Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “code compliance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Special Analysis of Transuranic Waste in Trench T04C at the Area 5 Radioactive Waste Management Site, Nevada Test Site, Nye County, Nevada, Revision 1

This Special Analysis (SA) was prepared to assess the potential impact of inadvertent disposal of a limited quantity of transuranic (TRU) waste in classified Trench 4 (T04C) within the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada Test Site (NTS). The Area 5 RWMS is a low-level radioactive waste disposal site in northern Frenchman Flat on the Nevada Test Site (NTS). The Area 5 RWMS is regulated by the U.S. Department of Energy (DOE) under DOE Order 435.1 and DOE Manual (DOE M) 435.1-1. The primary objective of the SA is to evaluate if inadvertent disposal of limited quantities of TRU waste in a shallow land burial trench at the Area 5 RWMS is in compliance with the existing, approved Disposal Authorization Statement (DAS) issued under DOE M 435.1-1. In addition, supplemental analyses are performed to determine if there is reasonable assurance that the requirements of Title 40, Code of Federal Regulations (CFR), Part 191, Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level, and Transuranic Radioactive Wastes, can be met. The 40 CFR 191 analyses provide supplemental information regarding the risk to human health and the environment of leaving the TRU waste in T04C. In 1989, waste management personnel reviewing classified materials records discovered that classified materials buried in trench T04C at the Area 5 RWMS contained TRU waste. Subsequent investigations determined that a total of 102 55-gallon drums of TRU waste from Rocky Flats were buried in trench T04C in 1986. The disposal was inadvertent because unclassified records accompanying the shipment indicated that the waste was low-level. The exact location of the TRU waste in T04C was not recorded and is currently unknown. Under DOE M 435.1-1, Chapter IV, Section P.5, low-level waste disposal facilities must obtain a DAS. The DAS specifies conditions that must be met to operate within the radioactive waste management basis, consisting of a performance assessment (PA), composite analysis (CA), closure plan, monitoring plan, waste acceptance criteria, and a PA/CA maintenance plan. The DOE issued a DAS for the Area 5 RWMS in 2000. The Area 5 RWMS DAS was, in part, based on review of a CA as required under DOE M 435.1-1, Chapter IV, Section P.(3). A CA is a radiological assessment required for DOE waste disposed before 26 September 1988 and includes the radiological dose from all sources of radioactive material interacting with all radioactive waste disposed at the Area 5 RWMS. The approved Area 5 RWMS CA, which includes the inventory of TRU waste in T04C, indicates that the Area 5 RWMS waste inventory and all interacting sources of radioactive material can meet the 0.3 mSv dose constraint. The composite analysis maximum annual dose for a future resident at the Area 5 RWMS was estimated to be 0.01 mSv at 1,000 years. Therefore, the inadvertent disposal of TRU in T04C is protective of the public and the environment, and compliant with all the applicable requirements in DOE M 435.1-1 and the DAS. The U.S. Environmental Protection Agency promulgated 40 CFR 191 to establish standards for the planned disposal of spent nuclear fuel, high level, and transuranic wastes in geologic repositories. Although not required, the National Nuclear Security Administration Nevada Site Office requested a supplemental analysis to evaluate the likelihood that the inadvertent disposal of TRU waste in T04C meets the requirements of 40 CFR 191. The SA evaluates the likelihood of meeting the 40 CFR 191 containment requirements (CRs), assurance requirements, individual protection requirements (IPRs), and groundwater protection standards. The results of the SA indicate that there is a reasonable expectation of meeting all the requirements of 40 CFR 191. The conclusion of the SA is that the Area 5 RWMS with the TRU waste buried in T04C is in compliance with all requirements in DOE M 435.1-1 and the DAS. Compliance with the DAS is demonstrated by the results of the Area 5 RWMS CA. Supplemental analyses in the SA indicate there is a reasonable expectation that the TRU in T04C can meet all the requirements of 40 CFR 191. Therefore, inadvertent disposal of a limited quantity of TRU in a shallow land burial trench at the Area 5 RWMS does not pose a significant risk to the public and the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing work flow and logistic at waste processing facilities using the waste compliance and tracking system - 15392

Work flow and logistics at a busy radioactive waste processing complex or permitted treatment, storage, and disposal facility (TSDF) can pose a monumental challenge. An efficient operation requires good communication between engineering, logistics, and waste operators. The Los Alamos National Laboratory (LANL) has implemented an application that facilitates seamless communication of work flow requirements, between engineering, logistics, and waste operations personnel in the field. The Waste Compliance and Tracking System (WCATS), a comprehensive waste management system designed at LANL, provides four key elements to support logistics: (a) the container work path, (b) directed unit operation requests, (c) notification of pending operations, and (d) real-time status tools for office and field workers. The combination of these elements allows everyone to function as a team, with a shared knowledge of what is needed to accomplish facility objectives. The first element is like a road map indicating which unit operations are needed and in what sequence they should be performed; this is referred to as a 'work path'. It automatically routes a waste item or container from operation to operation. For example, a given work path might indicate that waste items require radiological survey, radioassay, and a technical review, in that order. When the work path is assigned to a container, the system enforces the correct order of operations. Directed unit operation 'requests', the second element, fills a gap between pre-planned, formal 'work path' activities and the need for flexibility to direct preparatory operations or deal with unexpected issues, like staging or mining containers in preparation for a shipment or transferring containers from one storage unit to another to clear a path for building maintenance. Logistics engineers prepare these 'requests', and the system monitors the status and completion of the work. The third element, notifications, allows team members to subscribe to and receive notice that an operation is pending, initiated, or complete. This functionality supports a range of communication options, including e-mail, cell phone, pager, or application in-box messaging. Notifications allow waste operations personnel to multi-task, and remain in the loop on the status of facility-wide activities. Finally, the fourth element provides tools that communicate work path pending operations and directed requests to field workers on their mobile computer, allowing them to mine or pick containers from storage units, and leverage the capabilities of a bar-code scanner to avoid selection mistakes. Oversight and summary tools are provided, allowing logistics personnel to monitor work path and request task status, identify work-flow bottlenecks, and maximize the efficiency of waste operations. The Waste Compliance and Tracking System (WCATS) provides an innovative, comprehensive set of tools that allow large-scale radioactive waste processing facilities to manage logistics, maximize efficient use of the workforce, and create a team environment, where everyone from management to the waste handlers have an understanding of the work load and what needs to be accomplished. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

North Dakota Integrated Carbon Storage Complex Feasibility Study. Final report

In spring 2017, the Energy & Environmental Research Center (EERC) initiated an effort to determine the feasibility of developing a commercial-scale CO 2 geologic storage complex able to store 50+ million tonnes (Mt) of CO 2 in central North Dakota safely, permanently, and economically. The objective was to fulfill the goals of the U.S. Department of Energy (DOE) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative and address technical and nontechnical challenges specific to commercial-scale deployment of a CO2 storage project. The findings clearly show that the concept of capturing CO 2 from a lignite-fired electrical generation facility in central North Dakota and safely and permanently storing the CO 2 in the deep subsurface is indeed technically, economically, and socially feasible. This project evaluated two study areas and their respective geologic storage complexes located adjacent to separate coal-fired facilities in North Dakota: the Basin Electric Power Cooperative (BEPC)-owned Great Plains Synfuels Plant (GPSP) and the Minnkota Power Cooperative (Minnkota)-owned Milton R. Young Station (MRYS). These locations, one with CO 2 capture in place and an existing CO 2 pipeline, are bolstered by progressive North Dakota pore space ownership and long-term liability laws. These elements and a motivated team created an ideal synergistic scenario for ensuring success of the CarbonSAFE Initiative and promoting North Dakota’s statewide vision for carbon management. The project included drilling two new geologic characterization wells, integrating an existing 3-D seismic survey, creating a geologic model subsequently used for injection simulation, a risk assessment, public outreach, and generating a site development plan based on results. In addition, the performance of select National Risk Assessment Partnership tools was evaluated. The geologic characterization wells were drilled ~5600 feet deep to the Broom Creek Formation; ~350 feet of core was retrieved from each well. The core included the Broom Creek (targeted injection zone) and a portion of the overlying Opeche Shale (seal). The Flemmer-1 well, west of Beulah, North Dakota, yielded 169 feet of sandstone. The BNI-1 well located south of Center, North Dakota, yielded 124 feet of sandstone. In each case, laboratory analysis of the sandstone showed permeability in the 300–1000-mD range, with porosity of 20%–30%. The Flemmer-1 well was sited within the boundaries of an existing 3-D seismic survey. Colocating the well with the seismic survey maximized the relationship between new and legacy data and developed a first-of-its-kind interpretation of the geologic fabric of the Broom Creek. Geologic characterization data were integrated into a 5544-mi 2 geocellular model that encompassed both new wells and stratigraphy from the surface to the Amsden Formation (underlying the Broom Creek). The model was later expanded vertically to include the deeper Black Island–Deadwood interval to examine its potential viability as a storage target. The geocellular model provided the foundation for dynamic simulation of CO 2 into the Broom Creek. Results of the simulation suggest that the Broom Creek could accept the DOE target rate of 2 Mt/yr of CO 2 into as few as two wells. To bracket the expected capture from MRYS, simulations were also investigated for a 4-Mt/yr rate near MRYS. Although more wells are needed (two additional), the Broom Creek still has the storage resource to accept the CO 2 at the increased rate. A risk assessment exercise was conducted to identify and assess technical and nontechnical risks that could prevent potential candidate storage complexes within the study area from serving as commercial storage sites. The assessment identified and evaluated six technical risk categories: 1) CO 2 injectivity, 2) storage capacity, 3) lateral migration of CO 2 , 4) lateral pressure propagation, 5) vertical migration of CO 2 or formation brine, and 6) induced seismicity. Following two rounds of analysis and scoring, no risks were determined to preclude continued efforts to develop carbon capture, utilization, and storage (CCUS) in central North Dakota. The risk assessment results will be used to guide future site characterization, modeling and simulation, and monitoring activities. A specific nontechnical strategic risk based on challenges that may be realized in amalgamation of pore space resulted in vertically expanding the geologic model to incorporate the potential for stacked storage in multiple saline reservoirs. By including the Black Island–Deadwood interval (the basal sedimentary reservoir in this region), the amalgamated areal extent could be reduced by as much as 45%. Working with a smaller geographic area reduces risks and costs associated with monitoring and pore space leasing. An economic evaluation incorporating capture; transport (<5 mi); Class VI wells; permitting; and monitoring, verification, and accounting suggests implementing commercial-scale CCUS is economically attractive if the federal tax benefits of 45Q are included. This is validated by Minnkota’s continued pursuit of CO 2 capture and geologic storage at MRYS through its Project Tundra initiative, indicating that there is a business case for CCUS in central North Dakota. Currently, North Dakota is the only state with underground injection control (UIC) Class VI primacy. Built into the North Dakota Century Code is a series of regulatory requirements that guide the process to obtain a Class VI CO 2 storage facility permit. As part of this project, a site development plan was compiled to assure compliance with North Dakota’s requirements to permit a commercial-scale CO 2 storage operation and includes a prospective time line encompassing a general breakdown of activities. In total, an estimated 30 months would be needed to execute the necessary steps to attain a North Dakota CO 2 storage facility permit. Outreach was an integral part of the project and encompassed any project-related activity that had contact or exposure beyond the project team. The goals of outreach were to foster an environment from which stakeholders could make informed decisions about the project and gauge community receptiveness to a CCUS project. A consistent set of messages and outreach products were developed in conjunction with an outreach advisory board that integrated project partners and team members. To gauge public acceptability of geologically storing CO 2 , 5611 households in the project area were invited to participate in an online survey. The survey results indicate that the public attitude regarding CCUS is neutral to positive, with strong sentiment that CO 2 capture and storage may be an approach to maintain the economic vitality of the region. To achieve project objectives, critical support in the form of financial backing, engineering evaluations, site access, outreach collaboration, operations data, risk assessment/evaluation, and software access was provided by BEPC, the North Dakota Industrial Commission Lignite Research Council, ALLETE Clean Energy, BNI Energy, North American Coal Corporation, Minnkota, Prairie Public Broadcasting, Computer Modelling Group Ltd., and Schlumberger.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Thermal-hydraulic calculations for the conversion to LEU of a research reactor core

The thermal-hydraulic analysis performed for the needs of the conversion of the open pool 5MW Greek Research Reactor (GRR-1) to a pure Low Enrichment (LEU) configuration is presented. The methodology was based on a complete set of neutronic calculations performed for the new core configuration, in compliance with pre-defined Operation Limiting Conditions. The hottest channel analysis approach was adopted, and peaking factors were used to account for fabrication or measuring uncertainties. Calculations were carried out using the numerical codes NATCON, PLTEMP and PARET provided by Argonne National Laboratory (ANL). Two main different classes of conditions were considered, namely i) steady state normal operating conditions and ii) transient cases related to accidental events including reactivity feedback effects. For steady state operating conditions the behaviour of the new configuration was examined both for forced and natural convection cooling modes. Transient calculations considered several initiating events including reactivity insertion accidents (slow or fast reactivity insertion) and total or partial loss-of-flow accidents, i.e. in accordance to guidelines provided by the IAEA for research Reactors. (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

High Efficiency Low Cost CO2 Compression Using Supersonic Shock Wave Technology

Development and testing results from a supersonic compressor are presented. The compressor achieved record pressure ratio for a fully-supersonic stage and successfully demonstrated the technology potential. Several tasks were performed in compliance with the DOE award objectives. A high-pressure ratio compressor was retrofitted to improve rotordynamics behavior and successfully tested. An outside review panel confirmed test results and design approach. A computational fluid dynamics code used to analyze the Ramgen supersonic flowpath was extensively and successfully modified to improve use on high-performance computing platforms. A comprehensive R&D implementation plan was developed and used to lay the groundwork for a future full-scale compressor demonstration. Conceptual design for a CO2 demonstration compressor was developed and reviewed.

20 FOSSIL-FUELED POWER PLANTS↗

Roadmap Toward a Predictive Performance-based Commercial Energy Code

Energy codes have provided significant increases in building efficiency over the last 38 years, since the first national energy model code was published in late 1975. The most commonly used path in energy codes, the prescriptive path, appears to be reaching a point of diminishing returns. The current focus on prescriptive codes has limitations including significant variation in actual energy performance depending on which prescriptive options are chosen, a lack of flexibility for designers and developers, and the inability to handle control optimization that is specific to building type and use. This paper provides a high level review of different options for energy codes, including prescriptive, prescriptive packages, EUI Target, outcome-based, and predictive performance approaches. This paper also explores a next generation commercial energy code approach that places a greater emphasis on performance-based criteria. A vision is outlined to serve as a roadmap for future commercial code development. That vision is based on code development being led by a specific approach to predictive energy performance combined with building specific prescriptive packages that are designed to be both cost-effective and to achieve a desired level of performance. Compliance with this new approach can be achieved by either meeting the performance target as demonstrated by whole building energy modeling, or by choosing one of the prescriptive packages.

Rosenberg, Michael I.↗

Roadmap Toward a Predictive Performance-based Commercial Energy Code

Energy codes have provided significant increases in building efficiency over the last 38 years, since the first national energy model code was published in late 1975. The most commonly used path in energy codes, the prescriptive path, appears to be reaching a point of diminishing returns. The current focus on prescriptive codes has limitations including significant variation in actual energy performance depending on which prescriptive options are chosen, a lack of flexibility for designers and developers, and the inability to handle control optimization that is specific to building type and use. This paper provides a high level review of different options for energy codes, including prescriptive, prescriptive packages, EUI Target, outcome-based, and predictive performance approaches. This paper also explores a next generation commercial energy code approach that places a greater emphasis on performance-based criteria. A vision is outlined to serve as a roadmap for future commercial code development. That vision is based on code development being led by a specific approach to predictive energy performance combined with building specific prescriptive packages that are designed to be both cost-effective and to achieve a desired level of performance. Compliance with this new approach can be achieved by either meeting the performance target as demonstrated by whole building energy modeling, or by choosing one of the prescriptive packages.

Rosenberg, Michael I.↗

Recommendation for the Lower Limit of the Waste Shear Strength (Parameter Borehole: TAUFAIL)

The Waste Isolation Pilot Plant demonstrates compliance with federal containment requirements by means of performance assessment calculations carried out to estimate the probability and consequences of radionuclide releases from the repository to the accessible environment. These calculations are performed using a system of computer codes which assess twenty-four peer-reviewed conceptual models. One of those is the cuttings and cavings model, which determines the amount of waste material that would be eroded off a borehole wall due to drilling mud flowing up the borehole during an inadvertent drilling intrusion that intersects the repository. This paper describes the results of several investigations to better constrain the shear strength of the degraded waste material constituting the borehole wall. The lower limit of the range of waste shear strength values is specifically addressed. Based on experimental results on realistic surrogate waste materials, a detailed literature review, and additional analyses it is recommended that the lower value of waste shear strength be changed from 0.05 to 1.50 Pa. In addition to the increase from 0.05 to 1.50 in the lower bound to the range of waste shear strength, a change from log-uniform to a uniform distribution is also recommended for performance assessment calculations. These changes will result in a decrease in the estimated magnitude and frequency of radionuclide releases due to inadvertent human intrusion events. This paper is one of a series of papers describing proposed changes for Waste Isolation Pilot Plant performance assessment calculations as summarized in Nemer et al. (authors)

42 ENGINEERING↗

Comparisons of Wilks’ and Monte Carlo Methods in Response to the 10CFR50.46(c) Proposed Rulemaking

The Nuclear Regulatory Commission (NRC) is proposing a new rulemaking on emergency core system/loss-of-coolant accident (LOCA) performance analysis. In the proposed rulemaking, designated as 10CFR50.46(c), the US NRC put forward an equivalent cladding oxidation criterion as a function of cladding pre-transient hydrogen content. The proposed rulemaking imposes more restrictive and burnup-dependent cladding embrittlement criteria; consequently nearly all the fuel rods in a reactor core need to be analyzed under LOCA conditions to demonstrate compliance to the safety limits. New analysis methods are required to provide a thorough characterization of the reactor core in order to identify the locations of the limiting rods as well as to quantify the safety margins under LOCA conditions. With the new analysis method presented in this work, the limiting transient case and the limiting rods can be easily identified to quantify the safety margins in response to the proposed new rulemaking. In this work, the best-estimate plus uncertainty (BEPU) analysis capability for large break LOCA with the new cladding embrittlement criteria using the RELAP5-3D code is established and demonstrated with a reduced set of uncertainty parameters. Both the direct Monte Carlo method and the Wilks’ nonparametric statistical method can be used to perform uncertainty quantification. Wilks’ method has become the de-facto industry standard to perform uncertainty quantification in BEPU LOCA analyses. Despite its widespread adoption by the industry, the use of small sample sizes to infer statement of compliance to the existing 10CFR50.46 rule, has been a major cause of unrealized operational margin in today’s BEPU methods. Moreover the debate on the proper interpretation of the Wilks’ theorem in the context of safety analyses is not fully resolved yet, even more than two decades after its introduction in the frame of safety analyses in the nuclear industry. This represents both a regulatory and application risk in rolling out new methods. With the 10CFR50.46(c) proposed rulemaking, the deficiencies of the Wilks’ approach are further exacerbated. The direct Monte Carlo approach offers a robust alternative to perform uncertainty quantification within the context of BEPU analyses. In this work, the Monte Carlo method is compared with the Wilks’ method in response to the NRC 10CFR50.46(c) proposed rulemaking.

10CFR50.46(c)↗

Practical Thermal Evaluation Methods For HAC Fire Analysis In Type B Radiaoactive Material (RAM) Packages

Title 10 of the United States Code of Federal Regulations Part 71 for the Nuclear Regulatory Commission (10 CFR Part 71.73) requires that Type B radioactive material (RAM) packages satisfy certain Hypothetical Accident Conditions (HAC) thermal design requirements to ensure package safety during accidental fire conditions. Compliance with thermal design requirements can be met by prototype tests, analyses only or a combination of tests and analyses. Normally, it is impractical to meet all the HAC using tests only and the analytical methods are too complex due to the multi-physics non-linear nature of the fire event. Therefore, a combination of tests and thermal analyses methods using commercial heat transfer software are used to meet the necessary design requirements. The authors, along with his other colleagues at Savannah River National Laboratory in Aiken, SC, USA, have successfully used this &#x27;tests and analyses&#x27; approach in the design and certification of several United States&#x27; DOE/NNSA certified packages, e.g. 9975, 9977, 9978, 9979, H1700, and Bulk Tritium Shipping Package (BTSP). This paper will describe these methods and it is hoped that the RAM Type B package designers and analysts can use them for their applications.

42 ENGINEERING↗

Stack Test Summary for TA-59-0001

The Radioactive Air Emissions Management (RAEM) team performed stack flow characterization tests at Technical Area (TA) 59 Building 0001 Exhaust Stack (ES) 8. These tests were completed in accordance with Title 40 of the Code of Federal Regulations (CFR), Part 61, Subpart H and the American National Standards Institute (ANSI) N13.1-1999 required by the Clean Air Act. Subpart H of the regulation is the National Emission Standards for Hazardous Air Pollutants (NESHAP) for radionuclides, which compliance with is maintained by the REAM team.

54 ENVIRONMENTAL SCIENCES↗

Activation estimates of the RHIC beam dump

In anticipation of the expiration of the RHIC ASE in December 2025 and the need to demonstrate compliance with nuclear facility rule (10CFR830), this study quantifies the radionuclide inventory and respective activity at the beam dumps by simulating a period of five years of operation using conservative assumptions. Simulations were performed with the Monte Carlo particle transport and interaction code FLUKA and its dosimetry results were compared with measured dose rate data, showing good agreement. The beam dump was deemed to constitute the main hotspot of residual radiation and also representative of a worst case scenario in terms of induced activation. The activation levels calculated indicate that the RHIC tunnel will be well below the thresholds of a DOE’s category-3 nuclear facility classification.

43 PARTICLE ACCELERATORS↗

Cask RT-100 Type B(U) Self-Certification for DOT 7A, Type A Nuclear Waste Transportation - 20098

The purpose of this Type A certification is to diversify the use of the RT-100 cask by allowing the end user to transport either Type A or Type B radioactive waste in accordance with the handling procedures for each waste category. The project's scope included the development of a matrix that contains all applicable requirements for a Type A package from the Code of Federal Regulations (CFR), Title 49 for the Department of Transportation (DOT) with a justification for each requirement. Moreover, the scope included the writing of conditions and restrictions list for the transportation of Type A nuclear waste, the writing of a compliance statement, and the design and fabrication of a Type A placard to be permanently placed on the RT-100 cask. Type A packages are self-certified by the end user using one of three methods as permitted by 49 CFR 173.461, either by performance of tests with prototypes or samples of the specimens representing the packaging, or reference to a previous satisfactory demonstration of compliance of a sufficiently similar nature, or calculations or reasoned evaluation using reliable and conservative procedures and parameters. Since the RT-100 cask was licensed by the Nuclear Regulatory Commission (NRC) as a Type B cask, Robatel relied on the method of reference to a previous satisfactory demonstration of compliance of a sufficiently similar nature for Type A certification. This method was determined to be acceptable, since Type B packages are evaluated for more demanding transport conditions than those required for Type A packages. This paper presents Robatel's process for certifying the RT-100 cask for Type A shipments, an overview of the DOT regulations related to Type A packages, and the documents that were generated for the end user. This paper is concluded with a discussion on the advantages of having the option to transport both Type A and Type B nuclear waste, and possible future projects to further improve the operation of the cask when making Type A shipments. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimization Studies of Radiation Shielding for PIP-II Project at Fermilab

The Proton Improvement Plan-II (PIP-II) at Fermilab represents a significant advancement in the quest to answer some of the most profound questions about our universe using the world's most intense high-energy neutrino beam. The project requires the construction of a new addition to the Fermilab accelerator complex – an 800-MeV high-intensity superconducting linear accelerator. Ensuring the safety and regulatory compliance of this ambitious project is paramount, necessitating thorough dose rate assessments under both normal operational and accidental scenarios to align with the Fermilab Radiological Control Manual (FRCM) standards. Our approach included a shielding optimization used for the simulations with the Monte Carlo code MARS [1,2,3] to incorporate new magnet and collimator designs, essential for reflecting the current state of PIP-II infrastructure. The implementation of high-resolution detector planes, despite their computational demands, enabled us to gather detailed radiation field data crucial for optimizing shielding configurations. To overcome the significant computational demands, we developed a branching code that drastically reduced simulation runtimes while maintaining statistical integrity. This was achieved through geometry splitting and the application of Russian Roulette techniques, tailored to prioritize regions of interest based on predefined importances and weight limits.

43 PARTICLE ACCELERATORS↗

Optimization Studies of Radiation Shielding for PIP-II Project at Fermilab

The Proton Improvement Plan-II (PIP-II) at Fermilab represents a significant advancement in the quest to answer some of the most profound questions about our universe using the world's most intense high-energy neutrino beam. The project requires the construction of a new addition to the Fermilab accelerator complex – an 800-MeV high-intensity superconducting linear accelerator. Ensuring the safety and regulatory compliance of this ambitious project is paramount, necessitating thorough dose rate assessments under both normal operational and accidental scenarios to align with the Fermilab Radiological Control Manual (FRCM) standards. Our approach included a shielding optimization used for the simulations with the Monte Carlo code MARS [1,2,3] to incorporate new magnet and collimator designs, essential for reflecting the current state of PIP-II infrastructure. The implementation of high-resolution detector planes, despite their computational demands, enabled us to gather detailed radiation field data crucial for optimizing shielding configurations. To overcome the significant computational demands, we developed a branching code that drastically reduced simulation runtimes while maintaining statistical integrity. This was achieved through geometry splitting and the application of Russian Roulette techniques, tailored to prioritize regions of interest based on predefined importances and weight limits.

Makovec, Alajos↗

SU-G-JeP4-01: An Assessment of a Microsoft Kinect V2 Sensor for Voluntary Breath-Hold Monitoring in Radiotherapy

Purpose: To determine whether the Microsoft Kinect Version 2 (Kinect v2), a commercial off-the-shelf (COTS) depth sensors designed for entertainment purposes, were robust to the radiotherapy treatment environment and could be suitable for monitoring of voluntary breath-hold compliance. This could complement current visual monitoring techniques, and be useful for heart sparing left breast radiotherapy. Methods: In-house software to control Kinect v2 sensors, and capture output information, was developed using the free Microsoft software development kit, and the Cinder creative coding C++ library. Each sensor was used with a 12m USB 3.0 active cable. A solid water block was used as the object. The depth accuracy and precision of the sensors was evaluated by comparing Kinect reported distance to the object with a precision laser measurement across a distance range of 0.6m to 2.0 m. The object was positioned on a high-precision programmable motion platform and moved in two programmed motion patterns and Kinect reported distance logged. Robustness to the radiation environment was tested by repeating all measurements with a linear accelerator operating over a range of pulse repetition frequencies (6Hz to 400Hz) and dose rates 50 to 1500 monitor units (MU) per minute. Results: The complex, consistent relationship between true and measured distance was unaffected by the radiation environment, as was the ability to detect motion. Sensor precision was < 1 mm and the accuracy between 1.3 mm and 1.8 mm when a distance correction was applied. Both motion patterns were tracked successfully with a root mean squared error (RMSE) of 1.4 and 1.1 mm respectively. Conclusion: Kinect v2 sensors are capable of tracking pre-programmed motion patterns with an accuracy <2 mm and appear robust to the radiotherapy treatment environment. A clinical trial using Kinect v2 sensor for monitoring voluntary breath hold has ethical approval and is open to recruitment. The authors are supported by a National Institute of Health Research (NIHR) Career Development Fellowship (CDF-2013-06-005). Microsoft Corporation donated three sensors. The views expressed in this publication are those of the author(s) and not necessarily those of the NHS, the National Institute for Health Research or the Department of Health.

60 APPLIED LIFE SCIENCES↗

Modeling and Qualification of a Modified Emission Unit for Radioactive Air Emissions Stack Sampling Compliance

A planned laboratory space and exhaust system modification to the Pacific Northwest National Laboratory Material Science and Technology Building indicated a new evaluation of the mixing at the air sampling system location would be required for compliance to ANSI/HPS N13.1-2011. The modified exhaust system would add a third fan thereby increasing the overall exhaust rate out the stack thus voiding the previous mixing study. Prior to modifying the radioactive air emissions exhaust system, a three-dimensional computational fluid dynamics computer model was used to evaluate the mixing at the sampling system location. Modeling of the new original three-fan system indicated that not all mixing criteria could be met. A second modeling effort was conducted with the addition of an air blender downstream of the confluence of the three fans which then showed satisfactory mixing results. The final installation included an air blender, and the exhaust system underwent full-scale tests to verify velocity, cyclonic flow, gas, and particulate uniformity. The modeling results and those of the full-scale tests show agreement between each of the evaluated criteria. The use of a computational fluid dynamics code was an effective aid in the design process and allowed the sampling system to remain in its original location while still meeting the requirements for sampling at a well-mixed location.

atmospheric emissions, air monitoring, environment↗