Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “flexible operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Observing Mode Attitude Controller for the Lunar Reconnaissance Orbiter

The Lunar Reconnaissance Orbiter (LRO) mission is the first of a series of lunar robotic spacecraft scheduled for launch in Fall 2008. LRO will spend at least one year in a low altitude polar orbit around the Moon, collecting lunar environment science and mapping data to enable future human exploration. The LRO employs a 3-axis stabilized attitude control system (ACS) whose primary control mode, the "Observing mode", provides Lunar Nadir, off-Nadir, and Inertial fine pointing for the science data collection and instrument calibration. The controller combines the capability of fine pointing with that of on-demand large angle full-sky attitude reorientation into a single ACS mode, providing simplicity of spacecraft operation as well as maximum flexibility for science data collection. A conventional suite of ACS components is employed in this mode to meet the pointing and control objectives. This paper describes the design and analysis of the primary LRO fine pointing and attitude re-orientation controller function, known as the "Observing mode" of the ACS subsystem. The control design utilizes quaternion feedback, augmented with a unique algorithm that ensures accurate Nadir tracking during large angle yaw maneuvers in the presence of high system momentum and/or maneuver rates. Results of system stability analysis and Monte Carlo simulations demonstrate that the observing mode controller can meet fine pointing and maneuver performance requirements.

Calhoun, Philip C.↗

Port-O-Sim Object Simulation Application

Port-O-Sim is a software application that supports engineering modeling and simulation of launch-range systems and subsystems, as well as the vehicles that operate on them. It is flexible, distributed, object-oriented, and realtime. A scripting language is used to configure an array of simulation objects and link them together. The script is contained in a text file, but executed and controlled using a graphical user interface. A set of modules is defined, each with input variables, output variables, and settings. These engineering models can be either linked to each other or run as standalone. The settings can be modified during execution. Since 2001, this application has been used for pre-mission failure mode training for many Range Safety Scenarios. It contains range asset link analysis, develops look-angle data, supports sky-screen site selection, drives GPS (Global Positioning System) and IMU (Inertial Measurement Unit) simulators, and can support conceptual design efforts for multiple flight programs with its capacity for rapid six-degrees-of-freedom model development. Due to the assembly of various object types into one application, the application is applicable across a wide variety of launch range problem domains.

Lanzi, Raymond J.↗

Mars Terrain Generation

A suite of programs for the generation of disparity maps from stereo image pairs via correlation, and conversion of those disparity maps to XYZ maps, has been updated. This suite implements an automated method of deriving terrain from stereo images for use in the ground data system for in-situ (lander and rover) cameras. This differs from onboard correlation by concentrating more on accuracy than speed, since near-real-time is not a requirement on the ground. The final result is an XYZ value for every point in the image that passes several quality checks. A priori geometric camera calibration information is required for this suite to operate. The suite is very flexible, enabling its use in many special situations, such as non-linearized images required for applications like the Phoenix arm camera, or long-baseline stereo, where the rover moves between left and right images.

Deen, Robert G.↗

The ISS 2B PVTCS Ammonia Leak: An Operational History

In 2006, the Photovoltaic Thermal Control System (PVTCS) for the International Space Station's 2B power channel began leaking ammonia at a rate of approximately 1.5lbm/year (out of a starting approximately 53lbm system ammonia mass). Initially, the operations strategy was "feed the leak," a strategy successfully put into action via Extra Vehicular Activity during the STS‐134 mission. During this mission the system was topped off with ammonia piped over from a separate thermal control system. This recharge was to have allowed for continued power channel operation into 2014 or 2015, at which point another EVA would have been required. Without these periodic EVAs to refill the 2B coolant system, the channel would eventually leak enough fluid as to risk pump cavitation and system failure, resulting in the loss of the 2B power channel - the most critical of the Space Station's 8 power channels. In mid‐2012, the leak rate increased to approximately 5lbm/year. Once discovered, an EVA was planned and executed within a 5 week timeframe to drastically alter the architecture of the PVTCS via connection to a dormant thermal control system not intended to be utilized as anything other than spare components. The purpose of this rerouting of the TCS was to increase system volume and to isolate the photovoltaic radiator, thought to be the likely leak source. This EVA was successfully executed on November 1st, 2012 and left the 2B PVTCS in a configuration where the system was now being adequately cooled via a totally different radiator than what the system was designed to utilize. Unfortunately, data monitoring over the next several months showed that the isolated radiator was not leaking, and the system itself continued to leak steadily until May 9th, 2013. It was on this day that the ISS crew noticed the visible presence of ammonia crystals escaping from the 2B channel's truss segment, signifying a rapid acceleration of the leak from 5lbm/year to 5lbm/day. Within 48 hours of the crew noticing the leak, an EVA was in progress to replace the coolant pump - the only other replaceable leak source. This paper will explore the management of the 2B PVTCS leak from the operations perspective. It will discuss the methodology of performing the STS‐134 refill, the considerations and contingency plans which went into the architectural overhaul of the system in 2012, and the unprecedented effort which went into the EVA response to the visible leak of May 2013. In particular the paper will focus on the techniques utilized by flight controllers to monitor the system health and to respond to such instances as the rapid May 2013 leak by putting the electrical system in a safe configuration for loss of cooling, and will use recorded telemetry of these events to describe system response to EVA crew and ground actions. It will discuss the innovative design for redundancy of the integrated truss structure's cooling systems which allowed for this leak to be managed with minimal impact to other ISS operations and electrical services, contrasted against the real unintended operations consequences of utilizing the flexibility of the spacecraft's design in this manner. The paper will discuss how the training of the crew and flight controller personnel has adapted to the changing architecture of the power system and the unpredictable nature of the 2B leak.

Vareha, Anthony↗

Open Source Mission Control for Chrome

New technology presents the possibility to evolve mission control. WARP (Web Applications for Resource Prospector) a new open source toolset for mission visualization, brings mission control to the Chrome Web Browser. WARP integrates multiple data sources into a coherent visualization toolset from which users may assemble their own software, thus giving mission controllers more flexibility. This frees us to operate based on mission needs, rather than constraints enforced by software application boundaries.

software engineering↗

Operating a Crewed Spacecraft in the Age of Commercial Space Using Private/Government Partnership

Fifty years after humans completed a large-scale United States government-funded and government-engineered effort of landing humans on the moon, human spaceflight has entered a new paradigm. Private companies are now investing their own money and taking on an ever-increasing role in human spaceflight, in partnership with the U.S. government. This paper will describe the development of one of these partnerships through the lens of its mission operations team. As part of the Commercial Crew Program (CCP), NASA selected Boeing’s CST-100 Starliner as one of the next generation of crewed vehicles. Boeing opted to partner with the US Government for their Starliner operations by contracting with NASA’s Mission Control teams in the Flight Operations Directorate (FOD) at the Johnson Space Center to create its own Mission Operations (MO) flight controllers. Partnering with FOD provided benefits to both Boeing and NASA while also creating new challenges. MO brought over 60 years of crewed spaceflight experience and infrastructure to Boeing’s new program. Within certain legal constraints, MO was able to work closely and efficiently with their FOD counterparts who were performing both integration duties and, under the auspices of the CCP, insight of the contractors, in this case Boeing. Involvement of NASA as the Boeing operations agent did lead to what management deemed a ‘healthy tension’ within FOD, challenging old processes and often creating better, more robust teamwork. Successful development of the framework and boundaries of both the legal aspects and the oversight tensions has been one of the keys to developing a successful corporate/government partnership. Due to the highly automated nature of the Starliner, the MO organization was designed to be much smaller than previous NASA’s flight control teams for past programs. NASA has learned through the decades that spacecraft design and operations need to be as flexible and forgiving as possible. NASA’s Commercial Crew Program was established to sponsor corporate development of economical vehicles that could get humans to and from low Earth orbit. These companies, of course, need to meet contractual obligations in providing a safe means of transporting astronauts to the International Space Station (ISS), but also need to do so in a manner that leads to the venture resulting in a profit at the same time. Through MO’s involvement in the development of this spaceflight paradigm shift, there are ample lessons to be conveyed to future teams and programs working to develop similar missions.

Robert C Dempsey↗

Operating a Crewed Spacecraft in the Age of Commercial Space Using Private/Government Partnership

Fifty years after humans completed a large-scale United States government-funded and government-engineered effort of landing humans on the moon, human spaceflight has entered a new paradigm. Private companies are now investing their own money and taking on an ever-increasing role in human spaceflight, in partnership with the U.S. government. This paper will describe the development of one of these partnerships through the lens of its mission operations team. As part of the Commercial Crew Program (CCP), NASA selected Boeing’s CST-100 Starliner as one of the next generation of crewed vehicles. Boeing opted to partner with the US Government for their Starliner operations by contracting with NASA’s Mission Control teams in the Flight Operations Directorate (FOD) at the Johnson Space Center to create its own Mission Operations (MO) flight controllers. Partnering with FOD provided benefits to both Boeing and NASA while also creating new challenges. MO brought over 60 years of crewed spaceflight experience and infrastructure to Boeing’s new program. Within certain legal constraints, MO was able to work closely and efficiently with their FOD counterparts who were performing both integration duties and, under the auspices of the CCP, insight of the contractors, in this case Boeing. Involvement of NASA as the Boeing operations agent did lead to what management deemed a ‘healthy tension’ within FOD, challenging old processes and often creating better, more robust teamwork. Successful development of the framework and boundaries of both the legal aspects and the oversight tensions has been one of the keys to developing a successful corporate/government partnership. Due to the highly automated nature of the Starliner, the MO organization was designed to be much smaller than previous NASA’s flight control teams for past programs. NASA has learned through the decades that spacecraft design and operations need to be as flexible and forgiving as possible. NASA’s Commercial Crew Program was established to sponsor corporate development of economical vehicles that could get humans to and from low Earth orbit. These companies, of course, need to meet contractual obligations in providing a safe means of transporting astronauts to the International Space Station (ISS), but also need to do so in a manner that leads to the venture resulting in a profit at the same time. Through MO’s involvement in the development of this spaceflight paradigm shift, there are ample lessons to be conveyed to future teams and programs working to develop similar missions.

Robert C. Dempsey↗

Operating a Crewed Spacecraft in the Age of Commercial Space Using Private/Government Partnership

Fifty years after humans completed a large-scale United States government-funded and government-engineered effort of landing humans on the moon, human spaceflight has entered a new paradigm. Private companies are now investing their own money and taking on an ever-increasing role in human spaceflight, in partnership with the U.S. government. This paper will describe the development of one of these partnerships through the lens of its mission operations team. As part of the Commercial Crew Program (CCP), NASA selected Boeing’s CST-100 Starliner as one of the next generation of crewed vehicles. Boeing opted to partner with the US Government for their Starliner operations by contracting with NASA’s Mission Control teams in the Flight Operations Directorate (FOD) at the Johnson Space Center to create its own Mission Operations (MO) flight controllers. Partnering with FOD provided benefits to both Boeing and NASA while also creating new challenges. MO brought over 60 years of crewed spaceflight experience and infrastructure to Boeing’s new program. Within certain legal constraints, MO was able to work closely and efficiently with their FOD counterparts who were performing both integration duties and, under the auspices of the CCP, insight of the contractors, in this case Boeing. Involvement of NASA as the Boeing operations agent did lead to what management deemed a ‘healthy tension’ within FOD, challenging old processes and often creating better, more robust teamwork. Successful development of the framework and boundaries of both the legal aspects and the oversight tensions has been one of the keys to developing a successful corporate/government partnership. Due to the highly automated nature of the Starliner, the MO organization was designed to be much smaller than previous NASA’s flight control teams for past programs. NASA has learned through the decades that spacecraft design and operations need to be as flexible and forgiving as possible. NASA’s Commercial Crew Program was established to sponsor corporate development of economical vehicles that could get humans to and from low Earth orbit. These companies, of course, need to meet contractual obligations in providing a safe means of transporting astronauts to the International Space Station (ISS), but also need to do so in a manner that leads to the venture resulting in a profit at the same time. Through MO’s involvement in the development of this spaceflight paradigm shift, there are ample lessons to be conveyed to future teams and programs working to develop similar missions.

Robert C. Dempsey↗

A flexible all-temperature pressure vessel

By interrupting lines of stress with convolutions, structure can be designed to contain pressure, operate at cryogenic and high temperatures, and provide flexibility necessary for repetitive cycles of parallel-offset shear translation.

Strangeland, M. L.↗

Production and quality assurance automation in the Goddard Space Flight Center Flight Dynamics Facility

The Flight Dynamics Facility (FDF) at the NASA Goddard Space Flight Center (GSFC) generates numerous products for NASA-supported spacecraft, including the Tracking and Data Relay Satellites (TDRS's), the Hubble Space Telescope (HST), the Extreme Ultraviolet Explorer (EUVE), and the space shuttle. These products include orbit determination data, acquisition data, event scheduling data, and attitude data. In most cases, product generation involves repetitive execution of many programs. The increasing number of missions supported by the FDF has necessitated the use of automated systems to schedule, execute, and quality assure these products. This automation allows the delivery of accurate products in a timely and cost-efficient manner. To be effective, these systems must automate as many repetitive operations as possible and must be flexible enough to meet changing support requirements. The FDF Orbit Determination Task (ODT) has implemented several systems that automate product generation and quality assurance (QA). These systems include the Orbit Production Automation System (OPAS), the New Enhanced Operations Log (NEOLOG), and the Quality Assurance Automation Software (QA Tool). Implementation of these systems has resulted in a significant reduction in required manpower, elimination of shift work and most weekend support, and improved support quality, while incurring minimal development cost. This paper will present an overview of the concepts used and experiences gained from the implementation of these automation systems.

Chapman, K. B.↗

PCM Passive Cooling System Containing Active Subsystems

A multistage system has been proposed for cooling a circulating fluid that is subject to intermittent intense heating. The system would be both flexible and redundant in that it could operate in a basic passive mode, either sequentially or simultaneously with operation of a first, active cooling subsystem, and either sequentially or simultaneously with a second cooling subsystem that could be active, passive, or a combination of both. This flexibility and redundancy, in combination with the passive nature of at least one of the modes of operation, would make the system more reliable, relative to a conventional cooling system. The system would include a tube-in-shell heat exchanger, within which the space between the tubes would be filled with a phase-change material (PCM). The circulating hot fluid would flow along the tubes in the heat exchanger. In the basic passive mode of operation, heat would be conducted from the hot fluid into the PCM, wherein the heat would be stored temporarily by virtue of the phase change.

Blanding, David E.↗

Algorithm For Control Of Underactuated Manipulators

Algorithm for improved control of underactuated multiple-link robotic manipulators developed via spatial-algebra-operator approach. Aspects of this approach described in several previous articles in NASA Tech Briefs-most recently "Robot Control Based on Spatial-Operator Algebra" (NPO-17918). Underactuated manipulator has fewer actuators than it has degrees of freedom. Complexity of underactuated systems managed by unified analysis. It has implications for fault-tolerant control, and many practical manipulators underactuated. Examples include manipulators with flexible joints and/or flexible links; space/underwater robots; manipulators that operate with some actuators that turned off because of failure or because of need to conserve energy; manipulators that grasp objects loosely, and manipulators that grasp objects with internal degrees of freedom (e.g., plungers, rollers).

Jain, Abhinandan↗

ISS Regenerative Life Support: Challenges and Success in the Quest for Long-Term Habitability in Space

This presentation will discuss the International Space Station s (ISS) Regenerative Environmental Control and Life Support System (ECLSS) operations with discussion of the on-orbit lessons learned, specifically regarding the challenges that have been faced as the system has expanded with a growing ISS crew. Over the 10 year history of the ISS, there have been numerous challenges, failures, and triumphs in the quest to keep the crew alive and comfortable. Successful operation of the ECLSS not only requires maintenance of the hardware, but also management of the station resources in case of hardware failure or missed re-supply. This involves effective communication between the primary International Partners (NASA and Roskosmos) and the secondary partners (JAXA and ESA) in order to keep a reserve of the contingency consumables and allow for re-supply of failed hardware. The ISS ECLSS utilizes consumables storage for contingency usage as well as longer-term regenerative systems, which allow for conservation of the expensive resources brought up by re-supply vehicles. This long-term hardware, and the interactions with software, was a challenge for Systems Engineers when they were designed and require multiple operational workarounds in order to function continuously. On a day-to-day basis, the ECLSS provides big challenges to the on console controllers. Main challenges involve the utilization of the resources that have been brought up by the visiting vehicles prior to undocking, balance of contributions between the International Partners for both systems and resources, and maintaining balance between the many interdependent systems, which includes providing the resources they need when they need it. The current biggest challenge for ECLSS is the Regenerative ECLSS system, which continuously recycles urine and condensate water into drinking water and oxygen. These systems were brought to full functionality on STS-126 (ULF-2) mission. Through system failures and recovery, the ECLSS console has learned how to balance the water within the systems, store and use water for contingencies, and continue to work with the International Partners for short-term failures. Through these challenges and the system failures, the most important lesson learned has been the importance of redundancy and operational workarounds. It is only because of the flexibility of the hardware and the software that flight controllers have the opportunity to continue operating the system as a whole for mission success.

Bazley, Jesse A.↗

Vertically Aligned Graphene/Metal Oxide Based Lightweight Super Strong, Energy Storage Carbon Fiber Composites

In this era of budding smart technologies, flexible and smart wearable textiles are a long awaited product which are anticipated to reach a $10 B market in few years.1 Supercapacitors are an excellent power source for these smart textiles, because they are light in weight, safe in operation, provide longer life cycle, high flexibility, and faster charge discharge capabilities.

Energy storage↗

Coordinate transformation and truncation for rotating spacecraft with flexible appendages

The analytical structures of alternative coordinate transformations for the variables that characterize the deformations of finite element models of flexible appendages on rotating spacecraft are examined. Particular emphasis is given to the truncation operations that are essential for efficient numerical simulations of flexible spacecraft, due to the necessarily large number of coordinates employed in a finite element description. A theorem is developed which establishes necessary conditions for the commutativity of the required truncation and inversion operations. The recommended alternative for the rotating elastic appendage is a complex transformation with previously published orthogonality properties, which permit the derivation in this paper of a relatively simple explicit set of transformed and truncated equations of modal vibration in real variables.

Likins, P.↗

HIFOGS: Its design, operations and calibration

The High-efficiency, Infrared Faint Object Grating Spectrometer (HIFOGS) provides spectral coverage of selectable portions of the 3 to 18 micron range at resolving powers from 00 to 1000 using 120 Si/Bi detectors. Additional coverage to 30 microns is provided by a bank of 32 Si:P detectors. Selectable apertures, gratings and band-pass filters provide flexibility to this system. Software for operation of HIFOGS and reduction of the data runs on a MacIntosh computer. HIFOGS has been used to establish celestial flux standards using 3 independent approaches: comparison to star models, comparisons to asteroid models and comparisons to laboratory blackbodies. These standards are expected to have wide application in astronomical thermal-infrared spectroscopy.

Witteborn, Fred C.↗

Time scheduling of a mix of 4D equipped and unequipped aircraft

In planning for a future automated air traffic system, it is necessary to confront the transition situation in which some percentage of the traffic must be handled by conventional means. A safe, efficient transition system is needed since initially not all aircraft will be able to respond to a more automated system. The specific problem addressed was that of time scheduling a mix of 4D-equipped aircraft (aircraft that can accurately meet a controller specified time schedule at selected way points in the terminal area) when operating in conjunction with unequipped aircraft (aircraft that require air traffic handling by means of standard vectoring techniques). First, a relationship between time separation and system capacity was developed. The time separations were incorporated into a set of scheduling algorithms which contain the required elements of flexibility needed for terminal-area operation, such as delaying aircraft and changing time separations. The problem of reducing the size of time separations allotted for vectored aircraft by means of computer assists to the controller was also addressed.

Tobias, L.↗

Time scheduling of a mix of 4D equipped and unequipped aircraft

In planning for a future automated air traffic system, it is necessary to confront the transition situation in which some percentage of the traffic must be handled by conventional means. A safe, efficient transition system is needed since initially not all aircraft will be able to respond to a more automated system. The specific problem addressed was that of time scheduling a mix of 4D-equipped aircraft (aircraft that can accurately meet a controller specified time schedule at selected way points in the terminal area) when operating in conjunction with unequipped aircraft (aircraft that require air traffic handling by means of standard vectoring techniques). First, a relationship between time separation and system capacity was developed. The time separations were incorporated into a set of scheduling algorithms which contain the required elements of flexibility needed for terminal-area operation, such as delaying aircraft and changing time separations. The problem of reducing the size of time separations allotted for vectored aircraft by means of computer assists to the controller was also addressed.

Tobias, L.↗