Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “met”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Fleet-wide Electrification Impacts Assessment for the Valley Transportation Authority

This report explores the long-term electrification opportunities for the Valley Transit Authority’s (VTA) transit bus fleet. The potential for transit bus electrification at VTA as well as the economic impacts of partial and complete electrification are explored. We use the Revenue Operation and Device Optimization model to determine the optimal charging, operation and lowest capital and operating cost solution to achieve different levels of electrification to meet their existing routes. This study finds that, relying on only depot charging, around 70% of the daily trips by VTA’s transit bus fleet can be replaced with battery electric buses (BEBs) today. The benefits and drawbacks of five methods for improving the electrification potential beyond that achievable with only depot charging are discussed including (1) increase charger power, (2) purchase of larger vehicle batteries, (3) en-route charging, (4) purchasing additional buses and swapping them to enable the existing routes/blocks1 to be met, and (5) route/block redesign. A strategy is developed to enable full fleet electrification by increasing charger power or allowing intraday charging as a proxy for the options mentioned above. This method allows us to develop an understanding of the impacts and trade-offs of full fleet electrification. Two charging strategies are examined. Immediate charging, when the bus is charged as soon as it arrives at a depot or en-route charging station, and smart charging, which uses a controller to determine the best times to charge to achieve the lowest charging cost, while maintaining the same trip schedules. Smart charging is effective at reducing the peak power consumption, which can be reduced by between 31% and 65% compared to immediate charging. This translates directly to lower electricity demand charges and lower costs for possible distribution system upgrades. The total lifetime net present value (NPV) costs for different scenarios are presented in Figure ES-1. Scenarios are separated into three sections. The first stacked bar on the left is the base case (business-as-usual) where all buses are diesel hybrids, the next four bars include partial and full fleet electrification utilizing only immediate charging, and the last four bars include partial and full fleet electrification utilizing smart charging. The results show that smart charging scenarios are within ±4% of the lifetime NPV cost of the diesel-hybrid only (business-as-usual) scenario. The scenarios with full fleet electrification (i.e., including intraday charging) are 4% lower cost and those with partial fleet electrification (i.e., without intraday charging) are 2%–3% higher. However, it is important to note that the intraday charging scenarios do not include any additional costs for the equipment necessary to achieve intraday charging (e.g., additional chargers, larger batteries, new route design). Additionally, it is worth noting that the Low Carbon Fuel Standard (LCFS) credit received for implementing electric buses is essential to achieving these results.

33 ADVANCED PROPULSION SYSTEMS↗

Safety Review Board review of explosive pressing initiation event

On June 30, 2020, a 0.87 gram PETN charge being pressed in the Rapid Prototyping Facility (RPF), unexpectedly initiated, resulting in destruction of the pressing fixture but no injuries or facility damage. In response, the Safety Review Board (SRB) met on Aug. 13, 2020 and Oct. 1, 2020 to review information collected following the incident, consider likely direct causes, and form recommendations.

42 ENGINEERING↗

PDRD Project 19039 - All metal vacuum scroll pump development for tritium

Currently the United States relies on a single source, foreign company, Eumeca (formerly Normetex) for the supply of an all metal vacuum scroll pump to process tritium. This “one of a kind”, all metal, vacuum scroll pump utilizes no “wetted”, polymeric materials that degrade prematurely when exposed to tritium. U.S. based vacuum scroll pump suppliers typically utilize a polymer, Teflon®, as a tip seal material at the edge of the scroll impellers for proper pump function. Teflon® is known to degrade within a relatively short time frame (approximately 1 year) when continually exposed to tritium gas. This degradation results in “flaking” of the Teflon® material which results in particulate contamination of the process gas stream. While filtration of the particulate is possible, doing so requires additional maintenance which is costly in a glovebox environment. In addition, filtration can degrade pumping system performance as particulate collects in the filter media over time. To date, all of the well established U.S and European based vacuum scroll pump manufacturers have been uninterested in developing an all metal vacuum scroll pump that does not use a polymeric scroll tip seal. This position is taken as the vacuum scroll pump manufacturers do not see a large enough market to make it profitable for them to develop and market an all metal vacuum scroll pump. In the mid 2000s, one company, Air Squared, Inc., a small Original Equipment Manufacturer (OEM) specializing in design and fabrication of custom scroll vacuum pumps and compressors, was willing to pursue the effort. The first design effort incorporated Vespel® as a polymeric tip seal material. Results of this effort led to realizing the affect that the Met-Bel MB-601 metal bellows pump has on performance when used as a backing pump for an all metal vacuum scroll pump without a scroll tip seal. As a result, Air Squared subsequently designed an all metal vacuum scroll pump without a tip seal material for evaluation. Although the initial, all metal version of the Air Squared pump was found deficient in regard to scroll impeller stiffness, which resulted in scroll contact, general design and pump performance was verified to be adequate. SRS PDRD Project 19039 was launched in 2019 as a 3rd attempt with Air Squared, Inc. in regard to development of an all metal vacuum scroll pump for consideration as an equivalent to the Eumeca/ Normetex pump. The effort specified 300 series stainless steel for the scroll impellers, all metal sealing, and design to meet tritium throughput and ultimate vacuum requirements. In addition, a 60 psig design pressure rating requirement was specified for the pump containment boundary. The 3rd generation Air Squared pump has been designed, fabricated, and has received preliminary testing. Preliminary testing has indicated proper leak tightness and pump performance. However, work continues regarding development of a pumping chamber containment bellows that can be subjected to 66 psig without damage to the bellows. Work will continue in 2020 and 2021 to pursue a pumping chamber containment bellows that meets the pressure rating requirement.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of Control System Functional Capabilities within the IES Plug-and-Play Simulation Environment

The concept of an Integrated Energy System (IES) is meant to combine different energy technologies in synergistic ways to achieve a more secure and economical energy supply. The RAVEN-based HYBRID framework is used to find the optimal installed capacity and the optimal economical dispatch of each component of the IES. A new RAVEN (Risk Analysis Virtual ENvironment) plugin for grid and capacity optimization (HERON) has been developed for optimizing the production variables of the IES given the demand profile. Currently, only the limits that affect the production variables and their corresponding time rates of change are considered (explicit constraints). However, other variables are additionally subject to constraints, but the associated limits are not accounted for (implicit constraints). In particular, for the power dispatch problem, the optimization algorithm takes into account the limits on the electrical power output and the corresponding hourly power variations but does not consider other constraints on process variables whose response effects the service life of the IES. This report describes a scheme that allows accounting for implicit constraints without increasing the size of the optimization problem. The Reference Governor (RG) algorithm is traditionally used for enforcing state and control constraints by modifying the set-point trajectories supplied to the feedback regulators. In our application, the RG is coupled within an iterative loop with the HERON-power dispatcher to generate optimal trajectories that ensure the operational constraints are met. A data-driven procedure to derive a representation of the dynamics of the controlled system was developed. First, the variables that represented the state of the system are selected (PCA-based approach), and then state-space representation matrices are derived from the collected measurements (DMDc algorithm). A preliminary version of the developed workflow based on Linear Time Invariant matrices was assessed by adopting a two-unit test case. More sophisticated versions of this workflow foreseeing the on-line derivation of system matrices will be deployed in FY 2021. Finally, a “plug-and-play” library of controllers and state observers was developed in Dymola. Some aspects of the current configuration of the IES unit components, e.g., the encapsulation of the control schemes into dedicated blocks, are consistent with the “plug-and-play” philosophy. Other features, e.g., the system buses collecting the input and the output variables, are not. For this reason, once listed and described the limits of the current configuration, necessary modifications to the plant model interface are presented. As a test-case, the interfaces of the SES model in the RAVEN-based HYBRID framework were reworked accordingly, and two different control schemes were applied to the same plant model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Guidance for Monitoring Passive Groundwater Remedies Over Extended Time Scales

Passive remediation can be appropriate where natural processes and actions such as institutional controls mitigate exposure to contaminated groundwater, achieving remedial action objectives and protectiveness of human health and the environment. Monitored natural attenuation (MNA) is a prevalent passive remediation strategy supported by a regulatory framework and monitoring design guidance. MNA can also be used after active remediation has been completed (e.g., pump-and-treat) as a polishing step to reach ultimate remedial action objectives. However, MNA and existing monitoring guidance primarily target situations where the remedial action objectives are met within a few decades. When timescales for passive remediation extend to many decades, a corresponding change in monitoring strategy is needed to adapt to the extended time scale. This document provides guidance for implementing an extended-scale monitoring (ESM) approach appropriate for long-duration passive remediation. Extended-scale is defined in this document with respect to time (i.e., a long duration of remediation) and a large enough physical scale such that receptors will not be impacted within the remediation timeframe.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LDRD DR 20200022DR. First year Appraisal: A new era of nuclear physics at the electron-ion collider [PowerPoint]

The first year review of the project is presented, including the following topics: introduction of the EIC; project team and resources; project scope, science and outreach; feasibility review; minimal and stretch goals; organization chart - theory; summary of project deliverables met; detailed account of perturbative QCD accomplishments; and conclusions.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Assessment of the 3420 Building Filtered Exhaust Stack Sampling Probe Location: Stack Verification Following Fan and Air Blender Additions

The Pacific Northwest National Laboratory (PNNL) 3420 Building, which is part of the Physical Sciences Facility (PSF), houses radiological capabilities that results in the requirement that emissions monitoring must be conducted for potential radionuclides in the exhaust air discharge of this building. The air monitoring system is required to conform to Title 40 of the Code of Federal Regulations part 61 (40 CFR 61) Subpart H, which in turns requires a sampling probe in the exhaust stream to conform to the criteria of American National Standards Institute / Health Physics Society (ANSI/HPS) N13.1-2011, Sampling and Monitoring Releases of Airborne Radioactive Substances from the Stack and Ducts of Nuclear Facilities. To support the air emissions permit for the 3420 Building on the PNNL campus, stack testing that used computational fluid dynamics (CFD) modeling as a surrogate stack and verification tests of velocity uniformity and flow angle on the retrofitted facility stack was performed. The ANSI/HPS N13.1-2011 criteria for the air monitoring probe location are that velocity uniformity, gaseous tracer uniformity, and particulate tracer uniformity must be less than or equal to 20%COV. Furthermore, no point in the sampling location may have a gaseous tracer concentration that varies from the mean concentration by more than 30%. Additionally, the flow angle at the sampling location must not be more than 20°. The CFD modeling of the stack, as reported by Recknagle et al. (2018) demonstrated that the stack meets the criteria at the probe location. The velocity uniformity and flow angle results from the 3420 stack verification tests, performed in October 2020, demonstrated that the CFD model results may be used to support the qualification of the stack sampling location. The measured velocity uniformity verification test result was 1.4%COV. This value is well within the uniformity criterion, which is that the velocity uniformity be =20%COV. Additionally, this value is well within the criterion that the actual stack measurement must be within 5% of the surrogate stack result of 2.1%COV when all four fans were operating. Additionally, the measured average flow angle at the 3420 stack monitor location was 15.5 degrees. Although this is higher than expected based on the CFD model, the result is =20 degrees, so the criterion is met. Based on these stack verification test results, the reconfigured 3420 Building filtered exhaust stack meets the qualification criteria given in the ANSI/HPS N13.1-2011 standard. Further changes to the system configuration or operating conditions that are outside the bounds described in this and the CFD report (Recknagle et al., 2018) may require additional tests and additional analysis to determine compliance with the standard.

3420 Building↗

NNSA-IAEC Science Area V Environmental ISR: Waste Management and Subsurface Science (Final Report FY18-FY20)

In August 2017, the U.S. National Nuclear Security Administration (NNSA) and the Israel Atomic Energy Commission (IAEC) launched a joint waste management program to evaluate the feasibility of siting a radioactive waste repository at intermediate depths in Israel. The bilateral collaboration involves three National Laboratories (LLNL, LANL, and Sandia), and the Nuclear Research Center, Negev, Geological Survey of Israel, and Ben Gurion University in Israel. This research is designed to assist with the evaluation of locations for an intermediate nuclear waste repository in Israel. This final report is a high-level summary of the results from the past three years by the team that worked on the WM-2: Radionuclide colloid-facilitated transport in fractured carbonate rock project for Science Area V, Environmental ISR: Subsurface Science and Waste Management. We have completed all of our tasks and met all of our milestones. MW-2 had three integrated tasks. Task 1 was laboratory experiments investigating colloid transport of radionuclides in natural fractured carbonate rocks from the Avdat formation, Israel. Task 2 was field experiments injecting radionuclide analogues pre-sorbed to clay colloids into fractured carbonate rock, and task 3 was numerical modeling of laboratory and field experimental results to assess the importance of colloids in the migration of relevant radionuclides. This task was incorporated into tasks 1 and 2. A 4 th task was initiated in FY20, to investigate the role of organics in facilitating radionuclide transport under the same conditions explored in task 1 due to the high organic content of the rocks being investigated for the immediate borehole locations. Preliminary results will be summarized here and the work will continue in FY21-23. The overall objective of this research is to evaluate the role of colloids (naturally occurring < 1 micron particles) in facilitating the transport of long-lived radionuclides from a nuclear waste repository situated in fractured carbonate rocks. Currently little data exists on radionuclide transport in carbonate rocks, but this is the main rock type available for siting a repository in Israel. Laboratory experiments were carried out in both Israel and the U.S., field experiments have taken place in Israel, and reactive transport modeling involved LLNL, LANL and Israel partner institutions. LLNL hosted a graduate student, Emily Tran, from Ben Gurion University in FY18 and FY19 and much of the work presented here was part of her PhD research.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Qualification and Re-Qualification of NDA Instruments

Non-Destructive Assay (NDA) instruments are a large component of nuclear material (NM) measurement at LANL. Nuclear Material Control and Accountability Group (SAFE-NMCA) personnel in the Safeguards Division are responsible for oversight of the instruments used for material accountability measurements. It is the responsibility of SAFE-NMCA to ensure that all instruments are operating as expected and can produce quality measurements to provide assurance that requirements of the DOE approved NMCA Plan are being met.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Cummins Electric Truck with Range-Extending Engine (ETREE) Project (Final Technical Report)

The Cummins Electric Truck with Range Extending Engine (ETREE) program designed, developed, and demonstrated a range extending electric vehicle that employs an electrified propulsion system installed in a class 6 commercial vehicle (Peterbilt 220). This project was relevant to industry and the greater public because at the time of the project there were two keys to widespread electrified commercial vehicle adoption yet to be realize: 1) For pure electrified vehicle adoption, battery improvements are needed: Cost must decrease, and energy density must increase. 2) Electric vehicles must overcome fleet operator risks such as: operations in cold climates, hilly terrain, or where majority of conventional trucks are replaced with electrified vehicles. In the near to medium term these adoption hurdles were address by the objectives of this project. A plug-in hybrid vehicle that could be operated in all electric mode for most of its workday optimizing the use of grid energy with the ability to supplement energy demand with the onboard range extending engine. This project’s architecture provided ability to match a conventional class 6 commercial vehicle range and performance characteristics prior to the ubiquitous adoption of battery electric vehicle charging infrastructure as well. Additionally, the vehicles produced as part of this project can be considered a prototype for a commercially viable heavily electrified commercial vehicle because most of the physical hardware used for the project is commercially available in the market today. The ETREE program met its main objectives and demonstrated 65% fuel consumption reduction as compared to a conventional class 6 vehicle while meeting performance and range expectations. This was achieved by drawing upon the strengths of the assembled team: Cummins, PACCAR, the Ohio State University, Argonne National Laboratory and the National Renewable Energy Laboratory.

20 FOSSIL-FUELED POWER PLANTS↗

Cost Effective 6.5% Silicon Steel Laminate for Electric Machines

Iowa State University teamed with United Technologies Research Center and the University of Delaware and demonstrated a high switching frequency non-rare earth permanent magnet motor. A prototype motor with 400 Hz switching frequency, dummy MnBi permanent magnet with 8 MGOe energy density, and 6.5%Si steel as the laminate materials was designed, built, and tested. The performance of the prototype met the expectations showing a higher frequency motor enabled by 6.5%Si steel is a viable approach to meet DOE 2022 cost and performance targets for electric vehicle drive. Adoption of 6.5%Si steel will result in 3% improvement in energy conversion efficiency of the soft magnetic materials. In addition, the ability to use non-rare earth magnet for high power density application effectively mitigate the risk of EV traction motor from the rising rare earth price.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Baylor University Campus-Wide Deep Dive

In January 2020, staff members from the Engagement and Performance Operations Center (EPOC) and the Lonestar Education And Research Network (LEARN) met with researchers and staff at Baylor University for the purpose of a Campus-Wide Deep Dive into research drivers. The goal of this meeting was to help characterize the requirements for five campus research use cases and to enable cyberinfrastructure support staff to better understand the needs of the researchers they support. Profiled scientific use cases included: - Experimental High Energy Physics (HEP) - Proton Computed Tomography (pCT) - Nutrition and Relation to Digestive Microbiome - Baylor University Core Research Facilities - Molecular Quantum-dot Cellular Automata (QCA), and Material Science of Quantum Computing - Modeling and Simulation of Low-Dimensional and Nano-Structured Materials - Computational Fluid Dynamics Material for this event included the written documentation from each of the research areas at Baylor University, documentation about the current state of technology support, and a write-up of the discussion that took place in person. The Case Studies highlighted the ongoing challenges that Baylor University has in supporting a cross-section of established and emerging research use cases. Each Case Study mentioned unique challenges which were summarized into common needs. These included: - Tradeoffs for network/software security, and usability of the resulting infrastructure. Better communication to set expectations and understand realities is required. - Computation use on campus is widespread and healthy. While no major problems were uncovered, upgrades to maintain current usage patterns and encourage growth will be required. - Storage is a critical need for enterprise use cases and research. In particular, a campus wide ‘storage architecture’ to support research use cases (e.g. instruments, data sharing) is required in the 2-5 year time window. - Instrumentation on campus is healthy and expanding. Technology must scale with this in the form of computation and storage. - Working with LEARN to upgrade network capacity (in multiples of 10G, or upgrades to 100G) will be required in the 1-3 year time frame. - Network monitoring and visibility will help to establish external science use cases. - Data sharing via portal systems is not currently a critical need, but growing in scope. EPOC can assist Baylor with options.

99 GENERAL AND MISCELLANEOUS↗

ATDM AD projects to ECP Report (Q3 FY2020)

The SPARC team has completed much of the workflow development needed for the coupled and uncoupled analyses needed to support our flight test validation work. The SPARC team has continued to make progress on development activities to support unsteady, full reentry vehicle aero analysis, which have focused on turbulence modeling, uniform mesh refinement, in-situ visualization (with the Paraview/Catalyst team), and performance analysis. The SPARC team is making solid progress towards our Q4 goal of demonstrating an improved Wall Modeled Large Eddy Simulation (WMLES) capability for standard geometries using high-order finite difference, discontinuous Galerkin, and low-dissipation finite volume methods. The SPARC team has met the minimum completion criteria for parts of the L1, including documenting performance and scaling of SPARC on Trinity, Sierra and Astra, and performing runs for the flight test validation case.

97 MATHEMATICS AND COMPUTING↗

Electron Activity (Secondary Electron & Field Emission ) Suppression by Magnetic Field Placed on the Surface of Metals And Dielectric [Slides]

Secondary electron emission happens when the surface is exposed to an oscillating electromagnetic field. It has extremely dangerous effect when resonance condition of this oscillating field and higher SEY conditions are met. The dependence of the secondary electron on primary electron energy is shown in the figure. This multiplication effect on the number of electrons in oscillating electromagnetic field is called multipacting. The problem with multipacting exist in many scientific fields like LHC, ISS, ITER involving particle accelerator, space science and fusion research. In high intensity proton rings this multiplies electron get trapped inside the potential created by proton beam called electron cloud. In High power microwave sources, rf couplers and rf window to couple the power also hugely affected by multipacting.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

U.S. Renewables Portfolio Standards 2021 Status Update: Early Release

Berkeley Lab’s annual status report on U.S. renewables portfolio standards (RPS) provides an overview of key trends associated with U.S. state RPS policies. The report, published in slide-deck form, describes recent legislative revisions, key policy design features, compliance with interim targets, past and projected impacts on renewables development, and compliance costs. The 2021 Early Release, published in lieu of a 2020 edition, presents historical data through year-end 2019, with some limited results for the year 2020. Key trends from this edition of the report include the following: Evolution of state RPS programs: States continue to refine and revise their RPS policies. Among other significant changes since the start of 2019, eight states enacted higher RPS targets or created new clean-energy/zero-carbon targets (AZ, DC, MD, NM, NV, VA, WA), in most cases setting targets equal to at least 50% of retail sales. Historical impacts on renewables development: Roughly half of all growth in U.S. renewable electricity (RE) generation and capacity since 2000 is associated with state RPS requirements, though that percentage has declined in recent years, representing 23% of all U.S. RE capacity additions in 2019. However, within particular regions-namely, the Northeast and Mid-Atlantic-RPS policies continue to serve a central role in motivating RE growth. Future RPS demand and incremental needs: RPS demand growth through 2030 will require roughly 90 GW of new RE capacity and will require total U.S. non-hydro RE generation to reach 17% of electricity sales (compared to 12% in 2019). Relative to EIA projections, this amounts to roughly one-third of projected RE growth over the next decade. RPS target achievement to-date: States have generally met their interim RPS targets in recent years, with only a few exceptions reflecting unique, state-specific issues. REC pricing trends: Prices for NEPOOL Class I RECs rose steeply over 2019, reaching $40/MWh and remaining at roughly that level over 2020. PJM Tier I REC prices continued to rise at a modest pace over the course of 2020, reaching $10/MWh by year-end. Prices for solar RECs remained relatively stable over 2020, and continue to exhibit wide variation across states, with the highest prices ($200-450/MWh) in NJ, MA, and DC.RPS compliance costs and cost caps: RPS compliance costs in 2019 averaged roughly 2.6% of retail electricity bills in RPS states, compared to 2.3% in 2018, with costs in most states ranging from 0.5% to 4.5% of retail electricity bills.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Carbon Fiber Prepreg Recycling- Automated Perform Manufacturing Equipment (Final Technical Report)

Discontinuous fiber composites have a compelling business case as related to light metals such as aluminum and magnesium machined or die cast components. DFC’s have been in commercial production using carbon fiber/epoxy prepreg for both commercial aircraft and for military applications for a number of years and their usage is expanding into automotive and consumer goods components. Reasons for this include significantly lower cost as compared to continuous fiber composites easier design and understanding of the material by metal traditionalists, higher degree of part complexity with relatively simple and low cost molds when compared to high-pressure die casting, and potential for near zero waste. IACMI’s 10-year goals of reduction in carbon fiber reinforced plastics manufacturing cost by 25%, reduction in their embodied energy by 50%, and recyclability of 95% can all be advanced through robust recycling. With recycling We have shown that a 15% contribution in manufacturing cost reduction is feasible, that a significant reduction in embodied energy (over 90% for the recycled fraction) is achievable, and that when combined with primary pyrolysis recycling, the 95% target can be met. Large-scale application of advanced composites began with the aerospace industry, and CRTC’s location in Washington State provided access to a waste stream of nearly 900 tonnes/year that was going to landfill. As the aerospace industry has automated parts production, their material forms have become significantly easier to recycle, and some evidence of this exists for the future automotive and wind turbine components as well. CRTC decided to focus on re-purposing the carbon fiber/epoxy aerospace scrap streams through materials reformatting and reuse, and not on primary recycling (pyrolysis mainly) as this technology is commercially available. The main reasons for this were that it offers a route to effective use of the most widely available and consistent feedstock called edge-trim, as well as allows creation of complex and low-cost parts using rapid and cost-effective compression molding technologies. The reasons also include leading the way for potential automotive pre-preg recycling as the combination of roughly 85% virgin pre-preg and 15% recycled pre-preg directly supports IACMI’s goals and enables significant part cost reduction and a path to zero-waste composite manufacturing at the OEMs or Tier 1’s. The purpose of the project was to develop equipment and technology to transform continuous fiber pre-preg in roll forms into smaller chip-format DFC feedstock, and to determine impacts on moldability and performance based on lessons learned along the path. The availability of scrap from pre-preg manufacturers was a significant value to the program even though the aerospace pre-preg is designed to be autoclave molded thus has handling, tackiness, and processing factors that are not ideal for DFCs. The scope of the project was to develop a Phase 1 system that could identify and resolve some of the major hurdles, determine where to focus effort on building a commercial-scale Phase 2 system, and develop technology for handling a wide variety of incoming scrap materials to produce the most usable product. A chopping system was developed and reduced to practice via an experimental approach that enabled all forms of scrap coming from the pre-preg manufacturers and some forms of the scrap coming from OEM production lines to be very effectively re-purposed. The systems that were developed were not considered to be production robust but rather identified and resolved some of the major technical hurdles, and demonstrated the path towards effective full-scale commercialization.

36 MATERIALS SCIENCE↗

Cloud-Feedback Model Intercomparison Project: Tier 2 Simulations (Final Report)

The University of Miami (Subcontractor)’s Research Scientist James Benedict (with oversight by PI Amy Clement) was tasked with producing global climate model simulations as part of the Cloud-Feedback Model Intercomparison Project (CFMIP) Tier 2 protocol, managing the output of these simulations, providing assistance (as requested) to staff at Lawrence Livermore National Lab (LLNL) regarding model output and setup, and meeting with LLNL scientists and team members to coordinate work on the project. The simulations represent an important contribution to the CFMIP data repository and will advance understanding of a wide range of critical cloud, circulation, and precipitation responses to climate change. The Subcontractor completed all proposed simulations, formatted the model output to be compliant with CFMIP protocols, and published the model data to the CFMIP repository. When requested, the Subcontractor provided assistance to LLNL for model output and configuration queries. Benedict and/or Clement also met in person or virtually 1-2 times per year with project scientists to coordinate work and review results.

54 ENVIRONMENTAL SCIENCES↗