Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cycles”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Supercritical carbon dioxide cycle control analysis.

This report documents work carried out during FY 2008 on further investigation of control strategies for supercritical carbon dioxide (S-CO{sub 2}) Brayton cycle energy converters. The main focus of the present work has been on investigation of the S-CO{sub 2} cycle control and behavior under conditions not covered by previous work. An important scenario which has not been previously calculated involves cycle operation for a Sodium-Cooled Fast Reactor (SFR) following a reactor scram event and the transition to the primary coolant natural circulation and decay heat removal. The Argonne National Laboratory (ANL) Plant Dynamics Code has been applied to investigate the dynamic behavior of the 96 MWe (250 MWt) Advanced Burner Test Reactor (ABTR) S-CO{sub 2} Brayton cycle following scram. The timescale for the primary sodium flowrate to coast down and the transition to natural circulation to occur was calculated with the SAS4A/SASSYS-1 computer code and found to be about 400 seconds. It is assumed that after this time, decay heat is removed by the normal ABTR shutdown heat removal system incorporating a dedicated shutdown heat removal S-CO{sub 2} pump and cooler. The ANL Plant Dynamics Code configured for the Small Secure Transportable Autonomous Reactor (SSTAR) Lead-Cooled Fast Reactor (LFR) was utilized to model the S-CO{sub 2} Brayton cycle with a decaying liquid metal coolant flow to the Pb-to-CO{sub 2} heat exchangers and temperatures reflecting the decaying core power and heat removal by the cycle. The results obtained in this manner are approximate but indicative of the cycle transient performance. The ANL Plant Dynamics Code calculations show that the S-CO{sub 2} cycle can operate for about 400 seconds following the reactor scram driven by the thermal energy stored in the reactor structures and coolant such that heat removal from the reactor exceeds the decay heat generation. Based on the results, requirements for the shutdown heat removal system may be defined. In particular, the peak heat removal capacity of the shutdown heat removal loop may be specified to be 1.1 % of the nominal reactor power. An investigation of the oscillating cycle behavior calculated by the ANL Plant Dynamics Code under specific conditions has been carried out. It has been found that the calculation of unstable operation of the cycle during power reduction to 0 % may be attributed to the modeling of main compressor operation. The most probable reason for such instabilities is the limit of applicability of the currently used one-dimensional compressor performance subroutines which are based on empirical loss coefficients. A development of more detailed compressor design and performance models is required and is recommended for future work in order to better investigate and possibly eliminate the calculated instabilities. Also, as part of such model development, more reliable surge criteria should be developed for compressor operation close to the critical point. It is expected that more detailed compressor models will be developed as a part of validation of the Plant Dynamics Code through model comparison with the experiment data generated in the small S-CO{sub 2} loops being constructed at Barber-Nichols Inc. and Sandia National Laboratories (SNL). Although such a comparison activity had been planned to be initiated in FY 2008, data from the SNL compression loop currently in operation at Barber Nichols Inc. has not yet become available by the due date of this report. To enable the transient S-CO{sub 2} cycle investigations to be carried out, the ANL Plant Dynamics Code for the S-CO{sub 2} Brayton cycle was further developed and improved. The improvements include further optimization and tuning of the control mechanisms as well as an adaptation of the code for reactor systems other than the Lead-Cooled Fast Reactor (LFR). Since the focus of the ANL work on S-CO{sub 2} cycle development for the majority of the current year has been on the applicability of the cycle to SFRs, work has started on modification of the ANL Plant Dynamics Code to allow the dynamic simulation of the ABTR. The code modifications have reached the point where a transient simulation can be run in steady state mode; i.e., to determine the steady state initial conditions at full power without an initiating event. The results show that the steady state solution is maintained with minimal variations during at least 4,000 seconds of the transient. More SFR design specific modifications to the ANL Plant Dynamics Code are required to run the code in a full transient mode, including models for the sodium pumps and their control as well as models for reactivity feedback and control of the reactor power.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Supercritical Carbon Dioxide Power Cycle Design and Configuration Optimization to Minimize Levelized Cost of Energy of Molten Salt Power Towers Operating at 650 °C

This analysis investigates the design, cost, and performance of the simple, recompression, and partial-cooling configurations of the supercritical carbon dioxide power cycle integrated with a molten salt power tower concentrating solar power system. This paper uses a steady-state model to design each cycle with varying amounts of recuperator conductance to understand performance and cost trade-offs. The recompression cycle can achieve a higher thermal efficiency than the partial-cooling cycle, and the partial-cooling cycle achieves a higher thermal efficiency than the simple cycle. The partial-cooling cycle is the most expensive cycle because it requires more total turbomachinery capacity. However, the partial-cooling cycle has the largest temperature range of heat input. This feature leads to cheaper two-tank thermal energy storage, higher receiver efficiencies, and lower mass flow rates in the power tower. Crucially, the lower mass flow rates significantly reduce pump electricity consumption relative to the recompression-cycle system. Consequently, this study finds that the power tower system integrated with the partial-cooling cycle is both cheaper and generates more net electricity than systems integrated with the other two cycles. Finally, this paper presents a parametric study on the air-cooler approach temperature and shows that small approach temperatures can improve cycle efficiency and increase the temperature range of heat input, which can lead to smaller optimal approach temperatures than may be expected.

14 SOLAR ENERGY↗

Systems Analysis of an Advanced Nuclear Fuel Cycle Based on a Modified UREX+3c Process

The research described in this report was performed under a grant from the U.S. Department of Energy (DOE) to describe and compare the merits of two advanced alternative nuclear fuel cycles -- named by this study as the “UREX+3c fuel cycle” and the “Alternative Fuel Cycle” (AFC). Both fuel cycles were assumed to support 100 1,000 MWe light water reactor (LWR) nuclear power plants operating over the period 2020 through 2100, and the fast reactors (FRs) necessary to burn the plutonium and minor actinides generated by the LWRs. Reprocessing in both fuel cycles is assumed to be based on the UREX+3c process reported in earlier work by the DOE. Conceptually, the UREX+3c process provides nearly complete separation of the various components of spent nuclear fuel in order to enable recycle of reusable nuclear materials, and the storage, conversion, transmutation and/or disposal of other recovered components. Output of the process contains substantially all of the plutonium, which is recovered as a 5:1 uranium/plutonium mixture, in order to discourage plutonium diversion. Mixed oxide (MOX) fuel for recycle in LWRs is made using this 5:1 U/Pu mixture plus appropriate makeup uranium. A second process output contains all of the recovered uranium except the uranium in the 5:1 U/Pu mixture. The several other process outputs are various waste streams, including a stream of minor actinides that are stored until they are consumed in future FRs. For this study, the UREX+3c fuel cycle is assumed to recycle only the 5:1 U/Pu mixture to be used in LWR MOX fuel and to use depleted uranium (tails) for the makeup uranium. This fuel cycle is assumed not to use the recovered uranium output stream but to discard it instead. On the other hand, the AFC is assumed to recycle both the 5:1 U/Pu mixture and all of the recovered uranium. In this case, the recovered uranium is reenriched with the level of enrichment being determined by the amount of recovered plutonium and the combined amount of the resulting MOX. The study considered two sub-cases within each of the two fuel cycles in which the uranium and plutonium from the first generation of MOX spent fuel (i) would not be recycled to produce a second generation of MOX for use in LWRs or (ii) would be recycled to produce a second generation of MOX fuel for use in LWRs. The study also investigated the effects of recycling MOX spent fuel multiple times in LWRs. The study assumed that both fuel cycles would store and then reprocess spent MOX fuel that is not recycled to produce a next generation of LWR MOX fuel and would use the recovered products to produce FR fuel. The study further assumed that FRs would begin to be brought on-line in 2043, eleven years after recycle begins in LWRs, when products from 5-year cooled spent MOX fuel would be available. Fuel for the FRs would be made using the uranium, plutonium, and minor actinides recovered from MOX. For the cases where LWR fuel was assumed to be recycled one time, the 1st generation of MOX spent fuel was used to provide nuclear materials for production of FR fuel. For the cases where the LWR fuel was assumed to be recycled two times, the 2nd generation of MOX spent fuel was used to provide nuclear materials for production of FR fuel. The number of FRs in operation was assumed to increase in successive years until the rate that actinides were recovered from permanently discharged spent MOX fuel equaled the rate the actinides were consumed by the operating fleet of FRs. To compare the two fuel cycles, the study analyzed recycle of nuclear fuel in LWRs and FRs and determined the radiological characteristics of irradiated nuclear fuel, nuclear waste products, and recycle nuclear fuels. It also developed a model to simulate the flows of nuclear materials that could occur in the two advanced nuclear fuel cycles over 81 years beginning in 2020 and ending in 2100. Simulations projected the flows of uranium, plutonium, and minor actinides as these nuclear fuel materials were produced and consumed in a fleet of 100 1,000 MWe LWRs and in FRs. The model also included recycle and reuse of extant inventories of spent LWR fuel. The results of the simulations allowed comparisons of the two fuel cycles from the standpoints of cost, non-proliferation, radiological health, wastes generated, and sustainability. Results of the research also provide insights regarding (i) multiple recycling of uranium and plutonium from spent MOX fuel in LWRs, (ii) costs and benefits of reenriching and reusing uranium from spent LWR fuel; (iii) effects of using uranium, plutonium, and minor actinides from LWR spent fuels to produce fuel for FRs; (iv) net rates of consumption (burning) in FRs of actinide elements produced in LWRs, and (v) ependencies of and interactions among the different systems of an advanced nuclear fuel cycle -- and the flows of nuclear materials between these systems.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Novel Supercritical Carbon Dioxide Power Cycle Utilizing Pressured Oxy-combustion in Conjunction with Cryogenic Compression

The team of Southwest Research Institute ® (SwRI) and Thar Energy LLC (Thar) applied technology engineering and economic analysis to evaluate two advanced oxy-combustion power cycles, the Cryogenic Pressurized Oxy-combustion Cycle (CPOC), and the Supercritical Oxy-combustion Cycle. This assessment evaluated the performance and economic cost of the two proposed cycles with carbon capture and included a technology gap analysis of the proposed technologies to determine the technology readiness level of the cycle and the cycle components. The results of the engineering and economic analysis and the technology gap analysis were used to identify the next steps along the technology development roadmap for the selected cycle. The project objectives, as outlined in the FOA, were 90% CO 2 removal at no more than a 35% increase in cost of electricity (COE) as compared to a Supercritical Pulverized Coal Plant without CO 2 capture. The supercritical oxy-combustion power cycle with 99% carbon capture achieves a COE of $\$$121/MWe. This revised COE represents a 21% reduction in cost as compared to supercritical steam with 90% carbon capture ($\$$137/MWe). However, this represents a 49% increase in the COE over supercritical steam without carbon capture ($\$$80.95/MWe), exceeding the 35% target. The supercritical oxy-combustion cycle with 99% carbon capture achieved a 37.9% HHV plant efficiency (39.3% LHV plant efficiency), when coupling a supercritical oxy-combustion thermal loop to an indirect supercritical CO 2 (sCO 2 ) power block. In this configuration, the power block achieved 48% thermal efficiency for turbine inlet conditions of 650°C and 290 atm. Power block efficiencies near 60% are feasible with higher turbine inlet temperatures, however a design tradeoff to limit firing temperature to 650°C was made in order to use austenitic stainless steels for the high temperature pressure vessels and piping and to minimize the need for advanced turbomachinery features such as blade cooling. The overall technical readiness of the supercritical oxy-combustion cycle is TRL 2, Technology Concept, due to the maturity level of the supercritical oxy-combustor for solid fuels, and several critical supporting components, as identified in the Technical Gap Analysis. The supercritical oxycombustor for solid fuels operating at pressures near 100 atm is a unique component of the supercritical oxy-combustion cycle. In addition to the low TRL supercritical oxy-combustor, secondary systems were identified that would require adaptation for use with the supercritical oxycombustion cycle. These secondary systems include the high pressure pulverized coal feed, high temperature cyclone, removal of post-combustion particulates from the high pressure cyclone underflow stream, and micro-channel heat exchangers tolerant of particulate loading. Bench scale testing was utilized to measure coal combustion properties at elevated pressures in a CO 2 environment. This testing included coal slurry preparation, visualization of coal injection into a high pressure fluid, and modification of existing test equipment to facilitate the combustion properties testing. Additional bench scale testing evaluated the effectiveness of a rotary atomizer for injecting a coal-water slurry into a fluid with similar densities, as opposed to the typical application where the high density fluid is injected into a low density fluid. The swirl type supercritical oxy-combustor was developed from initial concept to an advanced design stage through numerical simulation using FLUENT and Chemkin to model the flow through the combustor and provide initial assessment of the coal combustion reactions in the flow path. This effort enabled the initial combustor mechanical layout, initial pressure vessel design, and the conceptual layout of a pilot scale test loop. A pilot scale demonstration of the supercritical oxy-combustion cycle is proposed as the next step in the technology development. This demonstration would advance the supercritical oxy-combustion cycle and the supercritical oxy-combustor from a current TRL of 2, Technology Concept, to TRL 6, Pilot Scale System Demonstrated in a Relevant Environment, and enable the evaluation and continued refinement of the supercritical oxy-combustor and critical secondary systems.

42 ENGINEERING↗

Predicting the Size and Timing of Sunspot Maximum for Cycle 24

For cycle 24, the minimum value of the 12-month moving average (12-mma) of the AA-geomagnetic index in the vicinity of sunspot minimum (AAm) appears to have occurred in September 2009, measuring about 8.4 nT and following sunspot minimum by 9 months. This is the lowest value of AAm ever recorded, falling below that of 8.9 nT, previously attributed to cycle 14, which also is the smallest maximum amplitude (RM) cycle of the modern era (RM = 64.2). Based on the method of Ohl (the preferential association between RM and AAm for an ongoing cycle), one expects cycle 24 to have RM = 55+/-17 (the +/-1 - sigma prediction interval). Instead, using a variation of Ohl's method, one based on using 2-cycle moving averages (2-cma), one expects cycle 23's 2-cma of RM to be about 115.5+/-8.7 (the +/-1 - sigma prediction interval), inferring an RM of about 62+/-35 for cycle 24. Hence, it seems clear that cycle 24 will be smaller in size than was seen in cycle 23 (RM = 120.8) and, likely, will be comparable in size to that of cycle 14. From the Waldmeier effect (the preferential association between the ascent duration (ASC) and RM for an ongoing cycle), one expects cycle 24 to be a slow-rising cycle (ASC > or equal to 48 months), having RM occurrence after December 2012, unless it turns out to be a statistical outlier.

Wilson, Robert M.↗

Does the Current Minimum Validate (or Invalidate) Cycle Prediction Methods?

This deep, extended solar minimum and the slow start to Cycle 24 strongly suggest that Cycle 24 will be a small cycle. A wide array of solar cycle prediction techniques have been applied to predicting the amplitude of Cycle 24 with widely different results. Current conditions and new observations indicate that some highly regarded techniques now appear to have doubtful utility. Geomagnetic precursors have been reliable in the past and can be tested with 12 cycles of data. Of the three primary geomagnetic precursors only one (the minimum level of geomagnetic activity) suggests a small cycle. The Sun's polar field strength has also been used to successfully predict the last three cycles. The current weak polar fields are indicative of a small cycle. For the first time, dynamo models have been used to predict the size of a solar cycle but with opposite predictions depending on the model and the data assimilation. However, new measurements of the surface meridional flow indicate that the flow was substantially faster on the approach to Cycle 24 minimum than at Cycle 23 minimum. In both dynamo predictions a faster meridional flow should have given a shorter cycle 23 with stronger polar fields. This suggests that these dynamo models are not yet ready for solar cycle prediction.

Hathaway, David H.↗

Evaluating the Impact of Tritium Permeation Membrane Performance and Direct Internal Recycling on Fusion Fuel Cycle Efficiency Using TMAP8

An efficient fuel cycle is vital to sustainable and cost-effective energy generation in fusion systems. Since tritium is not widely available, fusion systems must breed their own tritium for sustainable fusion deuterium-tritium reactions. An inefficient fuel cycle increases the tritium inventory needed for operations, which increases costs, constraints on tritium management systems, and safety concerns. A fuel cycle model is a powerful tool for understanding tritium inventories and flow rates across all systems in the fuel cycle. By simplifying the technical details into time-dependent tritium flow rates and inventories, the model can simulate the entire fuel cycle with high computational efficiency, even for technologies that are still under development. It can therefore quantify the impact of new tritium management technologies on fuel cycle efficiency. To evaluate the impact of key components on reducing tritium inventory, we are using and expanding an existing fuel cycle models based on latest advancements in fuel cycle research. The new model integrates Tritium Permeation Membrane (TPM) and Direct Internal Recycling (DIR) to enhance tritium transport from blanket breeders and plasma exhaust. These fuel cycle models are implemented in TMAP8 (Tritium Migration Analysis Program, version 8), a MOOSE-based open-source application designed to provide cutting-edge capabilities for tritium transport and fuel cycle modeling. The study aims to demonstrate the extensibility of existing fuel cycle modeling capability in TMAP8 and to offer a proof-of-principle design for future fusion plant systems. The presentation will cover the performance of fuel cycle modeling capabilities available in TMAP8, highlight advancements in fuel cycle research, and present a sensitivity analysis of these models. The results underline potential approaches and technology solutions to lower tritium inventory requirements, highlighting their role in shaping the future of fusion energy.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Effect of Gaseous Impurities on Long-Term Thermal Cycling and Aging Properties of Complex Hydrides for Hydrogen Storage

This program was dedicated to understanding the effect of impurities on Long-Term Thermal Cycling and aging properties of Complex Hydrides for Hydrogen Storage. At the start of the program we found reversibility between Li2NH+LiH LiH+LiNH2 (yielding ~5.8 wt.%H capacity). Then we tested the effect of impurity in H2 gas by pressure cycling at 255°C; first with industrial gas containing ppm levels of O2 and H2O as major impurities. Both these impurities had a significant impact on the reversibility and decreased the capacity by 2.65 wt.%H. Further increase in number of cycles from 500 to 1100 showed only a 0.2 wt%H more weight loss, showing some capacity is still maintained after a significant number of cycles. The loss of capacity is attributed to the formation of ~55 wt% LiH and ~30% Li2O, as major contaminant phases, along with the hydride Li2NH phase; suggesting loss of nitrogen during cycling. The effect of 100 ppm H2O in H2 also showed a decrease of ~2.5 wt.%H (after 560 cycles), and 100ppm O2 in H2; a loss of ~4.1 wt.%. Methane impurity (100 ppm, 100cycles), showed a very small capacity loss of 0.9 wt.%H under similar conditions. However, when Li3N was pressure cycled with 100ppmN2-H2 there were beneficial effects were observed (255oC); the reversible capacity increased to 8.4wt.%H after 853 cycles. Furthermore, with 20 mol.%N2-H2 capacity increased to ~10 wt.%H after 516 cycles. We attribute this enhancement to the reaction of nitrogen with liquid lithium during cycling as the Gibbs free energy of formation of Li3N (Go = -98.7 kJ/mol) is more negative than that of LiH (Go = -50.3 kJ/mol). We propose that the mitigation of hydrogen capacity losses is due to the destabilization of the LiH phase that tends to accumulate during cycling. Also more Li2NH phase was found in the cycled product. Mixed Alanates (3LiNH2:Li3AlH6) showed that 7 wt% hydrogen desorbed under dynamic vacuum. Equilibrium experiments (maximum 12 bar H2) showed up to 4wt% hydrogen reversibly stored in the material after the first desorption. The activation energy was found to be 51 kJ/mol, as compared to 81 kJ/mol for pure lithium alanate. It is proposed that based on the data obtained and CALPHAD modeling that the improvement in cycling is due to the formation of pure lithium (liquid at 255°C), which is able to react with nitrogen specifically forming Li3N. The presence of nitrogen in the 80/20 molar mixtures in a hydride bed along with hydrogen causes Li to form Li3N rather than LiH, and subsequently regenerates the Li2NH phase and yields a ~10 wt.%H reversibly.

08 HYDROGEN↗

AGR-3/4 Final Data Qualification Report for ATR Cycles 151A through 155B-1

This report provides the qualification status of experimental data for the entire Advanced Gas Reactor 3/4 (AGR 3/4) fuel irradiation. AGR-3/4 is the third in a series of planned irradiation experiments conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) for the AGR Fuel Development and Qualification Program, which supports development of the advanced reactor technology under the INL ART Technology Development Office (TDO). The main objective of AGR-3/4 irradiation is to provide a known source of fission products for subsequent transport through compact matrix and structural graphite materials due to the presence of designed-to-fail fuel particles. Full power irradiation of the AGR 3/4 test began on December 14, 2011 (ATR Cycle 151A), and was completed on April 12, 2014 (end of ATR Cycle 155B) after 369.1 effective full power days of irradiation. The AGR-3/4 test was in the reactor core for eight of the ten ATR cycles between 151A and 155B. During the unplanned outage cycle, 153A, the experiment was removed from the ATR northeast flux trap (NEFT) location and stored in the ATR canal. This was to prevent overheating of fuel compacts due to higher than normal ATR power during the subsequent Powered Axial Locator Mechanism cycle, 153B. The AGR 3/4 test was inserted back into the ATR NEFT location during the outage of ATR Cycle 154A on April 26, 2013. Therefore, the AGR-3/4 irradiation data received during these 2 cycles (153A and 153B) are irrelevant and their qualification status isnot included in this report. Additionally, during ATR Cycle 152A the ATR core ran at low power for a short enough duration that the irradiation data are not used for physics and thermal calculations. However, the qualification status of irradiation data for this cycle is still covered in this report. As a result, this report includes data from 8 ATR Cycles: 151A, 151B, 152A, 152B, 154A, 154B, 155A, and 155B, as recorded in the Nuclear Data Management and Analysis System (NDMAS). The AGR 3/4 data streams addressed in this report include thermocouple (TC) temperatures, sweep gas data (flow rates, pressure, and moisture content), and Fission Product Monitoring System (FPMS) data (release rates, release to birth rate ratios [R/Bs], and particle failure counts) for each of the twelve capsules in the AGR 3/4 experiment. During Outage Cycle 155A, fourteen flow meters were installed downstream from fourteen FPMS monitors to measure flows from the monitors; qualification status of these data are also included in the report. The final data qualification status for these data streams is determined by a Data Review Committee (DRC) composed of AGR technical leads, Sitewide Quality Assurance (QA), and NDMAS analysts. For ATR Cycles 151A through 154B, the DRC convened on February 12, 2014, reviewed the data acquisition process, and considered whether the data met the requirements for data collection as specified in QA approved INL ART TDO data collection plans. The DRC also examined the results of NDMAS data testing and statistical analyses, and confirmed the qualification status of the data as given in this report. The qualification status of AGR-3/4 irradiation data during the first six cycles were previously reported in INL/EXT-14-31186 document. This report presents data qualification status for the entire AGR-3/4 irradiation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Evaluation of waste arising from future nuclear fuel cycle - 15197

A comprehensive study was recently completed at the request of the US Department of Energy Office of Nuclear Energy (DOE-NE) to evaluate and screen nuclear fuel cycles. The final report was issued in October 2014. Uranium- and thorium-based fuel cycles were evaluated using both fast and thermal spectrum reactors. Once-through, limited-recycle, and continuous-recycle cases were considered. This study used nine evaluation criteria to identify promising fuel cycles. Nuclear waste management was one of the nine evaluation criteria. The waste generation criterion from this study is discussed herein. The fundamental characteristics of nuclear fuel cycles were used to create a comprehensive set of fuel cycle options. These options were categorized into 40 Evaluation Groups based on similarities in their physics-based performance. These Evaluation Groups, listed below, comprehensively represent all fuel cycle options: - 8 once-through Evaluation Groups: 5 uranium-based fuel cycles and 3 thorium-based fuel cycles - 10 limited-recycle Evaluation Groups: 6 uranium-based fuel cycles and 4 thorium-based fuel cycles, and - 22 continuous-recycle Evaluation Groups: 14 uranium-based fuel cycles and 8 thorium-based fuel cycles. The study focused on the quantity and characteristics of radioactive wastes generated by the different fuel cycles, examining 5 metrics characterizing waste generation: - mass of spent nuclear fuel (SNF) plus high level waste (HLW) disposed per energy generated, - activity of SNF + HLW (at 100 years) per energy generated, - activity of SNF + HLW (at 100,000 years) per energy generated, - mass of depleted uranium (DU) + recovered uranium (RU) + recovered thorium (RTh) disposed per energy generated, and - volume of low level radioactive waste (LLW) per energy generated. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hybrid Natural Gas Geothermal Combined Cycle Power Plant Analysis

Low temperature geothermal resources, including those associated with oil and gas production, are an underutilized source of low carbon energy. The present work investigates coupling of low-temperature geothermal resources with concentrating solar and/or natural gas energy sources to increase the number of locations at which power generation from low temperature geothermal resources would be technically and economically viable. Stand-alone and hybrid geothermal power cycles are simulated using SimTech IPSEpro process modeling software. Design point strategies for a hybrid power cycle that may operate with either a single heat source or two simultaneous heat input sources are considered. Additionally, off-design power plant operation is investigated to consider the impacts of the heat source availability and ambient temperature variations. The off-design analysis utilizes a modeling tool that predicts power plant performance at each time step as a function of topping cycle heat input (from gas or solar), bottoming cycle heat input (from geothermal), and ambient temperature. Addition of a steam topping cycle to an organic Rankine cycle geothermal power plant provides opportunities to increase the efficiency and power output relative to a stand-alone geothermal power plant. Additionally, use of the waste heat from gas turbine power generation in a geothermal bottoming cycle provides opportunities to increase the amount of power generation associated with each unit of carbon dioxide emitted. This paper will describe the hybrid plant configuration evaluated, discuss the predicted power cycle performance, and compare with stand-alone natural gas and geothermal power generation cases. The power cycle investigated is expected to be applicable for use with conventional hydrothermal resources as well as with geologic thermal energy storage applications and/or enhanced geothermal systems. The steam topping cycle could use a concentrated solar heat source for fully renewable hybrid plant configuration. A plant initially constructed with a natural gas topping cycle heat source could be converted to a solar heat source part way though the power cycle operational life to achieve life cycle carbon emission reductions.

concentrating solar power↗

Effect of KOH concentration on LEO cycle life of IPV nickel-hydrogen flight cells-update 2

An update of validation test results confirming the breakthrough in low earth orbit (LEO) cycle life of nickel-hydrogen cells containing 26 percent KOH electrolyte is presented. A breakthrough in the LEO cycle life of individual pressure vessel (IPV nickel-hydrogen cells has been previously reported. The cycle life of boiler plate cells containing 26 percent potassium hydroxide (KOH) electrolyte was about 40 000 LEO cycles compared to 3500 cycles for cells containing 31 percent KOH. This test was conducted at Hughes Aircraft Company under a NASA Lewis contract. The purpose was to investigate the effect of KOH concentration on cycle life. The cycle regime was a stressful accelerated LEO, which consisted of a 27.5 min charge followed by a 17.5 min discharge (2x normal rate). The depth of discharge (DOD) was 80 percent. The cell temperature was maintained at 23 C. The boiler plate test results are in the process of being validated using flight hardware and real time LEO test at the Naval Weapons Support Center (NWSC), Crane, Indiana under a NASA Lewis Contract. Six 48 Ah Hughes recirculation design IPV nickel-hydrogen flight battery cells are being evaluated. Three of the cells contain 26 percent KOH (test cells), and three contain 31 percent KOH (control cells). They are undergoing real time LEO cycle life testing. The cycle regime is a 90-min LEO orbit consisting of a 54-min charge followed by a 36-min discharge. The depth-of-discharge is 80 percent. The cell temperature is maintained at 10 C. The three 31 percent KOH cells failed (cycles 3729, 4165, and 11355). One of the 26 percent KOH cells failed at cycle 15314. The other two 26 percent KOH cells were cycled for over 16600 cycles during the continuing test.

Smithrick, John J.↗

Application of the Maximum Amplitude-Early Rise Correlation to Cycle 23

On the basis of the maximum amplitude-early rise correlation, cycle 23 could have been predicted to be about the size of the mean cycle as early as 12 mo following cycle minimum. Indeed, estimates for the size of cycle 23 throughout its rise consistently suggested a maximum amplitude that would not differ appreciably from the mean cycle, contrary to predictions based on precursor information. Because cycle 23 s average slope during the rising portion of the solar cycle measured 2.4, computed as the difference between the conventional maximum (120.8) and minimum (8) amplitudes divided by the ascent duration in months (47), statistically speaking, it should be a cycle of shorter period. Hence, conventional sunspot minimum for cycle 24 should occur before December 2006, probably near July 2006 (+/-4 mo). However, if cycle 23 proves to be a statistical outlier, then conventional sunspot minimum for cycle 24 would be delayed until after July 2007, probably near December 2007 (+/-4 mo). In anticipation of cycle 24, a chart and table are provided for easy monitoring of the nearness and size of its maximum amplitude once onset has occurred (with respect to the mean cycle and using the updated maximum amplitude-early rise relationship).

Willson, Robert M.↗

Anticipating Cycle 24 Minimum and its Consequences: An Update

This Technical Publication updates estimates for cycle 24 minimum and discusses consequences associated with cycle 23 being a longer than average period cycle and cycle 24 having parametric minimum values smaller (or larger for the case of spotless days) than long term medians. Through December 2007, cycle 23 has persisted 140 mo from its 12-mo moving average (12-mma) minimum monthly mean sunspot number occurrence date (May 1996). Longer than average period cycles of the modern era (since cycle 12) have minimum-to-minimum periods of about 139.0+/-6.3 mo (the 90-percent prediction interval), inferring that cycle 24 s minimum monthly mean sunspot number should be expected before July 2008. The major consequence of this is that, unless cycle 24 is a statistical outlier (like cycle 21), its maximum amplitude (RM) likely will be smaller than previously forecast. If, however, in the course of its rise cycle 24 s 12-mma of the weighted mean latitude (L) of spot groups exceeds 24 deg, then one expects RM >131, and if its 12-mma of highest latitude (H) spot groups exceeds 38 deg, then one expects RM >127. High-latitude new cycle spot groups, while first reported in January 2008, have not, as yet, become the dominant form of spot groups. Minimum values in L and H were observed in mid 2007 and values are now slowly increasing, a precondition for the imminent onset of the new sunspot cycle.

Wilson, Robert M.↗

Transition to a Thorium-based Fuel Cycle - Choices, Challenges, and Options

The Charter for the Evaluation and Screening (E and S) of Nuclear Fuel Cycle Options requested by the US Department of Energy calls for the identification of promising fuel cycle options to help guide the future directions of research and development in this area. The final report for this study, which was produced by various national laboratory and industry experts, collected the expansive set of fuel cycle options into 40 evaluation groups (EGs). In support of this study, detailed steady-state physics and mass flow data for each of these groups were compiled into a set of Fuel Cycle Data Packages (FCDPs). The data in the FCDPs were then used to quantify the nine criteria detailed in the study to identify the most promising EGs. In addition to supporting the E and S study, data from these FCDPs can be used to benchmark fuel cycle simulation tools for equilibrium calculations. Once benchmarked, their dynamic modeling capabilities can support the continuing effort to determine the most effective approaches for transitioning to proposed advanced future fuel cycles. While steady-state conditions can be calculated directly in some cases, fuel cycle simulation tools allow for the transition scenarios to be simultaneously optimized on multiple parameters such as the fissile material availability, the amount of desirable material in storage, and the time required for transition. In addition to fuel cycle simulations where material availability is considered and is often a constraint to achieving transition, determining the technology needs to enable a transition to take place is also a key consideration (e.g., what technology is needed, when it is needed, and whether it is needed only during the transition and not for the equilibrium fuel cycle). This paper evaluates the material and technology issues and challenges associated with a transition from a uranium-based fuel cycle (such as that operating in the US today, represented by EG01) to a thorium-based fuel cycle, recognizing that thorium requires fissile material to start up. Based on the findings of the E and S report, the two most promising thorium fuel cycle options are considered in this report: (1) EG26, a thermal spectrum molten salt reactor (MSR), and (2) EG28, represented by a sodium fast reactor (SFR, fast spectrum) and a resource-renewable boiling water reactor (RBWR, intermediate spectrum). (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SOLAR CYCLE 24: CURIOUS CHANGES IN THE RELATIVE NUMBERS OF SUNSPOT GROUP TYPES

Here, we analyze different sunspot group (SG) behaviors from the points of view of both the sunspot counts (SSCs) and the number of SGs, in four categories, for the time period of 1982 January-2014 May. These categories include data from simple (A and B), medium (C), large (D, E, and F), and decaying (H) SGs. We investigate temporal variations of all data sets used in this study and find the following results. (1) There is a very significant decrease in the large groups' SSCs and the number of SGs in solar cycle 24 (cycle 24) compared to cycles 21-23. (2) There is no strong variation in the decaying groups' data sets for the entire investigated time interval. (3) Medium group data show a gradual decrease for the last three cycles. (4) A significant decrease occurred in the small groups during solar cycle 23, while no strong changes show in the current cycle (cycle 24) compared to the previous ones. We confirm that the temporal behavior of all categories is quite different from cycle to cycle and it is especially flagrant in solar cycle 24. Thus, we argue that the reduced absolute number of the large SGs is largely, if not solely, responsible for the weak cycle 24. These results might be important for long-term space weather predictions to understand the rate of formation of different groups of sunspots during a solar cycle and the possible consequences for the long-term geomagnetic activity.

79 ASTRONOMY AND ASTROPHYSICS↗

Predicting Solar Cycle 24 Using a Geomagnetic Precursor Pair

We describe using Ap and F(10.7) as a geomagnetic-precursor pair to predict the amplitude of Solar Cycle 24. The precursor is created by using F(10.7) to remove the direct solar-activity component of Ap. Four peaks are seen in the precursor function during the decline of Solar Cycle 23. A recurrence index that is generated by a local correlation of Ap is then used to determine which peak is the correct precursor. The earliest peak is the most prominent but coincides with high levels of non-recurrent solar activity associated with the intense solar activity of October and November 2003. The second and third peaks coincide with some recurrent activity on the Sun and show that a weak cycle precursor closely following a period of strong solar activity may be difficult to resolve. A fourth peak, which appears in early 2008 and has recurrent activity similar to precursors of earlier solar cycles, appears to be the "true" precursor peak for Solar Cycle 24 and predicts the smallest amplitude for Solar Cycle 24. To determine the timing of peak activity it is noted that the average time between the precursor peak and the following maximum is approximately equal to 6.4 years. Hence, Solar Cycle 24 would peak during 2014. Several effects contribute to the smaller prediction when compared with other geomagnetic-precursor predictions. During Solar Cycle 23 the correlation between sunspot number and F(10.7) shows that F(10.7) is higher than the equivalent sunspot number over most of the cycle, implying that the sunspot number underestimates the solar-activity component described by F(10.7). During 2003 the correlation between aa and Ap shows that aa is 10 % higher than the value predicted from Ap, leading to an overestimate of the aa precursor for that year. However, the most important difference is the lack of recurrent activity in the first three peaks and the presence of significant recurrent activity in the fourth. While the prediction is for an amplitude of Solar Cycle 24 of 65 +/- 20 in smoothed sunspot number, a below-average amplitude for Solar Cycle 24, with maximum at 2014.5+/-0.5, we conclude that Solar Cycle 24 will be no stronger than average and could be much weaker than average.

predictions↗

Treatment of Early-Stage Unfavorable Hodgkin Lymphoma: Efficacy and Toxicity of 4 Versus 6 Cycles of ABVD Chemotherapy With Radiation

Purpose: The German Hodgkin Study Group HD11 trial validated 4 cycles of doxorubicin, bleomycin, vinblastine, dacarbazine (ABVD) chemotherapy followed by involved field radiation therapy (IFRT) for early unfavorable Hodgkin lymphoma (HL) patients. However, practitioners often recommend 6 cycles followed by RT, especially for bulky disease. We compared patient outcomes after treatment with 4 or 6 cycles of ABVD followed by RT (IFRT and involved site RT [ISRT]). Methods and Materials: We identified 128 patients treated for early unfavorable HL (GHSG criteria) between 2000 and 2013. Clinical outcomes (overall survival [OS] and freedom from relapse [FFR]) were estimated using Kaplan-Meier analysis. Toxicities were evaluated. Results: The median follow-up time was 5.0 years. Patients received 4 (70 patients, 55%) or 6 (58 patients, 45%) cycles of chemotherapy. Bulky disease was present in 22 patients (31%; 0 stage IA, 3 stage IB, 19 stage IIA) of the 4-cycle group and 42 patients (72%; 5 stage IA, 3 stage IB, 34 stage IIA) of the 6-cycle group. For patients receiving 4 and 6 cycles, the 6-year OS was 100% and 97% (P=.35), respectively, and the 6 year FFR was 100% and 98% (P=.28), respectively. More patients received 6 cycles if they were treated before 2010 (HD11 report) (P=.01) and if they had bulky disease (P<.01). Sixty-eight percent of patients received ISRT. The 6-year FFR was 99% and 100% for patients receiving ISRT and IFRT, respectively (P=.58). More patients experienced bleomycin pulmonary toxicity in the 6-cycle group (20% vs 31%, P=.16). For patients with bulky disease, the 4-year FFR was similar with receipt of 4 (100%) or 6 (98%) cycles (P=.48) and IFRT (100%) or ISRT (98%) (P=.52). There were no deaths among patients with bulky disease. Conclusions: Patients with early unfavorable HL have excellent outcomes with 4 cycles of ABVD chemotherapy followed by ISRT. Six cycles of chemotherapy does not appear superior for disease control, even for bulky disease.

62 RADIOLOGY AND NUCLEAR MEDICINE↗