Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “issues management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Coordinating Council. First Meeting: NASA/RECON database

A Council of NASA Headquarters, American Institute of Aeronautics and Astronautics (AIAA), and the NASA Scientific and Technical Information (STI) Facility management met (1) to review and discuss issues of NASA concern, and (2) to promote new and better ways to collect and disseminate scientific and technical information. Topics mentioned for study and discussion at subsequent meetings included the pros and cons of transferring the NASA/RECON database to the commercial sector, the quality of the database, and developing ways to increase foreign acquisitions. The input systems at AIAA and the STI Facility were described. Also discussed were the proposed RECON II retrieval system, the transmittal of document orders received by the Facility and sent to AIAA, and the handling of multimedia input by the Departments of Defense and Commerce. A second meeting was scheduled for six weeks later to discuss database quality and international foreign input.

Source record↗

Nasa Records Disposition Handbook: Procedures Governing the Retention, Retirement, and Destruction of Agency Records

This handbook sets forth the disposition of official records of the National Aeronautics and Space Administration. Its provisions are applicable to NASA Headquarters and all field installations. This revised edition has been enlarged in scope and re-titled to provide guidance in all aspects of records retirements, transfers, destruction, and retrievals from Federal Records Centers. New records control schedules have been added and others revised. Also included are procedures for making recommendations for improved coverage of records categories by additions or revisions. The NASA Records Control Schedules are issued under authority of the NASA Records Management Officer in accordance with Section 101-11.406, Federal Property Management Regulations. They were approved for NASA use by the National Archives and Records Service, the General Accounting Office, and by the Joint Committee on the Disposition of Executive Papers, U.S. Congress.

Source record↗

Intelligent Systems and Advanced User Interfaces for Design, Operation, and Maintenance of Command Management Systems

Historically Command Management Systems (CMS) have been large, expensive, spacecraft-specific software systems that were costly to build, operate, and maintain. Current and emerging hardware, software, and user interface technologies may offer an opportunity to facilitate the initial formulation and design of a spacecraft-specific CMS as well as a to develop a more generic or a set of core components for CMS systems. Current MOC (mission operations center) hardware and software include Unix workstations, the C/C++ and Java programming languages, and X and Java window interfaces representations. This configuration provides the power and flexibility to support sophisticated systems and intelligent user interfaces that exploit state-of-the-art technologies in human-machine systems engineering, decision making, artificial intelligence, and software engineering. One of the goals of this research is to explore the extent to which technologies developed in the research laboratory can be productively applied in a complex system such as spacecraft command management. Initial examination of some of the issues in CMS design and operation suggests that application of technologies such as intelligent planning, case-based reasoning, design and analysis tools from a human-machine systems engineering point of view (e.g., operator and designer models) and human-computer interaction tools, (e.g., graphics, visualization, and animation), may provide significant savings in the design, operation, and maintenance of a spacecraft-specific CMS as well as continuity for CMS design and development across spacecraft with varying needs. The savings in this case is in software reuse at all stages of the software engineering process.

Mitchell, Christine M.↗

Developing Information Power Grid Based Algorithms and Software

This was an exploratory study to enhance our understanding of problems involved in developing large scale applications in a heterogeneous distributed environment. It is likely that the large scale applications of the future will be built by coupling specialized computational modules together. For example, efforts now exist to couple ocean and atmospheric prediction codes to simulate a more complete climate system. These two applications differ in many respects. They have different grids, the data is in different unit systems and the algorithms for inte,-rating in time are different. In addition the code for each application is likely to have been developed on different architectures and tend to have poor performance when run on an architecture for which the code was not designed, if it runs at all. Architectural differences may also induce differences in data representation which effect precision and convergence criteria as well as data transfer issues. In order to couple such dissimilar codes some form of translation must be present. This translation should be able to handle interpolation from one grid to another as well as construction of the correct data field in the correct units from available data. Even if a code is to be developed from scratch, a modular approach will likely be followed in that standard scientific packages will be used to do the more mundane tasks such as linear algebra or Fourier transform operations. This approach allows the developers to concentrate on their science rather than becoming experts in linear algebra or signal processing. Problems associated with this development approach include difficulties associated with data extraction and translation from one module to another, module performance on different nodal architectures, and others. In addition to these data and software issues there exists operational issues such as platform stability and resource management.

Dongarra, Jack↗

A Characterization of the Terrestrial Environment of Kodiak Island, Alaska for the Design, Development and Operation of Launch Vehicles

A quantitative characterization of the terrestrial environment is an important component in the success of a launch vehicle program. Environmental factors such as winds, atmospheric thermodynamics, precipitation, fog, and cloud characteristics are among many parameters that must be accurately defined for flight success. The National Aeronautics and Space Administration (NASA) is currently coordinating weather support and performing analysis for the launch of a NASA payload from a new facility located at Kodiak Island, Alaska in late 2001 (NASA, 1999). Following the first launch from the Kodiak Launch Complex, an Air Force intercontinental ballistic missile on November 5, 1999, the site's developer, the Alaska Aerospace Development Corporation (AADC), is hoping to acquire a sizable share of the many launches that will occur over the next decade. One such customer is NASA, which is planning to launch the Vegetation Canopy Lidar satellite aboard an Athena I rocket, the first planned mission to low earth orbit from the new facility. To support this launch, a statistical model of the atmospheric and surface environment for Kodiak Island, AK has been produced from rawinsonde and surface-based meteorological observations for use as an input to future launch vehicle design and/or operations. In this study, the creation of a "reference atmosphere" from rawinsonde observations is described along with comparisons between the reference atmosphere and existing model representations for Kodiak. Meteorological conditions that might result in a delay on launch day (cloud cover, visibility, precipitation, etc.) are also explored and described through probabilities of launch by month and hour of day. This atmospheric "mission analysis" is also useful during the early stages of a vehicle program, when consideration of the climatic characteristics of a location can be factored into vehicle designs. To be most beneficial, terrestrial environment definitions should a) be available at the inception of the program and based on the desired operational performance of the launch vehicle, b) be issued under the signature of the program manager and be part of the controlled program definition and requirements documentation, and c) specify the terrestrial environment for all phases of activity including prelaunch, launch, ascent, on-orbit, decent, and landing. Since the beginning of the space era, NASA has utilized some of the most detailed assessments of the terrestrial climatic environment in design, development, and operations of both expendable and reusable launch vehicles.

Rawlins, Michael A.↗

Lunar and Planetary Science XXXV: Education

The session "Education" includes the following topics: 1) Convection, Magnetism, Orbital Resonances, Impacts, and Volcanism: Energies and Processes in the Solar System: Didactic Activities; 2) Knowledge Management in Aerospace-Education and Training Issues; 3) Creating Easy-to-Understand Planetary Maps; 4) Planetary Environment comparison in the Education of Astrobiology; and 5) Design and Construction of a Mechanism for the Orbital Resonances Simulation.

Source record↗

STS-114: Discovery L-1 Countdown Status Briefing

The STS-114 Discovery countdown status briefing is shown. Jessica Rye, NASA Public Affairs, introduces the panel. Jeff Spaulding, NASA Test Director, talks about the launch window and vehicle readiness for the flight. Scott Higgenbotham, Payload Manager, expresses that there are no hardware issues affecting the launch, and Kathy Winters, Shuttle Weather Officer, gives the launch weather forecast and talks about weather issues that may or may not affect the launch.

Source record↗

Ten steps to successful software process improvement

This paper identifies ten steps for managing change that address organizational and cultural issues. Four of these steps are critical, that if not done, will almost guarantee failure. This ten-step program emphasizes the alignment of business goals, change process goals, and the work performed by the employees of an organization.

software process improvement↗

The X-43 Fin Actuation System Problem - Reliability in Shades of Gray

Following the loss of the first X-43 during launch, the mishap investigation board indicated the Fin Actuator System (FAS) needed to have a larger torque margin. To supply this added torque, a second actuator was added. The consequences of what seemed to be a simple modification would trouble the X-43 program. Because of the second actuator, a new computer board was required. This proved to be subject to electronic noise. This resulted in the actuator latch up in ground tests of the FAS for the second launch. Such a latch up would cause the Pegasus booster to fail, as the FAS was a single string system. The problem was corrected and the second flight was successful. The same modifications were added to the FAS for flight three. When the FAS underwent ground tests, it also latched up. The failure indicated that each computer board had a different tolerance to electronic noise. The problem with the FAS was corrected. Subsequently, another failure occurred, raising questions about the design, and the probability of failure for the X-43 Mach 10 flight. This was not simply a technical issue, but illuminated the difficulties facing both managers and engineers in assessing risk, design requirements, and probabilities in cutting edge aerospace projects.

Peebles, Curtis↗

A Comprehensive Plan for the Long-Term Calibration and Validation of Oceanic Biogeochemical Satellite Data

The primary objective of this planning document is to establish a long-term capability and validating oceanic biogeochemical satellite data. It is a pragmatic solution to a practical problem based primarily o the lessons learned from prior satellite missions. All of the plan's elements are seen to be interdependent, so a horizontal organizational scheme is anticipated wherein the overall leadership comes from the NASA Ocean Biology and Biogeochemistry (OBB) Program Manager and the entire enterprise is split into two components of equal sature: calibration and validation plus satellite data processing. The detailed elements of the activity are based on the basic tasks of the two main components plus the current objectives of the Carbon Cycle and Ecosystems Roadmap. The former is distinguished by an internal core set of responsibilities and the latter is facilitated through an external connecting-core ring of competed or contracted activities. The core elements for the calibration and validation component include a) publish protocols and performance metrics; b) verify uncertainty budgets; c) manage the development and evaluation of instrumentation; and d) coordinate international partnerships. The core elements for the satellite data processing component are e) process and reprocess multisensor data; f) acquire, distribute, and archive data products; and g) implement new data products. Both components have shared responsibilities for initializing and temporally monitoring satellite calibration. Connecting-core elements include (but are not restricted to) atmospheric correction and characterization, standards and traceability, instrument and analysis round robins, field campaigns and vicarious calibration sites, in situ database, bio-optical algorithm (and product) validation, satellite characterization and vicarious calibration, and image processing software. The plan also includes an accountability process, creating a Calibration and Validation Team (to help manage the activity), and a discussion of issues associated with the plan's scientific focus.

Hooker, Stanford B.↗

Database for Safety-Oriented Tracking of Chemicals

SafetyChem is a computer program that maintains a relational database for tracking chemicals and associated hazards at Johnson Space Center (JSC) by use of a Web-based graphical user interface. The SafetyChem database is accessible to authorized users via a JSC intranet. All new chemicals pass through a safety office, where information on hazards, required personal protective equipment (PPE), fire-protection warnings, and target organ effects (TOEs) is extracted from material safety data sheets (MSDSs) and recorded in the database. The database facilitates real-time management of inventory with attention to such issues as stability, shelf life, reduction of waste through transfer of unused chemicals to laboratories that need them, quantification of chemical wastes, and identification of chemicals for which disposal is required. Upon searching the database for a chemical, the user receives information on physical properties of the chemical, hazard warnings, required PPE, a link to the MSDS, and references to the applicable International Standards Organization (ISO) 9000 standard work instructions and the applicable job hazard analysis. Also, to reduce the labor hours needed to comply with reporting requirements of the Occupational Safety and Health Administration, the data can be directly exported into the JSC hazardous- materials database.

Stump, Jacob↗

Reducing NPR 7120.5D to Practice: Preparing for a Life-Cycle Review

In March 2007, NASA issued revised rules for space flight project management, NPR 7120.5D, 'NASA Space Flight Program and Project Management Requirements.' Central to the new rules was the construct of Key Decision Points, maturity gates that the project team must pass in order to continue development. In order that the KDP decision be fully informed, the NPR required, as entrance criteria for the gate, the generation and delivery of specified planning, technical, and cost/schedule documents (gate products) and a life-cycle review, the Preliminary Design Review. Building on JPL experience on the Prometheus and Juno projects, the team successfully organized for and conducted these reviews on an aggressive schedule. Key actions were taken to proactively interact with the SRB, produce high-quality gate products with stakeholder review, generate review presentation materials, and handle a myriad of supporting logistical functions. A review preparation team was established, including a Review Captain and leads for documentation, information systems, and logistics, and their roles, responsibilities and task assignments were identified. Aids were produced, including a detailed review preparation schedule and a comprehensive gate products production table. Institutional support was leveraged early and often. Implementation strategy reflected the needs of a nationally-distributed team, as well as applicable export control and IT security requirements. This paper gives a brief overview of the GRAIL mission and its project management challenges, provides a detailed description of project PMSR and PDR preparation and execution activities, including positive and negative lessons learned, and identifies recommendations for future NASA (and non-NASA) project teams.

NPR 7120.5D↗

Identification of Crew-Systems Interactions and Decision Related Trends

NASA Vehicle System Safety Technology (VSST) project management uses systems analysis to identify key issues and maintain a portfolio of research leading to potential solutions to its three identified technical challenges. Statistical data and published safety priority lists from academic, industry and other government agencies were reviewed and analyzed by NASA Aviation Safety Program (AvSP) systems analysis personnel to identify issues and future research needs related to one of VSST's technical challenges, Crew Decision Making (CDM). The data examined in the study were obtained from the National Transportation Safety Board (NTSB) Aviation Accident and Incident Data System, Federal Aviation Administration (FAA) Accident/Incident Data System and the NASA Aviation Safety Reporting System (ASRS). In addition, this report contains the results of a review of safety priority lists, information databases and other documented references pertaining to aviation crew systems issues and future research needs. The specific sources examined were: Commercial Aviation Safety Team (CAST) Safety Enhancements Reserved for Future Implementation (SERFIs), Flight Deck Automation Issues (FDAI) and NTSB Most Wanted List and Open Recommendations. Various automation issues taxonomies and priority lists pertaining to human factors, automation and flight design were combined to create a list of automation issues related to CDM.

Jones, Sharon Monica↗

Aircraft Engine Gas Path Diagnostic Methods: Public Benchmarking Results

Recent technology reviews have identified the need for objective assessments of aircraft engine health management (EHM) technologies. To help address this issue, a gas path diagnostic benchmark problem has been created and made publicly available. This software tool, referred to as the Propulsion Diagnostic Method Evaluation Strategy (ProDiMES), has been constructed based on feedback provided by the aircraft EHM community. It provides a standard benchmark problem enabling users to develop, evaluate and compare diagnostic methods. This paper will present an overview of ProDiMES along with a description of four gas path diagnostic methods developed and applied to the problem. These methods, which include analytical and empirical diagnostic techniques, will be described and associated blind-test-case metric results will be presented and compared. Lessons learned along with recommendations for improving the public benchmarking processes will also be presented and discussed.

Simon, Donald L.↗

Potential Follow on Experiments for the Zero Boil Off Tank Experiment

Cryogenic Storage &Transfer are enabling propulsion technologies in the direct path of nearly all future human or robotic missions; It is identified by NASA as an area with greatest potential for cost saving; This proposal aims at resolving fundamental scientific issues behind the engineering development of the storage tanks; We propose to use the ISS lab to generate & collect archival scientific data:, raise our current state-of-the-art understanding of transport and phase change issues affecting the storage tank cryogenic fluid management (CFM), develop and validate state-of-the-art CFD models to innovate, optimize, and advance the future engineering designs

Thermodynamics↗

Satellite Conjunction Assessment Risk Analysis for "Dilution Region" Events: Issues and Operational Approaches

An important activity within Space Traffic Management is the detection and prevention of possible on-orbit collisions between space objects. The principal parameter for assessing collision likelihood is the probability of collision, which is widely accepted among conjunction assessment practitioners; but it possesses a known deficiency in that it can produce a false sense of safety when the orbital position uncertainties for the conjuncting objects are high. The probability of collision is said to be “diluted” in such a situation and to understate the possible risk; certain approaches have been recommended by researchers to provide (largely conservative) risk estimates and remediation methodologies in these cases. The present analysis explores two of the main proposals for quantifying and remediating possible risk in the dilution region and quantifies their operational implications. These implications with regard to imputed additional workload are considerable, especially in anticipating the conjunction event levels expected with the deployment of the USAF Space Fence radar. This effort has been undertaken as part of a larger enterprise that seeks to clarify the philosophical and statistical underpinnings of the conjunction risk assessment process. The analysis presented herein argues that a form of hypothesis testing is implicitly used in conjunction assessment risk analysis, and that there are a number of conceptual and practical reasons for constructing the associated null hypothesis to counsel against a satellite conjunction remediation action. In short, it is concluded that, for the purposes of determining whether a conjunction remediation action should be pursued, dilution-region probabilities of collision should be treated no differently from those produced under other circumstances.

Probability of collision↗

CISCC Countermeasures for Spent Fuel Canisters in Concrete Casks

Aging management of spent fuel is an important issue worldwide. Chloride-induced stress corrosion cracking (CISCC) of welded canisters is particularly important for concrete casks, where it occurs in response to a combination of environmental, material, and residual stress factors. In this paper, we introduce a countermeasure to prevent the occurrence of CISCC by adjusting the flow rate of the cooling air into the concrete cask so that the canister surface temperature does not decrease below 100°C, which is a conservative deliquesce temperature threshold for CISCC occurrence. The flow adjustment device was installed in a cask model, and two tests were conducted under the heat rate conditions corresponding to those of an actual canister. In the first test, the device was operated under a condition where the canister surface temperature was below 100°C to verify whether it could increase the canister surface temperature to above 100°C. In the second test, the heat rate was decreased from a state where the canister surface temperature was above 100°C, to verify whether the device could maintain the canister surface temperature above 100°C. Good results were obtained in both cases. However, in the case of a low decay heat rate of spent fuel after extended dry storage, the temperature of the canister surface may decrease below 100°C even if no air supply is provided. Therefore, in this case, it may be necessary to take measures such as blocking air outlets.

Takeda, Hirofumi↗

Twenty-Second Annual NASA Supply and Equipment Management Conference

The status of actions from the 1988 conference is reviewed. Environmental safety issues, definitions, and regulations; contract transition, payload logistics transition, and safety and support equipment; supply products and services, bar code technology, and inventory accuracy; equipment management workshop topics; and contract property workshop topics are outlined.

Source record↗