Spatially Resolved Domicile Charging Demands for Light-, Medium-, and Heavy-Duty Electric Vehicles in Virginia

The use of plug-in electric vehicles (PEVs) and resulting grid impacts are likely to grow rapidly, and evaluation of optimal smart charge management and grid integration strategies is warranted now. Evaluating distribution grid impacts requires fine-grained models of PEV operations to estimate charging loads across diverse vehicles at high spatial resolution. We propose such a model and consider a high-electrification scenario in Richmond and Newport News, Virginia. Our framework considers four categories of vehicle that are amenable to early aggressive electrification: light-duty passenger vehicles (LDV), trucks and vans with a focus on delivery or other local operations, school buses, and transit buses. These vehicles have a relatively consistent domicile, reducing the need for public charging infrastructure rollout to electrify. We apply a recent LDV model and propose new models for each vocation of medium- and heavy-duty vehicle, leveraging telematics data. We demonstrate our framework in Virginia and find energy demands in the region may total 15 GWh day, with most consumed by LDV. However, considering power demand at high spatial resolution reveals a different trend: LDVs have relatively small peak loads at specific sites (peak site demand around 800 kW) compared to average and high demand medium- and heavy-duty vehicle charging sites (peak site demand around 6,000 kW at a transit bus depot, 1,500 kW at a local freight hub, and 1,000 kW at a school). Our framework yields insights on the relative impacts of each vocation and enables future work to tailor grid integration strategies to each vehicle category.

33 ADVANCED PROPULSION SYSTEMS↗

The value of integrating a geothermal district heating system into a microgrid

As electrical grids increasingly rely on variable renewable energy, maintaining reliability and cost efficiency becomes more complex. To address these challenges, this study analyzed the integration of geothermal district heating as a grid-responsive thermal resource within a microgrid in Tuttle, Oklahoma. Building energy modeling using EnergyPlus estimated annual district heating demand at 2.9 GWh, with a peak load of 2.8 MW th . Techno-economic analyses were conducted to meet the heating demand under three geothermal scenarios, varying by production depth, flow rate, and thermal output, each supplemented by natural gas peaking boilers. In parallel, equivalent electrical load profiles were developed using typical coefficients of performance (COPs) for air-source heat pumps and electric boilers to establish an electrified baseline scenario. A complete end-use electrical load profile was also developed for the microgrid using Cambium dataset. The modeling results demonstrated reliable and economic operation of the geothermal systems over 30 years, with COPs ranging from 2.6 to 8.9 and the lowest levelized heating cost at $\$$54.6/MWh. Geothermal integration reduced electricity consumption by up to 94.7 % compared to the non-geothermal base case, yielding annual energy savings of up to $\$$803 k. Avoided grid costs ranged from $\$$65 k–$\$$147 k per year, with individual events avoiding up to $\$$4,863 per hour. Grid-responsive operation further reduced wholesale energy costs by 53–56 %. These findings demonstrate geothermal heating, traditionally treated as a non-grid-responsive thermal resource, can be reconfigured to support dynamic grid services, offering a scalable pathway to enhance reliability and reduce costs in renewable-rich microgrids and district heating networks.

15 GEOTHERMAL ENERGY↗

Evaluating the potential of short-term instrument deployment to improve distributed wind resource assessment

Distributed wind projects, which are connected at the distribution level of an electricity system or in off-grid applications to serve specific or local energy needs, often rely solely on wind resource models to establish wind speed and energy generation expectations. Historically, anemometer loan programs have provided an affordable avenue for more accurate onsite wind resource assessment, and the lowering cost of lidar systems has shown similar advantages for more recent assessments. While a full 12 months of onsite wind measurement is the standard for correcting model-based long-term wind speed estimates for utility-scale wind farms, the time and capital investment involved in gathering onsite measurements must be reconciled with the energy needs and funding opportunities that drive expedient deployment of distributed wind projects. Much literature exists to quantify the performance of correcting long-term wind speed estimates with 1 or more years of observational data, but few studies explore the impacts of correcting with months-long observational periods. This study aims to answer the question of how short you can go in terms of the observational time period needed to make impactful improvements to model-based long-term wind speed estimates. Three algorithms, multivariable linear regression, adaptive regression splines, and regression trees, are evaluated for their skill at correcting long-term wind resource estimates from the European Centre for Medium-Range Weather Forecasts Reanalysis version 5 (ERA5) using months-long periods of observational data from 66 locations across the US. On average, correction with even 1 month of observations provides significant improvement over the baseline ERA5 wind speed estimates and produces median bias magnitudes and relative errors within 0.22 m s −1 and 4 percentage points of the median bias magnitudes and relative errors achieved using the standard 12 months of data for correction. However, in cases when the shortest observational periods (1 to 2 months) used for correction are not well correlated with the overlapping ERA5 reference, the resultant long-term wind speed errors are worse than those produced using ERA5 without correction. Summer months, which are characterized by weaker relative wind speeds and standard deviations for most of the evaluation sites, tend to produce the worst results for long-term correction using months-long observations. The three tested algorithms perform similarly for long-term wind speed bias; however, regression trees perform notably worse than multivariable linear regression and adaptive regression splines in terms of correlation when using 6 months or less of observational data for correction. Translating the analysis to wind energy, median relative errors in the capacity factor are on average within 10 % using 1 month of training. If the observation period used for correction is not well correlated with the reference data, however, misrepresentation of the observed capacity factor can be substantial. The risk associated with poor correlation between the observed and reference datasets decreases with increasing training period length. In the worst-correlation scenarios, the median capacity factor relative errors from using 1, 3, and 6 months are within 47 %, 26 %, and 16 %, respectively.

17 WIND ENERGY↗

Production of Fischer-Tropsch Synfuels at Nuclear Plants

A case study analysis was performed to evaluate nuclear-powered synthetic fuel production in the midwestern United States (U.S.). A Fischer-Tropsch (FT) fuel synthesis plant design was used as the basis for the analysis. The FT plant design was configured to produce a product slate consisting of diesel fuel, jet fuel, and motor gasoline blend stocks from carbon dioxide (CO 2 ) and hydrogen (H 2 ) feedstocks. The CO 2 feedstock for the FT plant was assumed to be sourced from biorefineries in the region around a Midwest light water reactor (LWR) nuclear power plant (NPP). The analysis specifies that power from the LWR is used to produce H 2 via high-temperature steam electrolysis and to operate the FT synfuel production plant. Capital costs were estimated for the FT plant while capital costs for the electrolysis plant were based on previous Idaho National Laboratory (INL) studies. In addition to labor and maintenance costs for the FT and electrolysis plants, operating costs also include the costs for CO 2 feedstock transport. An analysis was performed to determine the cost of transporting CO 2 from the distributed biorefinery sources to the centralized fuel synthesis plant as a function of the synfuel plant capacity and corresponding CO 2 demand. The primary revenue streams are associated with sales of the synthetic fuel products. The synthetic fuel products will likely follow the same market trends as the conventional fuel products. The synfuel price data was thus based on projections made by the U.S. Energy Information Administration (EIA) 2021 Annual Energy Outlook (AEO) for conventional fuel products minus federal and state taxes, as well as marketing and distribution costs. The economic analysis also considered cases that included and excluded revenues from the 2022 Inflation Reduction Act (IRA) clean hydrogen production tax credit (PTC) of $\$ $3.00/kg for the first ten years of operation. The economic analysis calculated the net present value (NPV) for cases involving steady-state synfuel production for comparison with the NPV for a business-as-usual case in which NPP continues to sell only electric power to the grid. A synfuel production “Reference Case” was considered in addition to sensitivity cases in which the plant capacity, electricity price, and synthetic fuel product prices were perturbed. The synfuel production Reference Case considered a scenario in which the electrolysis and synfuel plants utilized a combined electrical load of 1000 megawatt electrical (MWe) from the LWR with the balance of the LWR power output being sold to the electric grid. The economic analysis suggests that the synfuel production Reference Case evaluated in this analysis would lead to considerable economic potential for near-term deployment of a nuclear-based synfuel production plant. Specifically, the economic analysis suggests that the deployment of a 1000 megawatt (MW) nuclear-powered synfuel plant could result in a NPV increase of approximately $\$ $1.7 billion for a case with no clean synfuel price premium relative to conventional petroleum fuels when accounting for the additional revenues from the 2022 IRA clean hydrogen PTCs of $\$ $3/kg. Sensitivity analysis was performed to evaluate the effect of perturbation of selected model input parameters on the NPV for the synfuel production Reference Case. The sensitivity analysis indicates that the plant capacity has the largest impact on the differential NPV, with a smaller synfuel production capacity resulting in a decrease in revenue when a larger fraction of the power from the NPP is sold to the grid and a smaller fraction of the power is used to produce synthetic fuel products. The synfuel product pricing has the next largest impact on the differential NPV, with lower synfuel prices resulting in decreased NPV from decreased synfuel sales revenue while higher synfuel prices result in increased NPV from increased synfuel sales revenue. Electricity pricing has a smaller effect on the NPV than the fuel sales price since, in the Reference Case, most of the energy from the NPP is used for synfuel production and a smaller amount of the system revenues are associated with electrical power sales. However, the electricity price sensitivity does indicate that the Synfuel Integrated Energy System (IES) would have a greater NPV than the business-as-usual case (e.g., grid power sales only) when electricity market prices are low, suggesting that synfuel production could provide a strategy for decreasing the economic risks to NPPs posed by a loss of revenues attributed to falling electricity market prices.

10 SYNTHETIC FUELS↗

Catalytic Bio-crude Production in a Novel, Short-Contact Time Reactor

RTI has developed a catalytic fast pyrolysis (CFP) process to produce biomass-based hydrocarbon replacement fuels. From a technology perspective, this advanced biofuels process produces liquid transportation fuels that can leverage capital expenditures in the existing petroleum distribution infrastructure. From a business perspective, this technology does not face potential market limitations caused by oxygenate blend limitations for light duty vehicle applications. A promising catalyst has been developed with excellent potential for deoxygenation to produce a hydrocarbon-rich biocrude that is more suitable for upgrading with traditional hydroprocessing technology. The role of the catalyst is to control the chemistry during biomass pyrolysis to produce a biocrude in a single step that has lower oxygen content and is more thermally stable than conventional biomass fast pyrolysis oil. Catalyst properties are optimized to minimize gas and coke production and improve catalytic deoxygenation and biocrude yields. Results from this project have demonstrated that biocrudes from catalytic fast pyrolysis contain <20 wt% oxygen, with the organic fraction as low as 12% oxygen. These oxygen numbers are > 50% lower compared to traditional fast pyrolysis oils. The biocrude produced from our CFP process can be upgraded to gasoline range hydrocarbons. A very conservative approach for upgrading included a preliminary stabilization step followed by a hydroprocessing step. The oxygen content in the upgraded product was decreased by 97% (to less than 3wt %) from the oxygen content of the biocrude sample. Additionally, the acid content was reduced by 99% from the acid content of the biocrude sample. In an optimized integrated process, the CFP step and the hydroprocessing (upgrading) step need to be carefully balanced to maximize the input biomass energy that is recovered in the finished biofuels. Hydrogen utilization and carbon recovery during both catalytic biomass pyrolysis and biocrude upgrading need to be optimized to maximize energy recovery in the finished biofuel. A nominal 1 ton per day (TPD) catalytic biomass pyrolysis system was designed based on the laboratory experimental data. The system was designed to achieve the short residence times (0.5–2 sec) and high heat transfer rates required for maximum liquid biocrude yields while optimizing process integration to maintain catalyst activity by continuous regeneration. The catalytic biomass pyrolysis reactor is a continuously circulating single-loop transport reactor design that is flexible enough to allow sensitivity studies around temperature, residence time, biomass feed rate, and catalyst-to-biomass ratio (i.e., catalyst circulation rate) for process optimization. For a nominal 100 lb/hr feed rate of dry biomass, the products include ~25 lb/hr char and coke, ~20 lb/hr permanent gases, and ~55 lb/hr condensable vapors. Pyrolysis temperatures are 350–600°C, and the system is operated close to ambient pressure. Production of the catalyst developed within the project was scaled up to provide enough material (200kg) for bench-scale testing. The 1TPD bench-scale unit was fabricated, installed and commissioned with this project. Biocrude samples from wood were produced in this unit with the CFP catalyst with material balance > 90%. The intermediate biocrude yields and chemical composition compare well with previous laboratory results and a hydroprocessing strategy for upgrading the resulting biocrude was developed. The experimental results obtained within this project were used to develop a process model for a 2000 TPD commercial facility. Detailed flow sheets were developed for all major unit operations in the process and provided a basis for an economic analysis to develop capital and operating costs. Estimates of the biofuel production costs were used to develop internal rates of return for the yields and compositions measured for the current state of technology at the end of this project and for the yields anticipated for an optimized (nth plant) scenario as additional process improvements are made.

09 BIOMASS FUELS↗

WISP: Watching grid Infrastructure Stealthily through Proxies (Final Technical Report)

The complex interdependencies of cyber systems (sensors and communications), physical grids and associated electricity market operations make protecting electric power grids a significant challenge. The energy sector is constantly under new, targeted, advanced and dangerous cyber-attacks that have the potential to result in the loss of human life. These threats are further exacerbated by our need to modernize the grid. One focus of cyber security research in smart grids is the securing of the SCADA system through advanced intrusion detection systems (IDS) and bad data detection algorithms in state estimation. These methods either require full knowledge of the system topology and parameters or fail to understand the physical behaviors under attack. WISP (Watching grid Infrastructure Stealthily through Proxies) is designed to provide additional protection to the power grid using only publicly available data. In particular, WISP exploits the spatio-temporal nature of the real time locational marginal prices (LMPs), in conjunction with other information such as bids, weather, outages and load data to analyze anomalous power pricing behaviors and then correlate those observations to localize regions of interest and identify potential cyber events. WISP is non-intrusive as the tool is deployed as a service in the Cloud or on premise and provides reliable information to system operators for enhanced situational awareness, without impeding energy delivery functions. The WISP technology comprises three modules: the data-driven anomaly detection core, the vulnerability and risk analysis and the root cause analysis. The data-driven anomaly detection core performs the tasks of feature selection, anomaly detection and attack region localization. The vulnerability and risk analysis module provides system level information of the vulnerable variables and times, assisting the operators in selecting monitoring and protection nodes. The root cause analysis module takes the detection results and identifies potential operational conditions that contribute to the detected anomalies. In Phase I, we have demonstrated the feasibility and effectiveness of WISP. We developed a realistic electricity market simulator capable of generating normal and attack market data under various operational conditions. We developed a series of cyber-attack detection and analysis algorithms and evaluated them under multiple data sources. Finally, we integrated all modules into an end-to-end software, providing functions for data management, data analytics and visualization. Specifically, we have achieved: (i) real-time data acceptance from external utility interfaces with >99% acceptance rate; (ii) high performance anomaly detection algorithms with >98% detection accuracy and <0.1% false alarm rate; and (iii) ultra-low computing delay <50 milliseconds. Additionally, our team developed algorithms to identify the vulnerable variables in electricity market operations and root cause analysis functions to identify major contributors to the price spikes. These ancillary modules are necessary when deploying WISP in real world industry environment. In Phase II, we have demonstrated the effectiveness of WISP software on realistic largescale power systems. We performed red team testing for the Phase I WISP software and identified software vulnerabilities and implemented corresponding mitigation solutions. We adapted the electricity market simulator for the Texas synthetic 2000-bus system and generated datasets for the false data injection attacks. We created database and visualization interfaces for the Texas system and the ISO New England system. We performed software optimization in terms of operation efficiency, computing speed and detection accuracy. Finally, we tested the software on the Texas system and the ISO New England system and evaluated the detection performance. Overall, we achieved above 89% detection rate, below 3% false alarm rate and below 37 seconds of end-to-end detection delay.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distribution Development for Residual Inventory at the New York West Valley Site - 20400

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351 ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into Agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States. NFS, a private company, built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations ended in 1972 and never reopened, leaving behind radioactive and chemical wastes. Operations led to contamination in a number of facilities and locations. Some of that contamination has migrated from waste disposal zones to other layers, formations, and features on and off the WNYNSC. Phase I decommissioning activities are ongoing and involve the removal of a number of areas and structures that have been associated with contamination. The purpose of this work is to outline the approach for characterizing contamination not associated with disposed wastes, contaminated structures, or specific releases. In this work, the term, residual radiological activity, is used to describe environmental contamination that exists subsequent to the completion of Phase I decommissioning activities, that is not associated with disposed wastes, contaminated structures, or specific releases. Contamination from the Site was quantified relative to data that characterize the concentrations of radionuclides that exist in background. Background concentrations are those present in the area but having no influence from Site related activities. The existence of residual radiological activity that is elevated relative to background has the potential to contribute to future risks to human health and the environment. As a consequence, the residual inventory information is used to inform the West Valley Probabilistic Performance Assessment (PPA) model to characterize potential future risks to human health and the environment. The centralized West Valley Data Management System (DMS) was the source of information for the data assembled in this analysis. The DMS is a fairly large compilation consisting of thousands of records from investigation studies, with sample dates ranging from 1990 to present. Samples from monitoring wells, boreholes, geoprobe studies, surface water, surface soils, storm water outfalls, ventilation stack filters, plant and animal tissues, and more are included in the DMS. Results are typically reported in units of activity per unit volume. For the purpose of the analyses presented here, all results were converted into consistent units of pCi per unit volume. Since 1990, data have been collected from various locations across the WNYNSC at different times with varying frequency over the course of several decades. As a consequence, a number of potential issues can arise with respect to the assembly of a dataset that is deemed adequate for the characterization of residual radiological activity. These issues were assessed and resolved to the extent possible through careful consideration of the properties of the distributions. The intent was to use data which characterize the current state of the Site. Radionuclides can be designated to one of several groups depending on their origin. In this work the groups considered were 1) Naturally Occurring Radioactive Material (NORM), 2) fallout, and 3) Other (including power plant, medical research, etc). This grouping is a useful construct with respect to the interpretation of fixed laboratory results. For example, NORM radionuclides that exist within a decay chain should have approximately equivalent distributions of concentrations if they are representative of background conditions. Insights such as these can be used as a check to identify sample results that need to be further investigated or omitted due to issues associated with reported results from fixed laboratory analyses. This type of analysis provided a foundation for the assessment of the adequacy of sample results for use in subsequent components of an assessment. The general process for the assessment of residual radiological contamination at the Site consists of a sequence of several steps. First, for each analyte, several statistical tests were performed to assess the weight of evidence against the null hypothesis that the mean of the distribution of concentrations was equal to zero. If the mean of the distribution of concentrations for a given radionuclide was not found to be greater than zero, then it was removed from consideration as a component of the residual radiological contamination. If there was significant evidence to reject the hypothesis of the mean being equal to zero, the second step was to compare the distribution of the data from the Site to that of the corresponding background. A suite of tests was used to compare the distributions of the site and background data. The results of these tests were collectively used to determine if site data are elevated relative to background. The third step was to develop distributions using a Bayesian framework to characterize the distribution of mean of the increment present above background for each of the radionuclides. The Bayesian model implemented allowed for the comparison of site-specific records to background concentrations to better approximate contamination attributed to the Site. A final screening step was employed for radionuclides that exceed background. This screening step compared 95% upper confidence limits (UCLs) from the increment distribution developed in the previous step to the risk screening levels. This approach yields a list of analytes that were determined to be elevated relative to background.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quantifying the Solar Energy Resource for Puerto Rico

After Hurricane Maria, multiple U.S. Department of Energy laboratories studied the state of the electric grid in Puerto Rico and analyzed grid resilience and grid integration of renewable energy. As part of the work done at the National Renewable Energy Laboratory, researchers created new solar resource data, conducted a technical potential and supply curve analysis, and studied the interannual variability of the solar resource. A new methodology was developed to downscale solar resource data from the National Solar Radiation Data Base (NSRDB) from a 4-km x 4-km spatial and 30-minute temporal resolution to a 2 km x 2 km and 5-minute resolution. This methodology primarily used simple physical principles to develop high-resolution cloud properties which were then used to compute solar radiation. The high-resolution datasets were validated against ground measurements and the error metrics were found to be similar to the original lower resolution dataset. Using 20 years of downscaled data from the NSRDB multi-year capacity factors for photovoltaics (PV) were developed for both single-axis tracking and fixed latitude-tilt configurations. Use of the multi-year data provides the ability to understand variability in capacity factors due to variability in weather over a long period of time. For Puerto Rico the coastal regions were found to have significant higher capacity factors than inland. Using land-use and terrain information a technical potential analysis was conducted for Puerto Rico. This analysis restricted single PV plant development to a maximum of 100 MW nameplate capacity. The nameplate capacity for each municipality were then determined. Based on our assumptions, 56 of the 78 total municipalities of Puerto Rico contain some level of solar capacity. Most of the interior municipalities did not have any capacity because of the geographic exclusions used in this study. The lowest capacity for a PV plant observed in a municipality was 10 MW. The maximum capacity within a county was 2,000 MW. Further a supply curve analysis was conducted by taking the results of the technical potential and quantifying system and transmission costs. The levelized cost of energy (LCOE) was calculated for each theoretical PV plant site, and the levelized cost of transmission was added to the LCOE to produce a total cost estimate for each site. The results of the supply curve analysis allow for a relative comparison of the cost for integrating new PV capacity into the grid. This analysis indicates that cheaper total LCOE sites tend to be larger in capacity. The total capacity in this study was found to be far beyond the maximum peak load for the island. However, this study does not consider the economic and market potential for development. The cumulative capacity presented in this study assumes that the best locations are developed first and ignores the complex decision paths for new power plant development. Therefore, this analysis can only be treated as illustrative. Finally this study investigates the impact of inter-annual variability of resource using a variety of metrices including probability of exceedance and variation in capacity factor and LCOE. This study demonstrates that the capacity factor or LCOE could vary by over 10% year to year. This clearly indicates the risks involved in using any particular year of data and clearly points to the use of multi-year data to reduce some of the risks related to variability in weather.

14 SOLAR ENERGY↗

Generator Interconnection Costs to the Transmission System in non-ISO Balancing Authorities [Slides]

Electric transmission system operators—including Independent System Operators (ISOs), Regional Transmission Organizations (RTOs), and utilities—require proposed power plants to undergo a series of interconnection studies before connecting to the grid. These studies assess what transmission upgrades or new infrastructure may be necessary and assign the associated costs to the project. Lawrence Berkeley National Laboratory has compiled, aggregated, and cleaned interconnection cost data, originally for ISOs/RTOs, and now for five non-ISO Balancing Authorities: PacifiCorp, Bonneville Power Authority, Duke Energy Progress, Duke Energy Carolinas and Duke Energy Florida. Insufficient transparency in interconnection cost data may contribute to rapidly expanding interconnection queues, with active queue capacities tripling between 2020 and 2024 in the studied BAs. Most projects withdraw after receiving high interconnection cost estimates. Interconnection costs have increased since the early 2000s, with average costs for "complete" projects reaching $194/kW between 2018 and 2024. Active queue projects and withdrawn projects incur substantially higher costs, primarily due to rising network upgrade costs. Recent interconnection costs in non-ISO balancing authorities are higher than in ISO regions, potentially due to a greater willingness to pay among developers. Utility-scale solar, wind, and storage projects have interconnection costs that exceed those for natural gas. However, when focusing on projects that do not withdraw from the queue, the interconnection costs for these technologies are more similar to natural gas projects. Other key findings include: (1) Larger generation projects benefit from lower proportional interconnection costs, (2) capacity transmission service (NRIS) often requires additional network investments, and (3) projects with high network upgrade costs are often clustered geographically. The dataset includes results from 2,104 interconnection studies conducted between 2000 and 2024, covering projects that are operational, withdrawn, or still progressing through the study process. The Excel file contains (a) the complete project-level interconnection cost dataset, and (b) seven additional tabs summarizing cost metrics across dimensions such as time, market structure, cost category (point of interconnection vs. broader network upgrades), fuel type, service type (ERIS vs. NRIS), generator size, and geography.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Findings on Subtask 3.1 - Bakken Rich Gas Enhanced Oil Recovery Project

Total in-place oil for the Bakken petroleum system (BPS) (which includes the Bakken and Three Forks Formations) has been estimated to be 600 billion barrels (bbl). However, BPS wells have decline rates as high as 85% over the first 3 years of their lives, and primary recovery factors typically range from 3% to 10% of original oil in place. Given the low initial recovery rates, even small incremental productivity improvements could dramatically increase technically recoverable oil in the BPS. One potential solution is enhanced oil recovery (EOR) using gas injection, such as carbon dioxide (CO2) or hydrocarbon (HC) gases. While commonly used in conventional reservoirs, CO2 EOR in unconventional tight oil reservoirs has been limited to pilot tests. EOR using rich gas (mixture of methane, ethane, and propane) has also been employed in numerous pilots in several unconventional plays and has recently been successfully applied in the Eagle Ford play. If successful, large-scale gas-based EOR in the BPS could dramatically increase oil productivity and recovery factors and extend the life of the play for decades. While CO2 may be a technically suitable working fluid for EOR in the BPS, supplies are limited and costs for using CO2 in EOR pilots are prohibitively high. Meanwhile, produced gas flaring has presented challenges for BPS operators in North Dakota. Analysis conducted by the North Dakota Pipeline Authority indicates that the current gas-gathering infrastructure in North Dakota is insufficient to accommodate all of the associated gas that is produced from the BPS. The geographically isolated location of North Dakota relative to large natural gas markets, combined with suppressed natural gas prices, has made it economically challenging for industry to invest capital in expanding gas-gathering infrastructure in the state. These circumstances led to a research program conducted by the Energy & Environmental Research Center (EERC) in partnership with Liberty Resources Management Company LLC (LR) to examine the potential to use rich gas injection for EOR and mitigate flaring. A rich gas EOR pilot test was designed and executed by LR at its Stomping Horse development area in Williams County, North Dakota. From July 2018 through May 2019, a total of 160 million standard cubic feet (MMscf) of rich produced gas was injected into the BPS using five different wells in a sequential injection strategy. LR’s Leon–Gohrick drill spacing unit (DSU) was used as the test site. Regulatory oversight was provided by the North Dakota Industrial Commission (NDIC). Technical support was provided by the EERC through a series of laboratory, modeling, and field-based activities, and additional post-pilot research activities incorporated learnings from the test, developed new laboratory data, improved fracture modeling methods, and developed machine learning and big data analytics. The results from the Stomping Horse rich gas EOR pilot activities indicate that developing an effective, economical EOR approach for the BPS will require more field tests. Another key lesson learned from the Stomping Horse tests is that detailed pre- and posttest data on reservoir conditions and fluids production are essential. Robust reservoir characterization provides information that is crucial to creating realistic geomodels and conducting valid dynamic simulations of potential EOR scenarios. A detailed understanding of the completions and production history of offset wells is also necessary for valid test result interpretations. This knowledge is essential to designing the operational parameters of injectivity tests and interpreting the results. A conformance control strategy is also essential to success. Laboratory-based examinations of rich gas interactions with reservoir fluids and rocks were conducted, with an emphasis on determining the ability to mobilize oil in the tight reservoir rocks and shales of the BPS. Injection fluid composition was shown to have a positive impact on reducing reservoir oil minimum miscibility pressure (MMP), reducing interfacial tension (IFT), and altering wettability. IFT and contact angle measurements demonstrated that wettability can be altered in the presence of rich gas, suggesting the potential to improve oil recovery. Iterative modeling of surface infrastructure and reservoir performance using data generated by the various project activities was conducted. A geologic model of the Stomping Horse area was built; history-matched oil, gas, and water production was used in simulations of various EOR scenarios. Early programmatic modeling results were used to support LR’s design and operation of the EOR pilot and to provide insight regarding optimization of future commercial-scale BPS EOR design and operations. Post-pilot modeling focused on alternative methods of understanding complex fracture networks and accelerating simulation time. These led to improved simulation run times and provide excellent history-matching results. Several of these iterative models were used as the bases for developing algorithms into machine learning and big data analytics. History matching in reservoir simulation is time-consuming and computer processing-intensive. Machine learning algorithms were created, and an automated history-matching tool was developed. A large set of synthetic reservoir simulations were created to generate well responses (oil, gas, and water production, well bottomhole pressure [BHP], and tracer or propane breakthrough) for a set of EOR operating parameters that included offset well status (open or closed), injectate (rich gas or propane), injection rate, and injection well BHP. A user interface was developed to provide real-time visualization. Machine learning-based models were developed to provide rapid forecasting of well performance given a set of user-defined EOR operating parameters. These predictive models allow the user to modify the offset well status, injection rate, and injection well BHP and rapidly forecast future production performance. The combination of real-time visualization tools with real-time forecasting tools provides a framework for real-time control—operational changes that the EOR site operator can enact (e.g., changing gas injection rates) to affect the observed performance and potentially improve the EOR outcome. There is great reason to be optimistic about the future of EOR in the Bakken. The results of the laboratory studies suggest significant potential for high rates of oil mobilization using produced field gas injection under the right conditions. The results of the lab studies, combined with rigorous statistical analysis of well production data and associated modeling efforts, confirm the notion that fluid mobility within the reservoir is controlled by fractures. As more knowledge is gained about the nature and distribution of fracture networks in the Bakken, the industry will be in a better position to predict and, ultimately, influence fluid mobility. New field tests are necessary to develop a more complete understanding of those conditions. Thoughtful and creatively engineered field tests within a well-characterized geologic setting will yield the fundamental knowledge needed to take Bakken oil production to the next level. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission’s Oil and Gas Research Program and Computer Modelling Group.

04 OIL SHALES AND TAR SANDS↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗