Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “field testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Investigation of Multi-Input, Multi-Output (MIMO) Random Control Applied to Direct Field Acoustic Testing

Direct Field Acoustic Testing (DFAT) offers potential cost and time savings over reverberant chamber acoustic testing of spacecraft. The NASA Multi-Purpose Crew Vehicle (MPCV) Program recently directed a series of acoustic tests on Orion structural test articles comparing DFAT and reverberant testing of the same test article with a view to qualifying DFAT for manned space flight vehicles. The verification process compared four parameters noise level compliance with the one third octave test specification, spatial uniformity of the acoustic field, spatial correlation of the acoustic field and vibration response of vehicle structure, including representative solar array panels. While the results of the verification were encouraging, MPCV Loads and Dynamics engaged Quartus Engineering to investigate whether alternative MIMO random control strategies might improve the spatial uniformity and/or the spatial correlation of the DFAT acoustic field. This paper presents the results of acoustic field simulations of the DFAT test and provides a better understanding of how MIMO random control systems originally developed for vibration and structural durability testing can be expected to perform in DFAT testing.

Direct Field↗

Simplified Space Conditioning in Low-Load Homes: Results from the Fresno, California, Retrofit Unoccupied Test House

Field testing was performed in a retrofit unoccupied test house in Fresno, California. Three air-based heating, ventilation, and air conditioning (HVAC) distribution systems -- a typical airflow ducted system to the bedrooms, a low airflow ducted system to the bedrooms, and a system with no ductwork to the bedrooms -- were evaluated during heating, cooling, and midseason conditions. The relative ability of each of the three systems was assessed with respect to relevant Air Conditioning Contractors of America (ACCA) and ASHRAE standards for house temperature uniformity and stability, respectively. Computational fluid dynamics (CFD) modeling also was performed and refined based on comparison to field test results to determine the air flow rate into the bedrooms of over-door and bottom-of-door air transfer grilles.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Impact of Acoustic Standing Waves on Structural Responses: Reverberant Acoustic Testing (RAT) vs. Direct Field Acoustic Testing (DFAT)

Loudspeakers have been used for acoustic qualification of spacecraft, reflectors, solar panels, and other acoustically responsive structures for more than a decade. Limited measurements from some of the recent speaker tests used to qualify flight hardware have indicated significant spatial variation of the acoustic field within the test volume. Also structural responses have been reported to differ when similar tests were performed using reverberant chambers. To address the impact of non-uniform acoustic field on structural responses, a series of acoustic tests were performed using a flat panel and a 3-ft cylinder exposed to the field controlled by speakers and repeated in a reverberant chamber. The speaker testing was performed using multi-input-single-output (MISO) and multi-input-multi-output (MIMO) control schemes with and without the test articles. In this paper the spatial variation of the acoustic field due to acoustic standing waves and their impacts on the structural responses in RAT and DFAT (both using MISO and MIMO controls for DFAT) are discussed in some detail.

speakers↗

Gearbox Reliability Collaborative Analytic Formulation for the Evaluation of Spline Couplings

Gearboxes in wind turbines have not been achieving their expected design life; however, they commonly meet and exceed the design criteria specified in current standards in the gear, bearing, and wind turbine industry as well as third-party certification criteria. The cost of gearbox replacements and rebuilds, as well as the down time associated with these failures, has elevated the cost of wind energy. The National Renewable Energy Laboratory (NREL) Gearbox Reliability Collaborative (GRC) was established by the U.S. Department of Energy in 2006; its key goal is to understand the root causes of premature gearbox failures and improve their reliability using a combined approach of dynamometer testing, field testing, and modeling. As part of the GRC program, this paper investigates the design of the spline coupling often used in modern wind turbine gearboxes to connect the planetary and helical gear stages. Aside from transmitting the driving torque, another common function of the spline coupling is to allow the sun to float between the planets. The amount the sun can float is determined by the spline design and the sun shaft flexibility subject to the operational loads. Current standards address spline coupling design requirements in varying detail. This report provides additional insight beyond these current standards to quickly evaluate spline coupling designs.

17 WIND ENERGY↗

Abstract for CRADA between the Japan Oil, Gas, and Metals National Corporation (JOGMEC) and NETL (AGMT-0671)

The US Department of Energy’s National Energy Technology Laboratory (NETL) and the Japan Oil, Gas, and Metals National Corporation (JOGMEC) have long-established gas hydrate R&D programs and both have identified an extended duration scientific field test of depressurization as a key requirement in advancing critical science and technology development objectives. Both Parties recognize that the Alaska North Slope (“ANS”) is the most feasible location on Earth to conduct such a test and that a proven ANS Operator should be engaged to carry out the desired scientific drilling and testing field programs in full compliance with all regulations. Given the unpredictable nature of field programs conducted in harsh operating environments, the parties have executed this CRADA to clearly establish a basic framework of the project goals, and to articulate roles, responsibilities, and decision-making protocols prior to the initiation of a field program. Therefore, this CRADA establishes a project “Steering Committee” to guide major project decision points and allocation of resources; an “R&D Committee” to jointly develop field program technical and scientific plans designed to achieve program objectives; and “Field Representatives” to enable effective, real-time, and collaborative decision making during field programs.

03 NATURAL GAS↗

Feasibility study on phyto-remediation techniques for soil contaminated by the Fukushima Dai-Ichi nuclear power plant accident

Tottori University and the Japan Atomic Energy Agency carried out jointly the feasibility study on phyto-remediation techniques, which apply to soil contaminated by the TEPCO's Fukushima Dai-ichi NPP accident. This paper illustrates the results from experimental investigations. Experimental investigations include both water-culture tests and field tests. Several plants, mainly halophytes that can specifically absorb more Na than K, and others like sunflower demonstrated for other domestic large-scale tests, were water-cultured and examined for screening. Easily cultivated and harvested plants without harmful effects on subsequent cultivation were also considered. New Zealand spinach was selected as a candidate for demonstrations in fields. The field tests were carried out at two sites of different agricultural types in Minami-soma, Fukushima prefecture. Concentration of {sup 137}Cs in soil is about 4.5 Bq/g-dry as the average of 10 cm depth. The aims of the field tests are to confirm absorption ability and environmental adaptation of the test plants and to document the cost and performance of projects. In conclusion, the absorption of {sup 137}Cs activity per unit area (Bq/m{sup 2}) by New Zealand spinach could be approximately 0.5%. To achieve an effective result in removal of {sup 137}Cs from soil in around a decade, it is required to find the plant which has ten or more times higher absorption capacity than New Zealand spinach. From the consistency of both results in water-culture and field tests, the water-culture test can be valid for screening. In addition, applicable sites will be limited to fields which are too steep or too narrow to use mechanical diggers, and which are free from any restrictions to enter. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Testing Large Structures in the Field

Field testing large structures creates unique challenges such as limited choices for boundary conditions and the fact that natural excitation sources cannot be removed. Several critical developments in field testing of large structures are reviewed, including: step relaxation testing which has been developed into a useful technique to apply large forces to operational systems by careful windowing; the capability of large structures testing with free support conditions which has been expanded by implementing modeling of the support structure; natural excitation which has been developed as a viable approach to field testing; and the hybrid approach which has been developed to allow forces to be estimated in operating structures. These developments have increased the ability to extract information from large structures and are highlighted in this presentation.

James, George↗

Field-Aging Test Bed for Behind-the-Meter PV + Energy Storage

Small DC-coupled battery test systems are deployed at the National Renewable Energy Laboratory to evaluate capacity fade models and report on performance parameters such as round-trip efficiency under indoor and outdoor deployment scenarios. Initial commercial battery products include LG Chem RESU lithium-ion (Li-ion) and Avalon vanadium redox flow batteries. Adapting indoor lab-scale test methods to outdoor systems has challenges, including maintaining constant temperature and fully controlling batteries through standard discharge curves. Initial measurements show the Li-ion battery systems performing within expectations, near 85% round-trip efficiency. Initial lifetime modeling and measurements indicate that battery capacity could degrade by 20%-35% over 10 years at current rates.

14 SOLAR ENERGY↗

Correlation of Qualification and Accelerated Testing with Field Degradation

Qualification testing of solar photovoltaic (PV) modules per IEC 61215 standard encompasses a set of well-defined accelerated stress tests (irradiation, environmental, mechanical and electrical) with strict pass/fail criteria based on functionality/performance, electrical and mechanical safety, and visual requirements. The qualification testing does not identify all the possible reliability failures or durability issues witnessed in the actual field. However, it does identify the major/catastrophic design quality issues (infant mortality), which could occur early in a module’s field life. Unfortunately, in the industry, there is no consensus-based standard or protocol available to validate manufacturers’ warranty period claims based on the end-of-life wear-out failure mechanisms. Being able to predict the field degradation rates and lifetime using mode-specific accelerated tests on moderately field-aged modules, for example 10 years, for certain commonly occurring degradation modes would be a powerful contribution to all the stakeholders of the PV industry. There is a need to formulate guidelines to find the correlation of accelerated testing with field degradation for individual degradation modes observed in the field. Potential approaches to fulfill this need were experimented in this project and are presented in this report. Two of the most commonly seen degradation modes – encapsulant browning and solder bond thermomechanical fatigue – are addressed in this report through presenting the accelerated testing methods and physical modelling approaches. Two accelerated test methods (UV and thermal cycling) were designed to induce the wear-out mechanisms in the modules and not infant mortality failures. To focus on the wear-out failure modes, the tests were performed on field-aged modules, instead of fresh modules, with known degradation rates and degradation modes. The degradation rates were measured based on the degradation rates of individual cell parameters (short-circuit current, I sc and series resistance, R s ) instead of the degradation rate of maximum power (P max ) which cannot be used to study any specific/limited degradation mode as the P max degradation could be caused by many different degradation modes. The key characteristic parameter considered for encapsulant discoloration and solder bond degradation is I sc and R s , respectively. The developed physical models/equations relating the testing degradation data and field weather data were utilized to determine the acceleration factor (AF) and to predict the degradation rate for a specific degradation mode of PV modules installed in two different climates, Arizona (hot) and New York (cold). The predicted degradation rates for encapsulant browning and solder bond degradation have also been validated against the actual measured field degradation rates. UV testing cost reduction: To determine acceleration factor, single UV chamber was used for accelerated UV testing at three different temperatures simultaneously, instead of three chambers for three temperatures (or one chamber sequentially which is an extremely time-consuming approach). A passive heating approach was successfully used to achieve and maintain multiple temperatures in the accelerated UV chamber. Foam insulation boards of varying thicknesses were utilized to obtain three different temperatures for UV testing. However, these foam materials tend to disintegrate in the presence of moisture. To alleviate this problem, silicone heating blankets with temperature controls and humidifier can be used if the UV testing is to be performed under hot-humid conditions instead of conventional hot-dry conditions. Thermal cycling testing cost reduction: Single thermal cycling chamber was used for accelerated thermal cycling testing at three different upper temperatures simultaneously, instead of three chambers for three upper temperatures (or one chamber sequentially which is an extremely time-consuming approach). An active heating approach based on silicone heating blankets was successfully used to achieve and maintain multiple upper temperatures in the accelerated thermal cycling chamber. Such blankets provide stable temperature control and thereby more reliable and repeatable for replicate experiments.

14 SOLAR ENERGY↗

Simplified Space Conditioning in Low-Load Homes: Results from Pittsburgh, Pennsylvania, New Construction Unoccupied Test House

Field testing was performed in a new construction unoccupied test house in Pittsburgh, PA. Four air-based heating, ventilation, and air conditioning distribution systems—a typical airflow ducted system to the bedrooms, a low airflow ducted system to the bedrooms, a system with transfer fans to the bedrooms, and a system with no ductwork to the bedrooms—were evaluated during heating, cooling, and midseason conditions. The relative ability of each system was assessed with respect to relevant Air Conditioning Contractors of America and ASHRAE standards for house temperature uniformity and stability, respectively.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Simplified Space Conditioning in Low-Load Homes: Results from Pittsburgh, Pennsylvania, New Construction Unoccupied Test House

Field testing was performed in a new construction unoccupied test house in Pittsburgh, Pennsylvania. Four air-based heating, ventilation, and air conditioning distribution systems--a typical airflow ducted system to the bedrooms, a low airflow ducted system to the bedrooms, a system with transfer fans to the bedrooms, and a system with no ductwork to the bedrooms--were evaluated during heating, cooling, and midseason conditions. The relative ability of each system was assessed with respect to relevant Air Conditioning Contractors of America and ASHRAE standards for house temperature uniformity and stability, respectively.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Salt Disposal Investigations to Study Thermally Hot Radioactive Waste In A Deep Geologic Repository in Bedded Rock Salt - 12488

A research program is proposed to investigate the behavior of salt when subjected to thermal loads like those that would be present in a high-level waste repository. This research would build upon results of decades of previous salt repository program efforts in the US and Germany and the successful licensing and operation of a repository in salt for disposal of defense transuranic waste. The proposal includes a combination of laboratory-scale investigations, numerical simulations conducted to develop validated models that could be used for future repository design and safety case development, and a thermal field test in an underground salt formation with a configuration that replicates a small portion of a conceptual repository design. Laboratory tests are proposed to measure salt and brine properties across and beyond the range of possible repository conditions. Coupled numerical models will seek to describe phenomenology (thermal, mechanical, and hydrological) observed in the laboratory tests. Finally, the field test will investigate many phenomena that have been variously cited as potential issues for disposal of thermally hot waste in salt, including buoyancy effects and migration of pre-existing trapped brine up the thermal gradient (including vapor phase migration). These studies are proposed to be coordinated and managed by the Carlsbad Field Office of DOE, which is also responsible for the operation of the Waste Isolation Pilot Plant (WIPP) within the Office of Environmental Management. The field test portion of the proposed research would be conducted in experimental areas of the WIPP underground, far from disposal operations. It is believed that such tests may be accomplished using the existing infrastructure of the WIPP repository at a lower cost than if such research were conducted at a commercial salt mine at another location. The phased field test is proposed to be performed over almost a decade, including instrumentation development, several years of measurements during heating and then subsequent cooling periods, and the eventual forensic mining back of the test bed to determine the multi-year behavior of the simulated waste/rock environment. Funding possibilities are described, and prospects for near term start-up are discussed. Mining of the access drifts required to create the test area in the WIPP underground began in November 2011. Because this mining uses existing WIPP infrastructure and labor, it is estimated to take about two years to complete the access drifts. WIPP disposal operations and facility maintenance activities will take priority over the SDI field test area mining. Funding of the SDI proposal was still being considered by DOE's Offices of Environmental Management and Nuclear Energy at the time this paper was written, so no specific estimates of the progress in 2012 have been included. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Examination of the Structural Response of the Orion European Service Module to Reverberant and Direct Field Acoustic Testing

The NASA Orion Multi-Purpose Crew Vehicle (MPCV), comprised of the Service Module, the Crew Module, and the Launch Abort System, is the next generation human spacecraft designed and built for deep space exploration. Orion will launch on NASAs new heavy-lift rocket, the Space Launch System. The European Space Agency (ESA) is responsible for providing the propulsion sub-assembly of the Service Module to NASA, called the European Service Module (ESM). The ESM is being designed and built by Airbus Safran Launchers for ESA. Traditionally, NASA has utilized reverberant acoustic testing for qualification of spaceflight hardware. The ESM Structural Test Article (E-STA) was tested at the NASA Plum Brook Stations (PBS) Reverberant Acoustic Test Facility in April-May 2016. However, Orion is evaluating an alternative acoustic test method, using direct field acoustic excitation, for the MPCVs Service Module and Crew Module. Lockheed Martin is responsible for the Orion proof-of-concept direct field acoustic test program. The E-STA was exposed to direct field acoustic testing at NASA PBS in February 2017. This paper compares the dynamic response of the E-STA structure and its components to both the reverberant and direct field acoustic test excitations. Advantages and disadvantages of direct field acoustic test excitation method are discussed.

Acoustics↗

Examination of the Structural Response of the Orion European Service Module to Reverberant and Direct Field Acoustic Testing

The NASA Orion Multi-Purpose Crew Vehicle (MPCV), comprised of the Service Module, the Crew Module, and the Launch Abort System, is the next generation human spacecraft designed and built for deep space exploration. Orion will launch on NASAs new heavy-lift rocket, the Space Launch System. The European Space Agency (ESA) is responsible for providing the propulsion sub-assembly of the Service Module to NASA, called the European Service Module (ESM). The ESM is being designed and built by Airbus Safran Launchers for ESA. Traditionally, NASA has utilized reverberant acoustic testing for qualification of spaceflight hardware. The ESM Structural Test Article (E-STA) was tested at the NASA Plum Brook Stations (PBS) Reverberant Acoustic Test Facility in April-May 2016. However, Orion is evaluating an alternative acoustic test method, using direct field acoustic excitation, for the MPCVs Service Module and Crew Module. Lockheed Martin is responsible for the Orion proof-of-concept direct field acoustic test program. The E-STA was exposed to direct field acoustic testing at NASA PBS in February 2017. This paper compares the dynamic response of the E-STA structure and its components to both the reverberant and direct field acoustic test excitations. Advantages and disadvantages of direct field acoustic test excitation method are discussed.

Acoustics↗

Materials for Advanced Ultra-Supercritical (AUSC) Steam Turbines – AUSC Component Demonstration

The work by the United States Department of Energy (U.S. DOE)/Ohio Coal Development Office (OCDO) Advanced Ultra-Supercritical (AUSC) Steam Boiler and Turbine Materials Consortia from 2001 through September 2015 was primarily focused on lab scale and pilot scale materials testing. The field testing included air-cooled probes and steam-cooled “loops” that were installed into existing utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion due to the constituents in the coal ash. Successful research and development resulted in identification of metallic alloy materials and fabrication processes suited for power generation applications with metal temperatures up to approximately 1472°F (800°C). These materials or alloys have shown, in extensive laboratory tests and shop fabrication studies, to have excellent applicability for high-efficiency low CO2 transformational power generation technologies. However, as valuable as these material field tests have been for obtaining information, their scale is significantly below that required to minimize the risk associated with a power company building a multi-billion-dollar AUSC power plant. To decrease the identified risk barriers to full-scale implementation of these advanced materials, the U.S. DOE/OCDO AUSC Steam Boiler and Turbine Materials Consortia identified the key areas of the technology that need to be tested at a larger scale. Based upon the recommendations and outcome of a Consortia-sponsored workshop with the U.S.’s leading utilities, a Component Test (ComTest) Program for AUSC was proposed. The AUSC ComTest program would define materials performance requirements, plan for overall advanced system integration, design critical component tests, fabricate components for testing from advanced materials, and carry out the tests. A Pre-FEED evaluation of the test facility including the evaluation of three potential sites has been completed and previously reported. This report describes the Front-End Engineering Design (FEED), Detailed Engineering and the Environmental Assessment of the ComTest project. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as INCONEL 740H or HAYNES 282 alloys. Pathways to supply these components for ComTest have been identified as well as any further development that would be required. Every project of this nature has challenges and this project was no exception. The greatest challenge has been the project cost. Largely due to the infrastructure and balance of plant equipment upgrades required for Youngstown Thermal, the estimated project cost for the “base case” project was greater than originally budgeted. The project team spent a significant amount of time exploring opportunities for reducing the project cost. These options included: • Youngstown Thermal was exploring building a Combined Heat and Power (CHP) unit at their facility. The Youngstown Thermal staff, supported by Thermal Engineering Group, worked with the project team to determine whether it was economically desirable to supply ComTest with steam and other utilities, which would be supplied by the CHP project. • The project team also evaluated opportunities to optimize the project scope to reduce cost, such as reducing project scope by eliminating the Superheater Outlet Header test. • Southern Company had offered two sites as possible host locations for ComTest. Both sites had infrastructure in place such as steam from an existing unit, natural gas, cooling water and ample electrical power that would be required to be added at the Youngstown Thermal site. Utilizing this existing infrastructure could reduce the project cost. An additional project challenge was the departure of Babcock and Wilcox from the project in September 2016. This project setback was overcome by GE Power’s willingness to assume the design of the ComTest superheater. Since the project could not proceed without the superheater, this was a very positive project development. The merger of the GE Power and Alstom Power steam turbine divisions created synergies leading to the conclusion that instead of building a small-scale turbine, a more practical and useful endeavor would be to validate the manufacturing technology and supplier readiness for fabricating and machining full scale steam turbine components. Consequently, in March 2017, GE Power decided that a steam turbine test would not be necessary as part of the ComTest demonstration. Removing the operational testing of the steam turbine from ComTest further reduced the total project cost. Additionally, there was an opportunity to move ComTest from Youngstown Thermal to one of the Southern Company sites and operate ComTest at supercritical steam conditions and test the steam turbine main stop/control valve at a temperature and pressure that would be representative of the conditions of a high pressure steam turbine inlet valve. The steam could also possibly be returned to the host boiler so there would be no economic penalty of using this steam for ComTest. Relocating the project could further reduce the project cost due to the infrastructure already in place, including high pressure natural gas and cooling water, and the potential for heat integration, allowing a reduction of operating costs. Due to these potential cost reductions, it was decided to move the project away from Youngstown Thermal in March 2017. As integrating ComTest at the Southern Company site was explored, an issue was raised regarding the integration of the ComTest cycle with the plant steam cycle. Steam would be supplied to ComTest at nominally ~3865 psia and 775°F. The steam would be heated with natural gas to 1400°F for the valve test and then cooled to 1000°F so that the steam would be returned to the host boiler at the same conditions as their high pressure steam turbine inlet. However, there were concerns raised that the addition of the energy (natural gas) to the steam could trigger a New Source Review on the unit. Southern Company did not want ComTest to cause this review, so condensing all of the steam exiting ComTest and returning it to the host steam cycle as condensate was explored to insure there would be no implication that ComTest was adding energy to the host plant’s steam cycle. Ultimately, Southern Company decided that they wanted to “decouple” ComTest from the operating unit, making ComTest self-supporting, similar to the Youngstown Thermal “base case.” Without the steam turbine, the project team reached a consensus that operating the ComTest Superheater and steam turbine valves at the typical pressure of a package boiler (~1000 psig) would not generate enough useful technical information to justify the cost of the test. Therefore, it was decided in the December 2017 project quarterly meeting to cancel the operational phase of ComTest. Throughout the engineering phase of ComTest, manufacturing and supply chain challenges were identified. When GE Power recommended dropping the steam turbine test from ComTest, they identified many important manufacturing issues that should be evaluated and demonstrated. Other challenges had been raised by the GE Power group designing the superheater as well as those engineering components such as pressure relief and steam turbine bypass valves. In the December 2017 meeting, the project team decided that it was more beneficial to the AUSC technology to pursue these manufacturing and supply chain issues as Phase 2 of the ComTest project. This report is organized in the following manner: • Section 2 discusses the ComTest project background and organization. • Section 3 discussed project management. • Section 4 discusses the design of the ComTest AUSC components – the Superheater, steam turbine and Superheater Outlet Header. • Section 5 discusses the implementation of ComTest at Youngstown Thermal and the Southern Company site. • Section 6 discusses the development of the AUSC Supply Chain • Section 7 discusses the recommended plan for Phase 2 of ComTest

01 COAL, LIGNITE, AND PEAT↗

SBIR Phase II Final Report - A Robust Wireless Communication System for Harsh Environments Including Nuclear Facilities

This is the Final Report for the DOE Phase II SBIR project “A Robust Wireless Communication System for Harsh Environments Including Nuclear Facilities.” The topics covered herein include technical progress made, progress against the planned milestones and deliverables, project outcomes, and a discussion on future expectations of deployment and impacts of the results of this work. In brief, all planned work for the project was successfully completed, on or ahead of schedule and on budget. The major accomplishment was the successful development of new sensor/communications systems with wideband (WB)/ultra-wideband (UWB) communications based on the software-defined-radio (SDR) technology to improve sensing and control in nuclear power plants and then a broad range of similar sensing applications. The impacts of these disciplines/focuses of this SBIR include: A new multi-frequency SDR-based architecture with WB/UWB communications integrated with sensors was developed, utilizing 310 MHz, 450 MHz, 915 MHz, and 5 GHz frequencies; Secure communications using Advanced Encryption Standard (AES) algorithm; Sensing possibilities not effectively addressed by previous technologies was addressed; and, The newly developed wireless sensor communications system can adapt its communications parameters to its operational environment for optimal performance. The performance of this system has been evaluated by systematic laboratory and field testing. The field testing was conducted at Massachusetts Institute of Technology (MIT)’s Nuclear Test Reactor, and the McClellan Nuclear center at the University of California Davis (UC Davis), as well as at Oak Ridge National Laboratory (ORNL). The success in this project resulted in DSI being awarded “The DOE’s 2018 SBIR/STTR Small Business of the Year”. This technology has attracted interest from The Rolls Royce company with ongoing discussions under NDA for potential strategic partnership between DSI and Rolls Royce in providing wireless sensor communications in nuclear facilities. Furthermore, the success of this project has attracted significant interest from the United Nations International Atomic Agency (IAEA) in Vienna, Austria, as well as other DOE and DOD offices. Currently, per request from IAEA, DOE’s office of International Safeguards has funded DSI to develop a WB/UWB wireless communication system for real-time transmission of images from IAEA’s safeguards cameras in various nuclear facilities. DSI also has received a Phase II and Phase II.5 SBIR awards from ARMY and NAVY for wireless communications capability for various DOD aircraft.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

SECARB Semi-Annual Field Review Reports - Early Test

The Southern States Energy Board (SSEB) managed the overall Southeast Regional Carbon Sequestration Partnership (SECARB) Phase III project and The Bureau of Economic Geology (BEG), at the University of Texas at Austin, managed all activities associated with the Early Test field site near Cranfield, Mississippi (the Early Test or Cranfield Project). BEG was assisted in the management of site activities by Sandia Technologies (Sandia). BEG and Sandia implemented reporting procedures that included monthly and quarterly technical progress reports, as well as periodic reporting on key field activities. Subsequent sections of this report catalog the field activities and are organized in a semiannual chronology. The Cranfield Project was located approximately 12 miles east of Natchez, Mississippi. Denbury Onshore, LLC, began operating a commercial CO 2 flood of the field (using the subsurface injection of CO 2 for EOR) in June 2008. Carbon dioxide from the Jackson Dome, a natural source near Jackson, Mississippi, was delivered to the Cranfield oilfield via pipeline. Beginning in October 2008, the SECARB Early Test team characterized the surface and subsurface of the Cranfield site. During the field test CO 2 was injected into the lower Tuscaloosa Formation, a regionally extensive saline formation with the potential to hold millions of tons of CO 2 emissions. By January 2015, the team injected more than 11 million metric tons of CO 2 and monitored a total stored CO 2 mass of 5,326,975 metric tons. SECARB’s study operations occurred in four integrated research program areas within Cranfield field: (1) the High Volume Injection Test area (HiVIT); (2) the Detailed Area of Study (DAS); (3) the Geomechanical area; and (4) the near-surface observatory, also called the “P-site.” Carbon dioxide injection activities were conducted at the HiVIT and the DAS. Figure 1.1-1 provides a depiction of the DAS.

01 COAL, LIGNITE, AND PEAT↗