Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “code compliance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Formerly Used Sites Remedial Action Program (FUSRAP) W. R. Grace Building 23 Remedial Action-Challenges and Successes - 12247

Monazite sand processing was conducted at the W. R. Grace Curtis Bay Facility (Baltimore, Maryland) from mid-May 1956 through the spring of 1957 under license to the Atomic Energy Commission (AEC), for the extraction of source material in the form of thorium, as well as rare earth elements. The processing was conducted in the southwest quadrant of a ca. 100 year old, five-story, building (Building 23) in the active manufacturing portion of the facility. Building components and equipment in the southwest quadrant of Building 23 exhibited residual radiological activity remaining from the monazite sand processing. U.S. Army Corps of Engineers (USACE) conducted a remedial investigation (RI) and feasibility study (FS) and prepared a Record of Decision (ROD) to address residual radioactivity on building components and equipment in the southwest quadrant of Building 23. The remedy selected for the southwest quadrant of Building 23, which was documented in the ROD (dated May 2005), was identified as 'Alternative 2: Decontamination With Removal to Industrial Use Levels'. The selected remedy provided for either decontaminating or removing areas of radioactivity to meet the RGs. Demonstration of compliance with the selected ARAR was performed using the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) and other appropriate guidance, as well as appropriate dose modeling codes where necessary. USACE-Baltimore District along with its private industry partner worked together under the terms of a 2008 Settlement Agreement to implement the remedial action (RA) for the southwest quadrant of Building 23. The RA was conducted in two phases: Phase 1 was completed to improve the building condition for support of subsequent remedial action and decrease scope uncertainty of the remedial action, and Phase 2 included decontamination and removal activities to meet the RGs and demonstration of compliance with the selected ARAR. Challenges encountered during the RA include: coordination with stakeholders, coordination between multiple RA contractors, addressing unique structural challenges for Building 23, nonradiological hazards associated with the RA, weather issues, and complex final status survey (FSS) coordination. The challenges during the Phase 1 RA were handled successfully. The challenges for the Phase 2 RA, which is anticipated to be complete by late-summer of 2012, have been handled successfully so far. By fall of 2012, USACE is expecting to finalize a robust RA Closure Report, including the Final Status Survey Report, which summarizes the RA activities and documents compliance with the ROD. During the ongoing RA at Building 23, there have been and still are many challenges both technically and from a project management perspective, due in part to the nature and extent of impact at the site (residual radioactivity within an active processing building), dual oversight by the property owner and USACE, and site-specific challenges associated with a complex RA and multiple contractors. Currently, USACE and its industry partner are overseeing the completion of RA field activities. RA closure documentation for the remediation of Building 23 to address residual contamination in building materials will be reviewed/approved by USACE and its industry partner upon completion of the field activities. USACE and its industry partner are working well together, through the Settlement Agreement, to conduct a cost-efficient and effective remedial action to address the legacy issues at Building 23. This cooperative effort has set a firm foundation for achieving a successful RA at the RWDA using a 'forward think' approach, and it is a case study for other sites where an industry partner is involved. The collaborative effort led to implementation of an RA which is acceptable to the site owner, the regulators, and the public, thus allowing USACE to move this project forward successfully in the FUSRAP program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WIPP PA Sensitivity Studies in Support of CRA-2014 Completeness Determination and Compliance Decision - 18209

The Waste Isolation Pilot Plant (WIPP) has been developed by the U.S. Department of Energy (DOE) for the geologic (deep underground) disposal of transuranic (TRU) waste. Containment of TRU waste at the WIPP is regulated by the U.S. Environmental Protection Agency (EPA). The DOE demonstrates compliance with the containment requirements by means of performance assessment (PA) calculations. WIPP PA calculations estimate the probability and consequence of potential radionuclide releases from the repository to the accessible environment for a regulatory period of 10,000 years after facility closure. Since TRU waste was first received at the WIPP in 1999, compliance recertification applications (CRAs) have been required by the EPA on five-year cycle. The latest CRA (CRA-2014) was submitted by the DOE to the EPA in 2014. As part of the application, a formal set of PA calculations (CRA-2014 PA) was performed and results were documented in detail. The CRA-2014 PA incorporated several parameter updates based on new data, as well as the implementation of a different model for panel closures, barriers planned for the opening of each waste panel. The results presented as part of the CRA-2014 showed via the required complementary cumulative distribution function (CCDF) release curves that the estimated releases were within compliance limits. As part of their process for reviewing the completeness of the CRA-2014 [1], the EPA formally requested that the DOE perform sensitivity studies based on EPA-requested changes to model parameters. The DOE performed and documented the results of three sensitivity studies described below: CRA14-SEN2 [2], CRA14-SEN3 [3], and CRA14-SEN4 [4]. In each case, the new analysis results were compared to CRA- 2014 PA (CRA14) results to determine the impact of the EPA-requested changes. CRA14-SEN2: the application of EPA-requested modified parameters in the operations and experimental (non-waste) areas of the repository to simulate an accelerated (instantaneous) creep closure, the inclusion of capillary pressure effects on relative permeability, and an increase in initial/residual brine saturation and residual gas saturation. The modifications to the repository model resulted in increased pressures and decreased brine saturations in waste areas and increased pressures and brine saturations in the operations and experimental areas. However, the overall effects on total high-probability mean releases from the repository were entirely insignificant. It was concluded that the modeling assumptions associated with the operations and experimental areas of the repository have an insignificant effect on the prediction of total releases from the repository and/or adequacy of the current (CRA14) model to demonstrate compliance with the regulatory limits. CRA14-SEN3: the application of EPA-requested modified parameters in the panel closure areas and operations and experimental (non-waste) areas of the repository to simulate an accelerated (instantaneous) creep closure, the inclusion of capillary pressure effects on relative permeability, and an increase in initial/residual brine saturation and residual gas saturation. The modifications to the repository model predominantly result in increased pressures and decreased brine saturations in waste areas, increased pressures and brine saturations in the operations and experimental areas, and decreased brine and gas flows across all panel closures. The pressure increases in repository waste regions yielded slightly decreased brine saturations (on average) in those areas. However, the overall effects on total high-probability mean releases from the repository are entirely insignificant. It was concluded that the modeling assumptions made for this sensitivity study which were associated with the panel closures and north end areas of the repository have only a small effect on the prediction of total releases from the repository and/or adequacy of the current (CRA14) model to demonstrate compliance with the regulatory limits. CRA14-SEN4: the application of several changes to the current WIPP PA model (CRA14), including: parameter changes, use of an updated code, and a revised computational grid for the BRAGFLO code. The modifications to the repository model resulted in increased releases in all primary release mechanisms. The impacts of each EPA-requested change to CRA14 were analyzed with respect to each release mechanism in the CRA14-SEN4 study. Overall, total high-probability predicted mean releases from the repository were increased by about 15%. Total low-probability predicted mean releases were increased by about 107%. It was concluded that the EPA-requested changes to the CRA14 result in increases to the predicted total releases from the repository. However, releases calculated in the CRA14-SEN4 analysis remained below regulatory limits, demonstrating continued compliance of the WIPP. In January 2017, the EPA determined that CRA-2014 was complete and then began a technical evaluation of CRA-2014 to determine whether the WIPP continued to comply with the radiation protection standards for disposal. During their evaluation, the EPA utilized the sensitivity study results to inform their ultimate determination in July 2017 that the WIPP continues to comply with regulatory standards. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Code for Photocathode Design

The Phase I activity demonstrated that PhotoQE could be upgraded and modified to allow input using a graphical user interface. Specific calls to platform-dependent (e.g. IMSL) function calls were removed, and Fortran77 components were rewritten for Fortran95 compliance. The subroutines, specifically the common block structures and shared data parameters, were reworked to allow the GUI to update material parameter data, and the system was targeted for desktop personal computer operation. The new structures overcomes the previous rigid and unmodifiable library structures by implementing new, materials library data sets and repositioning the library values to external files. Material data may originate from published literature or experimental measurements. Further optimization and restructuring would allow custom and specific emission models for beam codes that rely on parameterized photoemission algorithms. These would be based on simplified and parametric representations updated and extended from previous versions (e.g., Modified Fowler-Dubridge, Modified Three-Step, etc.).

43 PARTICLE ACCELERATORS↗

Determining Unabated Airborne Radionuclide Emissions Monitoring Requirements Using Inventory-Based Methods

Compliance with the airborne radionuclide emission monitoring requirements in the National Emission Standards for Hazardous Air Pollutants (NESHAP; Title 40 of the U.S. Code of Federal Regulations Part 61, Subpart H) and State requirements in Washington Administrative Code 246–247: Radiation Protection – Air Emissions and 173-480: Ambient Air Quality Standards and Emission Limits for Radionuclides were evaluated for Pacific Northwest National Laboratory (PNNL) operations. Additional guidance may be found in the U.S. Department of Energy Handbook, Environmental Radiological Effluent Monitoring and Environmental Surveillance. To meet regulatory requirements, reviews of planned or proposed projects and activities provide the basis for implementing necessary monitoring adjustments or for implementing changes to projects and activities in a timely manner. Potential unabated offsite doses were evaluated for emission locations managed by PNNL and licensed to the Department of Energy. These locations were at facilities in Richland, Washington (i.e., the Hanford Site and PNNL Richland Campus) and in Sequim, Washington, (PNNL Marine Sciences Laboratory). This report describes the inventory-based methods and provides the results for the NESHAP assessment performed in 2017.

61 RADIATION PROTECTION AND DOSIMETRY↗

Determining Unabated Airborne Radionuclide Emissions Monitoring Requirements Using Inventory-Based Methods

Compliance with the airborne radionuclide emission monitoring requirements in the National Emission Standards for Hazardous Air Pollutants (NESHAP; Title 40 of the U.S. Code of Federal Regulations Part 61, Subpart H) and State requirements in Washington Administrative Code 246–247: Radiation Protection – Air Emissions and 173-480: Ambient Air Quality Standards and Emission Limits for Radionuclides were evaluated for Pacific Northwest National Laboratory (PNNL) operations. Additional guidance may be found in the U.S. Department of Energy Handbook, Environmental Radiological Effluent Monitoring and Environmental Surveillance. To meet regulatory requirements, reviews of planned or proposed projects and activities provide the basis for implementing necessary monitoring adjustments or for implementing changes to projects and activities in a timely manner. Potential unabated off-site doses were evaluated for emission locations managed by PNNL and licensed to the Department of Energy. These locations were at facilities in Richland, Washington (i.e., the Hanford Site and PNNL–Richland campus) and in Sequim, Washington, (PNNL–Sequim campus). This report describes the inventory-based methods and provides the results for the NESHAP assessment performed in January 2024 for calendar year ending 2023.

40 CFR 61 Subpart H↗

Capturing Energy-Saving Opportunities: Improving Building Efficiency in Rajasthan through Energy Code Implementation

India adopted the Energy Conservation Building Code (ECBC) in 2007. Rajasthan is the first state to make ECBC mandatory at the state level. In collaboration with Malaviya National Institute of Technology (MNIT) Jaipur, Pacific Northwest National Laboratory (PNNL) has been working with Rajasthan to facilitate the implementation of ECBC. This report summarizes milestones made in Rajasthan and PNNL's contribution in institutional set-ups, capacity building, compliance enforcement and pilot building construction.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites

This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management in 2013 at six uranium mill tailings disposal sites reclaimed under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. These activities verified that the UMTRCA Title II disposal sites remain in compliance with license requirements. DOE manages six UMTRCA Title II disposal sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) established at Title 10 Code of Federal Regulations Part 40.28. Reclamation and site transition activities continue at other sites, and DOE ultimately expects to manage approximately 27 Title II disposal sites. Long-term surveillance and maintenance activities and services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective action; and performing administrative, records, stakeholder services, and other regulatory functions. Annual site inspections and monitoring are conducted in accordance with site-specific long-term surveillance plans (LTSPs) and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up inspections, or corrective action. LTSPs and site compliance reports are available online at http://www.lm.doe.gov

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NRC Job Code V6060: Extended In-Situ and Real Time Monitoring. Task 4: Detection and Monitoring of Leaks at Nuclear Power Plants External to Structures

In support of Task 4 of the NRC study on compliance with 10 CFR part 20.1406, minimization of contamination, Argonne National Laboratory (ANL) conducted a one-year scoping study, in concert with a parallel study performed by NRC/NRR staff, on monitoring for leaks at nuclear power plants (NPPs) external to structures. The objective of this task-4 study is to identify and assess those sensors and monitoring techniques for early detection of abnormal radioactive releases from the engineered facility structures, systems and components (SSCs) to the surrounding underground environment in existing NPPs and planned new reactors. As such, methods of interest include: (1) detection of anomalous water content of soils surrounding SSCs, (2) radionuclides contained in the leaking water, and (3) secondary signals such as temperature. ANL work scope includes mainly to (1) identify, in concert with the nuclear industry, the sensors and techniques that have most promise to detect radionuclides and/or associated chemical releases from SSCs of existing NPPs and (2) review and provide comments on the results of the NRC/NRR staff scoping study to identify candidate technologies. This report constitutes the ANL deliverable of the task-4 study. It covers a survey of sensor technologies and leak detection methods currently applied to leak monitoring at NPPs. The survey also provides a technology evaluation that identifies their strength and deficiency based on their detection speed, sensitivity, range and reliability. Emerging advanced technologies that are potentially capable of locating releases, identifying the radionuclides, and estimating their concentrations and distributions are also included in the report along with suggestions of required further research and development.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GridSTIX

SF-25-112 Grid-STIX is a comprehensive extension of the STIX (Structured Threat Information Expression) 2.1 ontology specifically designed for electrical grid cybersecurity applications. This ontology provides a standardized, machine-readable framework for modeling grid assets, operational technology devices, threats, vulnerabilities, supply chain risks, and security relationships in electrical power systems. ## Key Features - **Comprehensive Grid Coverage**: Physical assets, OT devices, grid components, sensors, and energy storage systems - **Zero Trust Architecture**: Policy decision points, enforcement points, trust brokers, and continuous monitoring - **AMI Infrastructure**: Advanced metering networks, head-end systems, mesh gateways, and MDM systems - **Advanced Security Modeling**: Attack patterns, vulnerabilities, mitigations, and supply chain risks - **Critical Grid Relationships**: Power flow, protection, control, and synchronization relationships - **Supply Chain Security**: Supplier modeling, country of origin tracking, and risk assessment - **Protocol Support**: DNP3, Modbus, IEC 61850, IEC 60870-5-104, OPC-UA, and IEEE standards - **Python Code Generation**: Automated STIX-compliant Python class generation from ontologies - **Interactive Visualization**: Enhanced HTML network graphs with grid-specific categorization - **STIX 2.1 Compliance**: Full compatibility with STIX threat intelligence ecosystem

Blakely, Benjamin [Argonne National Laboratory (AN↗

Force override rate control for robotic manipulators

The work reported deals with the problem of operating a robot manipulator under a rate control mode while the end effector is not in contact with the external environment, and then switching to a force control mode when contact is made. The paper details how the modal changeover may be accomplished in a manner transparent to the operator, and will allow operator applied forces to be reflected at the robot end effector. A one degree of freedom demonstration system is used to illustrate the concept, which is then applied to a PUMA manipulator. Sample code for the implementation of the control is provided, experimental results show that the optimum setting for the gain is a function of the compliance of the end effector, and the compliance of the external constraint.

Driels, Morris↗

Improving the AGR Fuel Testing Power Density Profile Versus Irradiation-Time in the Advanced Test Reactor

The Very High Temperature gas-cooled Reactor (VHTR), which is currently being developed, achieves simplification of safety through reliance on ceramic-coated fuel particles. Each TRISO-coated fuel particle has its own containment which serves as the principal barrier against radionuclide release under normal operating and accident conditions. These fuel particles, in the form of graphite fuel compacts, are currently undergoing a series of irradiation tests in the Advanced Test Reactor (ATR) at the Idaho National Laboratory (INL) to support the Advanced Gas-Cooled Reactor (AGR) fuel qualification program. A representive coated fuel particle with an 235U enrichment of 19.8 wt% was used in this analysis. The fuel burnup analysis tool used to perform the neutronics study reported herein, couples the Monte Carlo transport code MCNP, with the radioactive decay and burnup code ORIGEN2. The fuel burnup methodology known as Monte-Carlo with ORIGEN2 (MCWO) was used to evaluate the AGR experiment assembly and demonstrate compliance with ATR safety requirements. For the AGR graphite fuel compacts, the MCWO-calculated fission power density (FPD) due to neutron fission in 235U is an important design parameter. One of the more important AGR fuel testing requirements is to maintain the peak fuel compact temperature close to 1250°C throughout the proposed irradiation campaign of 550 effective full power days (EFPDs). Based on the MCWO-calculated FPD, a fixed gas gap size was designed to allow regulation of the fuel compact temperatures throughout the entire fuel irradiation campaign by filling the gap with a mixture of helium and neon gases. The chosen fixed gas gap can only regulate the peak fuel compact temperature in the desired range during the irradiation test if the ratio of the peak power density to the time-dependent low power density (P/T) at 550 EFPDs is less than 2.5. However, given the near constant neutron flux within the ATR driver core and the depletion of 235U in the graphite fuel compacts versus EFPD, the P/T ratio was calculated to be 5.3, which is unacceptable given the fuel compact temperature control requirement. To flatten the FPD profile versus EFPDs, two proposed options are – (a) add fertile (232Th) particles to the fuel compact and (b) add burnable absorber (B4C) to the graphite holder. The effectiveness of these two proposed options to flatten the FPD profile versus EFPDs were investigated and the results are compared in this study.

99 GENERAL AND MISCELLANEOUS↗

2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites

This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) in 2013 at 19 uranium mill tailings disposal sites established under Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978.1 These activities verified that the UMTRCA Title I disposal sites remain in compliance with license requirements. DOE operates 18 UMTRCA Title I sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) in accordance with Title 10 Code of Federal Regulations Part 40.27 (10 CFR 40.27). As required under the general license, a long-term surveillance plan (LTSP) for each site was prepared by DOE and accepted by NRC. The Grand Junction, Colorado, Disposal Site, one of the 19 Title I sites, will not be included under the general license until the open, operating portion of the cell is closed. The open portion will be closed either when it is filled or in 2023. This site is inspected in accordance with an interim LTSP. Long-term surveillance and maintenance services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective actions; and performing administrative, records, stakeholder relations, and other regulatory stewardship functions. Annual site inspections and monitoring are conducted in accordance with site-specific LTSPs and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up or contingency inspections, or corrective action in accordance with the LTSP. LTSPs and site compliance reports are available on the Internet at http://www.lm.doe.gov/.

2013↗

A User-Focused Renovation of CERES Metadata

Production software and public data products for Clouds and the Earth’s Radiant Energy System (CERES) continue to evolve as the project extends its climate data record. The data management team for CERES is currently undertaking major renovations of both code and data products, the latter of which is, of course, in service of improving user experience. A major mode of CERES’ data product improvement is in renovating products’ metadata. Metadata standards have evolved since CERES began producing its data products in 2000. In its twentieth year, CERES essentially asked the question: how would the project design its data products if it could start all over again? With forthcoming editions, this rebirth will be realized. CERES has redesigned its metadata standards to best position itself for data discoverability. The project has used the latest standards being developed in NASA’s Earth Science Data and Information Systems (ESDIS) Project’s Unified Metadata Model (UMM) documentation; collaborated with the Atmospheric Science Data Center (ASDC) to ensure compliance with Common Metadata Repository compatibility, and continued compliance with Climate and Forecast (CF) Conventions. In doing so, the team created its own, internal document for proper metadata creation and metadata verification software that is deployed prior to all code deliveries. This presentation will discuss this redesign process, as well as needs met and those that are still outstanding in the search for an improved user experience with CERES data products.

Kathleen Dejwakh↗

Comparison of German and American fabrication standards for transportation and storage containments of high level radioactive material type B packages - 15055

As the competent authority for the evaluation of German radioactive material (RAM) transport and storage packages, BAM (the German Federal Institute for Materials Research and Testing) has evaluated various international cask manufacturers regarding compliance with the German Type B(U) licensing requirements. The US NRC has recommended paragraphs in the ASME Boiler and Pressure Vessel (B and PV) Code, Section III, Division 3, as the measure to quantify the safety requirements of the US regulations regarding fabrication of RAM transportation and storage containments. The objective of this study is to compare the fabrication criteria of the German Dangerous Goods Procedural Rules (BAM-GGR) and the German Institute for Standardization (DIN) with the US quantitative measures for fabrication of RAM package containment vessels. This comparison will cover major similarities and differences between the requirements of the German standards and the ASME Code requirements for Type B package containment fabrication QC (quality control). While the material most often used for German RAM containment applications is ductile cast iron (DCI), in the US forged austenitic stainless steel is typically used. This study focuses on fabrication QC measures required to ensure reproducible and acceptable properties for DCI containments. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effects of Communication Modality on Pilot-Controller Coordination during a Simulated m:N Operation

The last decade or so has seen growing interest in new control paradigms and concepts of operation for uncrewed aircraft systems (UAS) in which multiple aircraft are piloted remotely by a single or relatively small number of people. Referred to as “one-to-many” and “many-to- many” (alternatively, “multi-operator, multi-vehicle”)—and frequently expressed as the corresponding ratios, 1:N and m:N—such novel configurations of aircraft and the people who manage them are seen as critical to the path to future operations involving UAS. Examples of industry domains interested in these control paradigms are small package delivery services utilizing small UAS and passenger-carrying, short-range “Urban Air Mobility” (UAM) operations. Stakeholders in such operations have identified communication and coordination of flight activity with air traffic controllers (ATC) as a barrier to operations. In contrast to present-day flight operations, in which a pilot communicates with one ATC on one radio frequency for one aircraft, multi-vehicle operations potentially entail a significant increase in pilot task load for management of comms. New concepts, such as UAS Service Suppliers (USSs) and Providers of Services to UAM (PSUs), have been proposed to address the known bottleneck for Air Traffic Management (ATM) presented by multi-vehicle operations. While progress has been steadily made over years developing USSs and PSUs, it is generally expected that initial UAM operations will rely on traditional voice-over-radio communication with ATC for purposes of ATM. The current study was a human-in-the-loop simulation that had participants, each possessing a Private Pilot License, act as the ground-based pilot-in- command for multiple vehicles in a hypothetical UAM service in the San Francisco Bay Area. The experiment utilized a 2-by-3, within-subjects design in which the pilot’s Vehicle Load (4 vs. 12) and Comm System (Voice, Datalink, and a Hybrid) were manipulated. The task given to pilots was to use the Comm System to coordinate flight activity for all aircraft with appropriate controllers, having to obtain departure and arrival clearances at “vertiport” facilities and transition clearances for any intermediate airspaces along the route. Pilots were additionally responsible for compliance with vectoring instructions issued by ATC. Subjective workload questionnaires (NASA-TLX) were administered following each experimental trial. Screen recordings of the pilot’s Ground Control Station (GCS) and audio recordings of trials were subsequently coded to obtain performance metrics: response times and error rates. Presented in this paper are results related to pilot responses to vectoring instructions issued by ATC. Workload was found to be significantly higher in the 12-Vehicle condition compared to the 4-Vehicle condition, nearly maxing out the NASA-TLX overall workload scale. There was no significant difference made by the Comm System on workload ratings. Pilots’ response times to communications were fastest in the Voice condition, although overall “service time” for compliance was shorter in Datalink and Hybrid conditions in most cases. Errors by pilots were frequent in both Vehicle Load conditions, most perniciously when using the Voice system. The results of this study suggest tradeoffs in advantages and disadvantages of the three comm systems. Recommendations for communication system design are provided taking the tradeoffs into account.

Garrett G Sadler↗

Effects of Communication Modality on Pilot-Controller Coordination during a Simulated m:N Operation

The last decade or so has seen growing interest in new control paradigms and concepts of operation for uncrewed aircraft systems (UAS) in which multiple aircraft are piloted remotely by a single or relatively small number of people. Referred to as “one-to-many” and “many-to- many” (alternatively, “multi-operator, multi-vehicle”)—and frequently expressed as the corresponding ratios, 1:N and m:N—such novel configurations of aircraft and the people who manage them are seen as critical to the path to future operations involving UAS. Examples of industry domains interested in these control paradigms are small package delivery services utilizing small UAS and passenger-carrying, short-range “Urban Air Mobility” (UAM) operations. Stakeholders in such operations have identified communication and coordination of flight activity with air traffic controllers (ATC) as a barrier to operations. In contrast to present-day flight operations, in which a pilot communicates with one ATC on one radio frequency for one aircraft, multi-vehicle operations potentially entail a significant increase in pilot task load for management of comms. New concepts, such as UAS Service Suppliers (USSs) and Providers of Services to UAM (PSUs), have been proposed to address the known bottleneck for Air Traffic Management (ATM) presented by multi-vehicle operations. While progress has been steadily made over years developing USSs and PSUs, it is generally expected that initial UAM operations will rely on traditional voice-over-radio communication with ATC for purposes of ATM. The current study was a human-in-the-loop simulation that had participants, each possessing a Private Pilot License, act as the ground-based pilot-in- command for multiple vehicles in a hypothetical UAM service in the San Francisco Bay Area. The experiment utilized a 2-by-3, within-subjects design in which the pilot’s Vehicle Load (4 vs. 12) and Comm System (Voice, Datalink, and a Hybrid) were manipulated. The task given to pilots was to use the Comm System to coordinate flight activity for all aircraft with appropriate controllers, having to obtain departure and arrival clearances at “vertiport” facilities and transition clearances for any intermediate airspaces along the route. Pilots were additionally responsible for compliance with vectoring instructions issued by ATC. Subjective workload questionnaires (NASA-TLX) were administered following each experimental trial. Screen recordings of the pilot’s Ground Control Station (GCS) and audio recordings of trials were subsequently coded to obtain performance metrics: response times and error rates. Presented in this paper are results related to pilot responses to vectoring instructions issued by ATC. Workload was found to be significantly higher in the 12-Vehicle condition compared to the 4-Vehicle condition, nearly maxing out the NASA-TLX overall workload scale. There was no significant difference made by the Comm System on workload ratings. Pilots’ response times to communications were fastest in the Voice condition, although overall “service time” for compliance was shorter in Datalink and Hybrid conditions in most cases. Errors by pilots were frequent in both Vehicle Load conditions, most perniciously when using the Voice system. The results of this study suggest tradeoffs in advantages and disadvantages of the three comm systems. Recommendations for communication system design are provided taking the tradeoffs into account.

urban air mobility↗

A Comparison of Select USDOE and USEPA Risk and Dose Assessment Tools Utilized at Two FUSRAP Projects - 17388

The US Army Corps of Engineers (USACE) utilizes several computer programs and models to conduct risk and dose assessments at Formerly Utilized Sites Remedial Action Program (FUSRAP) projects. In the past, the USACE has primarily relied on the US Department of Energy (USDOE)'s Argonne National Lab (ANL) RESidual Radioactivity (RESRAD) computer code for performing dose and risk assessments involving radiological contamination in onsite soils and the US Environmental Protection Agency (USEPA) Preliminary Remediation Goal (PRG) and Dose Compliance Calculator (DCC) for radiological contamination in ground water. Recent USEPA guidance requires use of USEPA calculators for all media at National Priority List sites, which includes some FUSRAP sites. The USACE recently utilized both RESRAD and the USEPA PRG and DCC calculators in assessments at two FUSRAP projects for all media in order to evaluate differences in the models and determine adjustments to potentially resolve differences. The two projects involve soil and groundwater assessments and address typical FUSRAP contaminants such as uranium, radium, thorium and their progeny. This paper discusses differences between the models, lessons learned, and methods used to address stakeholder and other concerns regarding these assessments. The paper's discussions are useful for anyone performing risk or dose assessments for radiological contamination and especially those using RESRAD and the PRG and DCC calculators. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radiological Safety Analysis Computer (RSAC 7.2) Presentation

This presentation will be for the graduate seminar class for the University of New Mexico. We will discuss the Radiological Safety Analysis Computer (RSAC) version 7.2, a critical tool in radiological consequence analysis within the nuclear safety domain. We will begin with an introduction to radiological consequence analysis and the importance of dose modeling in nuclear safety, referencing key regulatory frameworks such as DOE-STD-3009 and 10 CFR 20. The presentation will provide an overview of RSAC, including its history, primary functions, and the inputs and outputs involved in its calculations. A detailed examination of RSAC's atmospheric dispersion model, based on the Gaussian plume methodology, will be presented, highlighting how meteorological factors influence the results. We will discuss the regulatory alignment of RSAC with DOE and NRC guidelines, emphasizing the assumptions required for compliance and the balance between conservative and realistic inputs. The presentation will also address the limitations and assumptions inherent in RSAC, comparing it with other consequence analysis codes like MACCS, HotSpot, and RASCAL. An example RSAC run will be demonstrated, showcasing a hypothetical accident scenario and interpreting the resulting dose calculations. Finally, we will introduce new ideas to enhance the current RSAC framework. This future work aims to provide multi-industry adaptability and integration with new dispersion models, addressing the evolving needs of DOE and NRC. The presentation will conclude with a discussion on RSAC's ongoing role in nuclear safety and the opportunities for future innovation.

computer program↗