Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “observation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

S-NPP VIIRS Solar Diffuser Degradation at the View Direction of the Rotating Telescope Assembly

S-NPP VIIRS has been on-orbit for more than nine years since it was launched on October28th,2011. The VIIRS reflective solar bands (RSBs) are calibrated on-orbit primarily by an onboard solar diffuser (SD). The SD on-orbit degradation is tracked by an onboard SD stability monitor(SDSM). The VIIRS RSBs view the SD through a rotating telescope assembly (RTA). The RTA views the SD from a direction that is quite different from that of the SDSM. It has been shown that the SD degrades non-uniformly with respect to the incident and outgoing directions, especially at the short wavelengths. Thus, the SDSM calibration cannot provide an accurate SD degradation estimation for the view direction of the RTA, resulting in long-term drifts in the calibration coefficients derived from the SD and SDSM calibration. S-NPP VIIRS has been scheduled to view the Moon approximately monthly since its launch. The lunar observations can provide accurate long-term trends for the RSB calibration coefficients since the lunar surface reflectance is quite stable. By comparing the SD and lunar calibration results, we can obtain the SD degradation differences at the view directions of the SDSM and RTA and derive the SD degradation at the view direction of the RTA. Moreover, we can also derive the SD degradation in the short-wave infrared (SWIR) spectral range, wherein the SDSM cannot track the SD degradation. In this paper, we will derive the SD degradation for the view direction of the RTA from the SD, SDSM, and lunar calibrations from the visible to SWIR spectral range. We will also simulate the SD degradation with analytical models and compare their performances.

SNPP VIIRS↗

Controlled Rest: Investigating the Use of an In-Flight Sleepiness Countermeasure

INTRODUCTION: Sleepiness is commonly reported amongst commercial airline pilots and is recognized as a safety risk due to its impact on performance. Controlled Rest (CR) refers to a short, voluntary nap opportunity taken by pilots on the flight deck as a countermeasure to unanticipated sleepiness in flight. This study explores the profile of CR use in a long-haul commercial airline. METHODS: Forty-four pilots filled in an application-based sleep/work diary and wore actiwatches for approximately 2 weeks. Complete data sets from 239 flights including sleep diaries, actigraphy, and schedules were merged and analyzed. Sleep diary entries were used to set CR intervals in the actigraphy software, which was then used to predict sleep within these intervals. All time-stamps of sleep periods and flight schedules were adjusted for home-base time of the pilots. Pearson Correlations were used to assess the influence of pilot demographics on CR use. A mixed-effects logistic regression was used to analyze the impact of schedule factors on CR. RESULTS: Pilots reported taking CR on 46% (n=110) of observed flights. Average CR attempt duration was 43.1 ± 11.0 minutes. Eighty-percent (n=106/133) of all CR attempts were estimated by actigraphy to have successfully achieved sleep with an average sleep duration during successful rest periods of 31.7 ± 12.2 minutes. Captains reported taking CR on 38% of flights (n=39/102), compared to First Officers reporting 52% (n=71/137) of flights with CR (p=0.131). Age, experience, BMI, and sleep need were not associated with the percentage of flights with CR (all p>0.244). The following schedule factors were associated with a higher frequency of CR: night (55%, n=76) vs. day flights (34%, n=34); <10h (63%, n=80) vs. >10h duration flights (27%, n=30); return (60%, n=71) vs. outbound flights (33%, n=39); and 2-pilot (69%, n=83) vs. >2-pilot flights (23%, n=27) (all p≤0.001). There was a trend for more CR on eastbound flights, but this was not significant (eastbound: 51%, n= 57; westbound: 40%, n= 44; p=0.059). Of note, 22% (n=26) of augmented flights (>2-pilots) contained both CR and Bunk Rest (in a designated rest facility). DISCUSSION: Data from this airline show that pilots commonly use CR to mitigate sleepiness in-flight, especially on flights <10h duration and during home-base nighttime flights. Future studies are required to determine generalizability of these results to other airlines.

sleepiness↗

Preparing the JWST Observatory for Science Observations

The James Webb Space Telescope (JWST) is a large (6.5 m) near-and mid-infrared telescope scheduled for launch in 2021. JWST will be used to explore fundamental questions in astrophysics and planetary science, including the evolution of galaxies, the first light of stars, the formation of stars and planets as well as the characterization of exoplanets. To achieve these scientific goals, NASA and its international partners, the Canadian Space Agency (CSA) and the European Space Agency (ESA), have developed four science instruments for JWST and have prepared detailed commissioning plans for each. The NASA Project Science team has also outlined activities to characterize the performance of the Observatory as a whole. These activities include: 1) monitoring of the instrument and telescope cooldown for contamination mitigation; 2) measurements of straylight and other backgrounds for validation of the JWST stray light models as well as instrument background subtraction algorithms; 3) characterization of optical thermal distortion between its hot and cold telescope pointings within the observable field of regard and 4) trending of observatory performance parameters. Each of these activities has been planned in close collaboration with the observatory wavefront, commissioning planning, and science instrument teams. Here we present the plans for these activities, the expected results and how they will impact future guest observer (GO) proposals and JWST science community

Erin C Smith↗

Kepler Mission: A Mission to Find Earth-size Planets in the Habitable Zone

The Kepler Mission is a Discovery-class mission designed to continuously monitor the brightness of 100,000 solar-like stars to detect the transits of Earth-size and larger planets. It is a wide field of view photometer Schmidt-type telescope with an array of 42 CCDs. It has a 0.95 m aperture and 1.4 m primary and is designed to attain a photometric precision of 2 parts in 10(exp 5) for 12th magnitude solar-like stars for a 6 hr transit duration. It will continuously observe 100,000 main-sequence stars from 9th to 14th magnitude in the Cygnus constellation for a period of four years with a cadence of 4/hour. An additional 250 stars can be monitored at a cadence of l/minute to do astro-seismology of stars brighter than 11.5 mv. The photometer is scheduled to be launched into heliocentric orbit in 2007. When combined with ground-based spectrometric observations of these stars, the positions of the planets relative to the habitable zone can be found. The spectra of the stars are also used to determine the relationships between the characteristics of terrestrial planets and the characteristics of the stars they orbit. In particular, the association of planet size and occurrence frequency with stellar mass and metallicity will be investigated. Based on the results of the current Doppler-velocity discoveries, over a thousand giant planets will also be found. Information on the albedos and densities of those giants showing transits will be obtained. At the end of the four year mission, hundreds of Earth-size planets should be discovered in and near the HZ of their stars if such planets are common. A null result would imply that terrestrial planets in the HZ are very rare and that life might also be quite rare.

Borucki, W. J.↗

Air Traffic Controllers' Control Strategies in the Terminal Area Under Off-Nominal Conditions

A human-in-the-loop simulation investigated the robustness of a schedule-based terminal-area air traffic management concept, and its supporting controller tools, to off-nominal events - events that led to situations in which runway arrival schedules required adjustments and controllers could no longer use speed control alone to impose the necessary delays. The main research question was exploratory: to assess whether controllers could safely resolve and control the traffic during off-nominal events. A focus was the role of the supervisor - how he managed the schedules, how he assisted the controllers, what strategies he used, and which combinations of tools he used. Observations and questionnaire responses revealed supervisor strategies for resolving events followed a similar pattern: a standard approach specific to each type of event often resolved to a smooth conclusion. However, due to the range of factors influencing the event (e.g., environmental conditions, aircraft density on the schedule, etc.), sometimes the plan required revision and actions had a wide-ranging effect.

Martin, Lynne↗

Performance of the IVS R1 and R4 Sessions

The International VLBI Service for Geodesy and Astrometry (IVS) has observed the weekly IVS-R1 (R1) and IVS-R4 (R4) series of sessions since 2002. These regular series are generally stable in the sense that the networks were designed to be similar from week to week. The uniformity of these series has allowed researchers to conduct many scientific investigations. The IVS also observes with other networks that allow continued sampling of data from all VLBI stations, but the R1 and R4 observing sessions are a dominant part of overall VLBI observing accounting for 1841 sessions out of a total of 3129 24-hour sessions from 2002.0 to 2020.0 (where the last R1 and R4 in 2019 was on December 30 and December 26, respectively). In this paper, we investigate the evolution of these series in terms of their observing networks. We also discuss the construction of the R1 and R4 networks and the scheduling of these sessions. The performance of these networks in terms of the formal precision of polar motion have improved by factors of 2–3 over the period from 2002.0 to 2018.0. UT1 precision improved by a factor of about 1.2–1.5. The main reason for this improvement is the increased size of the networks. We also discuss the effect on this improvement arising from changes in the data rate and the number of observed sources. There is some degradation in performance after 2018 that is most likely due to a decline in the number of available network stations.

Cynthia C. Thomas↗

MODIS. Volume 2: MODIS level 1 geolocation, characterization and calibration algorithm theoretical basis document, version 1

The EOS Moderate Resolution Imaging Spectrometer (MODIS) is being developed by NASA for flight on the Earth Observing System (EOS) series of satellites, the first of which (EOS-AM-1) is scheduled for launch in 1998. This document describes the algorithms and their theoretical basis for the MODIS Level 1B characterization, calibration, and geolocation algorithms which must produce radiometrically, spectrally, and spatially calibrated data with sufficient accuracy so that Global change research programs can detect minute changes in biogeophysical parameters. The document first describes the geolocation algorithm which determines geodetic latitude, longitude, and elevation of each MODIS pixel and the determination of geometric parameters for each observation (satellite zenith angle, satellite azimuth, range to the satellite, solar zenith angle, and solar azimuth). Next, the utilization of the MODIS onboard calibration sources, which consist of the Spectroradiometric Calibration Assembly (SRCA), Solar Diffuser (SD), Solar Diffuser Stability Monitor (SDSM), and the Blackbody (BB), is treated. Characterization of these sources and integration of measurements into the calibration process is described. Finally, the use of external sources, including the Moon, instrumented sites on the Earth (called vicarious calibration), and unsupervised normalization sites having invariant reflectance and emissive properties is treated. Finally, algorithms for generating utility masks needed for scene-based calibration are discussed. Eight appendices are provided, covering instrument design and additional algorithm details.

Barker, John L.↗

Sleep, Circadian Rhythms, and Performance During Space Shuttle Missions

Sleep and circadian rhythms may be disturbed during spaceflight, and these disturbances can affect crewmembers' performance during waking hours. The mechanisms underlying sleep and circadian rhythm disturbances in space are not well understood, and effective countermeasures are not yet available. We investigated sleep, circadian rhythms, cognitive performance, and light-dark cycles in five astronauts prior to, during, and after the 16-day STS-90 mission and the IO-day STS-95 mission. The efficacy of low-dose, alternative-night, oral melatonin administration as a countermeasure for sleep disturbances was evaluated. During these missions, scheduled rest activity cycles were 20-35 minutes shorter than 24 hours. Light levels on the middeck and in the Spacelab were very low; whereas on the flight deck (which has several windows), they were highly variable. Circadian rhythm abnormalities were observed. During the second half of the missions, the rhythm of urinary cortisol appeared to be delayed relative to the sleep-wake schedule. Performance during wakefulness was impaired. Astronauts slept only about 6.5 hours per day, and subjective sleep quality was lower in space. No beneficial effects of melatonin (0.3 mg administered prior to sleep episodes on alternate nights) were observed. A surprising finding was a marked increase in rapid eye movement (REM) sleep upon return to Earth. We conclude that these Space Shuttle missions were associated with circadian rhythm disturbances, sleep loss, decrements in neurobehavioral performance, and alterations in REM sleep homeostasis. Shorter than 24-hour rest-activity schedules and exposure to light-dark cycles inadequate for optimal circadian synchronization may have contributed to these disturbances.

Neri, David F.↗

Analysis of a resistance-energy balance method for estimating daily evaporation from wheat plots using one-time-of-day infrared temperature observations

Accurate estimates of evaporation over field-scale or larger areas are needed in hydrologic studies, irrigation scheduling, and meteorology. Remotely sensed surface temperature might be used in a model to calculate evaporation. A resistance-energy balance model, which combines an energy balance equation, the Penman-Monteith (1981) evaporation equation, and van den Honert's (1948) equation for water extraction by plant roots, is analyzed for estimating daily evaporation from wheat using postnoon canopy temperature measurements. Additional data requirements are half-hourly averages of solar radiation, air and dew point temperatures, and wind speed, along with reasonable estimates of canopy emissivity, albedo, height, and leaf area index. Evaporation fluxes were measured in the field by precision weighing lysimeters for well-watered and water-stressed wheat. Errors in computed daily evaporation were generally less than 10 percent, while errors in cumulative evaporation for 10 clear sky days were less than 5 percent for both well-watered and water-stressed wheat. Some results from sensitivity analysis of the model are also given.

Choudhury, B. J.↗

BBXRT observations of X ray binaries

The Broad Band X Ray Telescope (BBXRT) is a new X ray spectrophotometer scheduled for launch Apr. 26, 1990, for a 10 day mission aboard the Space Shuttle Columbia. High quality spectra between 0.3 and 12 keV of about 100 different sources are expected. BBXRT has the best energy resolution for examining features due to the K-shell of Fe, seen in the spectra of X ray binaries. The resolution is sufficient to make sensitive searches for broadened emission lines, to resolve multiple features, and to determine the ionization state of the emitting plasma by measuring line energies. Simulated spectra of several sources are presented.

Marshall, F. E.↗

Real Time Monitoring of Flooding from Microwave Satellite Observations

In this report, we review the progress to date including results from data analyses and present a schedule of milestones for the remainder of the project. We discuss the processing of flood extent data and SSM/I brightness temperature data for the 1993 Midwest Flood. We present preliminary results from the derivation of open water fraction from brightness temperatures.

Galantowicz, John F.↗

Dynamic Controllability of Partially Observable Temporal Plans

The formalism of Simple Temporal Networks provides methods for evaluating the feasibility of temporal plans. The basic formalism deals with the consistency of quantitative temporal requirements on scheduled events. Over time, the formalism has been extended to handle exogenous events with varying degrees of observability.A major problem that has only been partially solved before now involves a combination of observable and unobservable events. In this paper, we present a sound and complete solution to this problem.

Arthur Bit-Monnot↗

Improvements of the Load Schedule for the Machine Calibration of a Strain-Gage Balance

The load schedule for the calibration of a six-component force balance in a calibration machine was improved. Now, single-component loads are repeated in regular intervals during the calibration. This approach has several advantages. First, the number of single-component loads increases to about twenty-two percent of all loads and load combinations. Consequently, more accurate numerical estimates of the primary bridge sensitivities can be obtained if global regression is used for the analysis of the calibration data. In addition, single-component repeats make it possible to track the stability of the applied loads during the calibration process. Finally, interactions of single-component repeats can be compared with interactions that are observed during the application of manual loads to the balance. Machine calibration and manual data sets of two force balances are used to illustrate benefits of the new load schedule. It is shown in the examples how differences between the observed interactions of machine calibration and manual data can be quantified. The suggested improvements can also be implemented in the load schedule for the machine calibration of a moment or direct-read balance as long as single-component loads are included that are described in the design load format of the balance.

wind tunnel test↗

Use of Historical EM Practices and Policies for Management of Cleanup Program and Address GAO Concerns - 20222

As Department of Energy (DOE) Environmental Management (EM) program policies and management practices are revised over time, it might be useful to periodically reflect on the DOE EM program's past to identify practices that have worked and those that might be appropriate for possible reuse in the future. An added impetus to examine alternative approaches is the recent Government Accountability Office (GAO) report entitled 'Nuclear Waste Cleanup - DOE Could Improve Program and Project Management by Better Classifying Work and Following Leading Practices.' The February 2019 GAO report states that EM categorizes most of its work in a way that does not adequately involve independent experts and DOE senior leadership. It also noted that EM has not followed leading practices for program and project management that could help keep the cleanup efforts on schedule and control costs. The GAO report recommended that EM, working with DOE Office of Project Management (PM): - Establish requirements and then assess EM's ongoing operations activities to determine if some activities should be reclassified as capital asset projects based on these newly established requirements. - Review and revise EM's 2017 cleanup policy to include program management leading practices related to scope, cost, schedule performance, and independent reviews. - Update the cleanup policy to require that earned value management (EVM) systems be maintained and used in a way that follows EVM best practices. - Develop a policy to ensure that work is categorized as level of effort (LOE) only in appropriate, specified circumstances, such as when work is not measurable or when measurement is impractical. - Integrate EVM data into EM's performance metrics for operations activities. To assist with improving program performance and implementing audit recommendations, this paper reviewed past successful cleanups such as Weldon Springs, Rocky Flats, Fernald, Ashtabula, Battelle Columbus (abs, and other historical resources and people with experience during the early years of EM program. As such, there are several past practices which may well be suited for reuse today. Some of these practices include: - In 1990's, as the DOE EM cleanup program, known as Environmental Restoration came into effect, the known cleanup scope at each geographic location or site was organized into four levels ranging from overall site-wide cleanup effort to the individual 'release sites', providing high granularity to the program. - The cleanup program was organized by geography (Northwest, Southwest, Eastern Area Programs, etc.). These 'sub-program' managers provided a degree of Headquarters oversight and management allowing upper management (EM-1, 2, and 3) to focus on major decisions and issues. - Budget levels at selected cleanup sites were funded above 'minimum-safety' levels to accelerate actual cleanup work. - Past practice utilized EVM techniques and uniform EM oversight over all discrete project-like activities, providing for a coordinated cleanup effort. - EM managed LOE activities using benchmarking and best in class management practice techniques to help manage costs. - EM managed and reviewed entire site cleanup baselines, not only individual projects, focusing on a successful overall outcome. - Sites had a 'Road map' or 'Management Action Plan' that provided the overall strategy or plan for that site's cleanup - this helped with understanding and coordination of efforts. - EM had a robust lessons-learned program and database to capture and transmit worthy ideas. - EM had well-structured cleanup baseline change control policies to control cost and schedule changes, at the contractor and higher Headquarters levels. Finally, some of the GAO observations may be valid, however it is not clear as to their extent. For example, for some operation types of work, the use of the Level of Effort (LOE) earned value method to track progress may be appropriate. Also, to ensure independence of thought, and to obtain useful insight on past practices, it may be suitable to have former EM employees to assist with understanding past practices or to verify that activities have been properly identified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Observing Mode Attitude Controller for the Lunar Reconnaissance Orbiter

The Lunar Reconnaissance Orbiter (LRO) mission is the first of a series of lunar robotic spacecraft scheduled for launch in Fall 2008. LRO will spend at least one year in a low altitude polar orbit around the Moon, collecting lunar environment science and mapping data to enable future human exploration. The LRO employs a 3-axis stabilized attitude control system (ACS) whose primary control mode, the "Observing mode", provides Lunar Nadir, off-Nadir, and Inertial fine pointing for the science data collection and instrument calibration. The controller combines the capability of fine pointing with that of on-demand large angle full-sky attitude reorientation into a single ACS mode, providing simplicity of spacecraft operation as well as maximum flexibility for science data collection. A conventional suite of ACS components is employed in this mode to meet the pointing and control objectives. This paper describes the design and analysis of the primary LRO fine pointing and attitude re-orientation controller function, known as the "Observing mode" of the ACS subsystem. The control design utilizes quaternion feedback, augmented with a unique algorithm that ensures accurate Nadir tracking during large angle yaw maneuvers in the presence of high system momentum and/or maneuver rates. Results of system stability analysis and Monte Carlo simulations demonstrate that the observing mode controller can meet fine pointing and maneuver performance requirements.

Calhourn, Philip C.↗

Observing Mode Attitude Controller for the Lunar Reconnaissance Orbiter

The Lunar Reconnaissance Orbiter (LRO) mission is the first of a series of lunar robotic spacecraft scheduled for launch in Fall 2008. LRO will spend at least one year in a low altitude polar orbit around the Moon, collecting lunar environment science and mapping data to enable future human exploration. The LRO employs a 3-axis stabilized attitude control system (ACS) whose primary control mode, the "Observing mode", provides Lunar Nadir, off-Nadir, and Inertial fine pointing for the science data collection and instrument calibration. The controller combines the capability of fine pointing with that of on-demand large angle full-sky attitude reorientation into a single ACS mode, providing simplicity of spacecraft operation as well as maximum flexibility for science data collection. A conventional suite of ACS components is employed in this mode to meet the pointing and control objectives. This paper describes the design and analysis of the primary LRO fine pointing and attitude re-orientation controller function, known as the "Observing mode" of the ACS subsystem. The control design utilizes quaternion feedback, augmented with a unique algorithm that ensures accurate Nadir tracking during large angle yaw maneuvers in the presence of high system momentum and/or maneuver rates. Results of system stability analysis and Monte Carlo simulations demonstrate that the observing mode controller can meet fine pointing and maneuver performance requirements.

Calhoun, Philip C.↗

A solar encounter mission - Starprobe

Accurate measurements of the internal mass distribution and dynamics of the sun as well as in situ observations of its environs are proposed through a JPL-designed satellite, STARPROBE. Scheduled for launch in 1988 under NASA's five-year plan, the probe will conduct radiometric experiments to determine the solar quadrupole moment (J2), fields-and-particles experiments (evaluating such phenomena as heating, acceleration, and peak random velocity of solar wind), and optical experiments potentially superior to those of the Earth-orbiting Solar Optical Telescope (SOT). With flight times ranging from 2.7 to 5.9 years, present delivery options comprise planetary gravity-assist trajectories that will give the spacecraft a perihelion of four solar radii at a 90 deg-inclination. Owing to science- and mission requirements, the thermal shield of the craft should tolerate a solar flux 3000 times greater than that at earth, radioisotope thermoelectric generators supplying 700 watts of power, and a three-axis stabilization system with reaction wheels providing control torque. Implementation concepts now under study may change some of the details of the design.

Randolph, J. E.↗

The role of scientists in developing Hubble Space Telescope

The objective of the Hubble Space Telescope Program is to build and operate a high-performance, fully-instrumented and long-lived optical observatory in earth orbit. Key Program elements are (1) a logistic strategy of Shuttle launch/maintenance and TDRSS communications, (2) overall responsibility at the MSFC Project for developing both the flight and ground systems, and (3) scientific participation in ST development and responsibility after launch for conducting the observing program. The ST Project is a management structure with a budget and schedule for delivering an ST system capable of achieving its established scientific objectives. The Project distributes through contracts the responsibility for supplying particular components, but retains the responsibility for system-level integrity. Scientists have set the performance objectives and now support the Project during the development stage by providing (1) PI management of the five Science Instruments, (2) continuing translations of scientific requirements into engineering specifications, (3) oversight of designs and performance tests, and (4) specific expertise on technical concerns.

Brown, R. A.↗