Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “lessons learned process”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Mars 2020 Center Differential Pivot Restraint: Flexurized Spring System Providing Compliance for Rover Mobility Deployment Prior to Landing

The Center Differential Pivot Restraint (CDPR) for the Mars 2020 mission is designed to constrain motion of the rover differential and to dampen out the load response of during rover’s mobility deployment event in Entry, Descent, and Landing (EDL) phase of the mission. For Mars 2020, it was required to redesign the mechanism to save minimum 33% of the mass from the previous Mars Science Laboratory (MSL) design. The new mechanism architecture used a monolithic spring-like flexure to act as the system compliance, resulting in 50% mass savings from the MSL design. Along the design and prototype testing process, several mechanism design principles were re-affirmed as well as lessons learned about potential race conditions.

Cameron, Matthew↗

Earth Science Data Processing With Nextflow

Earth science data processing tasks present many challenges. These tasks often process large input datasets and require scores of CPU-hours to generate results. All but the simplest tasks will be decomposed into a series of computational or data manipulation steps, also known as a scientific workflow. In order to reduce the burden of orchestrating and running the dependent processing steps, a workflow execution engine is required. This poster describes the lessons learned by the CLARREO Pathfinder (CPF) team while developing multiple scientific workflows and utilizing the open-source Nextflow engine to execute them in a cloud computing environment. The Nextflow engine is designed with the following stated goals: first, the engine does not dictate how individual steps in the task are implemented (i.e. it is language and interface agnostic); second, the engine supports easy configuration and modularity at the workflow level so that others can easily execute our workflows to reproduce results; lastly, the engine eases development by transparently scaling execution from local to remote environments. Nextflow was developed for the bioinformatics domain but is a good fit for other scientific workflows where the overall task is well-described by a dataflow diagram. The CPF team has developed Nextflow pipelines (i.e. scientific workflows) to simulate CLARREO radiance, generate large look-up tables for inter-calibration algorithms, and generate L4 intercalibration data products. These pipelines consume from single-digits to hundreds of thousands of CPU-hours. In the development and evolution of these pipelines we have discovered many design patterns, pitfalls, and solutions to common problems. Our goal is to demonstrate important aspects of how to design, implement, run, and ultimately share Nextflow pipelines in the domain of Earth science.

Aron D Bartle↗

Exploring the Use of Large Immersive Display Systems in the Nuclear Industry

Large immersive display systems play a critical role in the nuclear industry by enabling advanced training, design reviews, scientific visualization, and safety simulations. These systems, such as CAVE and powerwalls, allow engineers and operators to interact with virtual nuclear environments in real-time, providing a deeper understanding of complex systems. Their ability to simulate real-world scenarios for testing and optimization in a safe, controlled environment ensures that operators and engineers can refine process, enhance safety protocols, and troubleshoot complex challenges. This article outlines key lessons learned from deploying these systems, practical insights into their applications, and considerations for future improvements, aiming to guide their broader adoption and effective use in the nuclear industry.

99 - GENERAL AND MISCELLANEOUS↗

Status and Path Forward for the Large Ultraviolet Optical Infrared Surveyor (LUVOIR) Mission Concept Study

In preparation of the 2020 Astrophysics Decadal Survey, National Aeronautics and Space Administration (NASA) has commenced a process for the astronomical community to study several large mission concepts leveraging the lessons learned from past Decadal Surveys. This will enable the Decadal Survey committee to make more informed recommendations to NASA on its astrophysics science and mission priorities with respect to cost and risk. Four astrophysics large mission concepts were identified. Each of them had a Science and Technology Definition Teem(STDT) chartered to produce scientifically compelling, feasible, and executable design reference mission (DRM)concepts to present to the 2020 Decadal Survey. In addition, The Aerospace Corporation will perform an independent cost and technical evaluation (CATE) of each of these mission concept studies in advance of the 2020 Decadal Survey by interacting with the STDTs to provide detailed technical details on certain areas for which deep dives are appropriate. This paper presents the status and path forward for one of the four large mission concepts, namely, the Large UltraViolet, Optical, InfraRed surveyor (LUVOIR).

Study Office: science analyses↗

Learning Lessons from the X-37 Project

The X-37 was planned as an automated vehicle capable of flight-testing new aerospace technologies in combined environments that are beyond the capability of existing ground or flight platforms. Flight demonstration with the X-37 architecture and configuration in relevant environments was planned to reduce the risk of developing launch vehicle technologies for sustainable, affordable exploration and other aerospace applications. Current plans are for the X-37 Approach and Landing Test Vehicle (ALTV) to be atmospheric tested in 2005 from Scaled Composite's White Knight carrier aircraft at up to 40,000 feet over California's Mojave Spaceport, with and turnaround maintenance performed. The fight Operations Control Center will conduct the mission, using a streamlined operations concept. Taxi-tow and captive-carry tests will be conducted prior to the atmospheric-test series. Sponsored by the Defense Advanced Research Projects Agency (DARPA) with NASA participation, technical objectives are to: (1) mature Computed Air Data System/Remote Pressure Sensor technology, (2) manage energy during Terminal Area Energy Management/Heading Alignment Cone maneuvers, and (3) validate the aerodatabase. The X-37 Project began in 1999 under a cooperative agreement as an element of NASA's Future X Program and transitioned to a NASA Research Announcement under the Space Launch Initiative. In mid-2004, NASA transferred ownership to DARPA, with its heritage of performing high-risk, high-payoff research and development. NASA contributes technical expertise, including risk analysis and system integration. The Boeing Company is the prime contractor, with nationwide suppliers. This recent partnership exemplifies the synergy attainable when NASA Centers, other Government agencies, and industry work together toward a common goal - contributing to the knowledge base for U.S. exploration and other aerospace endeavors. The X-37 team represents a range of space transportation disciplines - from engineering to management. Some members have been with the project since its inception. All have gained priceless experience during the design, manufacturing, and testing of the ALTV, as well as through developing advanced orbital flight technologies, such as state-of-the-art Thermal Protection Systems and hot structures. Throughout this process, the X-37 Project team captures lessons that are directly applicable to other such efforts. The upcoming ALTV flights offer another dimension of data and first-hand experience that will prove invaluable to those designing new generations of reusable spacecraft. And ongoing technology developments will expand the aerospace knowledge base. Delivering prototype hardware is always a risky proposition. During the course of the X-37 effort, the team has experienced many challenging opportunities, delivering significant accomplishments and learning numerous lessons in the process. The ability to manage the risk landscape is key to overcoming obstacles, especially technical hurdles that are encountered in progressing hardware from design to flight. The approach to managing risk under this partnership is evolving but, in general, the team allocates resources to reduce the likelihood of severe-consequence risks, thus maximizing mission success and ensuring that the X-37 Project delivers value to its stakeholders. As the team sharpens its focus on operations, it continues to contribute knowledge to those who would undertake high-risk, high-payoff research and development and provides valuable experience to implement the exploration vision.

Turner, Susan↗

Learning Lessons from the X-37 Project

The X-37 was planned as an automated vehicle capable of flight-testing new aerospace technologies in combined environments that are beyond the capability of existing ground or flight platforms. Flight demonstration with the X-37 architecture and configuration in relevant environments was planned to reduce the risk of developing launch vehicle technologies for sustainable, affordable exploration and other aerospace applications. Current plans are for the X-37 Approach and Landing Test Vehicle (ALTV) to be atmospheric tested in 2005 from Scaled Composite s White Knight carrier aircraft at up to 40,000 feet over California's Mojave Spaceport, with landing and turnaround maintenance performed. The Flight Operations Control Center will conduct the mission, using a streamlined operations concept. Taxi-tow and captive-carry tests will be conducted prior to the atmospheric-test series. Sponsored by the Defense Advanced Research Projects Agency (DARPA) with NASA participation, technical objectives are to: (1) mature Computed Air Data System/Remote Pressure Sensor technology, (2) manage energy during Terminal Area Energy Management/Heading Alignment Cone maneuvers, and (3) validate the aerodatabase. The X-37 Project began in 1999 under a cooperative agreement as an element of NASA's Future X Program and transitioned to a NASA Research Announcement under the Space Launch Initiative. In mid-2004, NASA transferred ownership to DARPA, with its heritage of performing high-risk, high-payoff research and development (R&D). NASA contributes technical expertise, including risk analysis and system integration. The Boeing Company is the prime contractor, with nationwide suppliers. This partnership exemplifies the synergy attainable when NASA Centers, other Government agencies, and industry work together toward a common goal - contributing to the knowledge base for U.S. exploration and other aerospace endeavors. The X-37 team represents a range of space transportation disciplines - from engineering to management. Some members have been with the project since its inception. All have gained priceless experience during the design, manufacturing, and testing of the ALTV, as well as through developing advanced orbital flight technologies, such as state-of-the-art Thermal Protection Systems and hot structures. Throughout this process, the X-37 Project team captures lessons that are directly applicable to other such efforts. The upcoming ALTV flights offer another dimension of data and first-hand experience that will prove invaluable to those designing new generations of reusable spacecraft. And ongoing technology developments will expand the aerospace knowledge base. Delivering prototype hardware is always a risky proposition. During the course of this effort, the X-37 team has experienced many challenging opportunities, delivering significant accomplishments and learning numerous lessons in the process. The ability to manage the risk landscape is key to overcoming obstacles, especially technical hurdles that are encountered in progressing hardware from design to flight. The approach to managing risk under this partnership is evolving but, in general, the team allocates resources to reduce the likelihood of severe-consequence risks, thus maximizing mission success and ensuring that the X-37 Project delivers value to its stakeholders. As the team sharpens its focus on operations, it continues to contribute knowledge to those who would undertake high-risk, high-payoff R&D and provides valuable experience to implement the Vision for Space Exploration.

Turner, Susan↗

System Design and Implementation of the Detector Assembly of the Astro-H Soft X-Ray Spectrometer

The soft x-ray spectrometer (SXS) onboard Astro-H presents to the science community unprecedented capability (less than 7 eV at 6 keV) for high-resolution spectral measurements in the range of 0.5-12 keV to study extended celestial sources. At the heart of this SXS is the x-ray calorimeter spectrometer (XCS) where detectors (calorimeter array and anticoincidence detector) operate at 50 mK, the bias circuit operates at nominal 1.3 K, and the first stage amplifiers operateat 130 K, all within a nominal 20 cm envelope. The design of the detector assembly in this XCS originates from the Astro-E x-ray spectrometer (XRS) and lessons learned from Astro-E and Suzaku. After the production of our engineering model, additional changes were made in order to improve our flight assembly process for better reliability and overall performance. In this poster, we present the final design and implementation of the flight detector assembly, show comparison of parameters and performance to Suzakus XRS, and list susceptibilities to other subsystems as well as our lessons learned.

soft x-ray spectrometer↗

Shuttle orbit flight control design lessons - Direction for Space Station

The Space Shuttle orbit flight control system, which operates during all exo-atmospheric flight phases, has successfully met operational requirements. Many design integration and operational issues that required resolution during development and testing provide an experience base that will benefit the development of future space systems, particularly the Space Station. To this end, the applicable Shuttle and Space Station hardware/software is reviewed with some perspective provided on how current design groundrules were derived and how issues that affected the Shuttle orbit control system design are a pathway for the Space Station. Some of the most significant lessons learned from the Shuttle are summarized, with a discussion of the effect of performance and design of hardware, including the data processing system on software structures and usage procedures. Crew interface issues and important results from man-in-the-loop tests are summarized. Problems resulting from trying to meet difficult orbital operational objectives, including some sophisticated payload operations are characterized. Several proposed Shuttle flight control design improvements, developed in response to some of the lessons learned so far, are identified. Potential application of the Shuttle design lessons and new control technologies to the Space Station are discussed.

Cox, Kenneth J.↗

Application of Agile for Systems Engineering, Project Management and Modeling and Lessons Learned

The Systems Engineering team within the Human Research Program (HRP) Exploration Medical Capability (ExMC) Element has been transforming its development processes to be more efficient, robust,and responsive to change and to its stakeholders. To these ends, the Systems Engineering team trialed the integration of agile development techniques into existing and new processes. Agile development methods are well understood within the software development community. Outside ofsoftware development, however, how non-software project management (PM) and systems engineering (SE) teams implement agile development techniques is less well understood. In its transformation efforts, the ExMC SE team focused on three main areas: Improving the project communications among subsystem teams and stakeholders by adopting a scrum-like process, Changing the status and reporting mechanisms to improve schedule coordination between the subsystem team, SE leadership, and ExMC Element leadership, and Unifying the model-based SE workflow to improve understanding of Concepts of Operations across projects.This presentation highlights several of these transformations and what the SE team learned while undergoing the transformation.

S Lumpkins↗

Agent-Based Modeling for the Circular Economy: Lessons Learned From Three Case Studies

The circular economy (CE) aims at decoupling human activities from resource use, creating wealth in the process. Recently, many scholars have questioned the link between increased circularity and sustainability, resulting in many methodological approaches being developed for that purpose. This presentation summarizes the insights gained from the application of agent-based modeling (ABM) to study the techno-economic and social conditions promoting circularity and sustainability of three technologies: photovoltaic (PV) modules, hard disk drives (HDDs), and wind blades. Four main categories of agents are defined in the ABM: asset owners, service providers (e.g., refurbishers), recyclers, and manufacturers. Two main CE strategies are represented: lifetime extension (through repair or reuse) and recycling. The developed models start by projecting installed capacities and end-of-life (EOL) quantities. Then the theory of planned behavior - a social psychology model explaining behavior adoption based on attitude, peer influence, and costs - is used to model the asset owners' EOL decision (i.e., landfill, recycle or extend the lifetime of the asset). Then, the quantities of assets flowing to the recycler and service provider agents and quantities of materials flowing to manufacturers are computed. Recyclers' economies of scale are dynamically modeled, and the value generated by the CE strategies for the recyclers, service providers, and manufacturers is computed within the model. When data are available, avoided greenhouse gas emissions resulting from the CE strategies adoption are calculated exogenously from the ABM simulations. Results show that with improved used PV modules warranties, the reuse CE strategy adoption increases from 1% to 23% between 2020 and 2050. Similarly, improved standards could enhance HDDs end-users trust in data-wiping - a prerequisite to reuse - leading to a 3-fold increase in the reuse rate and avoid about 5 million tons of CO2 eq by 2050. Regarding wind blades, 5-15 years lifetime extension could reduce EOL blade quantities by 13%. High costs and logistic issues prevent blades from being recycled in greater quantities. One insight from the case studies is the necessity to have mature secondary markets for reuse to be a viable option. Interestingly, PV reuse is limited by the willingness of PV owners to purchase used modules (on the demand side), while HDDs reuse is constrained by the lack of trust toward data-wiping (limiting the supply of used HDDs). The six limits of the CE concepts presented by Korhonen et al. (2018) are finally used to interpret the results. The HDD case study is an exemplary lock-in, where the first accepted practice (shredding) retains most of the market. The PV results illustrate the technical limitation to reuse, as the growing demand cannot be supplied entirely with used PV modules. The wind case study shows the relevance of clearly defining physical flows - what type of waste should wind blades be considered, how should they be transported and landfilled? - a crucial consideration that also applies to PV modules. Finally, the three case studies highlight the relevance of studying a technology's technical, economic, and market material efficiency potentials altogether and the potential benefit of coupling ABM to life cycle assessment.

agent-based modeling↗

Safety and Mission Assurance Knowledge Management Retention: Managing Knowledge for Successful Mission Operations

Knowledge Management is a proactive pursuit for the future success of any large organization faced with the imminent possibility that their senior managers/engineers with gained experiences and lessons learned plan to retire in the near term. Safety and Mission Assurance (S&MA) is proactively pursuing unique mechanism to ensure knowledge learned is retained and lessons learned captured and documented. Knowledge Capture Event/Activities/Management helps to provide a gateway between future retirees and our next generation of managers/engineers. S&MA hosted two Knowledge Capture Events during 2005 featuring three of its retiring fellows (Axel Larsen, Dave Whittle and Gary Johnson). The first Knowledge Capture Event February 24, 2005 focused on two Safety and Mission Assurance Safety Panels (Space Shuttle System Safety Review Panel (SSRP); Payload Safety Review Panel (PSRP) and the latter event December 15, 2005 featured lessons learned during Apollo, Skylab, and Space Shuttle which could be applicable in the newly created Crew Exploration Vehicle (CEV)/Constellation development program. Gemini, Apollo, Skylab and the Space Shuttle promised and delivered exciting human advances in space and benefits of space in people s everyday lives on earth. Johnson Space Center's Safety & Mission Assurance team work over the last 20 years has been mostly focused on operations we are now beginning the Exploration development program. S&MA will promote an atmosphere of knowledge sharing in its formal and informal cultures and work processes, and reward the open dissemination and sharing of information; we are asking "Why embrace relearning the "lessons learned" in the past?" On the Exploration program the focus will be on Design, Development, Test, & Evaluation (DDT&E); therefore, it is critical to understand the lessons from these past programs during the DDT&E phase.

Johnson, Teresa A.↗

ATD-2 Perspective: SWIFT Day 2 Introduction

This presentation describes the manner in which the ATD-2 began consuming data from SWIM and gradually built new services to satisfy in its mission. This lessons learned from this work indicate that additional data-rich services will be required in the future. This also led to the development of data pre-processing and mediation services that are now of much interest to the community. The presentation mentions some of the barriers to progress that exist for those seeking to use SWIM flight data, and NASA's desire to share its lessons learned with the aviation community.

ATD-2↗

Parallelization of a Six Degree of Freedom Entry Vehicle Trajectory Simulation Using OpenMP and OpenACC

The art and science of writing parallelized software, using methods such as Open Multi-Processing (OpenMP) and Open Accelerators (OpenACC), is dominated by computer scientists. Engineers and non-computer scientists looking to apply these techniques to their project applications face a steep learning curve, especially when looking to adapt their original single threaded software to run multi-threaded on graphics processing units (GPUs). There are significant changes in mindset that must occur; such as how to manage memory, the organization of instructions, and the use of if statements (also known as branching). The purpose of this work is twofold: 1) to demonstrate the applicability of parallelized coding methodologies, OpenMP and OpenACC, to tasks outside of the typical large scale matrix mathematics; and 2) to discuss, from an engineer’s perspective, the lessons learned from parallelizing software using these computer science techniques. This work applies OpenMP, on both multi-core central processing units (CPUs) and Intel® Xeon Phi™ 7210, and OpenACC on GPUs. These parallelization techniques are used to tackle the simulation of thousands of entry vehicle trajectories through the integration of six degree of freedom (DoF) equations of motion (EoM). The forces and moments acting on the entry vehicle, and used by the EoM, are estimated using multiple models of varying levels of complexity. Several benchmark comparisons are made on the execution of six DoF trajectory simulation: single thread Intel® Xeon® E5-2670 CPU, multi-thread CPU using OpenMP, multi-thread Xeon Phi™ 7210 using OpenMP, and multi-thread NVIDIA® Tesla® K40 GPU using OpenACC. These benchmarks are run on the Pleiades Supercomputer Cluster at the National Aeronautics and Space Administration (NASA) Ames Research Center (ARC), and a Xeon Phi™ 7210 node at NASA Langley Research Center (LaRC).

Green, Justin S.↗

Business Intelligence Modeling in Launch Operations

This technology project is to advance an integrated Planning and Management Simulation Model for evaluation of risks, costs, and reliability of launch systems from Earth to Orbit for Space Exploration. The approach builds on research done in the NASA ARC/KSC developed Virtual Test Bed (VTB) to integrate architectural, operations process, and mission simulations for the purpose of evaluating enterprise level strategies to reduce cost, improve systems operability, and reduce mission risks. The objectives are to understand the interdependency of architecture and process on recurring launch cost of operations, provide management a tool for assessing systems safety and dependability versus cost, and leverage lessons learned and empirical models from Shuttle and International Space Station to validate models applied to Exploration. The systems-of-systems concept is built to balance the conflicting objectives of safety, reliability, and process strategy in order to achieve long term sustainability. A planning and analysis test bed is needed for evaluation of enterprise level options and strategies for transit and launch systems as well as surface and orbital systems. This environment can also support agency simulation .based acquisition process objectives. The technology development approach is based on the collaborative effort set forth in the VTB's integrating operations. process models, systems and environment models, and cost models as a comprehensive disciplined enterprise analysis environment. Significant emphasis is being placed on adapting root cause from existing Shuttle operations to exploration. Technical challenges include cost model validation, integration of parametric models with discrete event process and systems simulations. and large-scale simulation integration. The enterprise architecture is required for coherent integration of systems models. It will also require a plan for evolution over the life of the program. The proposed technology will produce long-term benefits in support of the NASA objectives for simulation based acquisition, will improve the ability to assess architectural options verses safety/risk for future exploration systems, and will facilitate incorporation of operability as a systems design consideration, reducing overall life cycle cost for future systems. The future of business intelligence of space exploration will focus on the intelligent system-of-systems real-time enterprise. In present business intelligence, a number of technologies that are most relevant to space exploration are experiencing the greatest change. Emerging patterns of set of processes rather than organizational units leading to end-to-end automation is becoming a major objective of enterprise information technology. The cost element is a leading factor of future exploration systems.

Bardina, Jorge E.↗

Safety-Related Instrumentation and Control Pilot Upgrade (Initial Scoping Phase Implementation Report)

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP), NISP-EN-04, Standard Digital Engineering Process (SDEP), and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrade.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Safety-Related Instrumentation & Control Pilot Upgrade Initiation Phase Implementation Report

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP) [Reference 2], NISP-EN-04, Standard Digital Engineering Process (SDEP) [Reference 3], and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrades.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Strength in Rotary Friction Welding of Five Dissimilar Nickel-Based Superalloys

Advanced manufacturing processes improve the cost and quality of goods. Rotary friction welding is a fast, energy-efficient, and reliable joining process for metals, but new applications are hindered by large development costs for each new alloy. Each alloy set has different welding characteristics; therefore, lessons learned from a single alloy are not always broadly applicable. To establish knowledge that is applicable across multiple alloys, a family of different superalloys were welded to discover process trends that were applicable beyond a single alloy set. In this study, weld symmetry did not correlate to weld strength across alloy systems. Some alloys’ strongest welds occurred at maximum symmetry, whereas high asymmetry was associated with different alloys’ maximum strength. High feed rates, high welding forces, low energy, and low temperatures all resulted in high-strength welds across all alloy and geometry combinations. Tensile strengths greater than 95% of base-metal strength were recorded for most alloy systems.

36 MATERIALS SCIENCE↗