Updated Baseline Cost Model for Hydropower (2023)
The "Updated Baseline Cost Model (BCM) for Hydropower" is an empirical model for estimating the costs of US hydropower projects in six categories (Non-Powered Dam (NPD), New Stream Development (NSD), Canal/Conduit, Pumped Storage Hydro (PSH), Capacity Expansion, Generator Rewind). The model equations have been estimated with data on existing or planned projects obtained from various sources. NOTE: This is a macro-enabled workbook, so Excel may block it on the first opening. In that case: 1. Save the workbook to a local directory 2. Right-click on the workbook in the local directory and select “Properties” 3. Then check “Unblock” at the bottom of the “General” tab.