Continuous-Domain Real-Time Distributed ADMM Algorithm for Aggregator Scheduling and Voltage Stability in Distribution Network
Not provided.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not provided.
Accurate and speedy detection of power system events is critical to enhancing the reliability and resiliency of power systems. Although supervised deep learning algorithms show great promise in identifying power system events, they require a large volume of high-quality event labels for training. This paper develops a bidirectional anomaly generative adversarial network (GAN)-based algorithm to detect power system events using streaming PMU data, which does not rely on a huge amount of event labels. By introducing conditional entropy constraint in the objective function of GAN and graph signal processing-based PMU sorting technique, our proposed algorithm significantly outperforms state-of-the-art event detection algorithms in terms of accuracy. To facilitate the adoption of the proposed algorithm, a prototype online platform is also developed using Apache Hadoop, Kafka, and Spark to enable real-time event detection. Here, the accuracy and computational efficiency of the proposed algorithm are validated using a large-scale real-world PMU dataset from the Eastern Interconnection of the United States.
This paper presents a methodology for simultaneous fault detection, classification, and topology estimation for adaptive protection of distribution systems. The methodology estimates the probability of the occurrence of each one of these events by using a hybrid structure that combines three sub-systems, a convolutional neural network for topology estimation, a fault detection based on predictive residual analysis, and a standard support vector machine with probabilistic output for fault classification. The input to all these sub-systems is the local voltage and current measurements. A convolutional neural network uses these local measurements in the form of sequential data to extract features and estimate the topology conditions. The fault detector is constructed with a Bayesian stage (a multitask Gaussian process) that computes a predictive distribution (assumed to be Gaussian) of the residuals using the input. Since the distribution is known, these residuals can be transformed into a Standard distribution, whose values are then introduced into a one-class support vector machine. The structure allows using a one-class support vector machine without parameter cross-validation, so the fault detector is fully unsupervised. Finally, a support vector machine uses the input to perform the classification of the fault types. All three sub-systems can work in a parallel setup for both performance and computation efficiency. In conclusion, we test all three sub-systems included in the structure on a modified IEEE123 bus system, and we compare and evaluate the results with standard approaches.
Not Available
The increasing penetration of distributed generations enables an innovative operation paradigm that allows islanded operation to enhance the resilience of the distribution grid. In this study, a cyber-physical oriented islanding strategy is proposed by coordinating centralised and distributed control to achieve seamless islanding transition and operational flexibility in emergency conditions. A cyber-physical control structure is developed to mitigate various disturbances (e.g. emergencies or fluctuations) according to different operation conditions. Specifically, the distributed fault isolation and seamless islanding transition are coordinated to mitigate the outage caused by unplanned islanding, while a secondary control is proposed to support primary control by reducing the power fluctuations during islanded operation. With a rapid response speed, the local cyber-physical devices are coordinated to accomplish islanding separation by selecting a feasible islanded area even under an unplanned islanding situation. A field test was conducted on a practical distribution network in China, and the results demonstrated the effectiveness and feasibility of the proposed islanding strategy.
In order to achieve stringent greenhouse gas emission reductions, a transition of our entire energy system from fossil to renewable resources needs to be designed. Such an energy transition brings two main challenges: most renewables generate variable electric energy, yet most demand is currently not electric (carrier mismatch) and does not always manifest at the same time as supply (temporal mismatch). Integrating multiple energy infrastructures can address both challenges by using the synergy between different energy carriers; building on existing infrastructure, while allowing a robust and flexible integration of the new. This paper proposes an optimization framework for long-term, multi-period investment planning of urban energy systems in an integrated manner. We formulate it as a mixed-integer linear program, combining a capacitated facility location with a multi-dimensional, capacitated network design problem. It includes generation and network expansion planning as well as interconnections between networks and storage infrastructure for each energy system. It can incorporate pathway effects like techno-economic developments, policy measures, and weather variations. The intended use is to support urban decision makers with long-term investment planning, though it can be tailored to fit other geographical or temporal scales. We demonstrate the model using two cases based on an average city in The Netherlands, which wants to reduce its CO 2 -emissions with 95% by 2050. In the first case, we include explicit carbon-emission constraints to study the effects of the carrier mismatch. In the second case, we implement interannual weather variations to analyze the temporal mismatch. The results give valuable insights into the energy transition design strategy for urban decision makers. They also show the future potential, as well as the computational challenges of the optimization framework.
Traditionally, centralized approaches have predominantly been used for the power system operation and control. With increasing penetration of small-scale distributed energy resources (DERs) in the distribution network, especially independently owned renewable resources, distributed algorithms can serve as a potential alternative for improving scalability, resiliency and addressing privacy concerns. However, the complexity of distributed algorithms significantly increases with the integration of the legacy devices, the operation of which depend on discrete control variables. This paper aims to provide a review of the distributed optimization algorithms incorporating discrete control variables for the power distribution system. While the research in this domain is still at its nascence, an extensive comparison of the approaches in the literature for applying quadratic penalty, branch and bound,ordinal optimization and proximal operator to handle discrete variables in the framework of ADMM and dual decomposition have been addressed. Future research direction in this field have been also provided.
Increasing penetration levels of inverter-based distributed energy resources (DERs) in distribution systems are creating challenges in system operation. Currently, wired or proprietary wireless communications are used by advanced distribution management systems (ADMS) to detect the state of the system and control the DERs for optimal operation. Wireless communications are an alternative solution that can enable connectivity between the dispersed assets used in distribution system applications. As demand for the seamless integration of distributed energy resources (DERs) continues to increase, proper networking and communications systems are becoming important to support the DER infrastructure. This report summarizes validation of a private wireless LTE network in a laboratory environment. The purpose of this work is to 1) demonstrate the effectiveness of private wireless LTE communication for grid applications and 2) provide a means of evaluating latency and overall performance of wireless communication in grid applications. First, private wireless LTE communication was validated in a direct transfer trip relaying scenario as an example of one-way communications using grid equipment. This study provided a baseline understanding of the variation in latency for seven different kinds of wireless scenarios shown in Figure A below. As expected, weak (attenuated) wireless signal-based communication yielded the widest ranges in latency. When higher priority was set for the trip signal communication, this resulted in lower latency in communication timing. In the final phase of this project, the private wireless LTE network was validated using two-way communications in an advanced distribution management system (ADMS) testbed which was developed in the ESIF at NREL. The purpose of this was to study the impact of wireless communication on grid performance.
Phasor measurement units (PMUs) play a crucial role in real-time monitoring and control of power grids. They rely on a communication network to transfer measurement data to the phasor data concentrator (PDC) for further processing and analysis. In this paper, a resilient cross-domain PMU and communication link placement method for minimizing the overall installation cost of the wide-area measurement system (WAMS) is proposed. Here, the main idea is to break down the barrier between the power grid domain and the communication domain, and consider the impact of one when design the other. The PMU placement in the power grid domain takes into account the cost of communication links by generating multiple solutions with equally minimum PMU costs for communication link placement evaluation. On the other hand, the communication link placement problem reduces the cost by customizing the routing policies based on the different roles of PMUs in grid observability. The proposed WAMS design is capable of withstanding any single component failure in the power domain (PMU failure or power branch failure) or in the communication domain (communication link failure or PDC failure). Numerical study on the IEEE 57-bus system reveals that the developed cross-domain optimization framework can significantly reduce the overall installation cost of WAMS while attaining multi-domain resiliency.
This paper presents a deep-learning framework, Multi-load Generative Adversarial Network (MultiLoad-GAN), for generating a group of synthetic load profiles (SLPs) simultaneously. The main contribution of MultiLoad-GAN is the capture of spatial-temporal correlations among a group of loads that are served by the same distribution transformer. This enables the generation of a large amount of correlated SLPs required for microgrid and distribution system studies. Here, the novelty and uniqueness of the MultiLoad-GAN framework are three-fold. First, to the best of our knowledge, this is the first method for generating a group of load profiles bearing realistic spatial- temporal correlations simultaneously. Second, two complementary realisticness metrics for evaluating generated load profiles are developed: computing statistics based on domain knowledge and comparing high-level features via a deep-learning classifier. Third, to tackle data scarcity, a novel iterative data augmentation mechanism is developed to generate training samples for enhancing the training of both the classifier and the MultiLoad-GAN model. Simulation results show that MultiLoad- GAN can generate more realistic load profiles than existing approaches, especially in group level characteristics. With little finetuning, MultiLoad-GAN can be readily extended to generate a group of load or PV profiles for a feeder or a service area.
The multiport autonomous reconfigurable solar power plant (MARS) is a promising concept for the integration of photovoltaic (PV) and energy storage system (ESS) to the transmission ac grid and a high-voltage direct current (HVdc) link. The presence of PV and ESS in each arm of the MARS results in uneven distribution of active power among different submodules (SMs), thereby leading to unbalanced SM capacitor voltages and potentially compromising the system stability. Moreover, in the case of partial shadings, shaded PV SMs will suffer from decreased power injections causing power mismatch in the MARS system. To address this issue, a neural-network-based power mismatch elimination (NNPME) strategy is proposed in this article. The proposed NNPME strategy optimizes ESS usage and leverages both dc and ac circulating currents to facilitate power transfer among the SMs, arms, and phases of the MARS system. Simulation and control hardware-in-the-loop (cHIL) experiments demonstrate the effectiveness of the proposed NNPME strategy. Compared with the traditional approaches, the proposed NNPME strategy can significantly enhance system efficiency and ensure stable and continuous operation, even in the presence of uneven power distribution within the MARS system.
Not Available
Conservation voltage reduction (CVR) is implemented in the distribution system to reduce the voltage along the feeder with the objective to reduce the power consumption. Due to the increased penetration of distributed generators in the distribution system the centralized control is cumbersome. Hence, in this paper, a distributed algorithm is proposed for volt-var optimization (VVO) with CVR objective in a three-phase unbalanced distribution network. The proposed method is based on alternating direction method of multipliers (ADMM) algorithm. Mathematically the problem is formulated as a convex optimization problem with reactive power support from smart inverters. The convexity guarantees the solution obtained using the proposed method is a converged solution. The proposed method is validated on IEEE 4-bus and 13-bus three-phase unbalanced systems.
This article introduces a techno-economic analysis aimed at identifying the optimal total size of movable energy resources (MERs) to enhance the resilience of electric power supply. The core focus of this approach is to determine the total size of MERs required within the distribution network to expedite restoration after extreme events. Leveraging distribution line fragility curves, the proposed methodology generates numerous line outage scenarios, with scenario reduction techniques employed to minimize computational burden. For each reduced multiple line outage scenario, a systematic reconfiguration of the distribution network, represented as a graph, is executed using tie-switches within the system. To evaluate each locational combination of MERs for a specific number of these resources, the expected load curtailment (ELC) is calculated by summing the load curtailment within microgrids formed due to multiple line outages. This process is repeated for all possible locational combinations of MERs to determine minimal ELC for each MER total size. For every MER total size, the minimal ELCs are determined. Finally, a techno-economic analysis is performed using power outage cost and investment cost of MERs to pinpoint an optimal total size of MERs for the distribution system. To demonstrate the effectiveness of the proposed approach, case studies are conducted on the 33-node and the modified IEEE 123-node distribution test systems.
Self-healing capability is a critical factor for a resilient distribution system, which requires intelligent agents to automatically perform service restoration online, including network reconfiguration and reactive power dispatch. Here, the article proposes the imitation learning framework for training such an agent, where the agent will interact with an expert built based on the mixed-integer program to learn its optimal policy, and therefore significantly improve the training efficiency compared with exploration-dominant reinforcement learning (RL) methods. This significantly improved training efficiency makes the training problem under N-k scenarios tractable. A hybrid policy network is proposed to handle tie-line operations and reactive power dispatch simultaneously to further improve the restoration performance. The 33-bus and 119-bus systems with N-k disturbances are employed to conduct the training. The results indicate that the proposed method outperforms traditional RL algorithms such as the deep-Q network.
This paper proposes a novel Soft-Actor-Critic (SAC) based Deep Reinforcement Learning (DRL) method for optimizing the cost of microgrid operation by leveraging load flexibility. The proposed SAC-DRL method is designed to coordinate the control of distributed energy resources (DERs) and flexible load, addressing practical energy billing formation by power distribution utilities. Key contributions include an innovative reward function to mitigate sparse reward challenges and a mixed control strategy for discrete and continuous variables, ensuring radial network topology and minimizing power loss. We evaluate the proposed method on the model of a real microgrid located in Southern California, U.S.. The SAC-DRL model is tested to demonstrate its efficacy in reducing grid dependence, optimizing resource use, and minimizing costs. The results highlight the potential of DRL in modern energy systems, offering a sustainable and economically efficient solution for energy management in microgrids.
A microgrid is simply a typical power system that has distributed energy resources (DERs), like small diesel generators, with loads in the network. The resiliency offered by microgrids to retain service during system events makes them a suitable support for the electric grid during natural disasters. One key factor that differentiates microgrids from a typical distribution grid is its ability to disconnect itself in the event of a blackout and sustain its loads through DERs. Microgrid systems will reconnect to the main grid when the grid comes back up. The resiliency offered by microgrids to retain service during system events makes them a suitable support for the electric grid during natural disasters. This presentation discusses the typical key steps involved in microgrid planning, installation, operation in a interoperable and interconnectable fashion.
Explore the source record for details and available documents.