Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “programming”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Design and feasibility of a novel program of cervical screening in Nigeria: self-sampled HPV testing paired with visual triage

Background: Accelerated global control of cervical cancer would require primary prevention with human papillomavirus (HPV) vaccination in addition to novel screening program strategies that are simple, inexpensive, and effective. We present the feasibility and outcome of a community-based HPV self-sampled screening program. Methods: In Ile Ife, Nigeria, 9406 women aged 30–49 years collected vaginal self-samples, which were tested for HPV in the local study laboratory using Hybrid Capture-2 (HC2) (Qiagen). HPV-positive women were referred to the colposcopy clinic. Gynecologist colposcopic impression dictated immediate management; biopsies were taken when definite acetowhitening was present to produce a histopathologic reference standard of precancer (and to determine final clinical management). Retrospective linkage to the medical records identified 442 of 9406 women living with HIV (WLWH). Results: With self-sampling, it was possible to screen more than 100 women per day per clinic. Following an audio-visual presentation and in-person instructions, overall acceptability of self-sampling was very high (81.2% women preferring self-sampling over clinician collection). HPV positivity was found in 17.3% of women. Intensive follow-up contributed to 85.9% attendance at the colposcopy clinic. Of those referred, 8.2% were initially treated with thermal ablation and 5.6% with large loop excision of transformation zone (LLETZ). Full visibility of the squamocolumnar junction, necessary for optimal visual triage and ablation, declined from 68.5% at age 30 to 35.4% at age 49. CIN2+ and CIN3+ (CIN- Cervical intraepithelial neoplasia), including five cancers, were identified by histology in 5.9 and 3.2% of the HPV-positive women, respectively (0.9 and 0.5% of the total screening population), leading to additional treatment as indicated. The prevalences of HPV infection and CIN2+ were substantially higher (40.5 and 2.5%, respectively) among WLWH. Colposcopic impression led to over- and under-treatment compared to the histopathology reference standard. Conclusion: A cervical cancer screening program using self-sampled HPV testing, with colposcopic immediate management of women positive for HPV, proved feasible in Nigeria. Based on the collected specimens and images, we are now evaluating the use of a combination of partial HPV typing and automated visual evaluation (AVE) of cervical images to improve the accuracy of the screening program.

59 BASIC BIOLOGICAL SCIENCES↗

Validating quantum-classical programming models with tensor network simulations

The exploration of hybrid quantum-classical algorithms and programming models on noisy near-term quantum hardware has begun. As hybrid programs scale towards classical intractability, validation and benchmarking are critical to understanding the utility of the hybrid computational model. In this paper, we demonstrate a newly developed quantum circuit simulator based on tensor network theory that enables intermediate-scale verification and validation of hybrid quantum-classical computing frameworks and programming models. We present our tensor-network quantum virtual machine (TNQVM) simulator which stores a multi-qubit wavefunction in a compressed (factorized) form as a matrix product state, thus enabling single-node simulations of larger qubit registers, as compared to brute-force statevector simulators. Our simulator is designed to be extensible in both the tensor network form and the classical hardware used to run the simulation (multicore, GPU, distributed). The extensibility of the TNQVM simulator with respect to the simulation hardware type is achieved via a pluggable interface for different numerical backends (e.g., ITensor and ExaTENSOR numerical libraries). We demonstrate the utility of our TNQVM quantum circuit simulator through the verification of randomized quantum circuits and the variational quantum eigensolver algorithm, both expressed within the eXtreme-scale ACCelerator (XACC) programming model.

97 MATHEMATICS AND COMPUTING↗

2020 Can Do Colorado E-Bike Mini Pilot Program Study

### The Colorado Energy Office conducted a mini pilot program study as part of the Can Do Colorado initiative, providing e-bikes to 13 low-income participants. The program aimed to encourage energy-efficient transportation during the COVID-19 pandemic as transit services were reduced and people were concerned about exposure. The insights garnered from this small-scale pilot study informed the design of a full-scale, 2-year pilot in locations across Colorado. For more information about the mini pilot program, see NLR's [Preliminary Results Report](https://www.nlr.gov/docs/fy21osti/79657.pdf). Micromobility options such as e-bikes offer a solution for improving energy efficiency for short-distance trips, especially in urban areas. Pedal-assist e-bikes use an electric motor and battery to help power the bike. The motor amplifies the power behind each pedal stroke, augmenting the energy you put into the bike. #### Data Collection Agency The Colorado Energy Office conducted the survey. #### Survey Methodology Participants in the program received a Momentum LaFree E+ e-bike (Class 1) and accessories at no cost and manually submitted travel data and feedback for 3 months using the CanBikeCo App. The smartphone app, developed in partnership with NLR, used a customized version of the [NLR OpenPATH platform](https://www.nlr.gov/transportation/openpath.html). #### Survey Records and Data Survey records include a total of 13 participants. This dataset contains 3 months of end-to-end, multimodal travel data manually submitted via smartphone app by 13 low-income essential workers in the greater Denver area. The data includes distance, mode (e.g., e-bike, car, transit), trip purpose, and demographic information.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of the electron cooling simulation program for JLEIC

In the JLab Electron Ion Collider (JLEIC) project the traditional electron cooling technique is used to reduce the ion beam emittance at the booster ring, and to compensate the intrabeam scattering effect and maintain the ion beam emittance during collision at the collider ring. A new electron cooling process simulation program has been developed to fulfill the requirements of the JLEIC electron cooler design. The new program allows the users to calculate the electron cooling rate and simulate the cooling process with either DC or bunched electron beam to cool either coasting or bunched ion beam. It has been benchmarked with BETACOOL in aspect of accuracy and efficiency. In typical electron cooling process of JLEIC, the two programs agree very well and we have seen a significant improvement of computational speed using the new one. Being adaptive to the modern multicore hardware makes it possible to further enhance the efficiency for computationally intensive problems. The new program is being actively used in the electron cooling study and cooler design for JLEIC. We will present our models and some simulation results in this paper.

Zhang, He↗

Business Models for Scaling Demand Flexibility Volume I – Value proposition characteristics, challenges, and lessons learned from U.S. programs

Load growth at the grid edge is driving increased attention to the distribution system and its ability to enable customer technology adoption in an affordable and timely manner. Key industry stakeholders, including electric utilities and regulators, can benefit from strategies to manage and balance customer needs with infrastructure investments, such as demand flexibility. This report focuses on demand flexibility—the ability to reduce, shift, shed, generate, or modulate loads in response to building and grid needs—to reduce the need for costly grid upgrades by deferring investment needs and increase system reliability by shifting electricity usage during periods of high risk. Specifically, we focus on the emerging characteristics of business models for demand flexibility as a framework to understand how demand flexibility programs generate value. In this report, we focus on demand flexibility value propositions, which provide information on value creation and describe how programs deliver clear benefits that address customer and grid needs. This report discusses the role of value propositions in demand flexibility programs, provides an overview of value propositions for a range of demand flexibility stakeholders, identifies existing challenges to establishing an effective value proposition, and describes lessons learned. This report is part of a series that includes reports on customer relationship management strategies, stakeholder ecosystem management, and program life cycle.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Science Training Program for Young Italian Physicists and Engineers at Fermilab

The summer training program for Italian undergraduate and graduate students at the Department of Energy (DOE) laboratory of Fermilab (Batavia, Illinois, USA) started in 1984 as a 2 month training program for Italian undergraduate students in physics of the Istituto Nazionale di Fisica Nucleare (INFN) collaborating in the Collider Detector experiment (CDF) at the Fermilab Tevatron proton - antiproton collider. While in 1984 the program involved only 4 physics students from the University of Pisa, in the following years it rapidly grew in scope and size under the management of the Cultural Association of Italians at Fermilab (CAIF). With an average number of 30 trainees/year reached in the last few years, the total number of Italian students hosted at Fermilab since 1984 has exceeded 500 units. Since 2015 the program has been included in the portfolio of the summer courses of the University of Pisa, which acknowledges 6 ECTS to the interns.

Barzi, Emanuela↗

ARIES Oxide Production Program Monthly Report – April 2014

A summary of the accomplishments, milestones, financial summary, project performance and issues facing the Oxide Production Program for the end of April 2014 is presented in this Executive Summary. PF-4 and ARIES operations remain paused in order to resolve issues and perform an extent-of-condition review for Criticality Safety and Conduct of Operations. On April 28th, Jeff Yarbrough issued a memorandum updating status on the “pause” of PF-4 programmatic operations. He reported that 150 of the procedures that control programmatic operations in PF-4 have successfully resumed. These 150 procedures represent about ½ of the total that will enable us to meet FY14 programmatic commitments. No formal letter of direction will be provided to LANS via the NNSA Field Office contracting officer to address the direction relative to shipments, analytical chemistry sampling and guidance for financial adjustments in FY14 and FY15. LANS will provide a revised plan based on the funding profile included in the President’s Budget Request for the remainder of FY14 and FY15 to include revised FY14 milestones and proposed FY15 milestones. The ARIES Pit Cutter project met the NNSA milestone (Complete Design of Simple Pit Disassembly Equipment [ARIES Pit Cutter] – Due 8/15/14) by completing the fabrication design on 4/3/14, well in advance of the 8/15/14 due date. The project team has started procurement of long-lead items in preparation of the prototype fabrication and cold testing. The fabrication is scheduled to complete in FY14 and the cold testing will begin in FY14 and complete in early FY15. LANL and PNNL met on April 14 to discuss the path forward for PNNL criticality support to the program. The consensus was that PNNL resources can be effectively applied to the generation of detailed CSEs to support the program independent of the current ESS strategy. FY15 program planning is underway. The team is working on planning/drafting the work packages and developing the schedule under the assumption that operations will begin October 1, 2014. A planning schedule has been finalized and the team is meeting regularly to discuss details at the work package and WBS levels. The FY15 PMP is also in the process of being updated. The goal is to have all the drafts reviewed/approved and finalized prior to the start of the FY. MQ personnel have completed ADPSM Management Assessment: Evaluate Quality Roles and Responsibility Agreements between ADPSM and LANL Technical Support Organizations (PFITS 2011-1943). Two findings and four opportunities for improvement were reported. The robotic lathe controller upgrade has entered the construction phase of the project. The controller cabling IWD pre-job meeting was completed. The initial robotic lathe functional test was completed. The existing controller power supply disconnect is scheduled for early May. The NDA Cage project team received notification on 3/28/14 to restart the NDA cage project. Since then the team have been busy with activities that include assigning a planner, getting the construction work package ready for construction and getting the USQ completed. The electrical services installation for the new welding skid for the Inner Can Welder was completed. A gas bottle rack, used to support welding operations, will be installed in early May. The Outer Can Welder design is complete and the IWD is in development to execute construction. Installation materials have been ordered. Work continues on the MD-2 preliminary design. The project engineer is performing a technical evaluation of the Project Management Plan that was submitted by the design agent in response to the LANL Request for Proposal. If all requirements have been captured, LANL procurement will develop a contract and give the design agent notice to proceed on the preliminary design. Estimated completion is scheduled for September 2014. The design for the TA-55 Bldg. 314 warehouse was issued at 90% complete and has begun the last review process. A constructability review is scheduled for early May. The Project Manager has been working with the LANL estimating group to get the class 3 estimate for review. The Oxide Production Cage Upgrade project has kicked-off efforts on the 30% design. Requirements documentation has been drafted. The floor space was walked-down with other project managers and stakeholders and the boundaries were agreed upon.

ARIES↗

Master of Engineering Energy Systems Engineering Program: Smart Campus Energy Systems Demonstration DE-SC0005523

Program Purpose and Position: The mission of the Master of Engineering in Energy Systems Engineering program is to invigorate the pipeline of new engineering graduates interested in energy oriented careers and thus produce a new generation of technical leaders for the energy and power industries. Over the next decade, nearly 50% of the skilled workers and technical leaders in the gas and electric utility industries will retire -- a much larger void than the current available and qualified professionals could fill [CEWD, 2012 survey]. The Masters of Engineering in Energy System Engineering program provides an opportunity for cross-discipline education for graduates interested in a career in the energy industry. It focuses on electric power and the challenges and opportunities to develop a sustainable, reliable and resilient system that meets human needs in an increasingly sustainable manner through the use of environmentally sound energy resources and delivery. Both graduates and employers benefit from a well-trained professional workforce that is ready to hit the road running and be immediately productive in meeting these challenges, through this innovative and unique program.

Dodge, Martha↗

Light Water Reactor Sustainability Program: Digital Technology Business Case Methodology Guide

The Department of Energy’s (DOE’s) Light Water Reactor Sustainability Program aims to develop and deploy technologies that will make the existing U.S. nuclear fleet more efficient and competitive. The program has developed a standard methodology for determining the impact of new technologies in order to assist nuclear power plant (NPP) operators in building sound business cases. The Advanced Instrumentation, Information, and Control (II&C) Systems Technologies Pathway is part of the DOE’s Light Water Reactor Sustainability (LWRS) Program. It conducts targeted research and development (R&D) to address aging and reliability concerns with the legacy instrumentation and control and related information systems of the U.S. operating light water reactor (LWR) fleet. This work involves two major goals: (1) to ensure that legacy analog II&C systems are not life-limiting issues for the LWR fleet and (2) to implement digital II&C technology in a manner that enables broad innovation and business improvement in the NPP operating model. Resolving long-term operational concerns with the II&C systems contributes to the long-term sustainability of the LWR fleet, which is vital to the nation’s energy and environmental security. The II&C Pathway is conducting a series of pilot projects that enable the development and deployment of new II&C technologies in existing nuclear plants. Through the LWRS program, individual utilities and plants are able to participate in these projects or otherwise leverage the results of projects conducted at demonstration plants. Performance advantages of the new pilot project technologies are widely acknowledged, but it has proven difficult for utilities to derive business cases for justifying investment in these new capabilities. Lack of a business case is often cited by utilities as a barrier to pursuing wide-scale application of digital technologies to nuclear plant work activities. The decision to move forward with funding usually hinges on demonstrating actual cost reductions that can be credited to budgets and thereby truly reduce O&M or capital costs. Technology enhancements, while enhancing work methods and making work more efficient, often fail to eliminate workload such that it changes overall staffing and material cost requirements. It is critical to demonstrate cost reductions or impacts on non-cost performance objectives in order for the business case to justify investment by nuclear operators. The Business Case Methodology (BCM) addresses the “benefit” side of the analysis—as opposed to the cost side—and how the organization evaluates discretionary projects (net present value (NPV), accounting effects of taxes, discount rates, etc.). The cost and analysis side is not particularly difficult for the organization and can usually be determined with a fair amount of precision (not withstanding implementation project cost overruns). It is in determining the "benefits" side of the analysis that utilities have more difficulty in technology projects and that is the focus of this methodology.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Light Water Reactor Sustainability Program: Computer-Based Procedures for Field Activities: Results from Three Evaluations at Nuclear Power Plants

The Computer-Based Procedure (CBP) research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by Department of Energy (DOE) and performed in close collaboration with industry R&D programs that provides the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. One of the primary missions of the LWRS program is to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. One area that could yield tremendous savings in increased efficiency and safety is in improving procedure use. Nearly all activities in the nuclear power industry are guided by procedures, which today are printed and executed on paper. This paper-based procedure process has proven to ensure safety; however, there are improvements to be gained. Due to its inherent dynamic nature, a CBP provides the opportunity to incorporate context driven job aids, such as drawings, photos, and just-in-time training. Compared to the static state of paper-based procedures (PBPs), the presentation of information in CBPs can be much more flexible and tailored to the task, actual plant condition, and operation mode. The dynamic presentation of the procedure will guide the user down the path of relevant steps, thus minimizing time spent by the field worker to evaluate plant conditions and decisions related to the applicability of each step. This dynamic presentation of the procedure also minimizes the risk of conducting steps out of order and/or incorrectly assessed applicability of steps.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Mechanical Analysis of W78/88-1 Life Extension Program Warhead Design Options

Life Extension Program (LEP) is a program to repair/replace components of nuclear weapons to ensure the ability to meet military requirements. The W78/88-1 LEP encompasses the modernization of two major nuclear weapon reentry systems into an interoperable warhead. Several design concepts exist to provide different options for robust safety and security themes, maximum non-nuclear commonality, and cost. Simulation is one capability used to evaluate the mechanical performance of the designs in various operational environments, plan for system and component qualification efforts, and provide insight into the survivability of the warhead in environments that are not currently testable. The simulation efforts use several Sandia-developed tools through the Advanced Simulation and Computing program, including Cubit for mesh generation, the DART Model Manager, SIERRA codes running on the HPC TLCC2 platforms, DAKOTA, and ParaView. Several programmatic objectives were met using the simulation capability including: (1) providing early environmental specification estimates that may be used by component designers to understand the severity of the loads their components will need to survive, (2) providing guidance for load levels and configurations for subassembly tests intended to represent operational environments, and (3) recommending design options including modified geometry and material properties. These objectives were accomplished through regular interactions with component, system, and test engineers while using the laboratory's computational infrastructure to effectively perform ensembles of simulations. Because NNSA has decided to defer the LEP program, simulation results are being documented and models are being archived for future reference. However, some advanced and exploratory efforts will continue to mature key technologies, using the results from these and ongoing simulations for design insights, test planning, and model validation.

42 ENGINEERING↗

Fiscal Year 2013 Trails Management Program Mitigation Action Plan Annual Report, October 2013

This Trails Management Program Mitigation Action Plan Annual Report (Trails MAPAR) has been prepared for the Department of Energy (DOE)/National Nuclear Security Administration (NNSA) as part of implementing the 2003 Final Environmental Assessment for the Proposed Los Alamos National Laboratory Trails Management Program (DOE 2003). The Trails Mitigation Action Plan (MAP) is now a part of the Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory (DOE/EIS 0380) Mitigation Action Plan (2008 SWEIS MAP) (DOE 2008). The MAP provides guidance for the continued implementation of the Trails Management Program at Los Alamos National Laboratory (LANL) and integration of future mitigation actions into the 2008 SWEIS MAP to decrease impacts associated with recreational trails use at LANL. This eighth MAPAR includes a summary of Trails Management Program activities and actions during Fiscal Year (FY) 2013, from October 2012 through September 2013.

54 ENVIRONMENTAL SCIENCES↗

SLAC Laboratory Directed Research and Development Program: FY2014 Annual Report

The Department of Energy (DOE) and the SLAC National Accelerator Laboratory (SLAC) encourage innovation, creativity, originality and quality to maintain the Laboratory’s research activities and staff at the forefront of science and technology. To further advance the Laboratory’s scientific research capabilities, the Laboratory allocates a portion of its funds for the Laboratory Directed Research and Development (LDRD) program. With DOE guidance, the LDRD program enables SLAC scientists to make rapid and significant contributions to seeding new strategies for solving important national science and technology problems. The LDRD program is conducted using existing research facilities. The project proposals can be characterized as: Small-scale research and development activities or pilot projects; Bench-scale research projects; and Information gathering, computer modeling, conceptual design and feasibility studies. In addition to building new core competencies that support the DOE missions, the LDRD project proposals may also conduct scientific research and development that support the missions of other federal agencies and/or non-federal sponsors. In FY2014, SLAC continued to see some of the previously funded LDRD programs transition to follow on funding with the Office of Science, (including an Early Career Award), EERE and other agencies such as DARPA and NIH. This external validation shows that the projects selected were important to continuing forefront science and use-inspired applications with mission relevance and demonstrates they were delivering significant results. Annual reports for the FY14 project activities are included in this report.

25 ENERGY STORAGE↗

Highlights of INT Program 14-3: Heavy Flavor and Electromagnetic Probes

The Institute for Nuclear Theory program, Heavy Flavor and Electro- magnetic Probes in Heavy-Ion Collisions (INT 14-3), was held 15 September to 10 October 2014. In addition to the four organizers: Ramona Vogt (LLNL and UC Davis), Peter Petreczky (BNL), Anthony Frawley (Florida State), and Enrico Scomparin (INFN Torino), the program was attended by 34 other participants spread out over the four week period. Almost all participants were recognized experts in the field and were invited to take part. Eight of the participants were postdocs and five were women. There are two main thrusts to the study of heavy quarks and quarkonia in heavy-ion physics: “hot matter” (effects specific to the high temperature medium produced in heavy-ion or nucleus-nucleus collisions) and “cold nu- clear matter” (effects that are present already in proton-nucleus collisions and are a baseline against which hot matter effects must be compared) as well as production of the heavy quarks and quarkonium (bound states of heavy quark-antiquark pairs) in perturbative QCD. The program was structured so that the first two weeks were generally devoted to hot matter, especially lattice QCD. The second half was devoted to issues related to production and cold matter effects. An intense 2.5 day workshop, from 29 September to 1 October. Although a theory program, experimentalists attended throughout, giving talks on recent data and future facilities.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Ecological Monitoring and Compliance Program 2014 Report

The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO, formerly Nevada Site Office), monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2014. Program activities included (a) biological surveys at proposed activity sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, and (f) habitat restoration monitoring. During 2014, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives. Sensitive and protected/regulated species of the NNSS include 42 plants, 1 mollusk, 2 reptiles, 236 birds, and 27 mammals. These species are protected, regulated, or considered sensitive according to state or federal regulations and natural resource agencies and organizations. The desert tortoise (Gopherus agassizii) and the western yellow-billed cuckoo (Coccyzus americanus) are the only species on the NNSS protected under the Endangered Species Act, both listed as threatened. However, only one record of the cuckoo has ever been documented on the NNSS, and there is no good habitat for this species on the NNSS. It is considered a rare migrant. Biological surveys for the presence of sensitive and protected/regulated species and important biological resources on which they depend were conducted for 18 projects. A total of 199.18 hectares (ha) was surveyed for these projects. Sensitive and protected/regulated species and important biological resources found during these surveys included a predator burrow, one sidewinder rattlesnake (Crotalus cerastes), two mating speckled rattlesnakes (Crotalus mitchellii), and several species of cacti. NSTec provided to project managers a written summary report of all survey findings and mitigation recommendations, where applicable. Of the 18 projects on the NNSS, 15 occurred within the range of the threatened desert tortoise. Approximately 2.19 ha of desert tortoise habitat were disturbed. No desert tortoises were accidentally injured or killed by project activities, and no tortoises were killed by vehicles. On 13 occasions, tortoises were moved off the road and out of harm’s way. Six tortoises were found and transmitters attached as part of an approved study to assess impacts of vehicles on tortoises on the NNSS. NSTec biologists continued to monitor 37 juvenile desert tortoises as part of a collaborative effort to study survival and temperament of translocated animals. From 1978 until 2013, there has been an average of 11.2 wildland fires per year on the NNSS with an average of about 83.7 ha burned per fire. There were no wildland fires documented on the NNSS during 2014. Results from the wildland fuel surveys showed a very low risk of wildland fire due to reduced fuel loads caused by limited natural precipitation. Limited reptile trapping and reptile roadkill surveys were conducted to better define species distribution on the NNSS. Sixteen reptiles were trapped representing five species. Combined with data from 2013, 183 road kills were detected, representing 11 snake and 8 lizard species. Selected natural water sources were monitored to assess trends in physical and biological parameters, and one new water source was found. Wildlife use at five water troughs and four radiologically contaminated sumps was documented using motion-activated cameras. As part of the statewide effort to disseminate information throughout the botanical community, NSTec prepared a shape file with site-specific data for all 17 sensitive plants on the NNSS and provided it to the Nevada Natural Heritage Program for inclusion in their statewide database. No field surveys were conducted this year for sensitive plants on the NNSS due to poor growing conditions. Surveys of sensitive and protected/regulated animals during 2014 focused on winter raptors, bats, wild horses (Equus caballus), mule deer (Odocoileus hemionus), desert bighorn sheep (Ovis Canadensis nelsoni), and mountain lions (Puma concolor). Two permanent, long-term winter raptor survey routes were established and sampled in January and February. A total of 27 raptors representing 4 species were observed. The wild horse population increased from 30 to 41, with several yearlings recruiting into the population, possibly due to the death of a mountain lion known to prey on horse foals. Mule deer abundance and density measured with standardized deer surveys was similar to 2013 and appears to be stable. Desert bighorn sheep, including rams, ewes, and lambs, were detected using motion-activated cameras at four water sources. There are plans to conduct helicopter surveys to census the population during September 2015 and then capture and radio-collar up to 20 sheep during November 2015. Over 150 sheep scat samples have been collected for genetic analysis to try to determine how sheep on the NNSS are related to surrounding sheep populations. Information is presented about bird mortalities, Migratory Bird Treaty Act compliance, and a summary of nuisance animals and their control on the NNSS. A total of 93 mountain lion images (i.e., photographs or video clips) were taken during 220,379 camera hours at 16 of 32 sites sampled and another 11,946 images of at least 29 species other than mountain lions were taken as well. A mountain lion telemetry study continued in 2014. NNSS7 was tracked from January 1 to November 15 using a global positioning system satellite transmitter. He consumed 21 mule deer, 17 desert bighorn sheep, 1 juvenile bobcat, and 3 coyotes. Mule deer were primarily taken in the summer and fall. No new mountain lions were captured. A minimum of four adult lions (two males, two females), a subadult male, and three kittens were known to inhabit the NNSS during 2014. Two previously revegetated sites on the NNSS and one on the Tonopah Test Range (TTR) were monitored in 2014. The cover cap on the U-3ax/bl disposal unit, revegetated in 2000, and the 92-Acre Site at the Area 5 Radioactive Waste Management Complex, revegetated in 2011, were the restoration sites monitored on the NNSS. The Corrective Action Unit 407 Rollercoaster RADSAFE site, revegetated in 2000, was the restoration site monitored on the TTR. Plant cover and density were recorded at all sites except U-3ax/bl (qualitative monitoring), and reclamation success standards were evaluated, where applicable.

54 ENVIRONMENTAL SCIENCES↗

Integrated research training program of excellence in radiochemistry

The overall goal of this “Integrated Research Training Program of Excellence in Radiochemistry” is to provide a rich and deep research experience in state-of-the-art radiochemistry and in the fundamentals of radioisotopic labeling and tracer methodology to develop researchers who are capable of meeting the challenges of designing and preparing radiotracers of broad applicability for monitoring and imaging diverse biological systems and environmental processes. This program was based in the Departments of Radiology and Radiation Oncology at Washington University Medical School and the Department of Chemistry at the University of Illinois at Urbana Champaign, and it was initially directed by Professor Michael J. Welch as Principal Investigator. After his passing in 2012, the program was led by Professor Suzanne E. Lapi. Programmatic content and participant progress was overseen by an Internal Advisory Committee of senior investigators consisting of the PIs, Professor Mach from the Department of Radiology at Washington University and Professor John A. Katzenellenbogen of the Department of Chemistry at the University of Illinois. A small External Advisory Committee to give overall program guidance was also constituted of experts in radiolabeled compounds and in their applications in environmental and plant science.

18F↗

2016 Fermilab Laboratory Directed Research & Development Program Plan

Fermilab is executing Laboratory Directed Research and Development (LDRD) as outlined by order DOE O 413.2B in order to enhance and realize the mission of the laboratory in a manner that also supports the laboratory’s strategic objectives and the mission of the Department of Energy. LDRD funds enable scientific creativity, allow for exploration of “high risk, high payoff” research, and allow for the demonstration of new ideas, technical concepts, and devices. LDRD also has an objective of maintaining and enhancing the scientific and technical vitality of Fermilab. LDRD is able to fund employee-initiated proposals that address the current strategic objectives and better position Fermilab for future mission needs. The request for such funds is made in consideration of the investment needs, affordability, and directives from DOE and Congress. Review procedures of the proposals will insure that those proposals which most address the strategic goals of the DOE and the Laboratory or which best position Fermilab for the future will be recommended to the Laboratory Director who has responsibility for approval. The execution of each approved project will be the responsibility of the Principal Investigator, PI, who will follow existing Laboratory guidelines to ensure compliance with safety, environmental, and quality assurance practices. A Laboratory Director-appointed LDRD Coordinator will work with Committees, Laboratory Management, other Fermilab Staff, and the PI’s to oversee the implementation of policies and procedures of LDRD and provide the management and execution of this Annual Program Plan. FY16 represents third fiscal year in which LDRD has existed at Fermilab. The number of preliminary proposals (117) submitted in response to the LDRD Call for Proposals indicates very strong interest of the program within the Fermilab community. The first two Calls have resulted in thirteen active LDRD projects – and it is expected that between five and seven new projects will be approved in response to the FY16 Call for Proposals. The implementation of the program compared with FY15 is mostly unchanged except that the program is on the expected normal fiscal year calendar cycle with new projects starting at the beginning of the fiscal year. Because of this, there is some expanded discussion that the Laboratory Director may decide to initiate mid-year Late Start or Strategic- Hire LDRD projects.

99 GENERAL AND MISCELLANEOUS↗

The Texas A&M Radioisotope Production and Radiochemistry Program

The main motivation of the project at Texas A&M University was to carry out the production of critically needed radioisotopes used in medicine for diagnostic and therapy, and to establish an academic program in radionuclide production and separation methods. After a lengthy battle with the Texas A&M University Radiation Safety Office, the Texas Department of State Health Services granted us a license for the production of radionuclides in July 2015, allowing us to work in earnest in our project objectives. Experiments began immediately after licensing, and we started the assembly and testing of our target systems. There were four analytical/theoretical projects and two experimental target systems. These were for At-211 production and for Zn- 62/Cu-62 production. The theoretical projects were related to the production of Mo-99/Tc-99m using (a) a subcritical aqueous target system and (b) production of Tc-99m from accelerator-generated Mo-99 utilizing a photon-neutron interaction with enriched Mo-100 targets. The two experimental projects were the development of targetry systems and production of At-211 and Zn-62/Cu-62 generator. The targetry system for At-211 has been tested and production of At-211 is chronic depending of availability of beam time at the cyclotron. The installation and testing of the targetry system for the production of Zn-62/Cu-62 has not been finalized. A description of the systems is described. The academic program in radionuclide production and separation methods was initiated in the fall of 2011; due to the lack of a radiochemistry laboratory, it was suspended. We expect to re-start the academic program at the Texas A&M Institute for Preclinical Studies under the Molecular Imaging Program.

43 PARTICLE ACCELERATORS↗