when compared to traditional uranium dioxide (UO2). While reducing internal thermal stresses and increasing efficiency, U3Si2 exhibits energetic oxidation during certain off-normal and accident scenarios, which include coolant or steam exposure. To mitigate this, Nb is investigated as an alloy constituent to enhance corrosion resistance and increase mechanical strength. The work presented investigates the response of Nb-alloyed U3Si2 to steam atmospheres. A thermogravimetric analysis is conducted in flowing steam to T > 1000 °C to assess oxidation resistance. The phase characterization of as-melted, thermally annealed and post-oxidation compositions with up to 12 vol% Nb by powder X-ray diffraction, scanning electron microscopy, and energy dispersive spectroscopy is reported.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Position-Dependent Neutron Time-of-Flight Deviation at VULCAN Diffractometer

In neutron diffraction, it is critical to precisely measure the lattice spacing, as it is an indicator of a material’s physical characteristics, such as lattice strain, thermal expansion, and phase structures. In time-of-flight (TOF) measurements, the lattice spacing is determined by the recorded TOF from a well-calibrated instrument. However, changes in neutron time-of-flight are sensitive to many factors, such as the alignment of instrument optics, temperature, sample positions, sample dimensions, internal strains, and chemical or physical heterogeneities at the grain level. At VULCAN (SNS, ORNL), which is a high-flux engineering neutron diffractometer, we used a 1-mm-diameter diamond powder sample to scan for changes in TOF by measuring d-spacing values at different sample positions under several configurations. The 2D map of the TOF deviation or d-spacing deviation, in terms of lattice shift/lattice strain, is reported. The change in TOF is dependent on the scanned location in the beam as well as on detector locations. The results are informative for experimental planning, data interpretation, and future instrument design.

36 MATERIALS SCIENCE↗

Analysis of Long-Term Cloud Cover, Radiative Fluxes, and Sea Surface Temperature in the Eastern Tropical Pacific

Grant activities accomplished during this reporting period are summarized. The contributions of the principle investigator are reported under four categories: (1) AHVRR (Advanced Very High Resolution Radiometer) data; (2) GOES (Geostationary Operational Environ Satellite) data; (3) system software design; and (4) ATSR (Along Track Scanning Radiometer) data. The contributions of the associate investigator are reported for:(1) longwave irradiance at the surface; (2) methods to derive surface short-wave irradiance; and (3) estimating PAR (photo-synthetically active radiation) surface. Several papers have resulted. Abstracts for each paper are provided.

Simpson, J. J.↗

Patient-based estimation of organ dose for a population of 58 adult patients across 13 protocol categories

Purpose: This study aimed to provide a comprehensive patient-specific organ dose estimation across a multiplicity of computed tomography (CT) examination protocols. Methods: A validated Monte Carlo program was employed to model a common CT system (LightSpeed VCT, GE Healthcare). The organ and effective doses were estimated from 13 commonly used body and neurological CT examination. The dose estimation was performed on 58 adult computational extended cardiac-torso phantoms (35 male, 23 female, mean age 51.5 years, mean weight 80.2 kg). The organ dose normalized by CTDI{sub vol} (h factor) and effective dose normalized by the dose length product (DLP) (k factor) were calculated from the results. A mathematical model was derived for the correlation between the h and k factors with the patient size across the protocols. Based on this mathematical model, a dose estimation iPhone operating system application was designed and developed to be used as a tool to estimate dose to the patients for a variety of routinely used CT examinations. Results: The organ dose results across all the protocols showed an exponential decrease with patient body size. The correlation was generally strong for the organs which were fully or partially located inside the scan coverage (Pearson sample correlation coefficient (r) of 0.49). The correlation was weaker for organs outside the scan coverage for which distance between the organ and the irradiation area was a stronger predictor of dose to the organ. For body protocols, the effective dose before and after normalization by DLP decreased exponentially with increasing patient's body diameter (r > 0.85). The exponential relationship between effective dose and patient's body diameter was significantly weaker for neurological protocols (r < 0.41), where the trunk length was a slightly stronger predictor of effective dose (0.15 < r < 0.46). Conclusions: While the most accurate estimation of a patient dose requires specific modeling of the patient anatomy, a first order approximation of organ and effective doses from routine CT scan protocols can be reasonably estimated using size specific factors. Estimation accuracy is generally poor for organ outside the scan range and for neurological protocols. The dose calculator designed in this study can be used to conveniently estimate and report the dose values for a patient across a multiplicity of CT scan protocols.

60 APPLIED LIFE SCIENCES↗

Long-term, hard X-ray observations of Scorpius X-1 from HEAO 1

The results of observations of Sco X-1 from three separate scanning epochs during 1977 and 1978 by the UCSD/MIT instruments aboard HEAO 1 in the 15-200 keV range are reported. Intensity and spectral variations have been studied on three time scales: 33-minute scans, daily averages, and weekly averages. No relationship was found between intensity and temperature over the very narrow range of temperatures observed, but comparison of the variability of the intensity, emission measure, and temperature implies at least two different emission mechanisms are at work. It is found that the spectral data are best fitted by either a thin-thermal-bremsstrahlung model of about 5 keV or a Comptonized thermal model of temperature about 3 keV. At higher energies (50-200 keV), no flux is found in excess of the thermal (as claimed by previous observers), and a 2-sigma upper limit from scanning data of 10 to the -5th photons/sq cm sec keV is set. This is an order of magnitude lower than reported detections. Using the distance derived from optical and UV measurements, X-ray luminosities from Sco X-1 incompatible with predictions for spherical accretion onto a white dwarf and emission volumes inconsistent with polar caps of white dwarfs are found.

Soong, Y.↗

In-situ characterization and quantification of melt pool variation under constant input energy density in laser powder bed fusion additive manufacturing process

Size and shape of a melt pool play a critical role in determining the microstructure in additively manufactured metals. However, it is very challenging to directly characterize the size and shape of the melt pool beneath the surface of the melt pool during the additive manufacturing process. Here, we report the direct observation and quantification of melt pool variation during the laser powder bed fusion (LPBF) additive manufacturing process under constant input energy density by in-situ high-speed high-energy x-ray imaging. We show that the melt pool can undergo different melting regimes and both the melt pool dimension and melt pool volume can have orders-of-magnitude change under a constant input energy density. Our analysis shows that the significant melt pool variation cannot be solely explained by the energy dissipation rate. We found that energy absorption changes significantly under a constant input energy density, which is another important cause of melt pool variation. Our further analysis reveals that the significant change in energy absorption originates from the separate roles of laser power and scan speed in depression zone development. The results reported here are important for understanding the laser powder bed fusion additive manufacturing process and guiding the development of better metrics for processing parameter design.

36 MATERIALS SCIENCE↗

Scanning tunneling microscope tip-induced formation of Bi bilayers on Bi 2 Te 3

We report the formation of Bi(111) bilayer islands and crater structures on Bi 2 Te 3 (111) surfaces induced by voltage pulses from a scanning tunneling microscope tip. Pulses above a threshold voltage (+3 V) produce craters ∼0.5μm in diameter, similar to the size of the tip. Redeposited material self-assembles into a network of atomically ordered islands with a lattice constant identical to the underlying Bi2Te3 surface. The island size monotonically decreases over several micrometers from the pulse site, until the pristine Bi 2 Te 3 surface is recovered. We assign these islands to Bi bilayer based on atomic resolution images, analysis of step heights, and tunneling spectroscopy. Here, the dependence of bilayer formation on bias polarity and the evidence for defect diffusion together suggest a mechanism driven by the interplay of field evaporation and tunneling-current-induced Joule heating.

Bi bilayer↗

Illinois Basin Coal Wells

Data described of the Illinois Basin Coal Wells from the Technical Report: Paronish, T.; Crandall, D.; Jarvis, K.; Workman, S.; Pohl, M.; Drosche, J.; Mckisic, T.; McLaughlin P.; Freidberg, J.; Delpomdor F. Computed Tomography Scanning and Petrophysical Measurements of Illinois Basin Coal Wells; DOE/NETL-2024/XXX; NETL Technical Report Series; U.S. Department of Energy, National Energy Technology Laboratory: Morgantown, WV, 2024; p 59.

Coal↗

Overview of Deployed EDS Technologies And Third Party Involvement with Advancedments

The term explosive detection system (EDS) is used by the TSA to describe equipment that is certified to detect explosives in checked bags. The EDS, as certified, by the TSL must consist of device for interrogating a bag and an automated detection algorithm (ATD) for evaluating the results of the interrogation. We only consider CT as the interrogation device in this report. A schematic drawing of a CT-based EDS is shown in Figure 2. The output of the ATD is the binary decision of alarm or non-alarm. Alarms may true- or false-positives. Non-alarms may be true- or false-negatives. False positives are also denoted false alarms. The true detection means that the ATD reports an alarm when a threat is present in the scanned bag. The probability of detecting a threat given that a threat is present is denoted the probability of detection (PD). The probability of false alarm (PFA) is the case when an alarm is reported when a threat is not present in a bag. Certification in this context means passing tests for PD and PFA at the TSL. The results of the EDS include CT cross-sectional images of the bag and specifics about the alarmed objects generated by ATD. These results are presented on a display so that a person may override the decision of ATD and declare the alarm to be a non-alarm. This process is denoted clearing. Bags that are not cleared by the person are sent to a secondary inspection process. Here the bags may be opened or assessed with explosive trace detection (ETD) in order to clear the bags. Bags that are not cleared at this point are evaluated by an ordinance disposal team. The CT scanner along with ATD is denoted Level 1 screening. The process of clearing on a display is denoted Level 2 screening. Secondary inspection is denoted Level 3 screening. Vendors of the deployed EDSs supply the TSA with equipment for all three levels. Therefore, the term EDS may include the equipment provided for Levels 1, 2 and 3. A schematic diagram of an EDS and the levels of screening are shown in Figure 7. The decision processes used as a bag is scanned and cleared is shown in Figure 8. Shield alarms and exceptions are discussed below. Since most alarms are false alarms, the probability of alarm is oftentimes denoted the probability of a false alarm. The expenses associated with clearing false alarms occur in Levels 2 and 3.

42 ENGINEERING↗

Overview of Deployed EDS Technologies

The term explosive detection system (EDS) is used by the TSA to describe equipment that is certified to detect explosives in checked bags. The EDS, as certified, by the TSL must consist of device for interrogating a bag and an automated detection algorithm (ATD) for evaluating the results of the interrogation. We only consider CT as the interrogation device in this report. A schematic drawing of a CT-based EDS is shown in Figure 2. The output of the ATD is the binary decision of alarm or non-alarm. Alarms may true- or false-positives. Non-alarms may be true- or false-negatives. False positives are also denoted false alarms. The true detection means that the ATD reports an alarm when a threat is present in the scanned bag. The probability of detecting a threat given that a threat is present is denoted the probability of detection (PD). The probability of false alarm (PFA) is the case when an alarm is reported when a threat is not present in a bag. Certification in this context means passing tests for PD and PFA at the TSL. The results of the EDS include CT cross-sectional images of the bag and specifics about the alarmed objects generated by ATD. These results are presented on a display so that a person may override the decision of ATD and declare the alarm to be a non-alarm. This process is denoted clearing. Bags that are not cleared by the person are sent to a secondary inspection process. Here the bags may be opened or assessed with explosive trace detection (ETD) in order to clear the bags. Bags that are not cleared at this point are evaluated by an ordinance disposal team. The CT scanner along with ATD is denoted Level 1 screening. The process of clearing on a display is denoted Level 2 screening. Secondary inspection is denoted Level 3 screening. Vendors of the deployed EDSs supply the TSA with equipment for all three levels. Therefore, the term EDS may include the equipment provided for Levels 1, 2 and 3. A schematic diagram of an EDS and the levels of screening are shown in Figure 7. The decision processes used as a bag is scanned and cleared is shown in Figure 8. Shield alarms and exceptions are discussed below. Since most alarms are false alarms, the probability of alarm is often times denoted the probability of a false alarm. The expenses associated with clearing false alarms occur in Levels 2 and 3.

42 ENGINEERING↗

Lessons Learned from a Complex FUSRAP Site - Sylvania Corning FUSRAP Site - 12269

Since its addition to the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 2005, the Sylvania Corning FUSRAP Site (the Site) in Hicksville, New York, has provided challenges and opportunities from which to gain lessons learned for conducting investigation work at a complex multi-contaminant FUSRAP Site. The United States Army Corps of Engineers (USACE) and its contractors conducted a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Remedial Investigation (RI) and are currently in the Feasibility Study (FS) phase at the Site. This paper presents the planning, execution, and reporting lessons learned by USACE during the RI/FS. The Site, operated from 1952 to 1967 for the research, development, and fabrication of nuclear elements under the Atomic Energy Commission, and other government and commercial contracts. Previous investigations performed by the New York State Department of Environmental Conservation (NYSDEC) and the current property owner have identified uranium, thorium, nickel, and chlorinated solvents, as Site contaminants [1]. The property owner is currently under two separate voluntary agreements with NYSDEC to investigate and remediate the Site. USACE's work at the site has been independent of this voluntary agreement and has moved on a parallel path with any work the property owner has completed. The project at the Site is complex because of the radiological and chemical concerns in both soils and groundwater, high hydraulically conductive soils, lack of a shallow aquiclude/aquitard, and a principal water table aquifer underlying the site. Contaminants are migrating from the Site and may potentially impact local drinking water supplies (municipal wells). During the RI/FS process the project team has encountered many issues and has thus developed many resolutions. The issues are organized into three categories: Planning and Contracting, Execution, and Reporting. Planning and Contracting lessons learned include: how to incorporate an overwhelming volume of historical data; how to manage a complex team of three prime contractors innovatively, and how to implement a project under an Award Fee task order. Execution lessons learned include: characterization of investigation derived wastes, and proper approach to radiological scanning of direct-push borings and soil cores. Reporting lessons learned include: coordinating multiple phase (iterative) reporting, large dataset presentation, and the National Priorities List (NPL) designation. The goal of this paper is to provide a resource for other project delivery teams that encounter similar situations on their projects to optimize cost savings, realization of efficiency, shorten schedules, or simply ensure higher quality deliverables. Each FUSRAP project is unique but there are many lessons we can apply to each site to gain efficiency and work more effectively. The Sylvania Corning FUSRAP site is a complex site with both soils and groundwater contamination, contamination to depths of 182 meters, and a highly politically charged environment of PRP involvement. Many of the lessons the project team has learned during the life of the project to date are being shared with others as well as being applied back to this project for future work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗