Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “departure time”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Human Exploration of Near-Earth Objects Accessibility Study

Key questions addressed: How short can the trip times be reduced in order to reduce crew exposure to the deep-space radiation and microgravity environment? Are there options to conduct easy, early missions?. What is the affect of infusion of advanced propulsion technologies on target availability When do the departure opportunities open up, how frequent and how long are they? How many launches are required to conduct a round trip human mission to a NEA? And, based on the above, how many Near-Earth Asteroids are available

Abell, Paul↗

The X-Ray Halo Scaling Relations of Supermassive Black Holes

We carry out a comprehensive Bayesian correlation analysis between hot halos and direct masses of supermassive black holes (SMBHs), by retrieving the X-ray plasma properties (temperature, luminosity, density, pressure, and masses) over galactic to cluster scales for 85 diverse systems. We find new key scalings, with the tightest relation being −, followed by −. The tighter scatter (down to 0.2 dex) and stronger correlation coefficient of all the X-ray halo scalings compared with the optical counterparts (as the −) suggest that plasma halos play a more central role than stars in tracing and growing SMBHs (especially those that are ultramassive). Moreover, correlates better with the gas mass than dark matter mass. We show the important role of the environment, morphology, and relic galaxies/coronae, as well as the main departures from virialization/self-similarity via the optical/X-ray fundamental planes. We test the three major channels for SMBH growth: hot/Bondi-like models have inconsistent anticorrelation with X-ray halos and too low feeding; cosmological simulations find SMBH mergers as subdominant over most of cosmic time and too rare to induce a central-limit-theorem effect; the scalings are consistent with chaotic cold accretion, the rain of matter condensing out of the turbulent X-ray halos that sustains a long-term self-regulated feedback loop. The new correlations are major observational constraints for models of SMBH feeding/feedback in galaxies, groups, and clusters (e.g., to test cosmological hydrodynamical simulations), and enable the study of SMBHs not only through X-rays, but also via the Sunyaev–Zel'dovich effect (Compton parameter), lensing (total masses), and cosmology (gas fractions).

Supermassive black holes↗

Field Evaluation of the Baseline Integrated Arrival, Departure, and Surface (IADS) Capabilities at Charlotte Douglas International Airport (CLT)

NASA is currently developing a suite of decision support capabilities for integrated arrival, departure, and surface (IADS) operations in a metroplex environment. The effort is being made in three phases, under NASA's Airspace Technology Demonstration 2 (ATD-2) sub-project, through a strong partnership with the Federal Aviation Administration (FAA), air carriers, airport, and general aviation community. The Phase 1 Baseline IADS capabilities provide enhanced operational efficiency and predictability of flight operations through data exchange and integration, tactical surface metering, and automated coordination of release time of controlled flights for overhead stream insertion. The users of the IADS system include the personnel at the Charlotte Douglas International Airport (CLT) air traffic control tower, American Airlines ramp tower, CLT terminal radar approach control (TRACON), and Washington Center. This paper describes the Phase 1 Baseline IADS capabilities and field evaluation conducted at CLT from September 2017 for a year. From the analysis of operations data, it is estimated that 538,915 kilograms of fuel savings, and 1,659 metric tons of CO2 emission reduction were achieved during the period with a total of 944 hours of engine run time reduction. The amount of CO2 savings is estimated as equivalent to planting 42,560 urban trees. The results have also shown that the surface metering had no negative impact on on-time arrival performance of both outbound and inbound flights. The technology transfer of Phase 1 Baseline IADS capabilities has been made to the FAA and aviation industry, and the development of additional capabilities for the subsequent phases is underway.

and Surface (IADS)↗

Towards real-time simulation of large space structures: Stabilization of fluid/thermal/structure interactions and implementation on high performance supercomputers

Within the Center for Space Construction, the SIMSTRUC project's objectives center around the development of simulation tools for the realistic analysis of large space structures. The word 'tools' is the broad sense; it designates mathematical models, finite element/finite difference formulations, computational algorithms, implementations on advanced computer architectures, and visualization capabilities. The results of our activities during the first year within the SIMSTRUC project are reported. On the modeling side, an alternative approach to fluid/thermal/structure interaction analysis that is a departure from the 'loosely coupled' and 'unified' approaches that are being currently practiced are described. The advantages of our approach both in terms of accuracy and computational efficiency were demonstrated. On the computational side, a software architecture for parallel/vector and massively parallel supercomputers that speeds up finite element and finite difference computations by several orders of magnitude is presented. As an example, the simulation of the deployment of a space structure that used to require over six hours of a workstation using a conventional finite element software, now runs on a multiprocessor using a parallel computation strategy in less than three seconds. In order to promote the physical understanding of the simulation behavior, a real-time visualization capability on the Connection Machine, which allows the analyst to watch the graphical animation of the results at the same time these are generated, was also developed. It is believed that by combining efficient analytical formulations with the state-of-the-art high performance computer implementations and superfast visualization capabilities, SIMSTRUC is moving fast towards the real-time simulation of large space structures. The designers as well as the researchers will certainly benefit from this technology.

Farhat, C.↗

Comparison of excitation and kinetic temperatures in a laser-produced plasma using absorption spectroscopy

High-resolution tunable laser absorption spectroscopy is used to measure time-resolved absorption spectra for six neutral uranium transitions in a laser-produced plasma. Here analysis of the spectra shows that kinetic temperatures are similar for all six transitions, but excitation temperatures are higher than kinetic temperatures from 10–100 μs, indicating departures from local thermodynamic equilibrium.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The design, construction and testing of the optics for a 147-cm-aperture telescope

Geodetic optics research for the Air Force Cambridge Research Laboratories (AFCRL) is described. The work consisted mainly of the fabrication of the optical components for a telescope with a 152-cm-diam (60-in.) primary mirror masked down to 147-cm-diam for use by the AFCRL for a lunar ranging experiment. Among the achievements of this contract were the following: completion of the primary and secondary mirrors for a high-quality 147-cm-diam telescope system in eight months from the start of edging the primary; manufacture and testing of a unique center mount for the primary according to an AFCRL design that allowed for a thin-edged and therefore less-massive mirror; and development of a quantitative analysis of the wire test for calculating the departure of the mirror figure from the design figure quickly and accurately after each polishing step. This analysis method in conjunction with a knowledge of polishing rates for given weights and diameters of tools, mirror, and polishing materials should considerably reduce the polishing time required for future large mirrors.

Buchroeder, R. A.↗

An International Strategy for Human Exploration of the Moon: The International Space Exploration Coordination Group (ISECG) Reference Architecture for Human Lunar Exploration

The International Space Exploration Coordination Group (ISECG) was established in response to The Global Exploration Strategy: The Framework for Coordination developed by fourteen space agencies and released in May 2007. Several ISECG participating space agencies have been studying concepts for human exploration of the moon that allow individual and collective goals and objectives to be met. This 18 month study activity culminated with the development of the ISECG Reference Architecture for Human Lunar Exploration. The reference architecture is a series of elements delivered over time in a flexible and evolvable campaign. This paper will describe the reference architecture and how it will inform near-term and long-term programmatic planning within interested agencies. The reference architecture is intended to serve as a global point of departure conceptual architecture that enables individual agency investments in technology development and demonstration, International Space Station research and technology demonstration, terrestrial analog studies, and robotic precursor missions to contribute towards the eventual implementation of a human lunar exploration scenario which reflects the concepts and priorities established to date. It also serves to create opportunities for partnerships that will support evolution of this concept and its eventual realization. The ISECG Reference Architecture for Human Lunar Exploration (commonly referred to as the lunar gPoD) reflects the agency commitments to finding an effective balance between conducting important scientific investigations of and from the moon, as well as demonstrating and mastering the technologies and capabilities to send humans farther into the Solar System. The lunar gPoD begins with a robust robotic precursor phase that demonstrates technologies and capabilities considered important for the success of the campaign. Robotic missions will inform the human missions and buy down risks. Human exploration will start with a thorough scientific investigation of the polar region while allowing the ability to demonstrate and validate the systems needed to take humans on more ambitious lunar exploration excursions. The ISECG Reference Architecture for Human Lunar Exploration serves as a model for future cooperation and is documented in a summary report and a comprehensive document that also describes the collaborative international process that led to its development. ISECG plans to continue with architecture studies such as this to examine an open transportation architecture and other destinations, with expanded participation from ISECG agencies, as it works to inform international partnerships and advance the Global Exploration Strategy.

Laurini, Kathleen C.↗

Targeting Low-Energy Transfers to Low Lunar Orbit

A targeting scheme is presented to build trajectories from a specified Earth parking orbit to a specified low lunar orbit via a low-energy transfer and up to two maneuvers. The total transfer delta V (velocity) is characterized as a function of the Earth parking orbit inclination and the departure date for transfers to each given low lunar orbit. The transfer delta V (velocity) cost is characterized for transfers constructed to low lunar polar orbits with any longitude of ascending node and for transfers that arrive at the Moon at any given time during a month.

mission designs↗

Space Flight Handbooks. Volume 3- Planetary Flight Handbook: Supplementary Trajectory Data: Venus to Earth and Mars to Earth - Part 2

Parts 2 and 3 present tabulations of trajectory data for scheduling flights to and from Venus and Mars during the period 1960-2000. Part 2 contains information for outbound flights to these planets; Part 3 contains information for trajectories returning from the planets to Earth. Each Part contains data for single-plane transfers, as well as for broken-plane transfers which employ a midcourse plane-change to eliminate the high speed "ridges." The mathematical analyses employed for all calculations are described in Part 1 of this handbook. To facilitate the construction of round-trip trajectories, the date at the target planet is held fixed while the trip duration is varied in 10-day increments from zero days to the length of that planet's synodic period with Earth. Dates of arrival at the target planet are presented in the extreme right-hand column of Part 2, and dates of departure from the target planet are presented in the extreme left-hand column of Part 3. Thus, by holding Part 2 directly to the left of Part 3, the analyst may easily and rapidly scan all trip possibilities which involve any desired stopover time at the target planet. Within approximately 200 days of each conjunction or opposition, data are presented in 10-day increments at the target planet. Only those trips are listed for which the hyperbolic excess speeds at either or both ends of the trajectory do not exceed 0.6 EMOS (Earth Mean Orbital Speed). For the remaining mission regions, the requirements are so smoothly varying that a 50-day interval in dates at the target planet may be employed; the 10-day interval in trip times is, however, preserved here. In these regions, only those trips are listed for which either or both speeds do not exceed 0.3 EMOS.

INTERPLANETARY FLIGHT↗

A high resolution spatial and temporal multiple Doppler analysis of a microburst and its application to aircraft flight simulation

Multiple Doppler radar data collected during the Joint Airport Weather Studies (JAWS) Project is used to synthesize the three-dimensional wind in the region of a microburst. The particular microburst used in this study is the strongest one to date for which three-dimensional winds have been recovered. As a diagnostic tool, a six-DOF numerical aircraft model having characteristics similar to 727 series aircraft is used to investigate jet transport aircraft response to observed microburst winds during simulated approaches and departures. Simple pilot control laws are used to adjust thrust, pitch, roll, and yaw so as to maintain given approach or departure parameters. Generally, when horizontal wind shear along the approach or departure path is 0.01/s or greater, the model is unable to maintain the desired approach path and suffers a significant reduction in climb performance during a go-around or departure. Although the mean wind shear along a path gives a good qualitative measure of the wind shear threat to a jet transport, different paths with similar mean shears can yield markedly different results, as do the same paths through the microburst at different times. These findings are a direct consequence of the fine temporal and spatial scale of microburst winds. During any given modeled aircraft traverse through the region of highest horizontal shear, time variations in the microburst wind field are shown to have an insignificant effect on the modeled flight path. This is because the traverse period is short (30 s) compared to the lifetime of a microburst (300-600 s).

Elmore, K. L.↗

Space Flight Handbooks. Volume 3- Planetary Flight Handbook: Supplementary Trajectory Data: Venus to Earth and Mars to Earth - Part 3

Parts 2 and 3 present tabulations of trajectory data for scheduling flights to and from Venus and Mars during the period 1960-2000. Part 2 contains information for outbound flights to these planets; Part 3 contains information for trajectories returning from the planets to Earth. Each Part contains data for single-plane transfers, as well as for broken-plane transfers which employ a midcourse plane-change to eliminate the high speed "ridges." The mathematical analyses employed for all calculations are described in Part 1 of this handbook. To facilitate the construction of round-trip trajectories, the date at the target planet is held fixed while the trip duration is varied in 10-day increments from zero days to the length of that planet's synodic period with Earth. Dates of arrival at the target planet are presented in the extreme right-hand column of Part 2, and dates of departure from the target planet are presented in the extreme left-hand column of Part 3. Thus, by holding Part 2 directly to the left of Part 3, the analyst may easily and rapidly scan all trip possibilities which involve any desired stopover time at the target planet. Within approximately 200 days of each conjunction or opposition, data are presented in 10-day increments at the target planet. Only those trips are listed for which the hyperbolic excess speeds at either or both ends of the trajectory do not exceed 0.6 EMOS (Earth Mean Orbital Speed). For the remaining mission regions, the requirements are so smoothly varying that a 50-day interval in dates at the target planet may be employed; the 10-day interval in trip times is, however, preserved here. In these regions, only those trips are listed for which either or both speeds do not exceed 0.3 EMOS.

Source record↗

Design and Evaluation of a Dynamic Programming Flight Routing Algorithm Using the Convective Weather Avoidance Model

The optimization of traffic flows in congested airspace with varying convective weather is a challenging problem. One approach is to generate shortest routes between origins and destinations while meeting airspace capacity constraint in the presence of uncertainties, such as weather and airspace demand. This study focuses on development of an optimal flight path search algorithm that optimizes national airspace system throughput and efficiency in the presence of uncertainties. The algorithm is based on dynamic programming and utilizes the predicted probability that an aircraft will deviate around convective weather. It is shown that the running time of the algorithm increases linearly with the total number of links between all stages. The optimal routes minimize a combination of fuel cost and expected cost of route deviation due to convective weather. They are considered as alternatives to the set of coded departure routes which are predefined by FAA to reroute pre-departure flights around weather or air traffic constraints. A formula, which calculates predicted probability of deviation from a given flight path, is also derived. The predicted probability of deviation is calculated for all path candidates. Routes with the best probability are selected as optimal. The predicted probability of deviation serves as a computable measure of reliability in pre-departure rerouting. The algorithm can also be extended to automatically adjust its design parameters to satisfy the desired level of reliability.

Ng, Hok K.↗

Optimizing Rate of Penetration and Tripping Decision-Making using Real-Time Bit Wear Monitoring While Drilling Geothermal Wells

Understanding bit wear while drilling is critical to minimizing non-productive time (NPT) and optimizing rate of penetration (ROP). Lengthening drilling runs with damaged bits does not only lower the ROP, but also elevates the risk of inducing severe bit damage, which could potentially lead to time-consuming fishing operations. When drillers believe the bit has worn off substantially, the bit is tripped out to be replaced. On geothermal wells, tripping can take up to 20% of the overall well construction time, and this is generally acknowledged as an opportunity for improvement. Ideally, a bit run should be terminated before the bit is damaged beyond repair. At the same time, premature bit pulls are to be avoided as well. This study aims to leverage bit and tooth wear metrics that can be obtained in real time to characterize bit condition in order to optimize ROP and determine the optimal time to pull the bit. Two metrics were explored in this study: a bit wear metric that incorporated depth-of-cut, and a tooth wear metric developed by Bourgoyne & Young characterizing the state of bit teeth dull. Both metrics were computed using recorded data from 12¼ inches roller cone insert bit runs in five geothermal wells targeting a granodiorite formation in the western United States. Together with the actual dull grades, determined after the bits were pulled to surface, the metric trends were interpreted to characterize the downhole bit condition and identify the point at which the bit should have optimally been tripped out. The insights from studying the actual dull grades and how they relate to the two metrics were used to establish a reliable bit pull criterion. The bit wear metric trend correctly showed a noticeable departure from baseline for bits experiencing major dulling behavior. Additionally, the tooth wear model predicted the cutter dull within two dull grades for most runs, with better performance in predicting the inner teeth dull. Moreover, the combination of the bit wear and tooth wear metrics was effective in revealing the cause of the bit performance impairment. Proactive tracking of these two metrics in real-time can facilitate geothermal drilling ROP optimization and better-informed tripping decision-making, thereby avoiding wasted time and cost.

Ashari, Rahmat↗

Analytic Modeling of Pressurization and Cryogenic Propellant

An analytic model for pressurization and cryogenic propellant conditions during all mission phases of any liquid rocket based vehicle has been developed and validated. The model assumes the propellant tanks to be divided into five nodes and also implements an empirical correlation for liquid stratification if desired. The five nodes include a tank wall node exposed to ullage gas, an ullage gas node, a saturated propellant vapor node at the liquid-vapor interface, a liquid node, and a tank wall node exposed to liquid. The conservation equations of mass and energy are then applied across all the node boundaries and, with the use of perfect gas assumptions, explicit solutions for ullage and liquid conditions are derived. All fluid properties are updated real time using NIST Refprop.1 Further, mass transfer at the liquid-vapor interface is included in the form of evaporation, bulk boiling of liquid propellant, and condensation given the appropriate conditions for each. Model validation has proven highly successful against previous analytic models and various Saturn era test data and reasonably successful against more recent LH2 tank self pressurization ground test data. Finally, this model has been applied to numerous design iterations for the Altair Lunar Lander, Ares V Core Stage, and Ares V Earth Departure Stage in order to characterize Helium and autogenous pressurant requirements, propellant lost to evaporation and thermodynamic venting to maintain propellant conditions, and non-uniform tank draining in configurations utilizing multiple LH2 or LO2 propellant tanks. In conclusion, this model provides an accurate and efficient means of analyzing multiple design configurations for any cryogenic propellant tank in launch, low-acceleration coast, or in-space maneuvering and supplies the user with pressurization requirements, unusable propellants from evaporation and liquid stratification, and general ullage gas, liquid, and tank wall conditions as functions of time.

Corpening, Jeremy H.↗

Ares V: Game Changer for National Security Launch

NASA is designing the Ares V cargo launch vehicle to vastly expand exploration of the Moon begun in the Apollo program and enable the exploration of Mars and beyond. As the largest launcher in history, Ares V also represents a national asset offering unprecedented opportunities for new science, national security, and commercial missions of unmatched size and scope. The Ares V is the heavy-lift component of NASA's dual-launch architecture that will replace the current space shuttle fleet, complete the International Space Station, and establish a permanent human presence on the Moon as a stepping-stone to destinations beyond. During extensive independent and internal architecture and vehicle trade studies as part of the Exploration Systems Architecture Study (ESAS), NASA selected the Ares I crew launch vehicle and the Ares V to support future exploration. The smaller Ares I will launch the Orion crew exploration vehicle with four to six astronauts into orbit. The Ares V is designed to carry the Altair lunar lander into orbit, rendezvous with Orion, and send the mated spacecraft toward lunar orbit. The Ares V will be the largest and most powerful launch vehicle in history, providing unprecedented payload mass and volume to establish a permanent lunar outpost and explore significantly more of the lunar surface than was done during the Apollo missions. The Ares V consists of a Core Stage, two Reusable Solid Rocket Boosters (RSRBs), Earth Departure Stage (EDS), and a payload shroud. For lunar missions, the shroud would cover the Lunar Surface Access Module (LSAM). The Ares V Core Stage is 33 feet in diameter and 212 feet in length, making it the largest rocket stage ever built. It is the same diameter as the Saturn V first stage, the S-IC. However, its length is about the same as the combined length of the Saturn V first and second stages. The Core Stage uses a cluster of five Pratt & Whitney Rocketdyne RS-68B rocket engines, each supplying about 700,000 pounds of thrust. Its propellants are liquid hydrogen and liquid oxygen. The two solid rocket boosters provide about 3.5 million pounds of thrust at liftoff. These 5.5-segment boosters are derived from the 4-segment boosters now used on the Space Shuttle, and are similar to those used in the Ares I first stage. The EDS is powered by one J-2X engine. The J-2X, which has roughly 294,000 pounds of thrust, also powers the Ares I Upper Stage. It is derived from the J-2 that powered the Saturn V second and third stages. The EDS performs two functions. Its initial suborbital burns will place the lunar lander into a stable Earth orbit. After the Orion crew vehicle, launched separately on an Ares I, docks with the lander/EDS stack, EDS will ignite a second time to put the combined 65-metric ton vehicle into a lunar transfer orbit. When it stands on the launch pad at Kennedy Space Center late in the next decade, the Ares V stack will be approximately 381 feet tall and have a gross liftoff mass of 8.1 million pounds. The current point-of-departure design exceeds Saturn V s mass capability by approximately 40 percent. Using the current payload shroud design, Ares V can carry 315,000 pounds to 29-degree low Earth orbit (LEO) or 77,000 pounds to a geosynchronous orbit. Another unique aspect of the Ares V is the 33-foot-diameter payload shroud, which encloses approximately 30,400 cubic feet of usable volume. A larger hypothetical shroud for encapsulating larger payloads has been studied. While Ares V makes possible larger payload masses and volumes, it may alternately make possible more cost-effective mission design if the relevant payload communities are willing to consider an alternative to the existing approach that has driven them to employ complexity to solve current launch vehicle mass and volume constraints. By using Ares V s mass and volume capabilities as margin, payload designers stand to reduce development risk and cost. Significant progress has been made on the Ares V to support a plaed fiscal 2011 authority-to-proceed (ATP) milestone. The Ares V team is actively reaching out to external organizations during this early concept phase to ensure that the Ares V vehicle can be leveraged for national security, science, and commercial development needs. This presentation will discuss Ares V vehicle configuration, the path to the current concept, accomplishments to date, and potential payload utilization opportunities.

Sumrall, Phil↗

Propulsion Technology Assessment: Science & Enabling Technologies to Explore the Interstellar Medium

As part of a larger effort led by the Keck Institute for Space Studies at the California Institute of Technology, the Advanced Concepts Office at NASA's George C. Marshall Space Flight Center conducted a study to assess what low-thrust advanced propulsion system candidates, existing and near term, could deliver a small, Voyager-like satellite to our solar system's heliopause, approximately 100 AU from the center of the sun, within 10 years and within a 2025 to 2035 launch window. The advanced propulsion system trade study consisted of three candidates, including a Magnetically Shielded Miniature (MaSMi) Hall thruster, a solar sail and an electric sail. Two aerial densities, and thus characteristic accelerations, 0.426 mm/s2 and 0.664 mm/s2, were analyzed for the solar sail option in order understand the impact of near and long term development of this technology. Similarly, two characteristic accelerations, 1 mm/s2 and 2 mm/s2, were also analyzed for the electric sail option in addition to tether quantities of 10 and 20, respectively, and individual tether length of 20 km. A second analysis was conducted to determine what existing solid rocket motor kick stage(s) would be required to provide additional thrust at various points in the trajectory, assuming an earth departure characteristic energy capability provided by a Space Launch System (SLS) Block 1B vehicle architecture carrying an 8.4 meter payload fairing. Two trajectory profiles were considered, including an escape trajectory using a Jupiter gravity assist (E-Ju), and an escape trajectory first performing a Jupiter gravity assist followed by an Oberth maneuver around the sun and an optional Saturn gravity assist (E-Ju-Su-Sa). The Oberth maneuver would need to be performed very close to the sun, wherein this study assumed a perihelion distance of approximately 11 solar radii, or 0.05 AU, away from the surface. The heat shield technology required to perform this type of ambitious maneuver was assumed to be similar to that of NASA's Solar Probe Plus mission, which is slated to launch in July 2018. With respect to a SLS Block 1B earth departure characteristic energy capability of 100 sq km/s2 for the E-Ju trajectory option, results indicated that compared to having no advanced propulsion system onboard, both the MaSMi Hall thruster and solar sail options subtract approximately 8 to 10 years from the total trip time while the electric sail outperforms all options by subtracting up to 20 years. With respect to an average kick stage velocity capability of 2.5 to 3.5 km/s at perihelion, the most sensitive segment of the E-Ju-Su-Sa trajectory option, results indicated that both the MaSMi Hall thrust and solar sail options only subtract 1 to 3 years from the total trip time whereas the electric sail again outperforms all other options by subtracting up to 5 years. In other words, if the Technology Readiness Level of an electric sail could be increased in time, this propulsion technology could not only enable a satellite to reach 100 AU in 10 years but it could potentially do so even faster. Completing such an ambitious mission in that short of a timespan would be very attractive to many as it would be well within the average career span of any of those involved.

Hopkins, Randall C.↗

Propulsion Technology Assessment: Science and Enabling Technologies to Explore the Interstellar Medium

Led by the Keck Institute for Space Studies at the California Institute of Technology, the Advanced Concepts Office at NASA's George C. Marshall Space Flight Center conducted a study to assess what low-thrust advanced propulsion system candidates, existing and near term, could deliver a small, Voyager-like satellite to our solar system's heliopause, approximately 100 AU from the center of the sun, within 10 years and within a 2025-2035 launch window. The advanced propulsion system trade study consisted of three candidates, including a Magnetically Shielded Miniature (MaSMi) Hall thruster, a solar sail and an electric sail. Two aerial densities, and thus characteristic accelerations, 0.426 mm/sq s and 0.664 mm/sq s were analyzed for the solar sail option in order understand the impact of near and long term development of this technology. Similarly, two characteristic accelerations, 1 mm/s2 and 2 mm/sq s, were also analyzed for the electric sail option in addition to tether quantities of 10 and 20, respectively, and individual tether length of 20 km. A second analysis was conducted to determine what existing solid rocket motor kick stage(s) would be required to provide additional thrust at various points in the trajectory, assuming an earth departure characteristic energy capability provided by a Space Launch System (SLS) Block 1B vehicle architecture carrying an 8.4 meter payload fairing. Two trajectory profiles were considered, including an escape trajectory using a Jupiter gravity assist (E-Ju), and an escape trajectory first performing a Jupiter gravity assist followed by an Oberth maneuver around the sun and an optional Saturn gravity assist (E-Ju-Su-Sa). The Oberth maneuver would need to be performed very close to the sun, wherein this study assumed a perihelion distance of approximately 11 solar radii, or 0.05 AU, away from the surface. The heat shield technology required to perform this type of ambitious maneuver was assumed to be similar to that of NASA's Solar Probe Plus mission, which is slated to launch in July 2018. With respect to a SLS Block 1B earth departure characteristic energy capability of 100 km2/sq s for the E-Ju trajectory option, results indicated that compared to having no advanced propulsion system onboard, both the MaSMi Hall thruster and solar sail options subtract approximately 8 to 10 years from the total trip time while the electric sail outperforms all options by subtracting up to 20 years. With respect to an average kick stage velocity capability of 2.5 to 3.5 km/s at perihelion, the most sensitive segment of the E-Ju-Su-Sa trajectory option, results indicated that both the MaSMi Hall thrust and solar sail options only subtract 1 to 3 years from the total trip time whereas the electric sail again outperforms all other options by subtracting up to 5 years. In other words, if the Technology Readiness Level of an electric sail could be increased in time, this propulsion technology could not only enable a satellite to reach 100 AU in 10 years but it could potentially do so even faster. Completing such an ambitious mission in that short of a timespan would be very attractive to many as it would be well within the average career span of any of those involved.

Hopkins, Randall C.↗