Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “lifecycle”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Requirements Development and Management on the Psyche Project

In January 2017, Psyche was one of two mission concepts selected by NASA for flight as part of the 14th Discovery mission competition. The project has been staffing up and maturing the spacecraft, instrument and mission system baseline designs on the path towards a 2022 launch. During much of 2018, the Project has been executing the lifecycle stage called Phase B, “Preliminary Design and Technology Completion,” one key element of which is the development and management of requirements at various levels. In the case of the Psyche project, this process has been particularly unique for several reasons. The project utilizes a Solar Electric Propulsion (SEP) Chassis from Space Systems Loral (SSL), a high volume manufacturer of commercial geostationary (GEO) telecom spacecraft based on the 1300 satellite bus. While SSL has an extensive, well-vetted set of requirements based on their very successful Earth-orbiting product line, translating that heritage to a deep space science mission required special care. In addition to the differences associated with the deep space environment and longer communication times, new interfaces had to be incorporated. While a substantial portion of the Flight System consists of the SEP Chassis, there were several new interfaces within various subsystems between SSL components and those provided by JPL and other contractors. Managing these interfaces through requirements at a relatively higher level than normally seen on internal or external builds proved challenging. Finally, the Psyche spacecraft plans to host the flight terminal of the Deep Space Optical Communications (DSOC) technology demonstration, which is itself a separate project with its own requirements that must be flowed down and managed. This paper will present an overview of the requirement development and management process for the Psyche project. It will discuss in detail the various challenges summarized above, the methods and decisions chosen to address them, and evaluate their overall effectiveness at this stage in the project.

Elkins-Tanton, Linda T.↗

How Do You Go From a Concept Idea to a NASA Selected Mission? Formulating the Psyche Discovery Mission with JPL's Concurrent Engineering Teams

JPL’s Office of Formulation provides continuity of support and access to domain subject matter experts, as Principal Investigators mature their mission concepts from “cocktail napkin” ideas to Preliminary Design Reviews [1]. Using NASA’s Psyche mission as a case study, we describe JPL’s concurrent engineering A-Team and Team X support to the Psyche competed concept study team in the areas of 1) Initial Feasibility, 2) Trade Space Exploration, 3) Spacecraft Point Design and Cost Estimate, 4) Science, Technical, Management, and Cost Review, and 5) Strategy and Communication Development. NASA’s Psyche Discovery-class mission started as a grassroots idea from Principal Investigator L.T. ElkinsTanton. Is there a compelling Discovery mission to visit the interior of a body for the first time, by sending a mission to an iron metal asteroid? In less than five years the Psyche concept was selected as a mission under NASA’s Discovery Program. While Psyche had a dedicated concept development team [2], they utilized JPL’s concurrent engineering teams, methods, analysis tools, and subject matter experts throughout their mission concept formulation lifecycle

Ziemer, John↗

MarCO: Interplanetary Mission Development on a CubeSat Scale

Shortly after JPL’s Interior Exploration using Seismic Investigations, Geodesy and Heat Transport (InSight) mission launches, separates, and commences its cruise phase, two CubeSats will deploy from the launch vehicle’s upper stage and begin independent flight to Mars (Fig. 1). During InSight’s entry, descent, and landing (EDL) sequence, these twin Mars Cube One (MarCO) spacecraft will fly 3,500 km above the Martian surface, recording and relaying InSight UHF radio data to the Deep Space Network (DSN) on Earth1. MarCO is a twin CubeSat mission developed by the NASA Jet Propulsion Laboratory (JPL) to accompany the InSight (Interior Exploration using Seismic Investigations, Geodesy and Heat Transport) Mars mission lander. MarCO's primary mission objective is to launch with InSight and independently fly to Mars to serve as a communications relay during InSight's entry, descent, and landing (EDL) phase. MarCO represents a new type of deep space mission: CubeSats at Mars. Building on the development of JPL's first interplanetary CubeSat project, the Interplanetary Nano-Spacecraft Pathfinder in Relevant Environment (INSPIRE), MarCO further refined the approach to hardware, software, and ground architecture development to solve the challenges of quickly building low-budget spacecraft to fly to Mars. The greatest constraint, beyond others typical of CubeSat missions, was time. The duration between MarCO's conception to completion of spacecraft assembly was less than two years - an unprecedented schedule for any planetary mission to date. Through necessity, MarCO has built on previous experience, procedures, systems, and development methodologies, defining a new niche for supporting larger primary missions. The MarCO spacecraft are poised to write a new chapter in deep space exploration. Originally slated to launch and reach Mars in 2016, the InSight mission schedule subsequently slipped to 2018. During the original landing of InSight, Earth would not be in view, and no orbiter around Mars would have been in position to both receive UHF EDL data and simultaneously relay it back to Earth. It was from this obstacle that MarCO was conceived. Regardless of any changes to InSight’s 2018 EDL configuration geometry, MarCO is still expected to fly and serve in the same capacity as originally designed: the first CubeSat mission to Mars. CubeSats have historically been firmly in the domain of universities and small companies. As first conceived, they served as a platform upon which to teach all aspects of the space mission lifecycle. JPL took on this mission type with Interplanetary Nano-Spacecraft Pathfinder in Relevant Environment2 (INSPIRE), moving the concept into a new domain: deep space. Building from the INSPIRE platform and lessons learned, MarCO addressed new challenges in the domain of planetary missions: independent interplanetary flight and navigation, integration with a large-scale mission, long-distance and long-delay communication, short development time, and a small development team. Of these, the greatest constraint was schedule: only 18 months passed from conception of mission concept until delivery of fully assembled and tested flight hardware. Careful selection of mission team, along with extensive use of off-the-shelf equipment, and streamlining automated processes, was essential. This achievement represents the next step in the evolution of CubeSats beyond low-Earth orbit.

Werne, Thomas↗

Improving Spacecraft Design and Operability for Europa Clipper through High-Fidelity, Mission-Level Modeling and Simulation

NASA’s planned Europa Clipper mission seeks to assess the habitability of Jupiter’s moon Europa, which exhibits strong evidence of an ocean of liquid water underneath its icy crust. The sheer number of unique instruments, all of which require quiescent environments in order to operate, compounded with Jupiter’s distance from the Sun and Earth, make this planned mission challenging and resource-constrained. High fidelity, mission-level simulations that model the spacecraft, ground, and environment from launch to end-of-mission with a given trajectory and mission plan have been employed early in the project lifecycle to better understand the interactions between various components of the mission and how design changes impact the entire system. These simulations have already resulted in tangible benefits to the project by providing vital input to key spacecraft trades, assessing impacts to operability, and quantifying how well the scientific objectives of the mission can be achieved. Improvements to simulation performance and to the process by which information defining the system is gathered and built into models used by simulations have the potential to further expand the scope of their use on Europa Clipper and future missions.

Lawler, C.R.↗

How Do You Go From a Concept Idea to a NASA Selected Mission? Formulating the Psyche Discovery Mission with JPL's Concurrent Engineering Teams

JPL’s Office of Formulation provides continuity of support and access to domain subject matter experts, as Principal Investigators mature their mission concepts from “cocktail napkin” ideas to Preliminary Design Reviews [1]. Using NASA’s Psyche mission as a case study, we will describe JPL’s concurrent engineering ATeam and Team X support to the Psyche competed concept study team in the areas of 1) Science Feasibility, 2) Trade Space Exploration, 3) Spacecraft Point Design and Cost Estimate, 4) Science, Technical, Management, and Cost Review, and 5) Strategy and Communication Development. NASA’s Psyche Discovery class mission started as a grassroots idea in our A-Team facility, and in less than five years was selected as a mission under NASA’s Discovery Program. While Psyche had a dedicated concept development team [2], they utilized JPL’s concurrent engineering teams, methods, analysis tools, and experts throughout their mission concept lifecycle.

Ziemer, John↗

Designing the Design Process for Early Problem Discovery for a Complex Aeronautics Systems Challenge

The earliest stage in the innovation lifecycle, problem formulation, is crucial for setting direction in an innovation effort. When faced with an interesting problem, engineers commonly assume the approximate solution area and focus on ideating innovative solutions. However, in this project, NASA and their contracted partner, Accenture, collaboratively conducted problem discovery to ensure that solutioning efforts were focused on the right problems, for the right users, and addressing the most critical needs—in this case, exploring weather tolerant operations (WTO) to further urban air mobility (UAM) – known as UAM WTO. The project team leveraged generative, qualitative methods to understand the ecosystem, players, and where challenges in the industry are inhibiting development. The complexity of the problem area required that the team constantly observe and iterate on problem discovery, effectively “designing the design process.” This report discusses the approach, methodologies, and selected results, including insights on the application of early-stage design methodologies to a complex, system-level problem.

Problem formulation↗

Maintenance-optimized Modular Robotic Concepts for Planetary Surface ISRU Excavators

Modular robotic concepts are identified and evaluatedover the design and operations/maintenance lifecycle forautonomous Lunar, Mars, and partial gravity planetary surfaceexcavation and in-situ earthworks equipment. In-Situ ResourceUtilization (ISRU) is the exploitation of available resources at thesite of a landed spacecraft on the surface of another planetary body.It is intended that this ISRU excavator concept be capable ofmaterial extraction from native regolith, and will be able to operatein a variety of planetary surface environments after initial shakedownon the moon. Using heritage from highly multi-functional,reconfigurable robotic systems like the All-Terrain Hex-LimbedExtra-Terrestrial Explorer (ATHLETE), Regolith AdvancedSurface Systems Operations Robot (RASSOR), and Marsexploration rovers, we propose a flexible maintenance-optimizedmobility platform concept with quick-connect/disconnect featuresfor robotically swappable excavation implements. Dust toleranttorque transmission, power & data docking, thermal fluidconnectors, and modular avionics and instrumentation will allow forautonomous swapping of tools, replacement of spares, and longtermmaintenance of robotic excavators. The architecture includesmodular tools for conventional excavate / scoop / haul / dump /process functions of a terrestrial mining operation on Earth, but alsowill have the capability to operate and robotically maintain itselfwithout human intervention. The concepts described in this studywill provide a suite of technologies, configurations, and operationsready for inclusion into a final flight-ready excavator system.

Schuler, Jason↗

Run Time Improvement Efforts for the Roman Space Telescope Thermal Analysis

"Observatory thermal models for large, complex missions, such as the Wide Field InfraRed Survey Telescope (WFIRST) mission, produce an immense amount of data to be processed. Configuration management of the model throughout the project life cycle has mainly focused on which versions of the subsystem models form the current observatory level configuration. However, the results produced by the model are not nearly as well The Roman Space Telescope (RST), formerly known as the Wide Field InfraRed Survey Telescope, is the next great astrophysics observatory mission to follow the James Webb Space Telescope with a planned launch in 2026. As a large scale, flagship mission for NASA with challenging wave front error stability requirements, a single model approach for both thermal discipline analysis and thermo-optical distortion analysis has been used since the early days of the project. In alleviating the need to maintain two separate models for different analysis types, it imposes run time penalties on the thermal analysis with a large model with significant radiation heat exchange. Throughout the lifecycle of the project, the component models have steadily grown in size, resulting in a continuous growth of the overall observatory model with each update and consequently a considerable increase in the model run time. While ongoing efforts to reduce run time are continuously investigated, previous efforts had primarily focused on timestep size and total simulation time to reach quasi-equilibrium. More recently, studies were performed on the total number of radiation couplings (radks) included in the model, which has a nearly linear impact on run time, but increases exponentially with node count. As standard practice for spacecraft analysis, small radks were excluded from the temperature solution based on the assumption that their interchange/view factors have a negligible impact on heat flow. Four approaches were investigated to reduce the model run time while minimizing the impact on accuracy: (1) the Equivalent Radiation Network node, (2) Progressive Radk Inclusion as solution proceeds, (3) Targeted Radk Filtering for critical/non critical areas, and lastly (4) Representation of culled radks with Backloads. Furthermore, the investigation of model run time also revealed that cold cases took noticeably longer to run than hot cases; the root computational inefficiencies were explored along with the computation penalty of linearization of the external radks and recalculation of temperature dependent linear couplings at each timestep. This paper outlines the details of each of the above approaches and their impact on run time and model accuracy.

Thermal Analysis↗

Astromaterial Curation and Research at NASA

Astromaterial sample return missions from other planetary bodies (e.g., the Moon, asteroids, the Sun) and astromaterial sample collection missions here on Earth (e.g., Antarctic Meteorites, Cosmic Dust) have been a vital part of NASA’s science vision since nearly its inception. Beginning with the Apollo missions to the Moon and extending to the recent successful sample collection by the OSIRIS-REx asteroid sample return mission, these astromaterials collections have been an invaluable resource to scientists and educators around the world. Sample studies continue to provide fundamental insight into how our solar system and its constituent bodies formed and evolved over the past 4.5 billion years. As evidence of their broad impact, there are over 19,141 samples on loan to 433 Principal Investigators in 24 countries [1]. As we plan for exploration missions through 2050, sample return missions will continue to play a vital role in NASA’s science vision. Returned samples truly are the gift that keeps on giving. Having the samples accessible on Earth allows new generations of scientists and new generations of instrumentation to pursue ever evolving scientific questions. For example, the Apollo samples were collected ~50 years ago, yet our views of how the Earth-Moon system formed, the role of volatiles in the early inner solar system, and even the positions of the gas giants in the outer solar system have changed dramatically as a result of Apollo sample analyses conducted very recently. Vital to the long-term viability of any sample return mission is the careful curation of the samples. Curatorial efforts need to begin early in the project lifecycle, not with the return of the samples, but at mission conception. The Astromaterials Acquisition and Curation Office at NASA Johnson Space Center is responsible for curating all of NASA’s current and future extraterrestrial samples. Looking at possible sample return missions over the next 35+ years [2], many samples would require curation efforts a step beyond current capabilities, e.g., cold or cryogenic curation, organically and biologically clean curation, curation of gases and ices, and curation of samples with extreme pressure, temperature, or redox requirements. During the lecture, we discuss the current curatorial efforts in JSC curation, as well as discoveries from the astromaterial research. [1] Zeigler, R. A. et al. (2017) Planetary Science Vision 2050 Workshop. [2] McCubbin F. M. et al. (2017) Planetary Science Vision 2050 Workshop.

astromaterial↗

Run Time Improvement Efforts for the Roman Space Telescope Thermal Analysis

Observatory thermal models for large, complex missions, such as the Wide Field InfraRed Survey Telescope (WFIRST) mission, produce an immense amount of data to be processed. Configuration management of the model throughout the project life cycle has mainly focused on which versions of the subsystem models form the current observatory level configuration. However, the results produced by the model are not nearly as well The Roman Space Telescope (RST), formerly known as the Wide Field InfraRed Survey Telescope, is the next great astrophysics observatory mission to follow the James Webb Space Telescope with a planned launch in 2026. As a large scale, flagship mission for NASA with challenging wave front error stability requirements, a single model approach for both thermal discipline analysis and thermo-optical distortion analysis has been used since the early days of the project. In alleviating the need to maintain two separate models for different analysis types, it imposes run time penalties on the thermal analysis with a large model with significant radiation heat exchange. Throughout the lifecycle of the project, the component models have steadily grown in size, resulting in a continuous growth of the overall observatory model with each update and consequently a considerable increase in the model run time. While ongoing efforts to reduce run time are continuously investigated, previous efforts had primarily focused on timestep size and total simulation time to reach quasi-equilibrium. More recently, studies were performed on the total number of radiation couplings (radks) included in the model, which has a nearly linear impact on run time, but increases exponentially with node count. As standard practice for spacecraft analysis, small radks were excluded from the temperature solution based on the assumption that their interchange/view factors have a negligible impact on heat flow. Four approaches were investigated to reduce the model run time while minimizing the impact on accuracy: (1) the Equivalent Radiation Network node, (2) Progressive Radk Inclusion as solution proceeds, (3) Targeted Radk Filtering for critical/non critical areas, and lastly (4) Representation of culled radks with Backloads. Furthermore, the investigation of model run time also revealed that cold cases took noticeably longer to run than hot cases; the root computational inefficiencies were explored along with the computation penalty of linearization of the external radks and recalculation of temperature dependent linear couplings at each timestep. This paper outlines the details of each of the above approaches and their impact on run time and model accuracy.

Thermal Analysis↗

A Model-Based Systems Engineering Journey to Developing a Concept of Operations

Starting in 2017, NASA’s Human Research Program (HRP) Exploration Medical Capability (ExMC) element began a systems engineering transition from traditional, document-centric development to model-centric development when defining its foundation medical systems. These foundation medical systems define a Concept of Operations (ConOps) and identify the generic requirements for a medical system based on assumptions about a generic crew and mission environments and guidance from NASA standards (e.g., Medical “Levels of Care”). By making the transition, ExMC intends to improve communication among stakeholders about foundation medical system requirements and content. In addition, this transition will enable ExMC to lower both development and crew treatment risks for future, mission-specific medical systems. ExMC followed a Model Based Systems Engineering (MBSE) paradigm when developing the foundation medical systems. A model-based approach provides several advantages over a traditional, document-centric approach. First, when Systems Engineers (SE) develop diagrams in a model using a standard modeling language, they produce information dense pictures that facilitate understanding much more efficiently with less room for misinterpretation than text. Second, due to the evolving nature of projects, documentation becomes out of date the minute it is published. This can result in people making decisions based on information that is no longer current, especially if they are referencing a locally-stored copy of a document. A model, on the other hand, is always up to date with the latest approved changes and information. It serves as a single point of truth. Third, a model-centric approach centralizes all important information in one place. Rather than having to flip through separate ConOps documents, design specifications, requirements specifications, and the like to coordinate information, a model captures the content in one, integrated spot. This integration makes tracing information from end-to-end easier with greater reliability. The ExMC Systems Engineering Lifecycle follows a well-defined process. ExMC Systems Engineers perform all major steps of the process, regardless of the development methodology. One of the first steps in the process is developing the ConOps that describes the operation of the system from the point of view of the users. It includes a list of the users and their needs, the goals of the medical system, key assumptions about the system, and definitions of the medical system’s operational environments. For this development effort, ExMC chose to replace the traditional text-based ConOps document with a model. While the decision to change the development workflow was not difficult, implementing the structural and organizational workflows were. It required showing ExMC’s users, most of whom are not Systems Engineers, how the information they require would be presented in the model and to gain their acceptance of this approach. This paper documents key lessons learned during the ConOps transformation by focusing on how the model represents information, the agile workflow used by SEs when developing the model and how it integrates into a project plan, how leadership influenced key users to accept the transformation, and how the users interact with the model information.

Jeffrey Robert Cohen↗

Bion-M2

Bion-M2, scheduled to launch in April 2023, continues the 30+ year collaboration between the Institute of Biomedical Problems of the Russian Academy of Sciences (IBMP RAS) and the National Aeronautics and Space Administration (NASA). Bion-M2 is the second biosatellite in the Bion-M series and its goal is to investigate how the space environment affects living organisms, with emphasis on physiological changes in rodents, gravitational biology using a wide variety of specimens, and radiation biology. The Bion-M2 biosatellite will complete a 30-day low earth orbit (LEO) flight to study the combined effects of microgravity and ionizing radiation (IR) on multiple organisms, where the payload may be exposed to IR at 20-30 times thedose rate seen on the International Space Station. Following return, nine U.S. collaborators selected through the NASA Space Biology Research Announcement will conduct post-flight rodent experiments using male C57BL/6 mice. The post-flight experiments will investigate the effects of the space environment on bone and skeletal muscle health, cardiac function, reproductive system function, neurovascular systems, protein composition in plasma, and thermoregulation in the mice. Currently, the Bion-M2 mission is in the development phase of theproject lifecycle. The mission objectives, constraints, requirements, and timeline have been defined in the project plan and contracts. Technology for the mission is under development and science procedures will be finalized by FY22. The aim of this presentation is to highlight the importance of the Bion-M2 mission and provide insight into the mission development process, including an overview of the project plan and the tissue sharing plan that will be utilized during the post-flight dissection procedures.

Bion-M2↗

Surface Systems Capability Gaps for Enabling NASA’s Sustainable Lunar Operations

This paper discusses the NASA Ground, Test, and Surface Systems Taxonomy (TX-13) related capability gaps, including details of architecture, technology, engineering, and policy gaps for enabling sustainable lunar surface operations and subsequent Mars missions. Architecture gaps include standardized architectures and interfaces, multi-element systems engineering and integration, design for supportability, and nuclear payload processing and launch approach. Technology gaps, primarily focused on uncrewed surface operations, include automated/autonomous cryogenic loading, transfer, servicing, and storage of commodities; health determination and fault management; automated/autonomous planning and scheduling; automated/autonomous inspection, maintenance and repair; logistics management and reliability; launch and landing site preparation; commodity management; and advanced umbilicals and dust tolerant interfaces. Engineering gaps include high-purity propellant production for ground and surface applications and large-scale xenon servicing capabilities. The policy gap includes nuclear propulsion acceptance testing and qualification approach. Strategically identifying human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle is essential for achieving the mission objectives for a sustainable human lunar presence, improving performance and mission effectiveness, reducing operations costs and reliance on humans to perform tasks, and accommodating ground communication delays.

Surface Systems↗

How Environment and Operational Considerations Guide Requirements Development for Clinical Decision Support Beyond Low Earth Orbit

The Aerospace Medical community is acutely aware of the need for automated cognitive systems to support astronauts in responding to and making critical decisions about assessing – and treating - medical conditions and assuring wellness during exploration spaceflight missions. Such systems will be critically important to mission success as we venture farther from terrestrial settings (particularly low-earth orbit platforms) and encounter increasingly Earth-independent medical decision-making scenarios and requirements. This need would likely be met through the development of a Clinical Decision Support System (CDSS) that assimilates information from various sources (e.g., vehicle environmental control system, blood pressure cuff, and heart rate monitor) integrated with medical and wellness data to provide detailed guidance tailored to individual crew member needs. This presentation will address some of the fundamental considerations and their implications that must be fully understood by CDSS requirement developers early in the system lifecycle.

B Burian↗

Updraft Dynamics and Microphysics: On the Added Value of The Cumulus Thermal Reference Frame in Simulations of Aerosol–Deep Convection Interactions

One fundamental question about atmospheric moist convection processes that remains debated is whether, or under which conditions, a relevant variability in background aerosol concentrations may have a significant dynamical impact on convective clouds and their associated precipitation. Furthermore, current climate models must parameterize both the microphysical and the cumulus convection processes, but this is usually implemented separately, whereas in nature there is a strong coupling between them. As a first step to improve our understanding of these two problems, we investigate how aerosol concentrations modify key properties of updrafts in eight large-eddy-permitting regional simulations of a case study of scattered convection over Houston, Texas, in which convection is explicitly simulated and microphysical processes are parameterized. Dynamical and liquid-phase microphysical responses are investigated using the following two different reference frames: static cloudy updraft grid cells versus tracked cumulus thermals. In both frameworks, we observe the expected microphysical responses to higher aerosol concentrations, such as higher cloud number concentrations and lower rain number concentrations. In terms of the dynamical responses, both frameworks indicate weak impacts of varying aerosol concentrations relative to the noise between simulations over the observationally derived range of aerosol variability for this case study. On the other hand, results suggest that thermals are more selective than cloudy updraft grid cells in terms of sampling the most active convective air masses. For instance, vertical velocity from thermals is significantly higher at upper levels than when sampled from cloudy updraft grid points, and several microphysical variables have higher average values in the cumulus thermal framework than in the cloudy updraft framework. In addition, the thermal analysis is seen to add rich quantitative information about the rates and covariability of microphysical processes spatially and throughout tracked thermal lifecycles, which can serve as a stronger foundation for improving subgrid-scale parameterizations.

aerosols↗

TAMU: a new space mission operations paradigm

The Transferable, Adaptable, Modular and Upgradeable (TAMU) Flight Production Process (FPP) is a model-centric System of System (SoS) framework which cuts across multiple organizations and their associated facilities, that are, in the most general case, in geographically diverse locations, to develop the architecture and associated workflow processes for a broad range of mission operations. Further, TAMU FPP envisions the simulation, automatic execution and re-planning of orchestrated workflow processes as they become operational. This paper provides the vision for the TAMU FPP paradigm. This includes a complete, coherent technique, process and tool set that result in an infrastructure that can be used for full lifecycle design and decision making during any flight production process. A flight production process is the process of developing all products that are necessary for flight.

Meshkat, Leila↗

Validation on the Europa Clipper Mission in the Formulation Phase

The Europa Clipper mission will perform a detailed investigation of Europa’s environment and habitability by placing a spacecraft into a looping orbit around Jupiter and performing repeated close Europa flybys. The Europa Clipper Project Verification and Validation (V&V) team is responsible for verifying that the Project System is compliant with the science and engineering requirements levied on it and validating that it is capable of meeting the mission objectives. Europa Clipper has developed a V&V framework to ensure that mission capabilities are realized at a reasonable confidence level prior to launch. The V&V team will coordinate the validation activities defined by this framework throughout the project lifecycle as the spacecraft evolves from design to implementation and operations. Validation of space missions is typically grouped into three categories: 1) requirements validation, 2) model validation, and 3) system validation. System validation, along with verification activities, are often the primary focus of V&V programs and these efforts peak in the implementation phase. However, the increasing reliance of exploration missions on models and simulations, and the complexity of the Europa Clipper mission, have dictated attention to requirements and model validation in the formulation phase. This paper discusses the development of the Europa Clipper V&V framework with emphasis on the validation of models and simulations, and of requirements. Approaches include the adaptation of institutional guidelines, such as those in the NASA-STD-7009 document, to create a Project Model V&V Plan and the use of tools such as DOORS NG to plan model validation and derive requirement quality metrics.

Srivastava, Priyanka↗

Psyche Early Project Verification & Validation Planning Development

The Psyche mission to the asteroid (16) Psyche was selected as the fourteenth mission in the Discovery program in January 2017. The Psyche mission will determine if (16) Psyche is the core of a larger differentiated body. As part of the development of this mission a Verification and Validation (V&V) engineer was assigned early in the project’s design Phase B. This paper will discuss some of the strategies that the Psyche team is using to take full advantage of the early planning for V&V on flight projects and specifically how the Psyche mission is approaching these tasks. This paper will discuss the effects of having a V&V mindset on: 1) The Psyche requirements development process, and how focusing not only on how the team will verify these requirements but also on developing the tools necessary to track and monitor that verification feeds back into the requirement development process. 2) The Psyche testbed development, and how using a verification mindset is useful for identifying holes in the testbed development process, including the required testbed speed and how to think about testbed certification early in the process while encouraging trades and developing relationships with the testbed team. 3) Developing new V&V Tools for Psyche, and how developing tools early in the project development process means that they can influence the development of other requirement and scheduling tools. 4) Verification Activity Planning, which is typically done to a preliminary level during Phase B of the project, and is important for understanding the major testing that is needed to ensure that the system as built represents the design. On Psyche we are not only focused on bringing this planning to a preliminary level, we are also developing a V&V focused schedule to help us de-conflict V&V activities that may require similar resources early on in the program’s development. 5) Validation Planning, for which we are working with the testbed and model development teams to ensure that their models can be effectively validated and that the plans to do so are in place. In this paper we will describe how the Psyche mission is approaching each of these V&V areas and identify lessons that can be taken by other space missions trying to decide how much effort should be put into V&V early in the project lifecycle.

Solish, Benjamin↗