Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “distribution system planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Incorporating energy justice into utility-scale photovoltaic deployment: A policy framework

Utility-scale photovoltaic (PV) installations made up 77 GW (6%) of installed capacity in the United States, as of the end of 2021. This will grow to more than 500 GW by 2050 under a mid-case projection or more than 800 GW if solar costs decline more rapidly. While utility-scale PV is projected to grow rapidly, to date, unlike energy efficiency or distributed PV, utility-scale PV has not been used to provide substantial financial benefits to underserved communities, either through ownership, financing of assets, or direct electricity bill reduction. We assess two mechanisms through which utility-scale PV could benefit underserved communities. We find that while a framework for direct electricity bill reduction can be meaningful to customers, this mechanism falls short of providing restorative justice via wealth creation for minority-owned businesses. In contrast, we find that a framework for procurement of utility-scale PV by public and private entities from PV projects that are financed, owned, and/or developed by minority-owned businesses can provide this restorative justice benefit, and thereby facilitate an equitable energy transition. We conclude with concrete recommendations for new policies and programs to ensure that the benefits of utility-scale PV systems are distributed to underserved communities.

14 SOLAR ENERGY↗

Assessing uncertainty in the timing of energy use during cost-optimal distributed energy technology selection and sizing

This paper empirically derives uncertainty ranges in cost-optimal solar PV and storage sizing by comparing results from the REopt Lite optimization platform from metered data and a set of simulated Department of Energy Commercial Reference Building (CRB) profiles at 65 sites. We find load profile shape alone does not explain a site’s optimal configurations (i.e., PV, Storage, PV and Storage, No System). Still, load profile shape does introduce uncertainty to optimal PV and storage capacities. Across all cases where PV is part of an optimal configuration, we find the average ratio of power capacities derived from metered loads to capacities derived from CRB profiles to be 0.97 (and as high as 1463), where 1 would be a perfect match in system size. For storage, the ratio is 1.6 (and as high as 42). We also assess how, in the absence of complete metered data, a CRB profile can be selected that would be expected to yield the most similar solar PV and storage capacities. From those metrics that can be available from billing data (i.e., peak demand, monthly load totals), we find that uncertainty is most reduced by selecting the CRB’s with an annual peak occurring at the most similar time, or those with the lowest average root mean square error (RMSE) among monthly peak loads. This research can help improve the implementation and interpretation of results derived from simulated load profiles and is an important next step in advancing smart grid solutions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Control and Optimization of Energy Storage System in Power Distribution System

The widespread adoption of electric vehicles (EVs) and transportation electrification is encumbered by two chief barriers: i) the limited driving range of EVs in the market today and ii) inadequate fast-charging infrastructure for long-distance trips. Extreme fast charging (XFC) technology can recharge EVs in less than 10 minutes for 200 miles range. Firstly, a novel robust optimization-based mixed integer linear programming model is proposed to size a battery energy storage system (BESS) and PV system in an XFCS. In this part, it is assumed that the sizing and location of the XFCS are known. Secondly, the aforesaid assumption is relaxed, and a strategic multi-period coordinated planning model is proposed to optimally site and size BESS-assisted charging stations in a highway transportation network and PV systems in a power distribution network by considering the coupling between both networks. Optimal operation and control of BESS-assisted EV charging stations are vital to alleviate the adverse impact of extreme fast charging of EVs on the host power network. A joint solution is proposed to mitigate the steady state and transient impact of extremefast charging of EVs and ensure grid-friendly integration of XFCSs with the host grid. Lastly, to make the operation of the XFCS cost-effective, a multi-layered energy management framework is proposed for the XFCS by considering forecast uncertainties, monthly demand charges reduction, and BESS degradation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Analytic Framework for Optimal Sizing of Hydrogen Fueling Stations for Heavy Duty Vehicles at Ports (CRADA 512)

This CRADA presents the strategy that PNNL and Sandia National Laboratories (SNL) will take to support Seattle City Light (SCL) in properly sizing a hydrogen station for class 8 drayage trucks at the Port of Seattle (Port), as part of a coordinated plan of mixed uses for hydrogen. The proper sizing for the fueling station is unique from past experiences because it will be part of a coordinated plan for a multi-use scheme for the hydrogen, and not a stand-alone fueling station. The multiple use-streams, and their relative values, will impact all facets of station sizing and design, including fueling rates, storage technology and size, equipment selection, and safety considerations. The future deployment of this fueling station, and its proper sizing, is seen as a critical first step in the larger vision of utilizing hydrogen to address a range of issues for SCL and the Port. These include, but are not limited to, large scale fueling of medium duty (MD) and heavy duty (HD) vehicles to reduce emissions, support of adjacent light duty (LD) vehicles, support of critical port operation during extreme events (e.g. resiliency), mitigation of capital intensive electrical distribution system upgrades to support evolving port operations, a market resource that can be used by SCL to generate revenue, and support of planned future maritime operations that currently require heavy use of shipboard hydrogen. While the broader use of hydrogen by SCL and the Port is not the focus of this CRADA, how its use impacts the design of the initial vehicle fueling station, and the modular approach, are the central work. As such, this project will develop the framework and process for developing a modular station design that considers the broader range of coordinate uses of hydrogen as an energy resource.

08 HYDROGEN↗

Experimental Analysis of Distribution Network Voltage Regulation Using Smart Inverters

Smart inverters (SIs) have demonstrated their potential to provide grid services for both transmission and distribution systems. One of these grid services, distribution network voltage regulation by SIs, has the potential to improve network voltage regulation through controlling the reactive and active power output of the SIs. Voltage regulation by SIs will be distributed and might be better suited to controlling local conditions to complement traditional voltage-regulating assets, e.g., tap-changing transformers, capacitor banks, and line voltage regulators. There is a gap in the literature on comparing the SI response characteristics when the SIs are controlled by a local controller or external control signals. This paper presents an experimental study to characterize SI reactive power regulation responses to two different control methods: autonomous control and remote dispatch. We found that SI reactive power regulation responses exhibit important differences between these methods in terms of delays and ramp rate. Finally, power-hardware-in-the-loop (PHIL) tests were conducted to evaluate the performance of these two methods. The PHIL test results show that the SI response characteristics for autonomous control and remote dispatch need to be considered when planning for distribution network voltage regulation using SIs.

autonomous control↗

Smart Process Planning for Automated Fiber Placement

Many industries, including aerospace, automotive, wind energy, maritime, and sporting goods, rely on strong, lightweight materials called composites. These materials are made by layering fibers, which can come in the form of narrow strips or wider sheets, and setting them in a polymer matrix. One of the most advanced ways to make these parts is through automated fiber placement, where a machine lays down the fibers in precise patterns. This method can create very efficient and strong designs, but it is complex, expensive, and often depends heavily on the experience of skilled engineers. Today, the design, manufacturing, and inspection stages of composite production are usually handled separately. This separation means that important information, such as how a part will be built or what defects might occur, is not always shared between stages. As a result, parts may not be as lightweight, strong, or defect-free as possible, and the process can take longer and cost more. This research develops a smart process planning system that connects design, manufacturing, and inspection into one continuous process. Built as software that works with existing tools, the system can automatically plan how the fibers are placed, predicting and reducing defects while improving both manufacturability and strength. The system optimizes not only individual layers but also how defects are distributed across all layers, preventing them from stacking up in ways that weaken the final part. It also uses inspection results from completed parts to improve future designs, creating a feedback loop where each stage informs the others. The system was tested by designing a composite panel using this new approach and comparing it to a panel made with state-of-the-art manual planning methods. The results showed that the system could intentionally control where defects appeared and increase the efficiency of the planning process. By unifying design, manufacturing, and inspection, this research shows a way to make advanced composite manufacturing more efficient, consistent, and cost-effective. This approach lowers the barrier to using automated fiber placement and opens the door for its wider adoption not only in aerospace but also in industries such as automotive, wind energy, maritime, and sporting goods, where strong and lightweight structures are essential.

Computer-Aided Process Planning↗

Toward Emittance Measurements at 11.7 GHz Short-Pulse High-Gradient RF Gun

A short pulse high gradient RF gun has been recently tested at Argonne Wakefield Accelerator (AWA) facility. The carried-out test showed that the 1,5-cell gun was able to inject 3 MeV, up to 100 pC bunches at room tem-perature being fed by 9 ns up to 300 MW 11.7 GHz puls-es. The cathode field was as high as about 400 MV/m. So high field is aimed to mitigate repealing Coulomb forces substantially. In accordance with simulations the emit-tance could be as low as less than 0.2 mcm. To obtain so low emittance in the experiment, the gun is assumed to be equipped with a downstream linac to be fed from the same power extractor as the gun itself. Here we report design of the RF power distribution system splitting RF power among the gun and the linac, results of low-power tests, and emittance measurement plans for upcoming new experiment at AWA.

43 PARTICLE ACCELERATORS↗

Storage Futures Study: The Four Phases of Storage Deployment: A Framework for the Expanding Role of Storage in the U.S. Power System

This report is one in a series of NREL’s Storage Futures Study (SFS) publications. The SFS is a multiyear research project that explores the role and impact of energy storage in the evolution and operation of the U.S. power sector. The SFS is designed to examine the potential impact of energy storage technology advancement on the deployment of utility-scale storage and the adoption of distributed storage, and the implications for future power system infrastructure investment and operations. The research findings and supporting data will be published as a series of publications. The table on the next page lists the planned publications and specific research topics they will examine under the SFS. This report, the first in the SFS series, explores the roles and opportunities for new, cost-competitive stationary energy storage with a conceptual framework based on four phases of current and potential future storage deployment, and presents a value proposition for energy storage that could result in substantial new cost-effective deployments. This conceptual framework provides a broader context for consideration of the later reports in the series, including the detailed results of the modeling and analysis of power system evolution scenarios and their operational implications

25 ENERGY STORAGE↗

PIPII cryoplant non thermal cycling updates

The Proton Improvement Plan-II (PIP-II) is a crucial upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LINAC) with 23 cryomodules operating at 2K. The LINAC thermohydraulic conditions are satisfied by the cryogenic subsystems: Cryogenic Distribution System (CDS), a helium refrigerator cold box (CB), a warm compression station (WCS) and a helium recovery system (RSYS). The accelerator has a strict requirement of non-thermal cycling of the LINAC cryomodules during planned and unplanned subsystem outages. This paper presents an integrated operating modes analysis of the of the LINAC/CDS thermohydraulic loads satisfied by the CB/WCS cooling system supported by the RSYS inventory management system. The study is based on latest cryoplant and CDS engineering deliverables, as well as the recent performance data from single cryomodule qualification tests performed at the Fermilab PIP-II Injector Test test s tand. The study evaluates both normal and abnormal operating modes, with a focus on identifying integrated scenarios that put subsystems components under stress. The conclusions of this study will help build redundancy to reduce the risk of thermal cycles during planned and unplanned subsystem outages.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Transactive Emergency Power Allocation

The devastating impacts of extreme weather events, many of which are climate-change related, are increasingly evident through the frequency and duration of outages on power grids, especially the distribution systems. One of the major modern-day concerns of utilities is dealing with such extreme supply outages where operators have used rolling blackouts as a contingency plan balance supply and demand while serving critical loads. Such events have significant repercussions social and economic costs. Such blackouts practices are a blunt instrument, depriving customers with low-capacity high-priority loads (i.e. refrigeration, water, telecommunication, etc.) that provide high marginal amenity. Our contribution presented in this work is a transactive emergency allocation mechanism that would provide some minimum level of service to all of the customers while enabling preference-based trading of this initial allocation. This is in contrast to the state-of-art TE mechanisms that allocate resources to customers solely based on their willingness-to-pay. The effectiveness of the proposed mechanism is demonstrated through simulation-based evaluation on a prototypical distribution system experiencing 12-hour scarcity-based emergency event due to extreme operating conditions. Simulation results clearly demonstrate the capability of the proposed transactive emergency allocation mechanism in effectively utilizing the available energy and providing some level of service to all customers to operate their high-priority loads throughout the extreme scarcity event while being economically efficient in allowing trading of allocation based on customer preferences.

transactive energy, power system economics, emerge↗

A Multistage Stochastic Transmission Expansion Algorithm for Wide-Area Planning under Uncertainty

The overall objective for this project was to develop and demonstrate a set of methods for solving the transmission investment problem for a large network considering many possible scenarios of future conditions and multiple decision points when investments can be made. Project sub-objectives achieved this goal through a succession of extending the methods to apply to problems with increasing complexity or additional features, including the number of decision points, whether generation and transmission are co-optimized, and whether AC or DC power flow is used. A transmission model was developed for the Western Electric Coordinating Council (WECC) region, the high-voltage transmission system that serves the western third of the continental U.S. Using a dataset provided by WECC and by researchers from John Hopkins University, we have validated and demonstrated the model and used it to compare the new method for solving multi-stage stochastic transmission planning to several state-of-the-art techniques. The project has resulted in several key outcomes and achievements: The covariance-based method for choosing a small set of hours to represent short-term variability has superior performance in terms of accuracy to existing methods, including K-means clustering and Importance Sampling; The combined partitioning method for long-term uncertainty with the nested clustering approach for choosing representative hours for each long-term group has superior accuracy for equivalent computational effort compared with existing methods; Using the partitioning/clustering method combined with Sample Average Approximation provides both statistical bounds on the quality of the solution and at the same time, a complete investment plan for all contingencies in the full uncertainty set; no existing methods can provide both at the same time; The method is demonstrated to work well for choosing both transmission and generation investments; A variant on the method allows for both scenario selection and simultaneous correction for the error from the DC power flow approximation to provide a tractable method for AC power flow-based transmission planning under uncertainty; The method applied to the WECC case study demonstrates the additional value to the system operator and the consumer of identifying flexible investment options in the near-term decisions. In particular, the case study exhibits significant option value in postponing some transmission additions that appear useful but in some long-term system states create new congestion problems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Value of Increased HVDC Capacity Between Eastern and Western U.S. Grids: The Interconnections Seam Study

The Interconnections Seam Study examines the potential economic value of increasing electricity transfer between the Eastern and Western Interconnections using high-voltage direct-current (HVDC) transmission and cost-optimizing both generation and transmission resources across the United States, proposing, assessing, justifying, and illustrating a major infrastructure change involving two of the worlds largest power grids. The study conducted a multi-model analysis that used co-optimized generation and transmission expansion planning and production cost modeling. Four transmission designs under eight scenarios were developed and studied to estimate costs and potential benefits. The results show benefit-to-cost ratios that reach as high as 2.5, indicating significant value to increasing the transmission capacity between the interconnections under the cases considered, realized through sharing generation resources and flexibility across regions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

PIP-II cryoplant non thermal cycling updates

The Proton Improvement Plan-II (PIP-II) is a crucial upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LINAC) with 23 cryomodules operating at 2 K. The LINAC thermohydraulic conditions are satisfied by the cryogenic subsystems: Cryogenic Distribution System (CDS), a helium refrigerator cold box (CB), a warm compression station (WCS) and a helium recovery system (RSYS). The accelerator has a strict requirement of non-thermal cycling of the LINAC cryomodules during planned and unplanned subsystem outages. This paper presents an integrated reliability analysis of the PIPII cryoplant. The study evaluates both normal and abnormal operating modes, with a focus on identifying integrated scenarios that put subsystems components under stress. The conclusions of this study will help build redundancy to mitigate LINAC thermal cycling risks during planned and unplanned subsystem outages.

43 PARTICLE ACCELERATORS↗

Electric Access System Enhancement (EASE): Assessment of a Distributed Energy Resource Management System for Enabling Dynamic Hosting Capacity

The Electric Access System Enhancement (EASE) project demonstrated a scalable, interoperable, and cost-effective means of integrating high penetration of distributed energy resources (DERs). The control architecture developed leveraged a Distributed Energy Resource Management System, Distribution System Operator for transacting energy, and 3rd Party DER Aggregator platform. The project identified ways to enhance the customer interconnection process to the grid and improve access to information from DERs and optimize the usage of DERs to provide energy services in a simulated day-ahead shadow market while maintain grid reliability. By integrating these capabilities into a scalable system of systems, the DSO can effectively balance DER generation and customer demand on the distribution network. This capability allows the grid to host more DER than traditionally possible on wires alone. Hosting more DER has the added benefit of supplying increased demand growth, sometimes beyond the capacity limits of the distribution network itself. This is known as a dynamic hosting capacity, which could help utilities manage the forecasted growth in electricity demand as California switch to electric vehicles and appliances. This could help to establish energy storage and PV generation as a “pseudo firm” generation resource mix if managed appropriately and provide sufficient resource adequacy for distribution capacity upgrade deferrals.

14 SOLAR ENERGY↗

Thermal and Deposition Modeling Update for the Canister Deposition Field Demonstration

This report provides an update on the thermal and deposition modeling being performed in support of the Canister Deposition Field Demonstration (CDFD). The goal of the CDFD testing is to collect deposition measurements on the surface of the dry shielded canister (DSC) to aid in chloride-induced stress corrosion cracking (CISCC) research. Ideally, this testing will occur in a marine coastal environment, but at the time of this report, no official site has been selected. The CDFD plans to use the NUHOMS® Advanced Horizontal Storage Module – High Seismic (AHSM-HS) with a 32PTH2 canister. The spent nuclear fuel (SNF) assemblies will be mimicked with electrical heaters. Canisters are currently being outfitted with these heaters and tested at Sandia National Laboratories (SNL). Thermal modeling was conducted to ensure the electrical heaters are representative of the temperature distribution found within a storage system with SNF. Deposition models were also built to evaluate particulate deposition on SNF canisters. A preliminary site model was constructed to support a planned upcoming ambient aerosol characterization campaign.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Mobile Agents Integrated Field Test: Mars Desert Research Station April 2003

The Mobile Agents model-based, distributed architecture, which integrates diverse components in a system for lunar and planetary surface operations, was extensively tested in a two-week field "technology retreat" at the Mars Society s Desert Research Station (MDRS) during April 2003. More than twenty scientists and engineers from three NASA centers and two universities refined and tested the system through a series of incremental scenarios. Agent software, implemented in runtime Brahms, processed GPS, health data, and voice commands-monitoring, controlling and logging science data throughout simulated EVAs with two geologists. Predefined EVA plans, modified on the fly by voice command, enabled the Mobile Agents system to provide navigation and timing advice. Communications were maintained over five wireless nodes distributed over hills and into canyons for 5 km; data, including photographs and status was transmitted automatically to the desktop at mission control in Houston. This paper describes the system configurations, communication protocols, scenarios, and test results.

Clancey, William J.↗