Experimental Validation of a 40kW, 480V Point-to-Point DC Interlinks for Controller-Agnostic, Interoperable Networked Microgrids

This paper presents the experimental validation of point-to-point dc-interlinks for interconnecting two solar-based, laboratory-scale AC microgrids. DC interlinks provide a solution to numerous technical and operational challenges encountered in networked microgrids, including precise power flow control, stable and fast synchronization, enhanced stability, and improved voltage and frequency regulation. By decoupling microgrids through power converters, dc-interlinks enable power exchange among microgrids that can be owned by different entities (such as communities, utilities, or universities) and managed by diverse microgrid controller vendors. This characteristic makes this dc-interlinks a promising solution for networking real-world microgrids. The presented point-to-point dc interlink utilizes two four-quadrant converters: a 40kW 3-phase ac/dc regulating the dc-link voltage to 800V, and a 3-phase dc/ac controlling power flow. These converters, connected via a 20-foot dc cable, interconnect two ac microgrids operating at 480V, each featuring energy storage, photovoltaic generation, and load emulation. Experimental validation employs commercially available off-the-shelf (COTS) converters and real-world data from solar-powered microgrids in Adjuntas, Puerto Rico. To the authors’ knowledge, this work provides the first at-scale experimental validation of dc-interlinks for networked ac microgrids using COTS inverters, demonstrating their practicality and effectiveness in addressing real-world operational challenges.

Ferrari Maglia, Max [ORNL]↗

Residential and Small Commercial Solar Photovoltaic and Storage Permitting, Inspection, and Interconnection Timelines: A Retrospective Review (2017-2023)

This report is part of the ongoing Solar Time-Based Residential Analytics and Cycle Time Estimator (SolarTRACE) project, led by the National Renewable Energy Laboratory (NREL). The SolarTRACE project utilizes time-stamped project-level data provided by installer-partners to assess nationwide and AHJ- and utility-level PI&I and other solar PV adoption timelines since 2017. Our dataset now covers 22% of residential solar and 33% of residential storage installs in the U.S. since 2017. This report provides an update to our previous 2022 report (Cruce et al., 2022b) and includes: updated 2017 2023 project timelines for residential rooftop solar PV up to 20kW; updated tracking of permitting process changes at nearly 4,000 AHJs nationwide; and first-ever reporting of timelines for residential PV+storage projects up to 20kW.

14 SOLAR ENERGY↗

Roadmap for Solar Photovoltaic (PV) Cybersecurity: A vision for improving cyber maturity of distributed and utility-scale solar energy installations

As the solar energy sector continues to expand, its integration into the broader energy infrastructure presents both unprecedented opportunities and new risks. The increasing reliance on digital technologies and interconnected systems in solar energy creates an expanded attack surface for motivated cyber adversaries. Cyberattacks have the potential to cause disruptions in energy production, damage to equipment, financial losses, and compromises in national security. Therefore, ensuring robust cybersecurity measures is paramount to protect the integrity, availability, confidentiality, and access control of solar energy systems. However, there are still key gaps and challenges to be addressed in industry and research, which stakeholders must race to address as they combat a growing number of real-world cyber incidents that affect solar energy systems and a growing number of vulnerabilities discovered and disclosed in key types of equipment. This roadmap explore the current state of solar PV cybersecurity and the gaps and challenges still to be addressed.

14 - SOLAR ENERGY↗

Cost-optimal evaluation of centralized and distributed microgrid topologies considering voltage constraints

Optimal design of hybrid renewable mini-grids requires both economic and power quality considerations. Existing modeling approaches address these considerations via separate or loosely coupled models. Here, we extend REopt—a techno-economic optimization model developed at the National Renewable Energy Laboratory—to consider both within a single model. REopt formulates the design problem as a mixed-integer linear program that solves for a site's optimal technology mix, sizing, and operation to minimize life cycle cost. REopt has traditionally assumed a single node system. In the work presented here, we expand the REopt platform to consider multiple connected nodes with associated voltage constraints. In order to do this, we model power flow using a fixed-point linear approximation method. Additionally, we then use the model to explore design considerations of mini-grids in Sub-Saharan Africa. Specifically, we evaluate under what combinations of transmission line distance and capacity it is technically viable and economically preferable to build multiple isolated mini-grids versus an interconnected, centralized system.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Quantitative Study of Deep Learning Training on Heterogeneous Supercomputers

Deep learning (DL) has become a key technique for solving complex problems in scientific research and discovery. DL training for science is substantially challenging because it has to deal with massive quantities of multi-dimensional data. High- performance computing (HPC) supercomputers are increasingly being employed for meeting the exponentially growing demand for DL. Multiple GPUs and high-speed interconnect network are needed for supporting DL on HPC systems. However, the excessive use of GPUs without considering effective benefits leads to inefficient resource utilization of these expensive setups. In this paper, we conduct a quantitative analysis to gauge the efficacy of DL workloads on the latest HPC system and identify viability of next-generation DL-optimized heterogeneous supercomputers for enabling researchers to develop more efficient resource management and distributed DL middleware. We evaluate well- known DL models with large-scale datasets using the popular TensorFlow framework, and provide a thorough evaluation in- cluding scalability, accuracy, variability, storage resource, GPU- GPU/GPU-CPU data transfer, and GPU utilization. Our analysis reveals that the latest heterogeneous supercomputing cluster shows varying performance trend as compared to the existing literature for single- and multi-node training. To the best of our knowledge, this is the first work to conduct such a quantitative and comprehensive study of DL training on a supercomputing system with multiple GPUs.

Han, Jingoo↗

The Way to the Future Has Already Started: ICAO Aeronautical Telecommunication Network (ATN) Using Internet Protocol Suite (IPS) Standards and Protocol Evolution Update

Millions of people are able to exchange information over phones, computers, tablets and an array of new interconnected devices such as sensors, cameras, home appliances and others are increasingly becoming networked. At the core of this sizeable interconnection is a set of underlying protocols that enable millions of devices to seamlessly talk to each other. Aviation, as many other industries have, utilizes the internet protocol for ground-to-ground network communications and efforts are underway to bring it to the cockpit.In 2015, the International Civil Aviation Organization (ICAO) published the second edition of Document 9896 (Doc 9896) titled: Manual on the Aeronautical Telecommunication Network (ATN) using Internet Protocol Suite (IPS) Standards and Protocol. This manual adopted the Internet protocol version 6 (IPv6) for Internet layer interoperability. Document 9896 defined data communications protocols and services to be used for implementing aeronautical telecommunication network (ATN) using the Internet protocol suite (IPS). The document provided technical specifications that addressed security, network and transport protocols, described applications, supported by ATN/IPS and provided communications guidance. The international aviation community working under the guidance of ICAO initiated work on updates to Doc 9896. Under the ICAO Communication Panel, Working Group Internetworking (WG-I) got this challenging task. Key areas of work for WG-I are related to ATN/IPS Security and ANT/IPS Mobility. Two sub-groups have been assembled to work on these elements. The ICAO anticipates the release of updated Doc 9896 in 2020. Additional ATN/IPS standardization efforts include Radio Technical Commission for Aeronautics Special Committee 223 (RTCA SC-223) IPS profile development, Airlines Electronic Engineering Committee (AEEC) A658 Roadmap of IPS future activities and European Organization for Civil Aviation Equipment (EUROCAE) WG-108 development of guidance documentation.This paper describes ICAO WG-I approach to update key areas of the document in closed coordination with AEEC, RTCA and EUROCAE committees supporting the development of ATN/IPS. Additionally, the paper will explore WG-I mobility solutions under investigation, security developments, IPv6 addressing challenges and other proposed updates. Finally, as new operational expectations such as Free Route and Remote Piloted Aircraft System integration are currently pushing the boundaries set by old operational concepts, the paper identifies the emerging new challenges that will drive the ATN/IPS development beyond 2020. They are related to future voice utilization, System Wide Information Management and Remotely Piloted Aircraft System deployment. IPS systems are seen as the only way forward.

Apaza, Rafael↗

CIGS P1, P2, P3 Scribing Processes using a Pulse Programmable Industrial Fiber Laser: Preprint

We describe a novel set of laser processes for the CIGS P1, P2 and P3 scribing steps, the development of which has been enabled by a unique pulse-programmable fiber laser. We find that the unique pulse control properties of this 1064 nm wavelength laser have significant effects on the material removal dynamics of the various film layers in the CIGS material system. In the case of the P2 and P3processes, the shaped pulses create new laser/material interaction effects that permit the material to be cleanly and precisely removed with zero Heat Affected Zone (HAZ) at the edges of the scribe. The new P2 and P3 processes we describe demonstrate the first use of infrared nanosecond laser pulses that eliminate the HAZ and the consequent localized compositional changes in the CIGS absorbermaterial that result in poor shunt resistance. SEM micrographs and EDX compositional scans are presented. For the P1 scribe, we process the bi-layer molybdenum from the film side as well as through the glass substrate. Microscopic inspection and compositional analysis of the scribe lines are not sufficient to determine electrical and optical performance in working PV modules. Therefore, todemonstrate the applicability of the infrared pulse-programmable laser to all three scribing processes for thin-film CIGS, we fabricate small-size multiple-cell monolithically interconnected mini-modules in partnership with the National Renewable Energy Laboratory (Golden, Colorado). A total of four mini-modules are produced, two utilizing all laser scribing, and two with the P2 and P3 stepsmechanically scribed (by a third party) for reference. Mini-module performance data measured at NREL is presented, and we also discuss the commercialization potential of the new single-laser CIGS scribing process. Finally we present a phenomenological model to describe this physics underlying this novel ablation process.

14 SOLAR ENERGY↗

NREL/SCE High Penetration PV Integration Project: FY13 Annual Report

In 2010, the National Renewable Energy Laboratory (NREL), Southern California Edison (SCE), Quanta Technology, Satcon Technology Corporation, Electrical Distribution Design (EDD), and Clean Power Research (CPR) teamed to analyze the impacts of high penetration levels of photovoltaic (PV) systems interconnected onto the SCE distribution system. This project was designed specifically to benefit from the experience that SCE and the project team would gain during the installation of 500 megawatts (MW) of utility-scale PV systems (with 1-5 MW typical ratings) starting in 2010 and completing in 2015 within SCE's service territory through a program approved by the California Public Utility Commission (CPUC). This report provides the findings of the research completed under the project to date.

14 SOLAR ENERGY↗

Screening Distribution Feeders: Alternatives to the 15 Percent Rule

Sandia National Laboratories (SNL) and the Electric Power Research Institute (EPRI) collaborated to develop new methods that utilities can use to quickly and accurately determine the capacity of individual distribution feeders to accept new photovoltaic (PV) projects without the risk of impacting the grid. A key outcome will be a data-driven, validated approach to determining feeder limits that can simplify interconnection processes and lead to greater PV adoption across the California distribution system. Additionally, project developers and potential PV system owners will be able to identify locations best suited to accommodate adding PV without the high capital cost for grid infrastructure. These results will directly contribute to the goals of the California Public Utilities Commission (CPUC) to enable and enhance integrating PVs on the electric grid.

14 SOLAR ENERGY↗

Evaluating Permeability Enchancement Using Electrical Techniques

Enhanced Geothermal Systems (EGS) development projects involve the artificial stimulation of relatively impermeable high-temperature underground regions (at depths of 2-4 kilometers or more) to create sufficient permeability to permit underground fluid circulation, so that hot water can be withdrawn from production wells and used to generate electric power. Several major research projects of this general type have been undertaken in the past in New Mexico (Fenton Hill), Europe, Japan and Australia. Recent U.S. activities along these lines focus mainly on stimulating peripheral areas of existing operating hydrothermal fields rather than on fresh 'greenfield' sites, but the long-term objective of the Department of Energy's EGS program is the development of large-scale power projects based on EGS technology (MIT, 2006; NREL, 2008). Usually, stimulation is accomplished by injecting water into a well at high pressure, enhancing permeability by the creation and propagation of fractures in the surrounding rock (a process known as 'hydrofracturing'). Beyond just a motivation, low initial system permeability is also an essential prerequisite to hydrofracturing. If the formation permeability is too high, excessive fluid losses will preclude the buildup of sufficient pressure to fracture rock. In practical situations, the actual result of injection is frequently to re-open pre-existing hydrothermally-mineralized fractures, rather than to create completely new fractures by rupturing intact rock. Pre-existing fractures can often be opened using injection pressures in the range 5-20 MPa. Creation of completely new fractures will usually require pressures that are several times higher. It is preferable to undertake development projects of this type in regions where tectonic conditions are conducive to shear failure, so that when pre-existing fractures are pressurized they will fail by shearing laterally. If this happens, the fracture will often stay open afterwards even if injection subsequently ceases. The principal barrier to EGS utilization for electricity generation is project economics. Costs for geothermal electricity obtained from conventional hydrothermal systems are just marginally competitive. Unless and until the costs of routinely and reliably creating and exploiting artificial subterranean fracture networks that can deliver useful quantities of hot fluid to production wells for long periods of time (years) are reduced to levels comparable to those of a conventional geothermal development project, EGS will be of little interest to the electrical power industry. A significant obstacle to progress in projects of this general type is the difficulty of appraising the properties (geometry, fluid transmissivity, etc.) of the fracture(s) created/re-opened by injection. Sustainability of power production is critically dependent upon reservoir thermal sweep efficiency, which depends in turn on the geometry of the fracture network and its interconnections with the various production and injection wells used to circulate fluid underground. If no permeable connections are created between the wells, fluid flow will be too slow for practical utility. If the connections are too good, however (such as a production/injection well pair connected by a single very permeable fracture), production wellhead temperatures will decline rapidly. Unless the permeable fractures created by hydrofracturing can be accurately mapped, the cost of subsequent trial-and-error drilling to try to establish a suitable fluid circulation system is likely to dominate project economics and render EGS impractical.

02 PETROLEUM↗

Plug and Play PV Systems for American Homes

The core objectives of the Plug & Play PV Systems Project were to develop a PV system that can be installed on a residential rooftop for less than $1.50/W in 2020, and in less than 10 hours (from point of purchase to commissioning). The Fraunhofer CSE team’s approach to this challenge involved a holistic approach to system design – hardware and software – that make Plug & Play PV systems: • Quick, easy, and safe to install • Easy to demonstrate as code compliant • Permitted, inspected, and interconnected via an electronic process Throughout the three years of work during this Department of Energy SunShot funded project, the team engaged in a substantive way with inspectional services departments and utilities, manufacturers, installers, and distributors. We received iterative feedback on the system design and on ideas for how such systems can be commercialized. This ultimately led us to conceiving of Plug & Play PV Systems as a framework, with a variety of components compatible with the Plug & Play PV approach, including string or microinverters, conventional modules or emerging lightweight modules. The framework enables a broad group of manufacturers to participate in taking Plug & Play PV Systems to market, and increases the market size for such systems. Key aspects of the development effort centered on the system hardware and associated engineering work, the development of a Plug & Play PV Server to enable the electronic permitting, inspection and interconnection process, understanding the details of code compliance and, on occasion, supporting applications for modifications to the code to allow lightweight modules, for example. We have published a number of papers on our testing and assessment of novel technologies (e.g., adhered lightweight modules) and on the electronic architecture.

14 SOLAR ENERGY↗

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY↗

Model Predictive Control of A Matrix-Converter Based Solid State Transformer for Utility Grid Interaction

The matrix converter solid state transformer (MC-SST), formed from the back-to-back connection of two three-to-single-phase matrix converters, is studied for use in the interconnection of two ac grids. The matrix converter topology provides a light weight and low volume single-stage bidirectional ac-ac power conversion without the need for a dc link. Thus, the lifetime limitations of dc-bus storage capacitors are avoided. However, space vector modulation of this type of MC-SST requires to compute vectors for each of the two MCs, which must be carefully coordinated to avoid commutation failure. An additional controller is also required to control power exchange between the two ac grids. In this paper, model predictive control (MPC) is proposed for an MC-SST connecting two different ac power grids. The proposed MPC predicts the circuit variables based on the discrete model of MC-SST system and the cost function is formulated so that the optimal switch vector for the next sample period is selected, thereby generating the required grid currents for the SST. Simulation and experimental studies are carried out to demonstrate the effectiveness and simplicity of the proposed MPC for such MC-SST-based grid interfacing systems.

Xue, Yaosuo↗

Adaptive RAS/SPS System Settings for Improving Grid Reliability and Asset Utilization through Predictive Simulation and Controls

Remedial Action Schemes (RAS) or Special Protection Schemes (SPS) are used throughout the bulk transmission system as a non-wires method of increasing transmission transfer capability. However, as the population grows within the Western Interconnection, more power needs to be transferred with less ability to build lines. This leads to a greater number of RAS, and the subsequent interaction between these disparate schemes can have unintended consequences. While the large number of RAS within the Western Electricity Coordinating Council (WECC) protect for different things, which can range from the violation of thermal limitations to transient stability issues, they can be described by common methods of operation. In order to understand these methods, a survey was sent out to members of the WECC Modeling & Validation Working Group (MVWG). The response received provides a necessary base in which to understand and build models that can be used within WECC. This report provides information on the survey results regarding RAS/SPS modeling practices for planning and operational studies within the WECC footprint, which is foundational for on-going and future work on RAS. Pacific Northwest National Laboratory (PNNL) and its industry partners are developing innovative methods for adaptively setting RAS parameters based on realistic and near real-time operational conditions to improve power grid reliability and grid asset utilization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

IEEE Smart Grid Series of Standards IEEE 2030 (Interoperability) and IEEE 1547 (Interconnection) Status: Preprint

The IEEE American National Standards smart grid publications and standards development projects IEEE 2030, which addresses smart grid interoperability, and IEEE 1547TM, which addresses distributed resources interconnection with the grid, have made substantial progress since 2009. The IEEE 2030TM and 1547 standards series focus on systems-level aspects and cover many of the technical integrationissues involved in a mature smart grid. The status and highlights of these two IEEE series of standards, which are sponsored by IEEE Standards Coordinating Committee 21 (SCC21), are provided in this paper.

24 POWER TRANSMISSION AND DISTRIBUTION↗

DTLMod: A simulation framework for in situ workflow optimization

In situ processing workflows have become essential for coping with the explosion in data volume and velocity in large-scale scientific computing, providing domain scientists with early insights at runtime. Multiple frameworks implement this paradigm through a data transport layer (DTL), offering different data access modes and deployment schemes, but researchers currently lack the appropriate tools to assess design and deployment options before committing to costly real experiments. We introduce DTLMod, an open-source simulated DTL that enables performance evaluation of in situ workflow configurations at scale. Built on SimGrid, it links into any SimGrid-based simulator and is available in C++ and Python. We evaluate DTLMod along four axes: scalability (tens of thousands of simulated processes across interconnected clusters in seconds, with linear memory scaling), versatility (three implementation variants trading fidelity for speed), accuracy (simulated times faithfully reflecting real behavior), and practical utility (two use cases demonstrating evidence-based workflow design decisions).

Suter, Fred [ORNL] (ORCID:0000000319021955)↗

Continuous Emulation and Multiscale Visualization of Traffic Flow Using Stationary Roadside Sensor Data

With the advent of the next-generation traffic monitoring systems, there has been a significant increase in the spatial-temporal resolution of vehicle mobility data in many cities. Effective analysis and visualization of such data can provide transportation planners with data-driven insights, which can facilitate the understanding of multiscale traffic dynamics. In this paper, we present a web-based traffic emulator for emulating and visualizing near-real-time and historical traffic flows on highways using data from road-side sensors. To construct a continuous traffic flow, the emulator adopts an analytical pipeline that can (a) integrate traffic data collected from discrete road-side radar detection sensors, (b) interpolate traffic conditions (vehicle speed and volume) on unmeasured road segments based on traffic flow theory, and (c) generate lane-specific vehicle trajectories and movements using a mathematically optimized representation of the road network. Our app also provides an integrated visual workflow that allows users to explore the interconnected traffic dynamics using an appropriate traffic flow visualization selected based on the level of detail. We devise two innovative geo-visualization techniques that utilize an animated strips-network representation and a lane usage matrix to visualize lane performances. To ensure a smooth emulation of large-scale traffic flow in an easy-to-access web environment, we implement the emulator using client-side GPU-accelerated techniques. Lastly, we close with a case study that visualizes traffic dynamics of two scenarios - an afternoon peak hour and a traffic accident - in Chattanooga, Tennessee. Our app visualizes the responses of traffic dynamics during different traffic conditions, and to the presence of the traffic accident at different spatial scales.