Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “human landers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Ares V: Game Changer for National Security Launch

NASA is designing the Ares V cargo launch vehicle to vastly expand exploration of the Moon begun in the Apollo program and enable the exploration of Mars and beyond. As the largest launcher in history, Ares V also represents a national asset offering unprecedented opportunities for new science, national security, and commercial missions of unmatched size and scope. The Ares V is the heavy-lift component of NASA's dual-launch architecture that will replace the current space shuttle fleet, complete the International Space Station, and establish a permanent human presence on the Moon as a stepping-stone to destinations beyond. During extensive independent and internal architecture and vehicle trade studies as part of the Exploration Systems Architecture Study (ESAS), NASA selected the Ares I crew launch vehicle and the Ares V to support future exploration. The smaller Ares I will launch the Orion crew exploration vehicle with four to six astronauts into orbit. The Ares V is designed to carry the Altair lunar lander into orbit, rendezvous with Orion, and send the mated spacecraft toward lunar orbit. The Ares V will be the largest and most powerful launch vehicle in history, providing unprecedented payload mass and volume to establish a permanent lunar outpost and explore significantly more of the lunar surface than was done during the Apollo missions. The Ares V consists of a Core Stage, two Reusable Solid Rocket Boosters (RSRBs), Earth Departure Stage (EDS), and a payload shroud. For lunar missions, the shroud would cover the Lunar Surface Access Module (LSAM). The Ares V Core Stage is 33 feet in diameter and 212 feet in length, making it the largest rocket stage ever built. It is the same diameter as the Saturn V first stage, the S-IC. However, its length is about the same as the combined length of the Saturn V first and second stages. The Core Stage uses a cluster of five Pratt & Whitney Rocketdyne RS-68B rocket engines, each supplying about 700,000 pounds of thrust. Its propellants are liquid hydrogen and liquid oxygen. The two solid rocket boosters provide about 3.5 million pounds of thrust at liftoff. These 5.5-segment boosters are derived from the 4-segment boosters now used on the Space Shuttle, and are similar to those used in the Ares I first stage. The EDS is powered by one J-2X engine. The J-2X, which has roughly 294,000 pounds of thrust, also powers the Ares I Upper Stage. It is derived from the J-2 that powered the Saturn V second and third stages. The EDS performs two functions. Its initial suborbital burns will place the lunar lander into a stable Earth orbit. After the Orion crew vehicle, launched separately on an Ares I, docks with the lander/EDS stack, EDS will ignite a second time to put the combined 65-metric ton vehicle into a lunar transfer orbit. When it stands on the launch pad at Kennedy Space Center late in the next decade, the Ares V stack will be approximately 381 feet tall and have a gross liftoff mass of 8.1 million pounds. The current point-of-departure design exceeds Saturn V s mass capability by approximately 40 percent. Using the current payload shroud design, Ares V can carry 315,000 pounds to 29-degree low Earth orbit (LEO) or 77,000 pounds to a geosynchronous orbit. Another unique aspect of the Ares V is the 33-foot-diameter payload shroud, which encloses approximately 30,400 cubic feet of usable volume. A larger hypothetical shroud for encapsulating larger payloads has been studied. While Ares V makes possible larger payload masses and volumes, it may alternately make possible more cost-effective mission design if the relevant payload communities are willing to consider an alternative to the existing approach that has driven them to employ complexity to solve current launch vehicle mass and volume constraints. By using Ares V s mass and volume capabilities as margin, payload designers stand to reduce development risk and cost. Significant progress has been made on the Ares V to support a plaed fiscal 2011 authority-to-proceed (ATP) milestone. The Ares V team is actively reaching out to external organizations during this early concept phase to ensure that the Ares V vehicle can be leveraged for national security, science, and commercial development needs. This presentation will discuss Ares V vehicle configuration, the path to the current concept, accomplishments to date, and potential payload utilization opportunities.

Sumrall, Phil↗

The Lunar Lab Initiative

Analogous to terrestrial Antarctic basecamps at our south pole, space exploration outposts will be a combination of habitation and science-focused assets. The Artemis Exploration Roadmap endeavors to establish a sustained human presence on the lunar south pole starting in 2028. Within the planned Artemis Base Camp, most efforts to date have focused on the habitation assets or a mixture of science and habitation assets . With the recent advent of commercial lunar landing capabilities, the trade space can be further expanded to include dedicated science focused assets that ensure adequate science capability. To that end, the Forge, an innovation team initiative created at the Johnson Space Center (JSC), explored alternative ways to increase the science capabilities within the basecamp. The Forge uses structured brainstorming and facilitation to increase innovation within the assigned team, while executing its process in a rapid turnaround fashion for ideation and design study. As a pilot study for the Forge, a multi-disciplinary team investigated a lunar lab module to augment the lunar surface plans for Artemis. This formulation study evaluated the scientific and operational considerations for this dedicated crew space that would increase the capabilities of lunar surface science operations. The trade space evaluated single lunar lander delivery versus multiple lunar lander delivery for module assembly, alternative structural designs, the science instrument outfitting with mapping to scientific goals to maximize lunar science objectives, and how the lab would be operated. The lab operations options explored a stand-alone facility, as well as a facility integrated into a larger lunar surface complex, while evaluating crew usage and habitability considerations. The resulting alternatives were evaluated by the Forge team with a set of metrics to determine their originality, feasibility, and science performance, and thereby provide a recommendation to the lunar architecture planning team. Lessons learned from the lunar lab study were compiled to improve the process and tools for future Forge studies. Forward work, open issues, and challenges to further refine the design of the various science-focused asset options were also documented. By providing a robust science capability at humanity’s furthest outpost, we can plan for a sustained human lunar presence once the initial lunar surface access capability is well established.

Lunar outpost↗

Lunar Base Construction Planning

Previous lunar missions and campaigns have been restricted to using robotic landers and lunar orbiting satellites as well as sortie type of operations using astronaut crews(NASA Apollo program).Now, the next phase of lunar exploration has begun under NASA’s Artemis program and there has been an international response where other nations such as China, Russia, India, Canada, Japan and theEuropean Union of nations, have all expressed interest in either collaborating or competing with NASA on theMoon. This next phase has an overarching goal of achieving a permanent human presence on theMoon via sustainable methods. A lunar base with human occupancy will require infrastructure to provide shelter, utilities, landing/launch pads, roads, communications, power and all the other necessities to sustain human life and protect equipment.Since human biology is not well suited for surviving in the lunar environment, there will be many forms of automated equipment, autonomy and robotic helpers that will minimize the amount of Extra-Vehicular Activity(EVA) required by the crew. This will mean that the radiation dosage received by the crew will stay within acceptable and safe career doses. Radiation shielding via the use of regolith can also mitigate radiation dangers.The required infrastructure must be constructed, but the mass and logistics of bringing all the construction materials from Earth are prohibitive, which makes the necessary construction difficult to achieve.In-Situ Resource Utilization (ISRU) aims to solve this challenge by sourcing construction materials locally or “in-situ”. This means that their transportation can be completely eliminated, resulting in large cost savings by avoiding the launch out of Earth’s deep gravity well and subsequent trans lunar injection, lunar orbit capture and landing. This paper will give ahistorical review and current status of lunar construction planning and a high level introduction to the required infrastructure and construction equipment that will be required to robotically build a lunar base using in-situ resources.It will also organize these tasks into logical groupings so that technology development and implementation can be pursued within a framework that can be referenced by all involved.

Lunar↗

Exobiological exploration of Mars

Of all the other planets in the solar system, Mars remains the most promising for further elucidating concepts about chemical evolution and the origin of life. Strategies were developed to pursue three exobiological objectives for Mars exploration: determining the abundance and distribution of the biogenic elements and organic compounds, detecting evidence of an ancient biota on Mars, and determining whether indigenous organisms exist anywhere on the planet. The three strategies are quite similar and, in fact, share the same sequence of phases. In the first phase, each requires global reconnaissance and remote sensing by orbiters to select sites of interest for detailed in situ analyses. In the second phase, lander missions are conducted to characterize the chemical and physical properties of the selected sites. The third phase involves conducting 'critical' experiments at sites whose properties make them particularly attractive for exobiology. These critical experiments would include, for example, identification of organics, detection of fossils, and detection of extant life. The fourth phase is the detailed analysis of samples returned from these sites in Earth-based laboratories to confirm and extend previous discoveries. Finally, in the fifth phase, human exploration is needed to establish the geological settings for the earlier findings or to discover and explore sites that are not accessible to robotic spacecraft.

Klein, H. P.↗

Exobiological Exploration of Mars

Of all the other planets in the solar system, Mars remains the most promising for studying concepts about chemical evolution and the origin of life. Strategies were developed to pursue three exobiological objectives for Mars: determine abundance and distribution of biogenic elements and organic compounds, detect evidence of an ancient biota, and determine if organisms exist anywhere on the planet. The three strategies share the same sequence of phases. In the first phase, each requires global reconnaissance and remote sensing by orbiters to select sites of interest for detailed in situ analyses. In the second phase, lander missions are conducted to characterize the chemical and physical properties of the selected sites. The third phase involves conducting "critical" experiments at sites whose properties make them particularly attractive for exobiology. These critical experiments would include, for example, identification of organics, detection of fossils, and detection of extant life. The fourth phase is the detailed analysis of samples returned from these sites in Earth-based laboratories to confirm and extend previous discoveries. Finally, in the fifth phase, human exploration is needed to establish the geological context or to discover and explore sites that are not accessible to robotic spacecraft.

DeVincenzi, Donald L.↗

The Wizard Staff: A Mobile Tool Supporting Human Exploration on The Lunar Surface

The Wizard Staff is a rechargeable, battery powered mobile tool with multiple uses for lunar surface exploration. It supports human activity as a surface survey tool, provides external illumination to enhance safety, delivers networking, communications, and navigation features to remote sites, and assists crew rescue with an emergency beacon and rigid splint structure. As a survey tool, it assists crewed geologic field site exploration with external lights, cameras, and LiDAR to illuminate, map, and record the sample collection process. As a relay station, it provides a surface intranet communications and navigation node for extended exploration far from the lander or habitation module. A separately developed Search-and-Rescue (SAR) handheld device can broadcast a signal to the Gandalf Staff containing crew position and biometric data. The staff then formats the message and sends it orbiting satellite(s) for emergency response via the LunaNET on a dedicated frequency similar to terrestrial applications using an Emergency Position-Indicating Radiobeacon (EPIRB). The staff is designed with an upper and lower segment. Components in the upper segment are the LiDAR, external lighting arrays, cameras, communications equipment, intelligence devices, and user interface for crew operations. The lower segment is a set of FeLiPO4 battery cells packed into the 2” diameter carbon fiber tube. When the battery pack is discharged, a spring connector (designed for the dusty lunar environment) easily disconnects the two segments for replacement with another fully charged battery pack. The lower segment can be used for Incapacitated Crew Rescue (ICR) as a rigid splint. As a stand-alone science platform, the Wizard Staff provides infrastructure for instruments and sensors to record the lunar environment over long periods of time. After a crew installs the components on the lunar surface, the platform delivers data to the lunar lander or base station for analysis. The stand-alone mode requires an auxiliary power source (e.g. solar array) and energy storage system (e.g. battery), so it could also be used as an electrical recharging station. A working prototype of Wizard Staff has been developed with collaboration between NASA (JSC, MSFC, and GSFC), Texas Space Technology Applications and Research (T STAR), and Texas A&M University (TAMU) using $300k of innovation funding in FY’21 and FY’22. The functional staff weights 36# on Earth (6# on the Moon), stands 2.1m tall and delivers external lighting with an array of 40 LED bulbs generating 1460 Lux at 2m range (near field), or 2 Lux at 50m (far field).

Gandalf Staff↗

Human life support during interplanetary travel and domicile. III - Mars expedition system trade study

Several alternative configurations of life-support systems (LSSs) for a Mars missions are compared analytically on a quantitative basis in terms of weight, volume, and power. A baseline technology set is utilized for the illustrations of systems including totally open loop, carbon dioxide removal only, partially closed loop, and totally closed loop. The analytical model takes advantage of a modular, top-down hierarchical breakdown of LSS subsystems into functional elements that represent individual processing technologies. The open-loop systems are not competitive in terms of weight for both long-duration orbiters and short-duration lander vehicles, and power demands are lowest with the open loop and highest with the closed loop. The closed-loop system can reduce vehicle weight by over 70,000 lbs and thereby overcome the power penalty of 1600 W; the closed-loop variety is championed as the preferred system for a Mars expedition.

Seshan, P. K.↗

Impacts of Launch Vehicle Fairing Size on Human Exploration Architectures

Human missions to Mars, particularly to the Martian surface, are grand endeavors that place extensive demands on ground infrastructure, launch capabilities, and mission systems. The interplay of capabilities and limitations among these areas can have significant impacts on the costs and ability to conduct Mars missions and campaigns. From a mission and campaign perspective, decisions that affect element designs, including those based on launch vehicle and ground considerations, can create effects that ripple through all phases of the mission and have significant impact on the overall campaign. These effects result in impacts to element designs and performance, launch and surface manifesting, and mission operations. In current Evolvable Mars Campaign concepts, the NASA Space Launch System (SLS) is the primary launch vehicle for delivering crew and payloads to cis-lunar space. SLS is currently developing an 8.4m diameter cargo fairing, with a planned upgrade to a 10m diameter fairing in the future. Fairing diameter is a driving factor that impacts many aspects of system design, vehicle performance, and operational concepts. It creates a ripple effect that influences all aspects of a Mars mission, including: element designs, grounds operations, launch vehicle design, payload packaging on the lander, launch vehicle adapter design to meet structural launch requirements, control and thermal protection during entry and descent at Mars, landing stability, and surface operations. Analyses have been performed in each of these areas to assess and, where possible, quantify the impacts of fairing diameter selection on all aspects of a Mars mission. Several potential impacts of launch fairing diameter selection are identified in each of these areas, along with changes to system designs that result. Solutions for addressing these impacts generally result in increased systems mass and propellant needs, which can further exacerbate packaging and flight challenges. This paper presents the results of the analyses performed, the potential changes to mission architectures and campaigns that result, and the general trends that are more broadly applicable to any element design or mission planning for human exploration.

Jefferies, Sharon↗

Lunar Base Construction Overview

Previous lunar missions and campaigns have been restricted to using robotic landers and lunar orbiting satellites as well as sortie type of operations using astronaut crews (NASA Apollo program). The next phase of lunar exploration has begun under NASA’s Artemis program and there has been an international response where other nations such as China, Russia, India, Canada, Japan and the European Union of nations, have all expressed interest in either collaborating or competing with NASA on the Moon. This next phase has an over arching goal of achieving a permanent human presence on the Moon via sustainable methods. A lunar base with human occupancy will require infrastructure to provide shelter, utilities, landing/launch pads, roads, communications, power and all the other necessities to sustain human life and protect equipment. Since human biology is not well suited for surviving in the lunar environment, there will be many forms of automated equipment, autonomy and robotic helpers that will minimize the amount of Extra-Vehicular Activity (EVA) required by the crew. This will mean that the radiation dosage received by the crew will stay within acceptable and safe career doses. The required infrastructure must be constructed, but the mass and logistics of bringing all the construction materials from Earth are prohibitive, which makes the necessary construction difficult to achieve. In-Situ Resource Utilization (ISRU) aims to solve this challenge by sourcing construction materials locally or “in-situ”. This means that their transportation can be completely eliminated, resulting in large cost savings by avoiding the launch out of Earth’s deep gravity well and subsequent trans lunar injection, lunar orbit capture and landing. This paper will give an overview of the required construction tasks and related equipment that will be required to robotically build a lunar base using in-situ resources. It will also organize these tasks into logical groupings so that technology development and implementation can be pursued within a framework that can be referenced by all involved.

Construction↗

Austere Human Missions to Mars

This slide presentation reviews a possible mission architecture for a more austere Mars mission, than the one developed by NASA outlined in the Design Reference Architecture 5 (DRA 5). "Austere" architecture is scaled back from DRA 5 and might offer lower development cost, lower flight cost, and lower development risk. This approach will not meet all the DRA 5 mission requirements. Included in the presentation are the elements of an Austere mission, diagrams of the trans-Mars injection (TMI), cruise, and Mars Orbital Insertion for various phases of the mission, the entry descent landing (EDL) concept. The key features of the Transit Habitat (TransHab), the Earth Departure Stage (EDS), the landers, are reviewed. A chart shows the Mass in tons, of the conceptual types of Mars Landers. The EDL concept, EDL Phase diagrams for the Mars Lander are reviewed. New technologies that would be required are also reviewed. Flight test programs for the various parts of the architecture and a flight schedule are reviewed.

transit habitat (TransHab)↗

MIP: the First ISRU Flight Experiment

In 2020, the Mars Oxygen In-Situ Resource Utilization Experiment (MOXIE) will fly to Mars as part of the Mars-2020 “Perseverance” rover’s experiment package, and for the first time will demonstrate the use of in-situ resources of another planet, by using the carbon dioxide atmosphere of Mars as a feedstock to produce oxygen. MOXIE, however, was not the first flight experiment proposed to test in-situ resource utilization (ISRU). The Mars ISPP Precursor, “MIP”, was a flight experiment on the 2001 Mars Surveyor Lander that was designed to demonstrate In-situ Propellant Production--ISPP--for the first time on Mars. The experiment was designed to show that it was possible to produce oxygen from the carbon dioxide atmosphere, and to demonstrate the individual technology components that would go into a full-scale production plant. The aim point of the oxygen production was to showcase the possibility of producing oxygen for use as rocket fuel, ultimately as an enabling technology for a future human expedition to Mars.

Geoffrey A Landis↗

Lunar Base Construction Overview

Previous lunar missions and campaigns have been restricted to using robotic landers and lunar orbiting satellites as well as sortie type of operations using astronaut crews (NASA Apollo program). Now, the next phase of lunar exploration has begun under NASA’s Artemis program and there has been an international response where other nations such as China, Russia, India, Canada, Japan and the European Union of nations, have all expressed interest in either collaborating or competing with NASA on the Moon. This next phase has an over arching goal of achieving a permanent human presence on the Moon via sustainable methods. A lunar base with human occupancy will require infrastructure to provide shelter, utilities, landing/launch pads, roads, communications, power and all the other necessities to sustain human life and protect equipment. Since human biology is not well suited for surviving in the lunar environment, there will be many forms of automated equipment, autonomy and robotic helpers that will minimize the amount of Extra-Vehicular Activity (EVA) required by the crew. This will mean that the radiation dosage received by the crew will stay within acceptable and safe career doses. Radiation shielding via the use of regolith can also mitigate radiation dangers. The required infrastructure must be constructed, but the mass and logistics of bringing all the construction materials from Earth are prohibitive, which makes the necessary construction difficult to achieve. In-Situ Resource Utilization (ISRU) aims to solve this challenge by sourcing construction materials locally or “in-situ”. This means that their transportation can be completely eliminated, resulting in large cost savings by avoiding the launch out of Earth’s deep gravity well and subsequent trans lunar injection, lunar orbit capture and landing. This paper will give an overview of the required construction tasks and related equipment that will be required to robotically build a lunar base using in-situ resources. It will also organize these tasks into logical groupings so that technology development and implementation can be pursued within a framework that can be referenced by all involved.

Lunar Base↗

Past US studies and developments for planetary rovers

The history of planetary rovers in the U.S. space program is outlined in the context of the goals, mission and spacecraft designs, and operations designs. The American lunar rover work has had three main stages. In the early sixties, the capacity of Surveyor lunar landers to deliver rovers with a mass of about 50 kg to the Moon was exploited. Several such machines were built and tested beginning in 1964 but none went to the Moon. A manned 400 kg short range rover was then developed. Three of these operated on the Moon in 1971 and 1972 as part of the Apollo 15, 16 and 17 missions. Following these Apollo successes, attempts were made to provide two kinds of follow on models: automated or dual mode (human carrying or not) rovers in the few hundred kg size class, and multi-ton mobile habitats that could carry humans on extended traverses. With the closing of both Soviet and American lunar exploration in the seventies, neither of these proposals succeeded. In parallel with these lunar developments, a lengthy technology program on Martian roving has gone on in the U.S., sometimes coming close to preproject status and sometimes fading away, but never quite being abandoned. As a result it is possible today to contemplate a wide range of lunar and Martian roving missions that could be made practical within a few years. However, with today's funding constraints none of the well studied, larger mission concepts appear to fit. Therefore new efforts are being made toward developing much smaller rovers taking advantage of new miniature techniques, not only in mobility systems but also in the scientific instruments that a small rover can carry. Illustrations are included.

Burke, James D.↗

Concept of Operations Visualization for Ares I Production

Establishing Computer Aided Design models of the Ares I production facility, tooling and vehicle components and integrating them into manufacturing visualizations/simulations allows Boeing and NASA to collaborate real time early in the design/development cycle. This collaboration identifies cost effective and lean solutions that can be easily shared with Ares stakeholders (e.g., other NASA Centers and potential science users). These Ares I production visualizations and analyses by their nature serve as early manufacturing improvement precursors for other Constellation elements to be built at the Michoud Assembly Facility such as Ares V and the Altair Lander. Key to this Boeing and Marshall Space Flight Center collaboration has been the use of advanced virtual manufacturing tools to understand the existing Shuttle era infrastructure and trade potential modifications to support Ares I production. These approaches are then used to determine an optimal manufacturing configuration in terms of labor efficiency, safety and facility enhancements. These same models and tools can be used in an interactive simulation of Ares I and V flight to the Space Station or moon to educate the human space constituency (e.g., government, academia, media and the public) in order to increase national and international understanding of Constellation goals and benefits.

Chilton, Jim↗

Evaluation of Dual-Launch Lunar Architectures Using the Mission Assessment Post Processor

The National Aeronautics and Space Administrations (NASA) Constellation Program is currently designing a new transportation system to replace the Space Shuttle, support human missions to both the International Space Station (ISS) and the Moon, and enable the eventual establishment of an outpost on the lunar surface. The present Constellation architecture is designed to meet nominal capability requirements and provide flexibility sufficient for handling a host of contingency scenarios including (but not limited to) launch delays at the Earth. This report summarizes a body of work performed in support of the Review of U.S. Human Space Flight Committee. It analyzes three lunar orbit rendezvous dual-launch architecture options which incorporate differing methodologies for mitigating the effects of launch delays at the Earth. NASA employed the recently-developed Mission Assessment Post Processor (MAPP) tool to quickly evaluate vehicle performance requirements for several candidate approaches for conducting human missions to the Moon. The MAPP tool enabled analysis of Earth perturbation effects and Earth-Moon geometry effects on the integrated vehicle performance as it varies over the 18.6-year lunar nodal cycle. Results are provided summarizing best-case and worst-case vehicle propellant requirements for each architecture option. Additionally, the associated vehicle payload mass requirements at launch are compared between each architecture and against those of the Constellation Program. The current Constellation Program architecture assumes that the Altair lunar lander and Earth Departure Stage (EDS) vehicles are launched on a heavy lift launch vehicle. The Orion Crew Exploration Vehicle (CEV) is separately launched on a smaller man-rated vehicle. This strategy relaxes man-rating requirements for the heavy lift launch vehicle and has the potential to significantly reduce the cost of the overall architecture over the operational lifetime of the program. The crew launch occurs first, four days prior to the optimal trans-lunar injection (TLI) departure window. This is done to allow for launch delays in the Altair/EDS launch. During this time, the Orion vehicle is required to conduct orbit maintenance while loitering in low Earth orbit (LEO). The alternative architectures presented aim to eliminate the need for costly orbit maintenance maneuvers while loitering in LEO. In all of the alternative architectures considered, it is assumed that the Altair and Orion vehicles are nominally launched 90 minutes apart, depart the Earth separately, and complete the rendezvous and docking sequence at the Moon. In this lunar orbit rendezvous (LOR) strategy, both the Altair and Orion vehicles will require separate EDS stages, and each will be required to perform lunar orbit insertion (LOI). This has the effect of balancing payload requirements between the two launch vehicles at the Earth. In this case, the overall payload mass is increased slightly, but the increased mission costs could potentially be offset by requiring the construction of two rockets similar in size and nature, unlike the current Constellation architecture. Three dual-launch architecture options with LOR were evaluated, which incorporate differing methodologies for mitigating the effects of launch delays at the Earth. Benefits and drawbacks of each of the dual-launch architecture options with LOR are discussed and the overall mission performance is compared with that of the existing Constellation Program lunar architecture.

Stewart, Shaun M.↗

Atmospheric In-Situ Resource Utilization For Mars Application

NASA now looks to Mars as the next step in human space exploration. A couple of challenges of such a destination include affordability and weight/volume limitations. As a way to solve these issues NASA is looking into the practice of In-Situ Resource Utilization (ISRU). Instead of manufacturing and bringing all the supplies necessary for a Mars mission and return trip, the goal is to send a preliminary mission to produce reserves of propellant, water, and oxygen on site. Part of this effort includes the Atmospheric Processing Module (APM). The APM is part of a lander that is composed of multiple compartments, each having a unique function; regolith collection/processing, water processing, atmospheric processing, and product storage. The overall goal is to develop the capability to produce methane (CH4) and oxygen as a fuel/oxidizer combo via a Sabatier reaction using resources from the Martian environment. The APM still must undergo modifications in design, and perhaps method, to become flight-ready to produce methane at the level of purity and quantity needed for a vehicle.

isru↗

Development and Testing of a New Family of Supersonic Decelerators

The state of the art in Entry, Descent, and Landing systems for Mars applications is largely based on technologies developed in the late 1960's and early 1970's for the Viking Lander program. Although the 2011 Mars Science Laboratory has made advances in EDL technology, these are predominantly in the areas of entry (new thermal protection systems and guided hypersonic flight) and landing (the sky crane architecture). Increases in entry mass, landed mass, and landed altitude beyond MSL capabilities will require advances predominantly in the field of supersonic decelerators. With this in mind, a multi-year program has been initiated to advance three new types of supersonic decelerators that would enable future large-robotic and human-precursor class missions to Mars.

Clark, Ian G.↗

Thermal Management and Thermal Protection Systems

During my internship in the Thermal Design Branch (ES3), I contributed to two main projects: i) novel passive thermal management system for future human exploration, ii) AVCOAT undercut thermal analysis. i) As NASA prepares to further expand human and robotic presence in space, it is well known that spacecraft architectures will be challenged with unprecedented thermal environments. Future exploration activities will have the need of thermal management systems that can provide higher reliability, mass and power reduction and increased performance. In an effort to start addressing the current technical gaps the NASA Johnson Space Center Passive Thermal Discipline has engaged in technology development activities. One of these activities was done through an in-house Passive Thermal Management System (PTMS) design for a lunar lander. The proposed PTMS, functional in both microgravity and gravity environments, consists of three main components: a heat spreader, a novel hybrid wick Variable Conductance Heat Pipe (VCHP), and a radiator. The aim of this PTMS is to keep electronics on a vehicle within their temperature limits (0 and 50 C for the current design) during all mission phases including multiple lunar day/night cycles. The VCHP was tested to verify its thermal performance. I created a thermal math model using Thermal Desktop (TD) and analyzed it to predict the PTMS performance. After testing, the test data provided a means to correlate the thermal math model. This correlation took into account conduction and convection heat transfer, representing the actual benchtop test. Since this PTMS is proposed for space missions, a vacuum test will be taking place to provide confidence that the system is functional in space environments. Therefore, the model was modified to include a vacuum chamber with a liquid nitrogen shroud while taking into account conduction and radiation heat transfer. Infrared Lamps were modelled and introduced into the model to simulate the sun's rays directly impinging on the system. Heating rate of the lamps were calculated by knowing fraction of emitted energy in a wavelength interval and the filament temperature. This version of the model can be used to predict performance of the system under vacuum with extreme cold or hot conditions. Initial testing of the PTMS showed promise, and the thermal math model predicts even better performance in thermal vacuum testing. ii) Thermal Protection Systems (TPS) are required for vehicles which enter earth's atmosphere to protect from aerodynamic heating caused by the friction between the vehicle and atmospheric gases. Orion's heat shield design has two aspects which needed to be analyzed thermally: i) a small excess of adhesive used to bond the outer AVCOAT layer to the inner composite structure tends to seep from under the AVCOAT and form a small bead in between two bricks of AVCOAT, ii) a silicone rubber with different thermophysical properties than AVCOAT fills the gap between two bricks of AVCOAT. I created a thermal model using TD to determine temperature differences that are caused by these two features. To prevent false results, all TD models must be verified against something known. In this case, the TD model was correlated to CHAR, an ablation modelling software used to analyze TPS. Analyzing a node far from the concerning features, we saw that the TD model data match CHAR data, verifying the TD model. Next, the temperature of the silicone rubber as well as the bead of adhesive were analyzed to determine if they exceeded allowable temperatures. It was determined that these two features do not have a significant effect on the max temperature of the heat shield. This model can be modified to check temperatures at various locations of the heat shield where the composite thickness varies.

Hasnain, Aqib↗