DOE OSTI2016
This report summarizes the historical development of the Confined Sluicing End Effector (CSEE) technology as well scarification technology. We also summarize the systems integration and deployment of that technology in the Gunite and Associated Tanks (GAAT) at the Oak Ridge Reservation where the retrieval system successfully removed the remaining sludge and heel in the eight tanks for tank closure and disposition. We also summarize the lessons learned from the deployment at Oak Ridge. Simulant development and testing have been key activities for any waste retrieval effort as many of the physical properties of the waste are unknown; therefore, this report discusses a bounding series of simulants that helps to reduce uncertainty for operations. These simulants have been developed for potential Hanford waste retrieval deployment. The potential key attributes for retrieval, based upon information provided by Washington River Protection Services (WRPS), of single-shell tank A-105 are discussed along with the potential application of CSEE technology to the challenges presented by the unique nature of A-105. These unique features include a major tear in the bottom of the tank, which necessitates technologies other than past practice sluicing to be deployed to prevent further intrusion of waste into the vadose zone. In addition, significant in-tank hardware makes A-105 particular challenging. However, there appear to be a number of parameters that should be investigated through additional testing or review of prior testing that may demonstrate the applicability of the CSEE technology to A-105. Testing of the Waste Retrieval End Effector (WREE), which was based on the original CSEE design, to demonstrate the ability to remove sludge and hardpan from Tank 241-C-106 will be reviewed to determine relevance to the Tank A-105 retrieval. There may be new requirements for the deployment system that accesses the tank with the CSEE because the tank bottom may not be flat, requiring the ability to maneuver the CSEE to maintain the appropriate stand-off distance from the CSEE and the tank bottom. Finally, we provide a set of recommendations, a set of task descriptions, and a range of estimated costs for a demonstration of the technology by the end of FY17. These tasks are summarized as: Complete system-level functional requirements; Procure or access the capacity to perform; Generate simulant development and simulant testing; Develop CSEE functionality; Develop demonstration plan; Perform demonstration; Analyze and document testing results; Perform project management and engineering.
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗