Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “custom”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Arbitrating Control of Control and Display Units

The ARINC 739 Switch is a computer program that arbitrates control of two multi-function control and display units (MCDUs) between (1) a commercial flight-management computer (FMC) and (2) NASA software used in research on transport aircraft. (MCDUs are the primary interfaces between pilots and FMCs on many commercial aircraft.) This program was recently redesigned into a software library that can be embedded in research application programs. As part of the redesign, this software was combined with software for creating custom pages of information to be displayed on a CDU. This software commands independent switching of the left (pilot s) and right (copilot s) MCDUs. For example, a custom CDU page can control the left CDU while the FMC controls the right CDU. The software uses menu keys to switch control of the CDU between the FMC or a custom CDU page. The software provides an interface that enables custom CDU pages to insert keystrokes into the FMC s CDU input interface. This feature allows the custom CDU pages to manipulate the FMC as if it were a pilot.

Sugden, Paul C.↗

The Applied Meteorology Unit: Nineteen Years Successfully Transitioning Research into Operations for America's Space Program

The Applied Meteorology Unit (AMU) provides technology transition and technique development to improve operational weather support to the Space Shuttle and the entire American space program. The AMU is funded and managed by NASA and operated by a contractor that provides five meteorologists with a diverse mix of advanced degrees, operational experience, and associated skills including data processing, statistics, and the development of graphical user interfaces. The AMU's primary customers are the U.S. Air Force 45th Weather Squadron at Patrick Air Force Base, the National Weather Service Spaceflight Meteorology Group at NASA Johnson Space Center, and the National Weather Service Melbourne FL Forecast Office. The AMU has transitioned research into operations for nineteen years and worked on a wide range of topics, including new forecasting techniques for lightning probability, synoptic peak winds,.convective winds, and summer severe weather; satellite tools to predict anvil cloud trajectories and evaluate camera line of sight for Space Shuttle launch; optimized radar scan strategies; evaluated and implemented local numerical models; evaluated weather sensors; and many more. The AMU has completed 113 projects with 5 more scheduled to be completed by the end of 2010. During this rich history, the AMU and its customers have learned many lessons on how to effectively transition research into operations. Some of these lessons learned include collocating with the operational customer and periodically visiting geographically separated customers, operator submitted projects, consensus tasking process, use of operator primary advocates for each project, customer AMU liaisons with experience in both operations and research, flexibility in adapting the project plan based on lessons learned during the project, and incorporating training and other transition assistance into the project plans. Operator involvement has been critical to the AMU's remarkable success and many awards from NASA, the National Weather Association, and two citations from the Navy's Center of Excellence for Best Manufacturing Practices. This paper will present the AMU's proven methods and explain how they may be applied by other organizations to effectively transition research into operations.

Madura, John T.↗

Challenges and Lessons Learned in the Application of Autonomy to Space Operations

NASA's Space Operations Management Office (SOMO) is working toward a goal of providing an integrated infrastructure of mission and data services for space missions undertaken by NASA enterprises. A significant portion of this effort is focused on reducing the cost of these services. We are interested in the potential of autonomy to reduce operations costs. SOMO services support space missions, but are not part of the mission objectives; therefore the level of acceptable risk is very low. In fact, SOMO could be effective ly prevented from applying autonomy if customers merely perceive it as adding risk to their mission(s). We are interested in this workshop from the standpoint of understanding what can be done to realize the potential cost savings due to autonomy while maintaining acceptable risk and serving the needs of our customers. We would like to present our lessons learned so far in adopting autonomy and automation, which we think will contribute to clarifying the challenges facing the use of such technology. SOMO provides services to a diverse and ambitious set of mission customers. Many of these missions are groundbreaking missions for which communications, data, and other operations requirements sometimes cannot be clearly articulated early in the program. This motivates a need for systems that are robust in the face of unanticipated situations so that customer missions are not unreasonably constrained or impacted by "shortcomings" in SOMO services. One of SOMO's primary goals is to realize a paradigm in which SOMO acts as a service provider to organizations that fly space missions for NASA, other government agencies, and even the commercial sector. These organizations purchase SOMO services "by the pound" as customers. We have to provide systems that are not experiments themselves, but rather stable bases from which to do bold experiments. To this end, SOMO also seeks to work closely with industry to see that robust autonomy technology gets infused into products and services for the space industry and beyond. The potential for application of these technologies spans space-based communications networks (e.g. TDRSS) and ground-based assets including communication and tracking antenna systems, data networks, and control centers. There are several problems that are candidates for the application of autonomy, if it can be made reliable enough, including: antenna control, antenna scheduling, communication link scheduling and operation, navigation, attitude determination, fault detection, isolation, and reconfiguration (for spacecraft or ground assets), and mission-level planning and scheduling. Some attempts have been made to apply autonomy and automation in these areas in the past with varying degrees of success. We will present relevant case histories and the lessons inferred from them. Combining this past experience with anticipated future needs, we can clarify the challenges that must be met in order to realize the benefits of autonomy.

Forrest, David J.↗

Reinventing the International Space Station Payload Integration Processes and Capabilities

The fundamental ISS payload integration philosophy, processes and capabilities were established in the context of how NASA science programs were conducted and executed in the early 1990 s. Today, with the designation of the United States (US) portion of ISS as a National Lab, the ISS payload customer base is growing to include other government agencies, private and commercial research. The fields of research are becoming more diverse expanding from the NASA centric physical, materials and human research sciences to test beds for exploration and technology demonstration, biology and biotechnology, and as an Earth and Space science platform. This new customer base has a broader more diverse set of expectations and requirements for payload design, verification, integration, test, training, and operations. One size fits all processes are not responsive to this broader customer base. To maintain an organization s effectiveness it must listen to its customers, understand their needs, learn from its mistakes, and foster an environment of continual process improvement. The ISS Payloads office is evolving to meet these new customer expectations.

Jones, Rod↗

Development of Hybrid Product Breakdown Structure for NASA Ground Systems

The Product Breakdown Structure is traditionally a method of identification of the products of a project in a tree structure. It is a tool used to assess, plan, document, and display the equipment requirements for a project. It is part of a product based planning technique, and attempts to break down all components of a project in as much detail as possible, so that nothing is overlooked. The PBS for ground systems at the Kennedy Space Center is being developed to encompass the traditional requirements including the alignment of facility, systems, and components to the organizational hierarchy. The Ground Operations Product Breakdown Structure is a hybrid in nature in that some aspects of a work breakdown structure will be incorporated and merged with the Architecture Concept of Operations, Master Subsystem List, customer interface, and assigned management responsibility. The Ground Operations Product Breakdown Structure needs to be able to identify the flexibility of support differing customers (internal and external) usage of ground support equipment within the Kennedy Space Center launch and processing complex. The development of the Product Breakdown Structure is an iterative activity Initially documenting the organization hierarchy structure and relationships. The Product Breakdown Structure identifies the linkage between the customer program requirements, allocation of system resources, development of design goals, and identification logistics products. As the Product Breakdown Structure progresses the incorporation of the results of requirement planning for the customer occurs identifying facility needs and systems. The mature Product Breakdown Structure is baselined with a hierarchical drawing, the Product Breakdown Structure database, and an associated document identifying the verification of the data through the life cycle of the program/product line. This paper will document, demonstrate, and identify key aspects of the life cycle of a Hybrid Product Breakdown Structure. The purpose is to show how a project management and system engineering approach can be utilized for providing flexible customer service in an evolving manned space flight launch processing environment.

Monaghan, Mark W.↗

Space Transportation System Availability Requirements and Its Influencing Attributes Relationships

It is essential that management and engineering understand the need for an availability requirement for the customer's space transportation system as it enables the meeting of his needs, goal, and objectives. There are three types of availability, e.g., operational availability, achieved availability, or inherent availability. The basic definition of availability is equal to the mean uptime divided by the sum of the mean uptime plus the mean downtime. The major difference is the inclusiveness of the functions within the mean downtime and the mean uptime. This paper will address tIe inherent availability which only addresses the mean downtime as that mean time to repair or the time to determine the failed article, remove it, install a replacement article and verify the functionality of the repaired system. The definitions of operational availability include the replacement hardware supply or maintenance delays and other non-design factors in the mean downtime. Also with inherent availability the mean uptime will only consider the mean time between failures (other availability definitions consider this as mean time between maintenance - preventive and corrective maintenance) that requires the repair of the system to be functional. It is also essential that management and engineering understand all influencing attributes relationships to each other and to the resultant inherent availability requirement. This visibility will provide the decision makers with the understanding necessary to place constraints on the design definition for the major drivers that will determine the inherent availability, safety, reliability, maintainability, and the life cycle cost of the fielded system provided the customer. This inherent availability requirement may be driven by the need to use a multiple launch approach to placing humans on the moon or the desire to control the number of spare parts required to support long stays in either orbit or on the surface of the moon or mars. It is the intent of this paper to provide the visibility of relationships of these major attribute drivers (variables) to each other and the resultant system inherent availability, but also provide the capability to bound the variables providing engineering the insight required to control the system's engineering solution. An example of this visibility will be the need to provide integration of similar discipline functions to allow control of the total parts count of the space transportation system. Also the relationship visibility of selecting a reliability requirement will place a constraint on parts count to achieve a given inherent availability requirement or accepting a larger parts count with the resulting higher reliability requirement. This paper will provide an understanding for the relationship of mean repair time (mean downtime) to maintainability, e.g., accessibility for repair, and both mean time between failure, e.g., reliability of hardware and the system inherent availability. Having an understanding of these relationships and resulting requirements before starting the architectural design concept definition will avoid considerable time and money required to iterate the design to meet the redesign and assessment process required to achieve the results required of the customer's space transportation system. In fact the impact to the schedule to being able to deliver the system that meets the customer's needs, goals, and objectives may cause the customer to compromise his desired operational goal and objectives resulting in considerable increased life cycle cost of the fielded space transportation system.

Rhodes, Russel E.↗

Recent Weather Technologies Delivered to America's Space Program by the Applied Meteorology Unit

The Applied Meteorology Unit (AMU) is a unique joint venture of NASA, the Air Force and the National Weather Service (NWS) and has been supporting the Space Program for nearly two decades. The AMU acts as a bridge between the meteorological research community and operational forecasters by developing, evaluating and transitioning new technology and techniques to improve weather support to spaceport operations at the Eastern Range (ER) and Kennedy Space Center. Its primary customers are the 45th Weather Squadron at Cape Canaveral Air Force Station (CCAFS), the Spaceflight Meteorology Group at Johnson Space Center and the National Weather Service Office in Melbourne, FL. Its products are used to support NASA's Shuttle and ELV programs as well as Department of Defense and commercial launches from the ER. Shuttle support includes landing sites beyond the ER. The AMU is co-located with the Air Force operational forecasters at CCAFS to facilitate continuous two-way interaction between the AMU and its operational customers. It is operated under a NASA, Air Force, and NWS Memorandum of Understanding (MOU) by a competitively-selected contractor. The contract, which is funded and managed by NASA, provides five full time professionals with degrees in meteorology or related fields, some of whom also have operational experience. NASA provides a Ph.D.- level NASA civil service scientist as Chief of the AMU. The AMU is tasked by its customers through a unique, nationally recognized process. The tasks are limited to development, evaluation and operational transition of technology to improve weather support to spaceport operations and providing expert advice to the customers. The MOU expressly forbids using the AMU resources to conduct operations or do basic research. The presentation will provide a brief overview of the AMU and how it is tasked by its customers to provide high priority products and services. The balance of the presentation will cover a sampling of products delivered over the last 18 years that are currently in operational use. Each example will describe the problem to be solved, the solution provided, and the operational benefits of implementing that solution.

Bauman, WIlliam, H., III↗

Development of Hybrid Product Breakdown Structure for NASA Ground Systems

The Product Breakdown Structure is traditionally a method of identification of the products of a project in a tree structure. It is a tool used to assess, plan, document, and display the equipment requirements for a project. It is part of a product based planning technique, and attempts to break down all components of a project in as much detail as possible, so that nothing is overlooked. The PBS for ground systems at the Kennedy Space Center is being developed to encompass the traditional requirements including the alignment of facility, systems, and components to the organizational hierarchy. The Ground Operations Product Breakdown Structure is a hybrid in nature in that some aspects of a work breakdown structure will be incorporated and merged with the Architecture Concept of Operations, Master Subsystem List, customer interface, and assigned management responsibility. The Ground Operations Product Breakdown Structure needs to be able to identify the flexibility of support differing customers (internal and external) usage of ground support equipment within the Kennedy Space Center launch and processing complex. The development of the Product Breakdown Structure is an iterative activity Initially documenting the organization hierarchy structure and relationships. The Product Breakdown Structure identifies the linkage between the customer program requirements, allocation of system resources, development of design goals, and identification logistics products. As the Product Breakdown Structure progresses the incorporation of the results of requirement planning for the customer occurs identifying facility needs and systems. The mature Product Breakdown Structure is baselined with a hierarchical drawing, the Product Breakdown Structure database, and an associated document identifying the verification of the data through the life cycle of the program/product line. This paper will document, demonstrate, and identify key aspects of the life cycle of a Hybrid Product Breakdown Structure. The purpose is to show how a project management and system engineering approach can be utilized for providing flexible customer service in an evolving manned space flight launch processing environment.

Monaghan, Mark W.↗

Markets and Economic Requirements for Fission Batteries and Other Nuclear Systems

Fission Batteries (FBs) are nuclear reactors defined by five characteristics which enable large-scale deployment: cost competitive, standardized sizes for economic mass production, easy installation and removal, secure and safe unattended operation with high reliability. FBs are not defined by technology or power level. Technical and market considerations suggest that most FBs will produce 20 to 30 MWt. This proceedings reports on the outcomes of two workshops that were held in January 2021 to better define markets and economic challenges for FBs. Three major markets were identified. The largest market is the industrial and commercial heat market. There are about 4000 industrial users (excluding utilities) that require more than one megawatt of heat. The number of customers versus size of heat demand was determined. In a low-carbon world there is the potential for many additional customers—including expanded biofuels production and district heat. The second market is for non-grid electricity. This includes co-generation plants that produce heat and electricity for a single customer. The third market is the maritime market with ~100,000 ships worldwide. In the United States, natural gas is the low-cost energy option today and will remain so unless constraints or taxes impact its use. If restrictions on greenhouse gas emissions, the FB competition includes natural gas with carbon capture, biofuels, hydrogen and grid electricity. Natural gas with carbon capture is not economically viable on a small scale. Biofuels may be expensive but may be the economically preferred option for locations with small energy demands of a few megawatts. Hydrogen is a potential competitor with many of the characteristics of natural gas. Grid electricity is not a competitive source of heat. For FBs to be economically competitive, the price of delivered heat must be $20-50/MWh ($6-15/million BTU). The economically competitive range for non-grid electricity is estimated at $70-100/MWh. These electricity prices are competitive with the retail prices of electricity in many parts of the United States for the customer. FBs are not expected to be competitive selling wholesale electricity to the grid. To achieve the aforementioned cost targets for heat and electricity markets, FB designers must (1) maximize the power output within the constraints of a FB (e.g., truck transportability, passive decay heat removal), (2) drastically reduce the size of onsite staff, (3) adopt core designs with low fuel costs (enrichment and fabrication), and (4) develop a system design that is efficiently manufactured in factories. The business case depends upon more than being just a replacement for natural gas. The largest incentives for adoption of FBs is where they create new markets and new sources of revenue. An example is the paper and pulp industry that burns biomass wastes to provide heat and electricity to make paper. An external heat source could meet the demand for heat and electricity by the paper process and enable converting waste biomass into liquid biofuels rather than burning to provide heat. Other markets, such as data centers, are driven by special energy requirements such as extreme reliability. Most customers are not in the energy business but need heat and electricity to produce a product—a manufactured good, education, retail sales (shopping malls), marine transport or some other product. As a consequence, there will be large incentives to lease rather than own FBs. Leasing avoids the regulatory challenges that remain with the owner of the FB. Leasing creates large incentives for FP standardization of sizes and transportability to maintain the value of the FB at the end of the lease—similar to the leasing of jet engines and aircraft. The economic constraints combined with technical constraints suggest competitive FBs will likely have outputs exceeding 10 MWt. There appear to be little incentives for very long-lived reactor cores because such machines require much larger inventories of fuel. Maintenance requirements and the options to provide technology updates may favor shorter lifetimes (~5 years). The assessment is that there is the potential for FBs to be economically viable and play a major role in global decarbonization in three markets: heat, non-grid electricity and maritime applications.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Nonstationary and Non-Gaussian Moving Average Model for Solar Irradiance

Historically, power has flowed from large power plants to customers. Increasing penetration of distributed energy resources such as solar power from rooftop photovoltaic has made the distribution network a two-way-street with power being generated at the customer level. The incorporation of renewables introduces additional uncertainty and variability into the power grid. Distribution network operation studies are being adapted to include renewables; however, such studies require high quality solar irradiance data that adequately reflect realistic meteorological variability. Data from satellite-based products are spatially complete, but temporally coarse, whereas solar irradiances exhibit high frequency variation at very fine timescales. We propose a new stochastic method for temporally downscaling global horizontal irradiance (GHI) to 1 min resolution, but we do not consider the spatial aspect due to limited availability of the in situ irradiance measurements. Solar irradiance's first and second-order structures vary diurnally and seasonally, and our model adapts to such nonstationarity. Empirical irradiance data exhibits highly non-Gaussian behavior; we develop a nonstationary and non-Gaussian moving average model that is shown to capture realistic solar variability at multiple timescales. We also propose a new estimation scheme based on Cholesky factors of empirical autocovariance matrices, bypassing difficult and inaccessible likelihood-based approaches. The model is demonstrated for a case study of three locations that are located in diverse climates through the United States. The model is compared against competitors from the literature and is shown to provide better uncertainty and variability quantification on testing data.

Cholesky factor↗

Severe weather, utility spending, and the long-term reliability of the U.S. power system

There has been a limited amount of peer-reviewed literature on long-term trends in electricity reliability including the underlying factors that impact reliability across the United States. In this analysis, we considered up to 16 years of data from 203 U S. utilities—representing about 70% of electricity sales. Annual frequency of interruptions for an average customer—at the regional and U.S. national-level—has generally decreased over this timeframe. But we do not find that there is a statistically significant trend in the annual duration of interruptions for an average customer. We find that more explicit measures of severe weather are correlated with reliability. We are able to explain 7% and 16% of past variation in the reliability metrics system average interruption duration and frequency indices, respectively, is due to severe weather—a significant improvement over earlier studies. We find that current year spending by utilities is correlated with worse reliability and that cumulative spending over the preceding three years is correlated with better reliability. Finally, we demonstrate that using a statistical instrument to represent the annual frequency of interruptions for an average customer can greatly improve analysis of trends in the annual duration of interruptions for an average customer.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Backup power or bill savings? How electricity tariffs impact residential solar-plus-storage usage in the United States

Adoption of paired solar-plus-storage systems has accelerated in recent years, driven by both the demand for backup power and a desire to manage utility bills. Tradeoffs between those two uses can arise through the reserve setting on the battery storage system, which serves to maintain a minimum state of charge in case of a power interruption. Our paper applies an economic framework to evaluate this tradeoff in terms of changes in bill savings and customer reliability value across reserve levels, considering how those tradeoffs depend on the underlying electricity rate structure and levels. The analysis is based on a representative set of load profiles, solar profiles, tariff designs, and stochastic power interruption events across ten different regions in the United States. We find that the opportunity cost of holding storage capacity in reserve, in terms of foregone bill reductions, outweighs any gains in reliability value from mitigated power interruptions in the majority of customer situations. Higher storage reserve levels increase total customer value only in specific circumstances, such as for customers with inferior reliability (10x average interruptions), with a very high value of lost load ($50/kWh), and with tariff or interconnection rules that disallow grid charging. However, even this result is dampened when considering tariff designs with higher price differentials that increase the opportunity cost of holding storage in reserve (e.g. import/export or time-of-use rates). Allowing grid charging in tariffs essentially eliminates the necessity to hold any storage in reserve in all sensitivity cases explored.

Electric resilience↗

Power now, pay later: the evolution of U.S. residential solar financing

Most U.S. residential rooftop solar customers finance their solar purchases through loans or by buying power from third-party owned systems. Prior research demonstrates how third-party ownership (TPO) models such as leases emerged in the early 2010s and accelerated solar adoption by low- and moderate-income households while driving market concentration in the installation industry. Since 2015, loans have emerged as a prevalent financing alternative, but the potential effects of loans on the customer base and industry remain understudied. Here, we fill that research gap by developing a methodology to identify loan-financed and third-party owned systems in a household-level solar adopter data set. The data suggest that loans accounted for increasing solar market shares from 2017 until reaching as high as 70% in 2022, but that the market has since shifted back to TPO. The data show that TPO adopters in our sample earned about 16%–18% less and loan recipients earned 3%–7% less, at the median, than customers who self-financed systems. These results reaffirm prior research showing that TPO has accelerated low- and moderate-income adoption and that loans have likewise expanded the customer base to a lesser extent. The results suggest that loan-financed systems entail around a 16%–26% price premium that is only partly explained by loan fees. Finally, the data suggest that the emergence of loans has likely reduced market concentration in the rooftop solar industry.

financing↗

Distributed Ledger Technology for Fault Tolerant Distribution Grid Operations

This paper explores the potential of distributed ledger technology (DLT) to improve fault-tolerant grid operations by leveraging its core features as an immutable, decentralized ledger, a distributed, consensus-based agreement process, and a distributed state-replication engine. Distribution power systems deliver electricity to millions of customers; however, they are susceptible to various threats that can result in customer interruptions. These include faults caused by adverse weather conditions, natural disasters, vegetation growth, equipment failure, and malicious attacks. To minimize the effects of these faults, fault-handling approaches rely on network knowledge to isolate affected areas and reconnect unaffected areas, reducing the number of affected customers while maintaining safety. Here, we present a trusted data-sharing architecture that enables independent, distributed actors to reconstruct the pre-fault system state by enabling distributed resources to make appropriate decisions with limited network/system information. Although the process requires some data sharing between switch-delimited areas, the approach limits the amount of private information shared, preserving customers' privacy and business-sensitive information. We include three use cases that form a foundation for third parties to develop functional solutions that can eventually be deployed in the field. The gross error detection method used within switch-delimited areas can identify sensor errors and accurately detect circuit breaker states. The evaluation of possible reconnection while preserving data ownership resulted in a voltage magnitude difference smaller than 0.001% from the OpenDSS power flow solution that has full system knowledge, which is below the expected power flow tolerance. The approach offers a promising opportunity for improving fault-tolerant distribution grid operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Pulse Generation Framework with Augmented Program-aware Basis Gates and Criticality Analysis

Near-term intermediate scale quantum (NISQ) de- vices are subject to considerable noise and short coherence time. Consequently, it is critical to minimize circuit execution latency. Traditionally, each basis gate of a transpiled circuit is decoded into a fixed episode of the device control pulses. Recently, people started to investigate merged pulse generation for customized gates through quantum optimal control (QOC). However, existing QOC approaches face the challenges of (i) restricted search space due to prohibitive compilation overhead; (ii) suboptimal end-to-end performance due to aggressive local optimization and falsely introduced dependency among the customized gates; (iii) inadequate adaptivity towards system calibration, which is critical for NISQ devices. In this work, we propose PAQOC, a novel QOC framework that can (i) automatically detect frequently encountered gate patterns in the logical circuit by modeling the problem as a subgraph mining process and reuse these patterns to enable much larger search space exploration (i.e., program aware); (ii) systemically construct customized gate-set based on the impact to the overall program latency (i.e., criticality-aware); and (iii) quickly adapt to system re-calibration thanks to the small-scale pattern-based gate generation (i.e., adaptivity-aware). PAQOC achieves a good tradeoff between circuit performance and compilation time, allowing fully automatic, single stop, ad- hoc customized pulse generation for more efficient execution of user programs on NISQ devices. Evaluations using fifteen applications show that PAQOC can achieve on average 1.95× speedup of the circuit latency and achieve on average 36.7% reduction in compilation overhead. With PAQOC, circuits can run faster with reduced noise, allowing deeper circuits to be tested within the coherence time of present NISQ platforms.

Chen, Yanhao↗

Advanced Metering Infrastructure for Distribution Planning and Operation: Closing the Loop on Grid-Edge Visibility

In the recent history of electric utilities, the potential to have visibility of the grid edge is gaining significance for the reliable planning and operation of a clean energy smart grid. Before the recent large-scale customer adoption of distributed energy resources (DERs), distribution networks were planned with a simpler fit-and-forget philosophy. The importance of customer-sited DERs to achieve climate change goals marks a major shift for utility operations. Changes to traditional fit-and-forget planning paradigms require better availability of grid-edge data. Smart metering is an enterprise-wide tool that is enabling visibility when and where it has been most needed. As of 2020, the rollout of smart metering, or advanced metering infrastructure (AMI), had reached more than 100 million meters in the United States, and nearly half of all electricity customers are now equipped with a smart meter (Figure 1). Smart meters are quickly becoming a ubiquitous data capture feature of smart grids. AMI enables utilities to record and measure electricity usage and power-flow metrics at a minimum of hourly intervals and at least once a day. At a minimum, AMI enables interval metering, automatic meter reading enabling accurate and time-interval billing, and the ability to provide feedback on customer energy consumption.

advanced metering infrastructure↗

Transactive Electric Vehicle Agent: Design and Performance Evaluation

Transactive electric vehicle (TEV) agent enables the utilization of EVs’ flexible resources for the benefits of both utility and customer by active market participation. In this work, we propose a novel TEV agent optimization with a novel slider feature that models an individual customer’s willingness to participate in the transactive market. We characterize the customer comfort in EV’s context using a slider that provides flexibility to the customer to choose a trade-off between comfort and profit. Finally, the proposed optimization framework is used to investigate the comparative benefits of V2G technology compared to V1G.

day-ahead electricity market, electric vehicle, fl↗