Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planning scheduling optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

479 records · Page 27

How Can Probabilistic Solar Power Forecasts Be Used to Lower Costs and Improve Reliability in Power Spot Markets? A Review and Application to Flexiramp Requirements

Net load uncertainty in electricity spot markets is rapidly growing. There are five general approaches by which system operators and market participants can use probabilistic forecasts of wind, solar, and load to help manage this uncertainty. These include operator situation awareness, resource risk hedging, reserves procurement, definition of contingencies, and explicit stochastic optimization. We review these approaches, and then provide a case study in which a method for using probabilistic solar forecasts to define needs for reserves is developed and evaluated. The case study has three parts. First, we describe building blocks for enhancing the Watt-Sun solar forecasting system to produce probabilistic irradiance and power forecasts. Second, relationships between Watt-Sun forecasts for multiple sites in California and the system's need for flexible ramp capability (flexiramp) are defined by machine learning and statistical methods. Third, the performance of present methods to defining flexiramp requirements, which are not conditioned on weather and renewables forecasts, is compared with that of probabilistic solar forecast-based requirements, using a multi-timescale production costing model with an 1820-bus representation of the WECC power system. Significant potential savings in fuel and flexiramp procurement costs from using solar-informed reserve requirements are found.

14 SOLAR ENERGY↗

Improvements in SMR Modular Construction through Supply Chain Optimization and Lessons Learned

Affordable energy is a critical societal need. Capital construction cost is a significant portion of nuclear energy cost. By controlling and reducing cost, companies can build more competitive nuclear power plants and hence provide access to more affordable energy. Modular construction provides an opportunity to reduce the cost of construction, and as projects scale up in number, the cost of each unit can be further reduced. The objective of this project was to advance design and construction methods for manufacturing Small Modular Reactors (SMRs), and in particular to improve modular construction techniques and develop best practices for designing and operating supply chains that take advantage of these techniques. The overarching objectives were to accelerate the construction schedule and reduce its variability, reduce the cost of construction, reduce interest costs accrued during construction (IDC), and thus enhance the economic attractiveness of SMRs. Our fundamental measure of merit was total capital investment cost (TCIC). To achieve these objectives, this project developed a decision support system, EVAL, to support identifying, addressing, and resolving or ameliorating challenges and deficiencies in the current modular construction approach. The results of this effort were consistent with the facts that the cost of a construction activity is often smallest when accomplished in the factory, greatest when accomplished at the construction site, and at an intermediate level when accomplished at an assembly area close to the construction site. Further, EVAL can aid in providing insight into ways to reduce waste, improve quality, efficiency, and throughput and reflects the fact that the more done early in the construction process, i.e., in the factory, the more upfront funding is required and hence the more IDC will be accrued. The analysis has lead to a better understanding of circumstances under which modular construction performed mainly in the factory will result in lower expected total cost, relative to more traditional, on-site construction procedures. Further, we anticipate that EVAL can be used to gain insight regarding what role standardization can play in order for modularization to be most effectively defined. Such results would ultimately benefit all (small and large) new nuclear construction.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Decentralized control of units in smart grids for the support of renewable energy supply

Due to the significant environmental impact of power production from fossil fuels and nuclear fission, future energy systems will increasingly rely on distributed and renewable energy sources (RES). The electrical feed-in from photovoltaic (PV) systems and wind energy converters (WEC) varies greatly both over short and long time periods (from minutes to seasons), and (not only) by this effect the supply of electrical power from RES and the demand for electrical power are not per se matching. In addition, with a growing share of generation capacity especially in distribution grids, the top-down paradigm of electricity distribution is gradually replaced by a bottom-up power supply. This altogether leads to new problems regarding the safe and reliable operation of power grids. In order to address these challenges, the notion of Smart Grids has been introduced. The inherent flexibilities, i.e. the set of feasible power schedules, of distributed power units have to be controlled in order to support demand–supply matching as well as stable grid operation. Controllable power units are e.g. combined heat and power plants, power storage systems such as batteries, and flexible power consumers such as heat pumps. By controlling the flexibilities of these units we are particularly able to optimize the local utilization of RES feed-in in a given power grid by integrating both supply and demand management measures with special respect to the electrical infrastructure. In this context, decentralized systems, autonomous agents and the concept of self-organizing systems will become key elements of the ICT based control of power units. In this contribution, we first show how a decentralized load management system for battery charging/discharging of electrical vehicles (EVs) can increase the locally used share of supply from PV systems in a low voltage grid. For a reliable demand side management of large sets of appliances, dynamic clustering of these appliances into uniformly controlled appliance sets is necessary. We introduce a method for self-organized clustering for this purpose and show how control of such clusters can affect load peaks in distribution grids. Subsequently, we give a short overview on how we are going to expand the idea of self-organized clusters of units into creating a virtual control center for dynamic virtual power plants (DVPP) offering products at a power market. For an efficient organization of DVPPs, the flexibilities of units have to be represented in a compact and easy to use manner. We give an introduction how the problem of representing a set of possibly 10{sup 100} feasible schedules can be solved by a machine-learning approach. In summary, this article provides an overall impression how we use agent based control techniques and methods of self-organization to support the further integration of distributed and renewable energy sources into power grids and energy markets. - Highlights: • Distributed load management for electrical vehicles supports local supply from PV. • Appliances can self-organize into so called virtual appliances for load control. • Dynamic VPPs can be controlled by extensively decentralized control centers. • Flexibilities of units can efficiently be represented by support-vector descriptions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Middlesex South FUSRAP Site: Collaboration Towards Beneficial Reuse - 20338

The US Department of Energy (DOE) Office of Legacy Management (LM) manages DoE's post-closure responsibilities and ensures the future protection of human health and the environment with respect to sites that have no continuing DOE mission after undergoing remediation. LM's beneficial reuse program promotes the LM strategic goal to sustainably manage and optimize use of public lands. The beneficial reuse program aims to repurpose former contaminated sites to restore the environment, protect the public health, revitalize communities, and spur economic growth. Benefits from the reuse of a site may increase the local tax base, facilitate job growth, utilize existing infrastructure, and enhance or protect natural resources. Beneficial reuse also promotes protectiveness by ensuring activities are compatible with long-term maintenance and protection of public health and the environment, as well as by retaining good stewardship of natural resources. LM actively participates in promoting the economic development vision of the surrounding communities by collaborating with local communities to promote regional or municipal initiatives. The Borough of Middlesex, New Jersey, has prepared the Lincoln Boulevard Redevelopment Plan, which will reinvent a once-viable downtown and enhance the quality of life for the community. The Middlesex South, New Jersey, Formerly Utilized Sites Remedial Action Program (FUSRAP) site lies within the boundaries of this redevelopment area. In support of this development plan, the Borough is interested in acquiring the site for its Department of Public Works and to increase street access in the future commercial district to be built near adjacent properties. The opportunity to put the FUSRAP site into productive use aligns with LM's mission and strategic goals. In support of beneficial reuse activities, DOE can dispose of excess real property using several mechanisms. The two disposal options applicable to the Middlesex south site include (1) utilizing the US General Services Administration (GSA) or (2) using the Title 10 Code of Federal Regulations Section 770, 'Transfer of Real Property at Defense Nuclear Facilities for Economic Development' (known as a '770 transfer') process. Using the 770 transfer requires economic development as the primary driver, and a specific redevelopment proposal must be submitted. If there is no interest in specific economic development, the GSA option becomes the default mechanism for disposal of the property. In the case of the Middlesex south site, the 770 transfer process is being utilized and the Borough has submitted its economic development proposal to LM. Although LM is encouraged by the opportunity to put the site into productive use, the Middlesex south site is currently on the US Environmental Protection Agency (EPA) National Priorities List and remediation is being performed by the US Army Corp of Engineers (USACE) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consequently, any property transfer must meet the requirements under CERCLA Section 120(h), 'Property Transferred by Federal Agencies.' As the groundwater remedy will not be in place for several years, approval would be required from the US EPA administrator and the governor of the state of New Jersey to perform an early transfer of the site (before all response actions have been completed). The time frame for these approvals to occur under the normal process conflicts with the proposed redevelopment schedule; therefore, various options for expedited sale, transfer, or lease of portions of the site to the Borough were evaluated. The subsequent decision on a mutually beneficial path forward was the result of a collaborative effort between LM, USACE, the Borough and its redevelopment team, EPA, and the New Jersey Department of Environmental Protection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Microgravity Flight - Accommodating Non-Human Primates

Spacelab Life Sciences-3 (SLS-3) was scheduled to be the first United States man-tended microgravity flight containing Rhesus monkeys. The goal of this flight as in the five untended Russian COSMOS Bion flights and an earlier American Biosatellite flight, was to understand the biomedical and biological effects of a microgravity environment using the non-human primate as human surrogate. The SLS-3/Rhesus Project and COSMOS Primate-BIOS flights all utilized the rhesus monkey Macaca mulatta. The ultimate objective of all flights with an animal surrogate has been to evaluate and understand biological mechanisms at both the system and cellular level, thus enabling rational effective countermeasures for future long duration human activity under microgravity conditions and enabling technical application to correction of common human physiological problems within earth's gravity, e.g., muscle strength and reloading, osteoporosis, immune deficiency diseases. Hardware developed for the SLS-3/Rhesus Project was the result of a joint effort with the French Centre National d'Etudes Spatiales (CNES) and the United States National Aeronautics and Space Administration (NASA) extending over the last decade. The flight hardware design and development required implementation of sufficient automation to insure flight crew and animal bio-isolation and maintenance with minimal impact to crew activities. A variety of hardware of varying functional capabilities was developed to support the scientific objectives of the original 22 combined French and American experiments, along with 5 Russian co-investigations, including musculoskeletal, metabolic, and behavioral studies. Unique elements of the Rhesus Research Facility (RRF) included separation of waste for daily delivery of urine and fecal samples for metabolic studies and a psychomotor test system for behavioral studies along with monitored food measurement. As in untended flights, telemetry measurements would allow monitoring of thermoregulation, muscular, and cardiac responses to weightlessness. In contrast, the five completed Cosmos/Bion flights, lacked the metabolic samples and behavioral task monitoring, but did facilitate studies of the neurovestibular system during several of the flights. The RRF accommodated two adult 8-11 kg rhesus monkeys, while the Russian experiments and hardware were configured for a younger animal in the 44 kg range. Both the American and Russian hardware maintained a controlled environmental system, specifically temperature, humidity, a timed lighting cycle, and had means for providing food and fluids to the animal(s). Crew availability during a Shuttle mission was to be an optimal condition for retrieval and refrigeration of the animal urine samples along with a manual calcein injection which could lead to greater understanding of bone calcium incorporation. A special portable bioisolation glove box was under development to support this aspect of the experiment profile along with the capability of any contingency human intervention. As a result of recent U.S./Russian negotiations, funding for Space Station, and a series of other events, the SLS-3 mission was cancelled and applicable Rhesus Project experiments incorporated into the Russian Bion 11 and 12 missions. A presentation of the RRF and COSMOS/Bion rhesus hardware is presented along with current plans for the hardware.

Dalton, Bonnie P.↗

Microgravity Flight: Accommodating Non-Human Primates

Spacelab Life Sciences-3 (SLS-3) was scheduled to be the first United States man-tended microgravity flight containing Rhesus monkeys. The goal of this flight as in the five untended Russian COSMOS Bion flights and an earlier American Biosatellite flight, was to understand the biomedical and biological effects of a microgravity environment using the non-human primate as human surrogate. The SLS-3/Rhesus Project and COSMOS Primate-BIOS flights all utilized the rhesus monkey, Macaca mulatta. The ultimate objective of all flights with an animal surrogate has been to evaluate and understand biological mechanisms at both the system and cellular level, thus enabling rational effective countermeasures for future long duration human activity under microgravity conditions and enabling technical application to correction of common human physiological problems within earth's gravity, e.g., muscle strength and reloading, osteoporosis, immune deficiency diseases. Hardware developed for the SLS-3/Rhesus Project was the result of a joint effort with the French Centre National d'Etudes Spatiales (CNES) and the United States National Aeronautics and Space Administration (NASA) extending over the last decade. The flight hardware design and development required implementation of sufficient automation to insure flight crew and animal bio-isolation and maintenance with minimal impact to crew activities. A variety of hardware of varying functional capabilities was developed to support the scientific objectives of the original 22 combined French and American experiments, along with 5 Russian co-investigations, including musculoskeletal, metabolic, and behavioral studies. Unique elements of the Rhesus Research Facility (RRF) included separation of waste for daily delivery of urine and fecal samples for metabolic studies and a psychomotor test system for behavioral studies along with monitored food measurement. As in untended flights, telemetry measurements would allow monitoring of thermoregulation, muscular, and cardiac responses to weightlessness. In contrast, the five completed Cosmos/Bion flights, lacked the metabolic samples and behavioral task monitoring, but did facilitate studies of the neurovestibular system during several of the flights. The RRF accommodated two adult 8-11 kg rhesus monkeys, while the Russian experiments and hardware were configured for a younger animal in the 44 kg range. Both the American and Russian hardware maintained a controlled environmental system, specifically temperature, humidity, a timed lighting cycle, and had means for providing food and fluids to the animal(s). Crew availability during a Shuttle mission was to be an optimal condition for retrieval and refrigeration of the animal urine samples along with a manual calcein injection which could lead to greater understanding of bone calcium incorporation. A special portable bioisolation glove box was under development to support this aspect of the experiment profile along with the capability of any contingency human intervention. As a result of recent U.S./Russian negotiations, funding for Space Station, and a series of other events, the SLS-3 mission was cancelled and applicable Rhesus Project experiments incorporated into the Russian Bion 11 and 12 missions. A presentation of the RRF and COSMOS/Bion rhesus hardware is presented along with current plans for the hardware.

Dalton, Bonnie P.↗

Analysis of Strategic Conflict Management Approaches as Applied to Simulated UAM Operations

This report presents the results of a comparison analysis of candidate Strategic Conflict Management (SCM) strategies as applied to Urban Air Mobility (UAM) operations. The SCM strategies investigated included: no SCM, resource scheduling (RS), resource flow rates (FR), area-based flow rates (AR), and conflict detection and resolution (CR). The study evaluated each strategy against the same 3 levels of flight demand in a representative airspace construct for the Dallas/Fort Worth region. The study also accounted for different levels of uncertainty in operational planning and equivalent levels of trajectory following error. In the analysis, we compared the SCM strategies’ effectiveness in reducing the need for the tactical conflict management layer to act and looked at the metrics of unmitigated losses-of-separation (LOS), flight delays imposed by strategic planning, and throughput of the overall airspace. The study results indicated that the CR strategy was the most effective at reducing LOS and percentage of flights with LOS, even in the presence of trajectory error when uncertainty is accounted for in planning. Thus, if the objective is to reduce the number of actions that the tactical conflict management layer will have to take, in terms of conflicts that may need to be resolved, CR is the strategy to use. The FR strategy was found to be the worst at reducing LOS and percentage of flights with LOS. Thus, it is not very effective at reducing the actions required by a tactical conflict management layer. In the airspace tested, the demand was high enough to produce unacceptable levels of flight delay and reductions of throughput when the SCM strategies were implemented. This was especially evident at the higher levels of trajectory uncertainty and error. The need to account for expected levels of uncertainty becomes more and more important as the demand level increases and as the level of trajectory error increases. This is because the likelihood of flights with LOS increases as the density of operations increases and as the level of trajectory error increases. Accounting for uncertainty in the SCM strategies improves the strategy effectiveness with respect to LOS but increases delays and reduces throughput. Thus, there is a tradeoff between scalability and allowable levels of uncertainty. That is, we can implement an air traffic management construct that allows high levels of uncertainty, but we can expect that same system to have limits on scalability that may be evident even at small demand levels, such as those used in this study. Therefore, the results in this study indicate that an air traffic system should attempt to implement mechanisms appropriate for reducing uncertainty where possible in order to increase the chances for scalability. And this increased level of predictability of operations needs to be balanced with mechanisms for ensuring flexibility when operational conditions and plans need to change, even though those types of changes should be the exception rather than the rule under normal conditions. The study also introduced a trade space that could serve as a mechanism for selecting the appropriate SCM strategy in a trade-off between uncertainty and error, mean flight delay, and the LOS metrics (which this study equates to the potential for tactical conflict management actions). The optimal solution for a given airspace, demand level, and other factors, could likely be a combination of SCM strategies, although this study only compared the use of a single SCM strategy at a time. The CR strategy appeared to have the best opportunity for scalability by limiting the number of potential tactical actions to nearly zero.

Strategic Conflict Management↗

The Uniform Methods Project: Smart Thermostat Evaluation Protocol

A smart thermostat is an internet-connected device that controls home heating, ventilation, and air-conditioning (HVAC) equipment and can automatically adjust temperature set points to optimize performance and achieve energy savings. Smart thermostat features often include two way communication, occupancy detection (such as geofencing and occupancy sensors), schedule learning, and seasonal optimization algorithms. Smart thermostats can control most conventional HVAC systems, including central air conditioners, heat pumps, and forced air furnaces. Several types of residential utility programs offer smart thermostats as replacements measures. Working with smart thermostat vendors, utilities can offer separate optimization programs to produce energy savings beyond those achieved by installing a smart thermostat. From an evaluation perspective, smart thermostat programs have several noteworthy features. First, the energy savings from a smart thermostat may change over the life of the device. As a smart thermostat is connected to the internet, original equipment manufacturers can update the thermostat software to improve the thermostat's energy efficiency. Likewise, users can adjust the thermostat settings and schedules over time in response to changes in weather, thermal comfort, energy prices, or preferences for energy efficiency. Additionally, many thermostat manufacturers offer seasonal optimization programs that recommend changes or make minor, automated adjustments to the thermostat settings to improve energy efficiency. These opt-in programs are now standard offerings for many smart thermostat manufacturers and provided at no additional cost to users. The potential for software updates and continuous optimization and the evolving nature of user interactions mean future energy savings may differ from first-year savings and the energy savings of smart thermostats may need to be evaluated more than once. Second, smart thermostats often have small unit energy savings relative to a home's total energy consumption, especially in comparison to whole- home retrofit programs. This can make it difficult to detect the smart thermostat savings in billing or advanced metering infrastructure (AMI) meter consumption data. For example, as cooling loads in many regions average about 20% of annual electricity consumption, smart thermostat savings of 10% of cooling energy use would equate to a 2% reduction in home electricity consumption. Evaluators should use regression analysis of whole-home billing consumption or advanced metering infrastructure (AMI) meter consumption data to evaluate smart thermostat savings because, as explained at greater length below , these data are usually available to evaluators and regression can control for the impacts of weather and other potentially confounding factors on a home's energy consumption. Finally, as with other energy efficiency programs, participation in smart thermostat programs is self-selective. As discussed at greater length below , smart thermostat participants tend to be, among other things, younger, higher-income, and more likely to adopt electric vehicles (EVs) and internet connected devices than nonparticipants. These differences are often unobservable to the evaluator and correlated with a home's energy consumption, creating the potential for bias in estimating savings. Due to the small unit savings of thermostats, errors and biases from self-selection that may not be very consequential when evaluating a whole- home retrofits (e.g., ±2% of home electricity consumption) can have a major impact when evaluating the savings and cost-effectiveness of smart thermostat programs. A percentage point change in the estimated savings could affect the cost-effectiveness of a program. This means it is important for evaluators to assess and to minimize the potential for error from selection bias in estimating smart thermostat program savings. The Uniform Methods Project provides model protocols for determining energy savings and demand reductions that result from specific energy efficiency measures implemented through state and utility programs. In most cases, the measure protocols are based on a particular option identified by the International Performance Verification and Measurement Protocol ; however, this work provides a more detailed approach to implementing that option. Each chapter is written by technical experts in collaboration with their peers, reviewed by industry experts, and subject to public review and comment. The UMP protocols can be used by utilities, program administrators, public utility commissions, evaluators, and other stakeholders for both program planning and evaluation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Motor Configuration Selection for A New Technical Challenge to Develop A 5 MW Cryogenic Motor and Drive

Due to aviation’s appreciable and growing share of humanity’s impact on our environment and estimates that CO2emissions only account for 34% of aviation’s total effective radiative forcing [1], there is a need to reach beyond climate goals that focus only on CO2emissions, such as the US Aviation Climate Action Plan’s [3] goal to reach net-zero carbon emissions by 2050.There is motivation to develop technology that pushes toward future large transport aircraft with net zero climate impact that are highly electrified (i.e., have higher power electrical propulsion system components). This paper describes a new, 6-year technical challenge to address this need by developing a 5 MW superconducting motor and cryogenic drive. Section 1 will detail the motivation for this work. Section 2 will describe the technical challenge and the selected specifications for the motor. Section 3 will present the results of a motor configuration trade study and the down selection of one configuration to develop a detailed design for. The technical challenge focuses on the design of a5 MW superconducting motor and cryogenic drive and demonstration of it at a 2+ MW scale to achieve TRL 3. Both fully superconducting (superconducting stator and rotor) and fully cryogenic (superconducting rotor and cryogenic stator) machine configurations will be explored. An emphasis will be placed on addressing the key tall poles for high power superconducting machines. Further details will be included in the full paper. The requirements and goals of the motor will be detailed. The rated speed (2,000 to 3,000 rpm) is defined to be appropriate for directly driving multi-MW fans or propellers. A range of rated speed is permitted because the motor is not designed for a specific aircraft and to provide design flexibility if AC losses in the stator winding are found to be a significant constraint (i.e., a lower speed can be selected to reduce electrical frequency). Relatively conservative requirements for efficiency (99%) and specific power (20 kW/kg) are defined, because TRL advancement and pushing toward flight readiness is emphasized over performance optimization. However, more aggressive efficiency and specific power goals are specified (99.9% and 40 kW/kg). The 3rd section will present the results of a motor configuration trade study. The study started with a qualitative assessment of sixteen motor configurations based on geometric, mechanical, thermal, and electromagnetic criteria. This assessment has been completed with three evaluators scoring all nine criteria. A configuration down select was made by prioritizing the sixteen configurations into four tiers based on each configuration’s total score and consideration of manufacturability, complexity, and support hardware (e.g., rotary vacuum seals, bearings). Configurations in priority A and B will be further evaluated through quantitative assessments, whereas those in priority C will only be further evaluated if time permits and priority D will not be further evaluated. Eight of the sixteen configurations were down selected for quantitative assessment, which will include analytical calculations and low-to moderate-fidelity finite element analysis to produce a preliminary Pareto front of efficiency versus specific power for each configuration. This assessment emphasizes the calculation of AC losses in the stator winding and an exploration of thermal management approaches to remove that heat and maintain cryogenic temperature. The final paper will include a description of each motor configuration that was considered. The quantitative assessments are underway, and an assessment of one configuration is complete for multiple stator conductor options. The remaining assessments are scheduled to be completed by late March so that the final down select to one configuration can be included in this paper.

Net Zero↗

Supporting ARPA-E Power Grid Optimization (Final Report)

Pacific Northwest National Laboratory (PNNL), Arizona State University (ASU), Georgia Institute of Technology (Georgia Tech), Los Alamos National Laboratory (LANL), National Renewable Energy Laboratory (NREL), Texas A&M University (TAMU), The University of Texas at Austin (UT), and the University of Wisconsin-Madison (UW-M) supported the ARPA-E Grid Optimization (GO) Competition by providing a common problem formulation, data format, datasets, evaluation mechanism, scoring, rules, and results that resulted in the awarding of $\$9.24$ million dollars to teams from academia, industry, and national labs for solving three sets of increasingly difficult non-linear, security- constrained AC Optimal Powerflow (AC-OPF) optimization problems in order to increase the efficiency of the US Electric Grid. It is estimated that a 1% increase in efficiency can save $\$1$ billion. Current industry practices typically use a linear DC model (DC-OPF) in order solve the OPF problem within the time constraints of the operation schedule. The GO Competition challenges the best power engineers, mathematicians, and computer scientists to make possible operational decisions based on accurate physical models. To accomplish this, the GO Competition created a series of Challenges and funded teams to produce the best solver. Challenge 1 was to solve the security constrained Alternating Current Optimal Power Flow (ACOPF) problem. Challenge 2 extended that to by adding adjustable transformer tap ratios, phase shifting transformers, switchable shunts, price-responsive demand, ramp rate constrained generators and loads, and fast-start unit commitment (UC). Furthermore, Challenge 2 was a maximization problem while Challenge 1 was a minimization problem. While Challenge 3 was being developed, the entrants were invited to find better solutions to the Challenge 2 synthetic datasets with no restrictions on time, hardware, or algorithms. The Challenge 2 solutions turned out to be very good. Challenge 3 expanded the Challenge 2 problem further by using multiperiod dynamic markets, including advisory models for extreme weather events, day-ahead markets, and the real-time markets with an extended look-ahead. These problems included active bid-in demand and topology optimization. Together the Challenges used nearly 30 million CPU hours. Since each team was working on the same problem, using the same data, and running on the same hardware, fair comparisons could be drawn as to the best solver. The datasets were varied enough, however, that the best solver for one dataset was not necessarily the best at another, so cumulative scores were used. The process was managed by the PNNL maintained website https://GOCompetition.energy.gov, where Entrants could find information about the problem, the data, the rules, submit their solver for evaluation, and see the scores of all the competing teams on a Leaderboard. Interest was world-wide but only American teams were eligible for prizes. The Competition has produced 34 journal articles 115 papers and been cited over 500 times in the literature, including 12 dissertations (4 from foreign countries; Columbia (2), Germany, and Italy) and 3 from the DOE ExaScale project. Software developed by Pearl Street Technologies for Challenges 1 and 2 is now deployed by Southwest Power Pool (SPP) and Midcontinent Independent Service Operator (MISO). Other teams have received inquiries from venture capitalists. Google DeepMind has thanked the Competition for making the datasets developed for the Competition public. They are using it to train machine learning models. The larger datasets have billions of unknowns to be solved for, but only a small percent matter in the final solution. Knowing what unknowns are important can dramatically speedup the solution.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Machine Learning Approach to Improve Air Traffic Management Initiatives

Collaborating closely with commercial air carriers and related organizations, the Federal Aviation Administration(FAA) regulates air traffic and ensures the safety and efficiency of air operations. Air traffic controllers make strategic decisions, such as delaying, rerouting, or canceling flights, partly based on guidance provided by the FAA’s Air TrafficControl System Command Center (ATCSCC). The guidance includes, among other things, control measures known asTraffic Management Initiatives (TMIs) designed to enhance safety and improve operational efficiency. TMIs play a crucial role in managing the demand and capacity within the U.S. National Airspace System (NAS). Two major TMIs that are routinely used (primarily to mitigate the adverse effects of bad weather) are Ground Delay Programs (GDPs) andGround Stops (GSs). In a GDP, flights destined for airports facing thunderstorm activity experience delays at their origin airports. This proactive approach minimizes the risk of routing aircraft through hazardous weather conditions and also replaces (fuel burning) airborne delays with ground delays. In a GS, a temporary restriction is imposed on the departure or arrival of aircraft at a specific airport or within a designated airspace. Although other TMIs (e.g., miles-in-trail) are also implemented as part of (air) traffic flow management in the NAS, the focus of this work is on GDPs and GSs. Since TMIs, by design, lead to flight delays or cancellations, it is crucial to put in place the right set of parameters(e.g., scope and duration of the GDP). For example, when the end time of a GDP extends beyond what is necessary, it imposes unnecessary delays on departing flights. This situation could occur as a result of inaccurate prediction of the(required) duration of the GDP based on the weather forecast. On the other hand, if a GDP ends prematurely before the underlying capacity constraints are resolved at the destination airport, it may result in airborne holding. The delicate balance lies in matching the termination of the GDP precisely with the resolution of capacity constraints, avoiding both the imposition of unnecessary ground delays and the need for airborne holding due to premature program termination.Failing to specify the right parameters for TMIs also leads to flight delays, creating a significant obstacle in managing the increasing traffic volumes causing increased work load for the controllers. To address this issue, we propose the integration of Machine Learning (ML) models in the traffic flow management(TFM) pipeline. In current operations, decisions are made by human experts based on extensive training, historical patterns, available traffic and weather data. Since we have an abundance of data from past events that tell us the likely impact of various TMIs, by ingesting historical data, properly trained ML models can offer valuable insights and aid human decision-making. With the FAA increasingly exploring advanced analytics, ML emerges as a focal point for enhancing TFM within the National Airspace System (NAS). As a first step, this study aims to provide traffic controllers with decision-making support for the issuance and adjustment of TMIs. Data analytics and machine learning have been previously employed to address some of the challenges associated with TMIs. Numerous studies have concentrated on various facets of TMI issuance, exploring factors influencing TMI parameters, including arrival rate, airport capacity, and delay prediction. For example, using weather forecasts, several statistical methods were used to produce probabilistic capacity profiles which in conjunction with deterministic models provided insights into the GDP planning process [1–4]. The downside of using deterministic models is that they rely on fixed inputs and predetermined rules, which lack the ability to account for the inherent uncertainty and variability present in real-world scenarios. In a separate series of studies, researchers aimed to predict the occurrences of GDPs and GSs. The majority of these studies utilized various supervised learning methods, including Decision Trees, Naive Bayes, Support VectorMachines, and Random Forests to analyze the influence of weather conditions and arrival demand on TMI incidents[5–8]. However, these studies primarily focused on predicting the incidence of TMIs without explicitly addressing the scope of TMIs, including their duration and their geographical coverage. Furthermore, the emphasis of these studies was largely on GDPs, given their higher frequency and longer duration when compared to GSs. A limited number of studies focused on predicting the parameters of TMIs, specifically addressing their duration and extent. In one such study focusing on optimizing the TMI parameters at San Francisco International Airport (SFO),the authors utilized a probabilistic forecast of fog [9]. They simulated various capacity scenarios based on the (fog)burn-off forecasts, selecting GDP parameters that minimized airborne and overall ground delays. However, this approach exclusively emphasizes stratus (fog) burn-off as the primary determinant of GDP and GS, neglecting other influential factors like severe weather events, runway closures, lower capacity than traffic demand, and other important variables. Given the complexity of predicting the TMI and determining its scope, we seek a more holistic approach. We aim to consider all significant factors that could impact TMIs and their parameters. What sets this research apart is the fusion of all data sources relevant to the issuance and adjustment of TMIs and it represents the first comprehensive attempt to optimize TMIs in this manner. Since this comprehensive solution involves various aspects, we break down the problem into smaller components and input all parameters into a unified model called the “TMI Adjuster”. Figure 1 shows the overall framework and the list of datasets used in each model. The objective of the TMI Adjuster module is to deliver reliable, consistent and expedited recommendations for the progression, adjustment, and termination of TMIs. The ML solution entails developing a pipeline capable of predicting the necessity of a TMI (e.g., GS or GDP) along with its various parameters. For example, in the case of a GS, this includes the scope of the GS either in terms of distance from the destination airport or based on pre-defined airspace sectors. Here, scope refers to those regions and departing airports that are subject to the GS. In this paper, we concentrate on the issuance of GSs in the three major airports in the New York area — LaGuardia(LGA), John F. Kennedy International (JFK), and Newark Liberty International (EWR). We fuse traffic, weather and other relevant aviation data from years 2017 to 2019 to train and validate the ML models. In particular, we use the following datasets: •Terminal Aerodrome Forecast (TAF): meteorological forecasts specific to each airport, issued four times a day, covering predefined time periods. •TMI data: includes all GSs and GDPs along with their respective parameters. •Aviation System Performance Metrics (ASPM): includes traffic related data such as aircraft delays, arrival, and departure rates. •Notices to Airmen (NOTAMs): utilized to extract runway closure data and manage interdependencies between terminals in close proximity. •Flight cancellation data •Airspace Flow Programs (AFP): includes information on flight airborne holdings caused by TMIs. The data preprocessing entails transforming ASPM, TMI, AFP, NOTAMs, and weather data into an hourly format and consolidating all datasets by merging them based on date and time as the primary key. The TMI Adjuster framework comprises two parallel models: one dedicated to GS and a second model focused on GDP. As previously mentioned, our specific focus is on the GS model as a multi-classification problem. In this framework, each data point of the GS model input summarizes ten hours of data. Specifically, the data loader for the GS model generates the input and output of the model as follows: at a given time step, the input includes the actual traffic, weather, and TMI data from the two-hour window before the time step, alongside the weather forecast and scheduled traffic for the next 8 hours starting from the time step. Based on this information, the output of the GS model for each time interval consists of three dimensions. The first dimension represents a binary decision on whether there should be a GS in place for the next hour or not. The second dimension is related to the scope of the GS in the United States, and the third dimension is related to the scope of the GS in Canada (i.e., to determine if the GS impacts airports in Canada).One of the challenges with TMI modeling is the sparsity of TMI events, particularly regarding its scope. To address this challenge in the scope of the GS model output, we implement grouping. The GS scope for the US region is defined based on a list of centers that should be included when the GS is in place. With 20 centers in the US, we utilized historical data to group them into 4 categories. In particular, we summarized our historical data in a graph format where nodes represent centers, and link weights are defined based on the co-occurrence of centers in the scope parameter ofTMIs. By identified strongly connected components in this graph, we were able to partition the centers into four groups. We consider two model structures for the GS Model. Firstly, a hierarchical classification model [10], where the human decision-making for a GS is of hierarchical nature. The decision-maker first decides whether there is a need fora GS, and if the answer is yes, determines the scope. A hierarchical classification model organizes the problem into a class hierarchy, typically a tree or a Directed Acyclic Graph (DAG) structure, and considers the dependency of the decision in the previous step to the next component [10]. Here, we employ the local classifier per level approach, which involves training one multi-class classifier for each level of the class hierarchy. The second structure is the independent structure. In this setting, as the name suggests, we do not consider the dependency of the decisions in the different dimensions of the output of the model. Instead, for each dimension, we train a multi-class classifier independently. Table 1 summarizes GS model statistics for training, validation and testing. The table documents the effect of limiting data to the time steps when there was actually a TMI in place or when a TMI had just terminated. This resulted in a more balanced distribution of the GS class(GS positive class)versus “No GS”(GS negative class), which might help the training process. While JFK and LGA follow very similar distributions, with 40% and 42% GS positive class respectively, EWR has proportionally fewer GS incidents at 28%. Our subsequent phase involves evaluating the performance of both hierarchical structure and independent structure using different state-of-the-art multi-class classifier models such as Random Forest, Decision Trees, K-nearest Neighbors, and Logistic Regression and forecast the duration and scope of the GSs.

Farzan Masrour Shalmani↗