Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Work Package”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Experimental Verification of the Parabolic Deformable Mirror for the ExoSpec Project

For the Habitable Worlds Observatory (HWO), it is essential to broaden the controllable wavelength bandwidth for high-contrast imaging and spectroscopy to increase the exoEarth yield and characterization. The Parabolic Deformable Mirrors (PDM) subpackage, under the NASA Headquarters-directed Exoplanet Spectroscopy (ExoSpec) Work Package, is specifically tailored to do so. We have successfully procured a first-generation (Gen 1) PDM device and completed in-depth characterization of the device. This robust evaluation has become instrumental in informing subsequent stages of development, particularly in shaping the design and specifying requirements for the next generation, Gen 2, PDM device. We have built a testbed in an environmentally controlled cleanroom to experimentally demonstrate the use of a PDM in a coronagraph instrument with an integral field spectrograph (IFS). This versatile testbed is designed to test different DM architectures, low-order wavefront sensing schemes, and a lenslet-based IFS. This provides us with a basis for comparison with different DM configurations: 1) flat DM, 2) PDMs, and 3) a flat DM and PDMs. In this communication, we will discuss the testbed design and updates, PDM characterization, and Gen 2 requirement definitions.

Hari B. Subedi↗

NEAMS safeguards and separations

This presentation provides a program management update on the Safeguards and Separations Integrated Performance and Safety Code (IPSC) program in the DOE Nuclear Energy Advanced Modeling and Simulation (NEAMS). It provides an overview of FY11 work packages at multiple DOE Labs and includes material on challenge problem definitions for the IPSC effort.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Postmortem Cost and Schedule Analysis - Lessons Learned On NCSX

The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative fusion energy confinement device developed by the Princeton Plasma Physics Laboratory (PPPL) and Oak Ridge National Laboratory (ORNL) under contract from the US Department of Energy. The project was technically very challenging, primarily due to the complex component geometries and tight tolerances that were required. As the project matured these challenges manifested themselves in significant cost overruns through all phases of the project (i.e. design, R&D, fabrication and assembly). The project was subsequently cancelled by the DOE in 2008. Although the project was not completed, several major work packages, comprising about 65% of the total estimated cost (excluding management and contingency), were completed, providing a data base of actual costs that can be analyzed to understand cost drivers. Technical factors that drove costs included the complex geometry, tight tolerances, material requirements, and performance requirements. Management factors included imposed annual funding constraints that throttled project cash flow, staff availability, and inadequate R&D. Understanding how requirements and design decisions drove cost through this top-down forensic cost analysis could provide valuable insight into the configuration and design of future state-of-the art machines and other devices.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Results of the Phenix Dissymmetric Test Benchmark Exercise

In the context of the European H2020 project SESAME, a work package was dedicated to the validation of code coupling for the thermal-hydraulics of pool type reactors. To this end, CEA proposed a benchmark exercise of the so-called dissymmetric test performed at the end of life of the PHENIX reactor. The PHENIX reactor was an experimental reactor operated by CEA in France from 1974 until 2009. The knowledge and data acquired over the lifetime of this reactor are of paramount importance for the development of future sodium-cooled generation IV reactors. At the beginning of this test, the reactor is operated at nominal power (350 MWth) with 3 primary pumps and 4 intermediate heat exchangers. During this test, a pump trip occurs at the secondary side of one of the two loops (one loop provides coolant to two intermediate heat exchangers). The chain reaction is then stopped while the pumps remain operating at nominal speed. Dissymmetric flow patterns are then observed in the cold pool as hot sodium leaves the intermediate heat exchangers that are no longer cooled. The failed secondary pump is then restarted while the rotational speed of the other is reduced. Eventually, a stable homogeneous state is reached. This transient is challenging for both modelers and codes since this exercise tackles an industrial scale reactor featuring complex flows and interactions between different scales. The physical phenomena observed include thermal stratification, flow mixing and buoyancy effects. In order to accurately model these phenomena for a reasonable computational costs, the partners used System Thermal Hydraulics codes coupled with Computational Fluid Dynamics codes and one even included a subchannel code. In this paper, the PHENIX reactor and its behavior during the dissymmetric test are described. Then, a comparison of the different modeling options selected by the partners is offered. Finally, the results are compared to the experimental data and discussed and modelling recommendations are proposed.

code coupling↗

Elevated-temperature cyclic properties of advanced manufactured materials

Microreactor developers at the 2019 GAIN Microreactors workshop expressed a need for advanced manufacturing to fabricate microreactor components. Powder metallurgy (PM) hot isostatic pressing (HIP) is more mature than other advanced manufacturing techniques for the following reasons: 1. a code case exists for Section III, Division 1, Subsection NB components of light water reactors to be manufactured using PM HIP Alloy 316L, and 2. tensile and creep properties have been shown to be equivalent to wrought material for Type 316 stainless steel and Grade 91. Thus, PM HIP is more readily deployable in the near term. Elevated-temperature cyclic properties of PM-HIP materials, however, have not been established. The scope of testing for Code qualification could be significantly reduced compared to a new material for the following reasons: 1. only a limited amount of time consuming creep testing would be required, and 2. testing of fatigue and creep-fatigue behavior could be reduced if it can be demonstrated that the properties are comparable to wrought material. The objective of this work package is to develop an understanding of the relationship of advanced materials processing on the material characteristics as they relate to elevated-temperature component design and construction. This will be achieved by the following: • Elevated-temperature fatigue and creep-fatigue testing of PM HIP and wrought Alloy 316L. • Fracture and microstructural characterization of the PM HIP and wrought Alloy 316L. • Analysis of the elevated-temperature fatigue and creep-fatigue properties of PM HIP Alloy 316L. • Draft a report evaluating the elevated-temperature fatigue and creep-fatigue properties of PM HIP Alloy 316L. • Pursue procurement of Alloy 316H and Grade 91 manufactured using PM HIP. • Initiate scoping studies of the procured Alloy 316H or Grade 91 manufactured using PM HIP contingent upon successful material procurement.

36 MATERIALS SCIENCE↗

HTGR Simulation Methods & International Collaborations

ART-GCR “Methods” activity is split between Experimental Validation data from the ANL NSTF and OSU HTTF (next three presentations). HTGR core simulation (this presentation). International collaboration within OECD Generation-IV (Gen-IV) and USA/Japan bi-lateral agreements (this presentation) HTGR Simulation Methods No new NE-52 funding for HTGR Methods support in FY20; ~$200K FY19 carry-over funds only. Consists of international code-to-code benchmarks (IAEA CRP on HTGR UAM and OECD/NEA MHTGR-350) and refinement of a few-group Pebble Bed Reactor (PBR) cross section (XS) generation methodology. Funding will be requested in FY21 to produce the final reports for the two benchmarks and continue the development of the PBR XS generation methodology. Additional (non-ART) HTGR-related support work at INL NEAMS: HTR-Application work package at INL Create a benchmark for the pebble shuffling and depletion algorithms being developed for NEAMS Griffin code. iFOA award with X-Energy: Develop independent Monte Carlo model of Xe-100 design. Independent design confirmatory analysis of Xe-100 design using NEAMS tools Griffin and Pronghorn. Support X-Energy design team to use their own legacy design tools (VSOP99 and MGT). Support NEAMS Griffin and Pronghorn development team for the iFOA needs (received $50K additional funding for required development).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Continue Effort to Improve Alloy 800H Weldment

This memorandum formally documents the completion of the Level 3 milestone M3AT-22IN0604055 titled, “Continue effort to improve Alloy 800H weldment creep rupture performance,” by the transmittal of this deliverable document, entitled, “Issue memo ‘Preliminary assessment of UTP A 2133 Mn as a matching filler metal for Alloy 800H in Section III Division 5 applications.’” The deadline for this milestone is August 27, 2022. This milestone is part of the ART GCR work package AT-22IN060405, “Long-Term Very-High Temperature Reactor (VHTR) Material Qualification – INL.”

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

HTGR PBR Reactor Optimization Methodology

This presentation showcases the work done under the ART work package in FY23 regarding optimization and sensitivity analysis of pebble-bed reactors. The slides include a description of the problem, the proposed methodology, the developed model used for analysis, and the methodologies for sensitivity and reduced-order modeling.

97 MATHEMATICS AND COMPUTING↗

Waste Management Strategy for Dismantling Waste to Reduce Costs for Power Plant Decommissioning - 13543

Decommissioning of nuclear power plants generates large volumes of radioactive or potentially radioactive waste. The proper management of the dismantling waste plays an important role for the time needed for the dismantling phase and thus is critical to the decommissioning cost. An efficient and thorough process for inventorying, characterization and categorization of the waste provides a sound basis for the planning process. As part of comprehensive decommissioning studies for Nordic NPPs, Westinghouse has developed the decommissioning inventories that have been used for estimations of the duration of specific work packages and the corresponding costs. As part of creating the design basis for a national repository for decommissioning waste, the total production of different categories of waste packages has also been predicted. Studsvik has developed a risk based concept for categorization and handling of the generated waste using six different categories with a span from extremely small risk for radiological contamination to high level waste. The two companies have recently joined their skills in the area of decommissioning on selected market in a consortium named 'ndcon' to further strengthen the proposed process. Depending on the risk for radiological contamination or the radiological properties and other properties of importance for waste management, treatment routes are proposed with well-defined and proven methods for on-site or off-site treatment, activity determination and conditioning. The system is based on a graded approach philosophy aiming for high confidence and sustainability, aiming for re-use and recycling where found applicable. The objective is to establish a process where all dismantled material has a pre-determined treatment route. These routes should through measurements, categorization, treatment, conditioning, intermediate storage and final disposal be designed to provide a steady, un-disturbed flow of material to avoid interruptions. Bottle-necks in the process causes increased space requirements and will have negative impact on the project schedule, which increases not only the cost but also the dose exposure to personnel. For these reasons it is critical to create a process that transfers material into conditioned waste ready for disposal as quickly as possible. To a certain extent the decommissioning program should be led by the waste management process. With the objective to reduce time for handling of dismantled material at site and to efficiently and environmental-friendly use waste management methods (clearance for re-use followed by clearance for recycling), the costs for the plant decommissioning could be reduced as well as time needed for performing the decommissioning project. Also, risks for delays would be reduced with a well-defined handling scheme which limits surprises. Delays are a major cost driver for decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long-term stewardship - surveillance and maintenance at Hanford - 15155

In FY 2015, Hanford's Long-Term Stewardship (LTS) Program is tasked to complete the required entries into five cocooned plutonium production reactors (105-C, 105-D, 105-F, 105-H and 105-N), which sit adjacent to the Columbia River. The first reactor entered in October 2014, the cocooned plutonium production reactor, 105-F, signaled the LTS Program's entry into the Surveillance and Maintenance (S and M) era. Reactor entries at Hanford are conducted at 5-year intervals to assess the condition of the structures and evaluate potential deterioration of the reactor core, shield walls and roof. The cocooned structures are designed to protect the reactor core for up to 75 years while radioactive decay continues, ultimately making the structures safe for demolition and removal. The 105-F entry demonstrates that the LTS program at Hanford is shifting from a program focused on transitioning cleaned up land and waste sites to a program focused primarily on S and M activities. The entry process is carefully planned, choreographed and monitored to ensure safety of the workers and minimize the time the reactor structure is opened. The process includes controlled opening of the reactor, air quality monitoring, structural safety inspections, and radiological clearance. Once the structure is cleared for entry, assessments of the structural integrity and radiologic conditions are completed. Evaluation of the interior temperature and flood monitoring equipment is conducted. Facility visits by regulators and DOE personnel close out the process prior to welding the door closed until the next assessment, five years later. This paper will document execution of the entry work package, identify challenges overcome, and provide video documentation as reference material for future workers and the public. The current LTS program has responsibility for approximately 100,000 acres, over 200 waste sites and six cocooned reactors. Just over 5,600 documents have been identified, indexed and tagged for storage in the LTS document library. The program has successfully completed seven consecutive transitions since July 2011, with six more transitions planned in the next 18 months to support the U.S. Department of Energy Richland Operations Office's (DOE-RL) near-term cleanup objectives to significantly reduce the footprint of active cleanup operations for the River Corridor. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Leaning the tank closure process at the Savannah River Site - 15515

The Savannah River Site liquid waste system consists of multiple facilities that safely receive and store legacy radioactive waste prior to treatment and disposition. The liquid radioactive waste is stored in large underground tanks. The waste inventory currently stored in these tanks is a complex mixture of insoluble metal hydroxide solids and soluble salt supernate. The high-level (radioactive) portion of the waste is vitrified into a glass waste form, while the low-level waste is immobilized into a cementitious grout waste form called salt-stone. Once the waste is retrieved and processed, the tanks are closed. The closure process includes; waste removal, characterizing residuals, isolating the tank systems, and stabilizing the tank with tailored grout formulations. The core of Lean is to eliminate waste or non-value added steps from processes to maximize customer value. From the perspective of the customer, 'value' is defined as any action or process for which a customer would willingly pay. In this case our product is to safely and efficiently remove waste from the underground storage tanks and demonstrate operational closure to the State of South Carolina. Savannah River Remediation (SRR) initiated the use of the Lean process in late 2013 and identified the Tank Closure process as one of the targeted areas to improve. The first step in the Lean process is to 'map' out the value stream and identify areas where non-value added steps are present and then prioritize Rapid Improvement Events (RIE). Based on this mapping process, there were a number of areas that SRR determined warranted further evaluation for improvements, including; standard equipment design, characterization, standard work packages, regulatory documentation, tank characterization, structural evaluations, engineering documentation and equipment re-use. This paper focuses on the application of the Lean process at SRR and more specifically, effective application to the Tank Closure Process. This paper discusses the value stream mapping process for Tank Closures, as well as, summarizes the RIEs and demonstrate the realized benefits. Benefits can come in a variety of forms, from schedule compression to decreased costs. Through the Lean process we have been able to identify close to $10 M in savings over the life cycle of the tank closure process and a 4 year schedule compression. Cost and schedule savings are used to accomplish further risk reduction efforts. In addition to hard benefits, there are also soft benefits. These soft benefits are a result of the process itself and help drive improved efficiencies through better communication with key stakeholders, such as regulators and customers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The DISTINCTIVE University Consortium: Legacy Ponds and Silo Wastes - 18135

The UK Engineering and Physical Sciences Research Council (EPSRC) sponsored DISTINCTIVE consortium (Decommissioning, Immobilisation and Storage Solutions for Nuclear Waste Inventories) is undertaking 22 science and engineering projects across 11 universities related to the decommissioning of the Legacy Ponds and Silos at Sellafield. These are grouped into three work packages that focus on wasteform durability, effluent treatment and pond and silo sludges. Specific challenges include understanding the durability of intermediate level waste (ILW) glass-ceramic waste forms, studying thermally treated Pu-containing materials, producing and testing new inorganic ion exchange materials including derivatized magnetic nanoparticles for Cs, Sr and U removal from effluent, developing micro- and ultra-filtration methods, providing improved modelling and simulation of sludge disturbance, mobilisation and transport, developing a better understanding of gas hold-up in sludges, exploring methods for sludge characterisation including the use of acoustic backscatter and quartz crystal microbalance techniques and Raman spectroscopy and computer modelling of the interaction of cations with brucite surfaces. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WIPP Safety Significant Confinement Ventilation System (SSCVS) Quality Assurance Program - 20237

Construction and major equipment fabrication are underway for a new ventilation exhaust system at the Waste Isolation Pilot Plant (WIPP). The new system will provide continuous HEPA filtration of the exhaust from the WIPP underground while meeting the ventilation demands for expanded waste emplacement and mining operations over the next 40 years. The SSCVS project has proceeded with the awarding of CD-3A for Long Lead Procurements followed by CD-2/3 approval for the construction of the facilities. The SSCVS project team made the decision to increase the quality oversight throughout the complete project per the Project Quality Assurance Plan (PQAP) such that it can ensure the final products meet applicable NQA-1 requirements and general quality requirements, and that the project will proceed to operations without significant delays due to post installation quality concerns. The PQAP was established prior to approval of the project at the CD-2/3 milestone. The SSCVS project has 2 major long lead procurements which commenced with the awarding of CD-3A. These procurements include the HEPA filter housing assemblies and the Exhaust Fans. There are 22 HEPA filter assemblies for the SSCVS, which are designated Safety Significant for pressure boundary confinement, per the approved PDSA. The exhaust fans also have Safety Significant components to maintain the pressure confinement boundary. NWP made the decision to install resident Quality Inspectors at the fabrication facilities to ensure the documentation for each fabricated unit meets all the QA requirements as defined in the respective contract documents. For the construction of the SSCVS Salt Reduction Building (SRB) and New Filter Building (NFB), dedicated, on-site quality inspectors have been utilized to ensure that all work being performed will comply with quality requirements and the Special Inspections as defined in IBC-2015. At each stage of inspection, hold points are placed into the work packages to ensure NWP QA personnel are present to inspect and verify the installations are in accordance with the design specifications, codes and standards. With this level of oversight, NWP anticipates that the level of quality related issues, as seen on multiple other DOE complex site projects, will be avoided and that the commissioning, start-up and hot operations will progress in a timely fashion, as all documentation will be in place and approved prior to initiation of these activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The TRANSCEND Consortium - In-situ Identification of Surface Corrosion Products on Spent Nuclear Fuels - 20276

The management of spent nuclear fuel is a major ongoing concern for the UK owing to the cessation of reprocessing operations at Sellafield and the large, complex inventory arising from Magnox, AGR, PWR and prototype reactors. Retrieval and relocation operations for legacy fuels are imminent and therefore, any models that enhance our understanding of fuel evolution will help mitigate the risks associated with fuel storage and disposal. The TRANSCEND Consortium on nuclear waste management comprises four work packages, within this current paper we provide a summary overview of progress to date and illustrative results from Theme 3: Spent Nuclear Fuels. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High Temperature Materials

Overview of high temperature metals, including component construction rules for advanced reactor designs, assessment of filler metal for Alloy 800H weldments, high-temperature crack growth rate testing, work packages and contributors for FY24, creep-fatigue damage summation evaluation, GCR metal needs, and high temperature metals from other programs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗