Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installed capacity”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Wetlands Geoprocessor (v 1.0)

Wetlands have often been described as the “Earth’s kidneys” because wetlands have the ability filter pollutants and purify water. Based upon wetland storage capacity, average daily flow, and inflow nutrient loading this model estimates potential load reductions of nitrate and orthophosphate) from a constructed surface flow wetland (CW). The model relies upon equations, coefficients, and models provided by Cheng et al. 2020 and Cheng & Basu 2017. Nitrogen (N) and phosphorus are important nutrients to ecosystems, but high concentrations can lead to water quality issues. Major sources of these nutrients come from agricultural areas where fertilizer is applied in large quantitates and/or animal waste is present. Excess nitrate and phosphorus may result in overgrowth of algae, which can decrease the dissolved oxygen in water, thereby harming and killing fish and other aquatic species. This model evaluates water purification results and estimates cost to install a surface flow constructed wetlands.

Davis, Cleve↗

Life Cycle Assessment for Closed-Loop Pumped Hydropower Energy Storage in the United States

The federal government has initiated an aggressive set of policies to achieve a net-zero carbon emission goal for the electricity sector by 2050. As a result, rapid growth in deployment of renewable energy technologies is expected. Most commercially mature technologies are temporally variable and do not provide grid inertia, while renewable technologies with high projected deployment have intermittent generation methods. Energy storage technologies are needed to both dispatch power on-demand and help provide the needed grid inertia. Pumped storage hydro (PSH) is a well-established technology that has gained renewed interest in recent years offering energy-balancing, grid stability, control of electrical network frequency, and large-scale storage capacity. For widespread adoption of PSH, more information is needed regarding its current life cycle environmental impacts. The objective of this study is to perform a full life cycle assessment (LCA) of new closed-loop PSH in the U.S. The functional unit for this study is 1 kWh of electrical power delivered to the grid and the base case project lifetime is 80 years. The life cycle inventory for this project accounts for all material and energy flows associated with the green-field construction, operation, maintenance, and decommissioning of a closed-loop PSH plant in the U.S. Collected data represents a range of potential PSH specifications and geographic locations coming from all prospective closed-loop PSH installations in the U.S. with data available. In addition, existing PSH installations are used to provide assumptions for inventory inputs. Results presented will include the global warming potential (GWP IPCC 100a) and Energy Return on Investment (EROI) from our base case (average PSH installation) as well as from scenario analyses and model sensitivity. These results will be compared to the impacts from existing PSH sites and alternate storage technologies. Methods align with the assumptions and guidelines put in place by previous PSH LCAs to ensure an accurate comparison with the results from this report.

ENERGY PLANNING, POLICY, AND ECONOMY,HYDRO ENERGY↗

Microstructural Characterizations of Two High Fluence Baffle-Former Bolts Retrieved from a Westinghouse Two-loop Downflow Type PWR

As one of the pressurized water reactor (PWR) internal components, baffle-former bolts (BFBs) are subjected to significant mechanical stress and neutron irradiation from the reactor core during the plant operation. Over the long operation period, these conditions lead to potential degradation and reduced load-carrying capacity of the bolts. In support of evaluating long-term operational performance of materials used in core internal components, the Oak Ridge National Laboratory (ORNL), through the Department of Energy (DOE), Office of Nuclear Energy, Light Water Reactor Sustainability (LWRS) Program, Materials Research Pathway (MRP), has harvested two high fluence BFBs from a commercial Westinghouse two-loop downflow type PWR. The two bolts of interest, i.e. bolts # 4412 and 4416, were withdrawn from service in 2011 as part of a preventative replacement plan. No identification of cracking or potential damage was found for these bolts during their removal in 2011. However, the bolts required a lower torque for removal from the baffle structure than the original torque specified during installation. Irradiation damage levels in the bolts range from 15 to 41 displacements per atom. The goal of this project is to perform detailed microstructural and mechanical property characterization of BFBs following in-service exposures. The information from these bolts will be integral to the LWRS program initiatives in evaluating end of life microstructure and properties. Furthermore, valuable data will be obtained that can be incorporated into model predictions of long term irradiation behavior and compared to results obtained from experimental reactor conditions

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Development of an Indexing Media Filtration System for Long Duration Space Missions

The effective maintenance of air quality aboard spacecraft cabins will be vital to future human exploration missions. A key component will be the air cleaning filtration system which will need to remove a broad size range of particles derived from multiple biological and material sources. In addition, during surface missions any extraterrestrial planetary dust, including dust generated by near-by ISRU equipment, which is tracked into the habitat will also need to be managed by the filtration system inside the pressurized habitat compartments. An indexing media filter system is being developed to meet the demand for long-duration missions that will result in dramatic increases in filter service life and loading capacity, and will require minimal crew involvement. The filtration system consists of three stages: an inertial impactor stage, an indexing media stage, and a high-efficiency filter stage, packaged in a stacked modular cartridge configuration. Each stage will target a specific range of particle sizes that optimize the filtration and regeneration performance of the system. An 1/8th scale and full-scale prototype of the filter system have been fabricated and have been tested in the laboratory and reduced gravity environments that simulate conditions on spacecrafts, landers and habitats. Results from recent laboratory and reduce-gravity flight tests data will be presented. The features of the new filter system may also benefit other closed systems, such as submarines, and remote location terrestrial installations where servicing and replacement of filter units is not practical.

Filtration↗

Optimizing Renewable Ammonia Production for a Sustainable Fertilizer Supply Chain Transition

Local renewable ammonia production using electrolytic hydrogen is an emerging approach to alleviate emissions attributed to synthetic nitrogen fertilizer production while also insulating against fluctuations in fertilizer prices and mitigating transportation costs and emissions. However, replacing ammonia currently produced using fossil fuels will not be immediate. To this end, we develop a supply chain transition model, which first optimizes the design and hourly operation of new renewable ammonia facilities to minimize production costs and then optimizes the annual installation timing, production scale, and location of these new renewable facilities along with ammonia transportation to meet county resolution demands. The objective is to augment and eventually replace conventional ammonia market imports in an economically competitive manner. We performed a case study for Minnesota's ammonia supply chain and found that a full transition to in-state renewable production by 2032 is optimal. This is incentivized by the U.S. federal government's clean hydrogen production credits. This transition results in 99 % reduction in carbon intensity along with stable supply costs below $475 per metric tonne. New renewable production facilities are an order of magnitude smaller than existing conventional plants. They use both wind and solar resources and operate dynamically to minimize expensive battery and hydrogen storage capacities.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Life Extension Activities for the Hubble Space Telescope

With the cancellation of the Hubble Space Telescope (HST) Servicing Mission 4 (SM4), the HST Project will face numerous challenges to keep the Telescope operating during the remainder of the decade. As part of the SM4, the HST Project had planned to install various upgrades to the Telescope including the installation of new batteries and new rate integrating gyros. Without these upgrades, reliability analysis indicates that the spacecraft will lose the capability to conduct science operations later this decade. The HST team will be severely challenged to maximize the Telescope's remaining operational lifetime, while still trying to maximize - its science output and quality. Two of the biggest areas of concern are the age and condition of the batteries and gyros. Together they offer the largest potential extension in Telescope lifetime and present the biggest challenges to the HST team. The six Ni-H batteries on HST are the original batteries from launch. With fourteen years of operational life, these batteries have collectively lasted longer than any other comparable mission. Yet as with all batteries, their capacity has been declining. Engineers are examining various methods to prolong the life of these mission critical batteries, and retard the rate of degradation. This paper will focus on these and other efforts to prolong the life of the HST, thus enabling it to remain a world-class observatory for as long as possible.

Walyus, Keith D.↗

Integrated Thermal Energy Storage System for Air-Conditioners with Phase-Change Composites

Thermal energy storage (TES) is a promising solution to store and dispatch energy and shave peak electric load, reducing the operational cost of HVAC systems. We present results of a TES system using phase-change materials (PCM) integrated with an air conditioner. The proposed system uses an organic PCM (tetradecane) encapsulated within compressed expanded natural graphite foams referred to as phase-change composite. The graphite foam encapsulates the PCM eliminating the need for expensive storage vessels, reduces installation costs, and provides higher thermal conductivity that can lead to faster charge/discharge rates. Two serpentines, multi-pass circuits, operating as a heat source and a sink, exchange heat to and from the phase-change composite. These two circuits are embedded in multiple slabs of this material. The "charge" circuit contains the refrigerant that is directly coupled to a vapor compression system, and the "discharge" circuit removes heat from an airstream and releases it into the PCM composite through a water-glycol liquid coupling. This configuration allows for multiple modes of operation depending on the state of charge of the thermal energy storage module, the building air-conditioning load, and the current electricity and demand charges. This flexible operation allows variable air volume capacity control without the need to have a variable capacity refrigeration system. We developed a 21 kW-hr (6 RT-hr) prototype TES system coupled with a commercial air-conditioner to characterize the component-and system-level performance.

air-conditioning↗

Best Practices for Equitable Solar Workforce Development

The Midwest Renewable Energy Association (MREA) was selected to serve as a lead organization for the U.S. Department of Energy Solar Energy Technology Office’s Equitable Solar Communities of Practice initiative. This project, facilitated through a partnership with ENERGYWERX, aimed to develop strategies to support the expansion of equitable benefits in solar adoption across the U.S. Specifically, the MREA was chosen to lead the solar workforce development community of practice, focusing on scaling the U.S. solar workforce, to meet growing industry demands and ensure that these opportunities are accessible and beneficial to all communities. For the purpose of this initiative, we define the solar workforce in line with the National Solar Jobs Census, which defines a solar worker as someone who spends a majority of their time on solar-related work. This also includes workers who spend a plurality of their time on solar tasks. It’s important to note that manufacturing jobs were not included in this research, as the focus is primarily on solar installation, development, and related roles. To achieve the goals of the Equitable Solar Communities of Practice initiative, the MREA leveraged existing resources and engaged a diverse core team and group of stakeholders including industry professionals, educators, policymakers, and community leaders. The MREA began with a literature review and gap analysis to identify existing best practices and gaps in the solar workforce. This was followed by a community convening to gather insights from a wide range of stakeholders. The findings informed the best practices and pathways to scale the benefits of solar workforce development, focusing on training programs, workforce services, apprenticeship, and justice, inclusion, and sustainability. This report outlines the background, methodology, findings, and conclusions drawn from the landscape and gap analysis, providing valuable insights into workforce needs and training program capacities across the U.S. The outcomes of this research are presented in this report and contain recommendations for optimizing workforce development and training funding to support the equitable growth of the solar industry, ensuring that the transition to solar energy is inclusive and beneficial for all communities.

14 SOLAR ENERGY↗

An Improved Design for Air Removal from Aerospace Fluid Loop Coolant Systems

Aerospace applications with requirements for large capacity heat removal (launch vehicles, platforms, payloads, etc.) typically utilize a liquid coolant fluid as a transport media to increase efficiency and flexibility in the vehicle design. An issue with these systems however, is susceptibility to the presence of noncondensable gas (NCG) or air. The presence of air in a coolant loop can have numerous negative consequences, including loss of centrifugal pump prime, interference with sensor readings, inhibition of heat transfer, and coolant blockage to remote systems. Hardware ground processing to remove this air is also cumbersome and time consuming which continuously drives recurring costs. Current systems for maintaining the system free of air are tailored and have demonstrated only moderate success. An obvious solution to these problems is the development and advancement of a passive gas removal device, or gas trap, that would be installed in the flight cooling system simplifying the initial coolant fill procedure and also maintaining the system during operations. The proposed device would utilize commercially available membranes thus increasing reliability and reducing cost while also addressing both current and anticipated applications. In addition, it maintains current pressure drop, water loss, and size restrictions while increasing tolerance for pressure increases due to gas build-up in the trap.

Ritchie, Stephen M. C.↗

The Land Sparing, Water Surface Use Efficiency, and Water Surface Transformation of Floating Photovoltaic Solar Energy Installations

Floating photovoltaic solar energy installations (FPVs) represent a new type of water surface use, potentially sparing land needed for agriculture and conservation. However, standardized metrics for the land sparing and resource use efficiencies of FPVs are absent. These metrics are critical to understanding the environmental and ecological impacts that FPVs may potentially exhibit. Here, we compared techno-hydrological and spatial attributes of four FPVs spanning different climatic regimes. Next, we defined and quantified the land sparing and water surface use efficiency (WSUE) of each FPV. Lastly, we coined and calculated the water surface transformation (WST) using generation data at the world’s first FPV (Far Niente Winery, California). The four FPVs spare 59,555 m2 of land and have a mean land sparing ratio of 2.7:1 m2 compared to ground-mounted PVs. Mean direct and total capacity-based WSUE is 94.5 ± 20.1 SD Wm−2 and 35.2 ± 27.4 SD Wm−2, respectively. Direct and total generation-based WST at Far Niente is 9.3 and 13.4 m2 MWh−1 yr−1, respectively; 2.3 times less area than ground-mounted utility-scale PVs. Our results reveal diverse techno-hydrological and spatial attributes of FPVs, the capacity of FPVs to spare land, and the utility of WSUE and WST metrics.

14 SOLAR ENERGY↗

Commissioning of Extended Electron Beam Ion Source at Brookhaven National Laboratory

Here, the Extended Electron Beam Ion Source (EEBIS) has been installed and commissioned at Brookhaven National Laboratory (BNL) hadron accelerator complex in the spring of 2023. EEBIS has replaced its predecessor, RhicEBIS, which provided ions for BNL hadron facilities for over a decade since 2009. The motivations for the source upgrade are to provide higher intensities of the Au 32+ ion beam for the Relativistic Heavy Ion Collider (RHIC) and to provide of an intense source of polarized 3 He 2+ ions for the future Electron Ion Collider (EIC) at BNL. EEBIS is and will continue to be the primary source for a variety of different ion species for the NASA Space Radiation Laboratory (NSRL) at BNL. EEBIS utilizes two identical, two-meter-long unshielded 5T warm bore superconducting solenoids, and it is operated with electron beam current up to 10 A, providing a high-capacity ion traps to fulfill the requirement for high intensity ion beams. The upstream solenoid contains a “short ion trap” with a length of 95 cm, while the “long ion trap” with a length of 178 cm is located inside the downstream solenoid bore. The main features of EEBIS are: * A Gas injection and ionization cell equipped with a Lorenz pulse valve * High-capacity ZAO non-evaporable getter (NEG) custom linear pumping units * In situ apparatus for pumping speed measurements to monitor NEG activation and saturation * “External drift tube” construction with differential pumping stages to provide space for Lorentz pulse valve and 3 He high-field polarization cell * A Ba oxide electron gun cathode. The design of EEBIS as well as the results of its commissioning and first-year operation are presented and discussed.

43 PARTICLE ACCELERATORS↗

Design and testing of a model CELSS chamber robot

A robot system for use in an enclosed environment was designed and tested. The conceptual design will be used to assist in research performed by the Controlled Ecological Life Support System (CELSS) project. Design specifications include maximum load capacity, operation at specified environmental conditions, low maintenance, and safety. The robot system must not be hazardous to the sealed environment, and be capable of stowing and deploying within a minimum area of the CELSS chamber facility. This design consists of a telescoping robot arm that slides vertically on a shaft positioned in the center of the CELSS chamber. The telescoping robot arm consists of a series of links which can be fully extended to a length equal to the radius of the working envelope of the CELSS chamber. The vertical motion of the robot arm is achieved through the use of a combination ball screw/ball spline actuator system. The robot arm rotates cylindrically about the vertical axis through use of a turntable bearing attached to a central mounting structure fitted to the actuator shaft. The shaft is installed in an overhead rail system allowing the entire structure to be stowed and deployed within the CELSS chamber. The overhead rail system is located above the chamber's upper lamps and extends to the center of the CELSS chamber. The mounting interface of the actuator shaft and rail system allows the entire actuator shaft to be detached and removed from the CELSS chamber. When the actuator shaft is deployed, it is held fixed at the bottom of the chamber by placing a square knob on the bottom of the shaft into a recessed square fitting in the bottom of the chamber floor. A support boot ensures the rigidity of the shaft. Three student teams combined into one group designed a model of the CELSS chamber robot that they could build. They investigated materials, availability, and strength in their design. After the model arm and stand were built, the class performed pre-tests on the entire system. A stability pre-test was used to determine whether the model robot arm would tip over on the stand when it was fully extended. Results showed the stand tipped when 50 Newtons were applied horizontally to the top of the vertical shaft while the arm was fully extended. This proved that it was stable. Another pre-test was the actuator slip test used to determine if there is an adequate coefficient of friction between the actuator drive wheels and drive cable to enable the actuator to fully extend and retract the arm. This pre-test revealed that the coefficient of friction was not large enough to prevent slippage. Sandpaper was glued to the drive wheel and this eliminated the slippage problem. The class preformed a fit test in the CELSS chamber to ensure that the completed robot arm is capable of reaching the entire working envelope. The robot was centered in the chamber and the arm was fully extended to the sides of the chamber. The arm was also able to retract to clear the drain pipes separating the upper and lower plant trays.

Davis, Mark↗

Front-End Engineering Design for Piperazine with the Advanced Stripper

This Department of Energy (DOE) funded project was executed with the goal of preparing a Front-End Engineering Design (FEED) for the capture and compression of 90% of the CO2 that would normally be emitted from an existing natural gas combined cycle (NGCC) plant. The FEED focused on the application of the piperazine advanced stripper (PZAS) process at Mustang Station of the Golden Spread Electric Cooperative (GSEC), which consists of two gas turbines with common heat recovery steam generator (HRSG). The University of Texas at Austin (UT) served as the prime contractor, and subcontracted AECOM Technical Services and Trimeric Corporation to support FEED development. This project team has worked together to advance PZAS for more than a decade. ExxonMobil, Chevron, and Total provided project co-funding. The objectives of this work included: 1. To advance engineering design such that a comprehensive estimate for the total installed cost of a full-scale PZAS CO2 Capture Plant with CO2 compression can be developed on an existing NGCC power plant. a. These detailed costs can also be used to qualify PZAS and other related second generation (2G) amine scrubbing processes for use on cogeneration facilities in refineries and chemical plants that use gas turbines with HRSGs to produce steam. b. These detailed costs will help qualify 2G amine scrubbing for use on NGCC power plants and establish a more accurate baseline cost to be used as a target by other capture technologies. 2. To provide cost details to be used in the economic optimization of the process features of PZAS and other 2G amine scrubbing processes. 3. To provide DOE with a more detailed understanding of carbon capture costs in a commercial application, enabling DOE to better design its R&D program to improve the economics for carbon capture. 4. To provide the host site and cost share partners with the information necessary to determine whether a commercial project to capture and use CO2 for enhanced oil recovery (EOR) or for sequestration can be justified (when accounting for the 45Q tax credit). A key component of the FEED is the estimated total installed cost, which provides a basis for the likely capital investment necessary to implement the PZAS carbon capture process at this location and scale. In combination with the included economic analysis, which accounts for potential revenue from the produced CO2, potential avenues to profitability are explored. The major findings of the FEED are as follows: The Mustang Station PZAS CO2 Capture Plant estimated total project cost of $698 MM of which $384 MM was direct costs. The annual operating costs were $32.6 MM. The total investment for a PZAS facility at Mustang Station is $725 MM. This estimate includes owner’s cost of $25 million and a contingency of $110 MM. • The study estimated the CO2 capture plant at Mustang Station would generate CO2 at $110/tonne for EOR, assuming a 12% IRR (internal rate of return) and an 85% capacity factor. For CO2 storage, the same case would achieve a 12% IRR at about $114/tonne. At a capacity factor of 52%, the storage and EOR cases would break even when carbon is priced ~$150/tonne. The economic analysis determined that the capacity factor and utility pricing, among other variable factors, had a significant effect on the economics and will need additional studied. • The energy penalty of the PZAS plant would be about 46 MW in connected power and 35 MW in operating load. The natural gas requirement (for the Gas Boiler package) would be about 354 MMBTU/hr. • The FEED revealed no major risks in process maturity. However, some areas were outlined for further engineering during detailed design, which included the Gas Boiler system, general arrangement and site layout, air coolers, schedule development, and optimization of the process for higher CO2 removal. • If PZAS were to be implemented at another host site, additional opportunities for cost reduction for would include cost reduction through use of cooling water and steam extraction.

03 NATURAL GAS↗

Hydrogen Production Cost with Alkaline Electrolysis

Rigorous stakeholder-vetted techno-economic analysis was performed to assess the cost of hydrogen (H 2 ) produced using state-of-the-art Liquid Alkaline (LA) electrolysis. Projected high-volume, untaxed levelized cost of hydrogen (LCOH) range from 2020US $\$ 1.84$ to $\$ 2.88$/kg-H 2 depending on technology year, process design, and electrolyzer project scale, assuming an electricity price of $\$ 0.03$/kWh. The total installed capital cost for a LA electrolysis plant was estimated from bottom-up stack and installed cost models that account for purchased equipment, installation costs, site preparation, and general overhead costs. For this study, the LA electrolysis plant is assumed to be a stick-built, greenfield project developed by an EPC firm with electrolysis stacks purchased directly from an electrolysis stack manufacturer. The price of the electrolysis stacks is based on a bottom-up cost assessment with business markup for the electrolysis company fabricator. Methods from the Hydrogen Analysis (H 2 A) production model, a peer-reviewed national laboratory-developed discounted cash flow model, were used to calculate the LCOH production in 2020$/kg-H 2 . The baseline electricity price case ($\$ 0.03$/kWh) corresponds to average wholesale electricity prices currently possible in U.S. markets with plentiful wind. Similar low-cost electricity pricing is possible from solar Power Purchase Agreements (PPA) although these prices are typically limited by renewable energy capacity factors.

08 HYDROGEN↗

A Clean Energy Deployment Baseline for the Energy Community and Low-Income Tax Credit Bonuses [Slides]

The Inflation Reduction Act of 2022 introduced, for the first time, place-based federal tax incentives for projects sited in “Energy Communities,” potentially changing the economic calculus of where projects are best sited. Storage projects can qualify for a 10-percentage-point bonus to the Investment Tax Credit (e.g., from 30% to 40%), while wind and solar projects may qualify for either the ITC bonus or a 10% bonus to the Production Tax Credit (e.g., from $\$27.5$ to $\$30.25$/MWh). Energy Communities are areas with historical ties to fossil fuel industries and above average unemployment levels (FFEU), with closed coal mines or power plants, or contaminated properties. They seek to identify locations across the US that could especially benefit from economic revitalization. This report explores how the new federal tax credit incentives are impacting clean energy deployment patterns and establishes historical baselines against which future changes can be compared. We include a few case studies of clean energy projects going specifically to areas that were recently impacted by coal power plant closures to provide concrete examples of investments in Energy Communities. However, this publication does not assess how much of the incentive benefits pass from clean energy developers to hosting communities, nor does it offer a comprehensive view of the economic effects of clean energy deployment on Energy Communities. Key highlights include: - As clean energy projects take multiple years to conceptualize and develop, it is likely too early to see shifts towards Energy Community locations either among newly built projects or those that entered interconnection queues in 2023. - Approximately 35% of onshore wind, 50% of solar, and 60% of storage capacity built in 2023 and the first half of 2024 are located in Energy Communities, making them likely eligible for bonus incentives. While these bonus incentives were not available to projects coming online before 2023, we used 2023 Energy Community definitions to classify whether past projects were built in what is now considered an Energy Community. The deployment levels for 2023-2024 are similar to recent years (2020-2022) for solar and storage but slightly lower for wind. - Clean energy capacity has surged in the interconnection queues over the last few years, with about 45-50% of both recently proposed and total queued capacity being located in Energy Communities. While the amount of capacity in Energy Communities has also grown, its relative share is either stable (solar and storage) or slightly lower (wind) among projects that entered the queue in 2023. - Clean energy projects can be built at lower costs in Energy Communities. The levelized cost of energy after incentives was on average $\$9$/MWh (24%) lower for solar projects and $\$2$/MWh (6%) lower for wind projects built in 2023, relative to projects not located in Energy Communities. Wholesale electricity values at Energy Community locations relative to the rest of the market vary by region. The average value was often higher for wind projects (-$\$3$ to $\$11$/MWh) but lower for solar projects (-$\$6$ to 0/MWh). - Distributed solar that is owned by commercial entities is eligible for the Energy Community bonus and also, potentially, a Low-Income Community bonus. Residential solar installations in qualifying Energy Communities that are third-party owned represent about 10% of the total residential market. Larger commercial and industrial solar installations in Energy Communities make up 17% of the total market in 2023. Nearly 2 GW of distributed solar was built in areas qualifying as Low-Income Communities in 2023, exceeding the available annual program cap of 700 MW. Continued tracking of these trends will be important for system planners, investors, and local communities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Solar +: Clean Energy Strategies for the Sunshine State (Final Technical Report (FTR) of the Florida Alliance for Accelerating Solar and Storage Technology Readiness (FAASSTeR))

This reports on a four-year effort to provide foundational research, analysis, strategies and assistance to help Florida, and other states that might learn from this work, to grow solar energy in conjunction with other distributed energy resources by addressing and overcoming existing barriers, and in way that delivers increased value. The start of this effort coincided with an inflection point of sorts into a new dawn for solar energy in Florida, where the Sunshine state’s national ranking in total installed solar, according to the Solar Energy Industries Association (SEIA), has rose from 13th to 4th. Florida has now become the national leader in annual utility-scale solar growth as dozens of large plants have come online. Also, during this time, Florida utilities have expressed a strong and growing interest in understanding the role of energy storage and how to best plan for and deploy this unique resource as part of strategies to grow solar. The utility-scale solar growth experienced has been fueled by the economics of solar cost-parity with natural gas combined cycle plants and Florida Public Service Commission’s (PSC) approval of cost-recovery for the Investor-Owned Utilities (IOU’s), primarily through the Solar Base Rate Adjustment (SoBRA) mechanism. This has led to gigawatts (GW’s) of rate-based solar capacity additions over several years, along with fairly significant amounts of energy storage. Meanwhile, municipal electric utilities, which, collectively, are the third largest source of power in the state, have been increasing solar considerably through power purchase agreements (PPA’s) and are on track to have close to 1 GW of grid-connected solar by 2024. Florida’s municipal utilities and the Florida Municipal Electric Association (FMEA) have been key partners in the Florida Alliance for Accelerating Solar and Storage Technology Readiness (FAASSTeR), formed to carry out this effort. The six largest of these have been Core Team utilities, engaging throughout the project in weekly calls, discussions, and project direction, participating in and hosting workshops and benefiting from technical assistance in several areas.

14 SOLAR ENERGY↗

Hydrogen Based Energy Storage System for Integration with Dispatchable Power Generator (Phase I Feasibility Study)

This project examined the feasibility of integrating hydrogen generation, storage, and use as a means to decarbonize campus activities while retaining the ability to utilize the existing natural gas fired combined heat and power system installed at the campus of the University of California @ Irvine. Analysis of specific potential sites for the integrated system identified a location adjacent to the existing central plant which resulted in minimization of interconnections. A strategy based on use of commercial electrolyzers and gas storage was identified. Primary technology advancements are required for the gas turbine to accommodate higher levels of hydrogen and the integrated controls. The project indicated challenges for adopting the proposed strategy with the present rates and constraints. The availability of a relatively low-cost biogas resource by the campus already decarbonizes the gas turbine to some extent. In the absence of this resource, procurement of electricity directly from large scale renewable operations could facilitate lower electricity costs. Additional solar resources on campus could also help in this regard. The gas turbine cannot be operated below 50% capacity due to air permit constraints. Using the otherwise curtailed gas turbine operation to generate hydrogen via electrolysis by consuming natural gas is not highly efficient and therefore leads to relatively high costs of electricity returned. Several scenarios demonstrate potential for effective decarbonization, yet most involve lower and lower capacity factor for the legacy gas turbine which is not a good use of the asset. A small gas turbine output with higher efficiency operation would help. As would ability to export electricity to the grid. Certainly current rate structures and operational scenarios are less attractive than other possible future structures which should be pushed for in the future.

03 NATURAL GAS↗