Design and Evaluation of a Secure Virtual Power Plant.

For three years, Sandia National Laboratories, Georgia Institute of Technology, and University of Illinois at Urbana-Champaign investigated a smart grid vision in which renewable-centric Virtual Power Plants (VPPs) provided ancillary services with interoperable distributed energy resources (DER). This team researched, designed, built, and evaluated real-time VPP designs incorporating DER forecasting, stochastic optimization, controls, and cyber security to construct a system capable of delivering reliable ancillary services, which have been traditionally provided by large power plants or other dedicated equipment. VPPs have become possible through an evolving landscape of state and national interconnection standards, which now require DER to include grid-support functionality and communications capabilities. This makes it possible for third party aggregators to provide a range of critical grid services such as voltage regulation, frequency regulation, and contingency reserves to grid operators. This paradigm (a) enables renewable energy, demand response, and energy storage to participate in grid operations and provide grid services, (b) improves grid reliability by providing additional operating reserves for utilities, independent system operators (ISOs), and regional transmission organization (RTOs), and (c) removes renewable energy high-penetration barriers by providing services with photovoltaics and wind resources that traditionally were the jobs of thermal generators. Therefore, it is believed VPP deployment will have far-reaching positive consequences for grid operations and may provide a robust pathway to high penetrations of renewables on US power systems. In this report, we design VPPs to provide a range of grid-support services and demonstrate one VPP which simultaneously provides bulk-system energy and ancillary reserves.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Review of Dissimilar Metal Welding for the NGNP Helical-Coil Steam Generator

The U.S. Department of Energy (DOE) is currently funding research and development of a new high temperature gas cooled reactor (HTGR) that is capable of providing high temperature process heat for industry. The steam generator of the HTGR will consist of an evaporator economizer section in the lower portion and a finishing superheater section in the upper portion. Alloy 800H is expected to be used for the superheater section, and 2.25Cr 1Mo steel is expected to be used for the evaporator economizer section. Dissimilar metal welds (DMW) will be needed to join these two materials. It is well known that failure of DMWs can occur well below the expected creep life of either base metal and well below the design life of the plant. The failure time depends on a wide range of factors related to service conditions, welding parameters, and alloys involved in the DMW. The overall objective of this report is to review factors associated with premature failure of DMWs operating at elevated temperatures and identify methods for extending the life of the 2.25Cr 1Mo steel to alloy 800H welds required in the new HTGR. Information is provided on a variety of topics pertinent to DMW failures, including microstructural evolution, failure mechanisms, creep rupture properties, aging behavior, remaining life estimation techniques, effect of environment on creep rupture properties, best practices, and research in progress to improve DMW performance. The microstructure of DMWs in the as welded condition consists of a sharp chemical concentration gradient across the fusion line that separates the ferritic and austenitic alloys. Upon cooling from the weld thermal cycle, a band of martensite forms within this concentration gradient due to high hardenability and the relatively rapid cooling rates associated with welding. Upon aging, during post weld heat treatment (PWHT), and/or during high temperature service, C diffuses down the chemical potential gradient from the ferritic 2.25Cr 1Mo steel toward the austenitic alloy. This can lead to formation of a soft C denuded zone near the interface on the ferritic steel, and nucleation and growth of carbides on the austenitic side that are associated with very high hardness. These large differences in microstructure and hardness occur over very short distances across the fusion line (~ 50 100 ?m). A band of carbides also forms along the fusion line in the ferritic side of the joint. The difference in hardness across the fusion line increases with increasing aging time due to nucleation and growth of the interfacial carbides. Premature failure of DMWs is generally attributed to several primary factors, including: the sharp change in microstructure and mechanical properties across the fusion line, the large difference in coefficient of thermal expansion (CTE) between the ferritic and austenitic alloys, formation of interfacial carbides that lead to creep cavity formation, and preferential oxidation of the ferritic steel near the fusion line. In general, the large gradient in mechanical properties and CTE serve to significantly concentrate the stress along the fusion where a creep susceptible microstructure has evolved during aging. Presence of an oxide notch can concentrate the stress even further. Details of the failure mechanism and the relative importance of each factor varies.

2.25Cr-1Mo↗

Analysis of Fast Charging Station Network for Electrified Ride-Hailing Services

Today's electric vehicle (EV) owners charge their vehicles mostly at home and seldom use public direct current fast charger (DCFCs), reducing the need for a large deployment of DCFCs for private EV owners. However, due to the emerging interest among transportation network companies to operate EVs in their fleet, there is great potential for DCFCs to be highly utilized and become economically feasible in the future. This paper describes a heuristic algorithm to emulate operation of EVs within a hypothetical transportation network company fleet using a large global positioning system data set from Columbus, Ohio. DCFC requirements supporting operation of EVs are estimated using the Electric Vehicle Infrastructure Projection tool. Operation and installation costs were estimated using real-world data to assess the economic feasibility of the recommended fast charging stations. Results suggest that the hypothetical transportation network company fleet increases daily vehicle miles traveled per EV with less overall down time, resulting in increased demand for DCFC. Sites with overhead service lines are recommended for hosting DCFC stations to minimize the need for trenching underground service lines. A negative relationship was found between cost per unit of energy and fast charging utilization, underscoring the importance of prioritizing utilization over installation costs when siting DCFC stations. Although this preliminary analysis of the impacts of new mobility paradigms on alternative fueling infrastructure requirements has produced several key results, the complexity of the problem warrants further investigation.

33 ADVANCED PROPULSION SYSTEMS↗

Time-Based Data Streams: Fundamental Concepts for a Data Resource for Streams

Real time data, which we call data streams, are readings from instruments, environmental, bodily or building sensors that are generated at regular intervals and often, due to their volume, need to be processed in real time. Often a single pass is all that can be made on the data, and a decision to discard or keep the instance is made on the spot. Too, the stream is for all practical purposes indefinite, so decisions must be made on incomplete knowledge. This notion of data streams has a different set of issues from a file, for instance, that is byte streamed to a reader. The file is finite, so the byte stream is becomes a processing convenience more than a fundamentally different kind of data. Through the duration of the project we examined three aspects of streaming data: the first, techniques to handle streaming data in a distributed system organized as a collection of web services, the second, the notion of the dashboard and real time controllable analysis constructs in the context of the Fermi Tevatron Beam Position Monitor, and third and finally, we examined provenance collection of stream processing such as might occur as raw observational data flows from the source and undergoes correction, cleaning, and quality control. The impact of this work is severalfold. We were one of the first to advocate that streams had little value unless aggregated, and that notion is now gaining general acceptance. We were one of the first groups to grapple with the notion of provenance of stream data also.

97 MATHEMATICS AND COMPUTING↗

MO-DE-BRA-02: SIMAC: A Simulation Tool for Teaching Linear Accelerator Physics

Purpose: The first goal of this work is to develop software that can simulate the physics of linear accelerators (linac). The second goal is to show that this simulation tool is effective in teaching linac physics to medical physicists and linac service engineers. Methods: Linacs were modeled using analytical expressions that can correctly describe the physical response of a linac to parameter changes in real time. These expressions were programmed with a graphical user interface in order to produce an environment similar to that of linac service mode. The software, “SIMAC”, has been used as a learning aid in a professional development course 3 times (2014 – 2016) as well as in a physics graduate program. Exercises were developed to supplement the didactic components of the courses consisting of activites designed to reinforce the concepts of beam loading; the effect of steering coil currents on beam symmetry; and the relationship between beam energy and flatness. Results: SIMAC was used to teach 35 professionals (medical physicists; regulators; service engineers; 1 week course) as well as 20 graduate students (1 month project). In the student evaluations, 85% of the students rated the effectiveness of SIMAC as very good or outstanding, and 70% rated the software as the most effective part of the courses. Exercise results were collected showing that 100% of the students were able to use the software correctly. In exercises involving gross changes to linac operating points (i.e. energy changes) the majority of students were able to correctly perform these beam adjustments. Conclusion: Software simulation(SIMAC), can be used to effectively teach linac physics. In short courses, students were able to correctly make gross parameter adjustments that typically require much longer training times using conventional training methods.

60 APPLIED LIFE SCIENCES↗

Effect of thermal aging and irradiation on microstructure and crack growth response of Alloy 690

Nickel-base Alloy 690 and the associated weld Alloys 52 and 152 are typically used for nozzle penetrations in replacement heads for pressurized water reactor (PWR) vessels, because of their excellent overall resistance to general corrosion and environmental degradation, primarily stress corrosion cracking (SCC). However, many of the existing PWRs reactors are expected to operate for 40-80 years. Likewise, advanced water-cooled small modular reactors (SMRs) will use Ni-Cr alloys and are expected to receive initial operating licenses for 60 years. Hence, the thermal stability of Ni-Cr alloys is a potential concern for the long-term performance of both existing and advanced nuclear plants, and possibly spent fuel storage containers. The objective of this research is to understand the microstructural changes occurring in high-Cr, Ni-based Alloy 690 during long time exposure to the reactor operating temperatures, and the effect of these changes on the service performance. One area of particular concern is the potential for long range ordering (LRO), i.e. formation of the intermetallic Ni 2 Cr phase under prolonged exposure to reactor temperatures and/or irradiation, which can increase strength, decrease ductility, and cause dimensional changes or lead to in-service embrittlement of components made with these alloys. Hence, this research focused on the microstructural evolution and the SCC response of Alloy 690 under accelerated thermal aging and irradiation conditions. The materials studied involved Alloy 690 from two sources: (i) Alloy 690 plate from an Alloy 152 dissimilar metal weld (DMW) joining the Alloy 690 plate to Alloy 533 LAS, aged at three different temperatures (370°C, 400°C and 450°C) for up to 75,000h (equivalent to 60 years of service), and (ii) specimens neutron-irradiated in the BOR-60 reactor up to 40 dpa. For aged Alloy 690 specimens, hardness was found to increase with aging time, however, the microstructural characterization by means of synchrotron X-ray did not find evidence of LRO. The microstructural characterization of neutron-irradiated specimens by TEM found no evidence of LRO either. Testing in a primary water environment of Alloy 690 specimens aged to a 60-year service equivalent revealed a fatigue and corrosion fatigue crack growth responses similar to those measured on the un-aged alloy. The SCC CGR response was also low. Overall, the two Alloy 690 heats investigated in this work, aged up to 60-year service equivalents or exposed to neutron irradiation up to 40 dpa, did not exhibit a deterioration in microstructure or performance.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Digital Twins for Materials

Digital twins are emerging as powerful tools for supporting innovation as well as optimizing the in-service performance of a broad range of complex physical machines, devices, and components. A digital twin is generally designed to provide accurate in-silico representation of the form (i.e., appearance) and the functional response of a specified (unique) physical twin. This paper offers a new perspective on how the emerging concept of digital twins could be applied to accelerate materials innovation efforts. Specifically, it is argued that the material itself can be considered as a highly complex multiscale physical system whose form (i.e., details of the material structure over a hierarchy of material length) and function (i.e., response to external stimuli typically characterized through suitably defined material properties) can be captured suitably in a digital twin. Accordingly, the digital twin can represent the evolution of structure, process, and performance of the material over time, with regard to both process history and in-service environment. This paper establishes the foundational concepts and frameworks needed to formulate and continuously update both the form and function of the digital twin of a selected material physical twin. The form of the proposed material digital twin can be captured effectively using the broadly applicable framework of n-point spatial correlations, while its function at the different length scales can be captured using homogenization and localization process-structure-property surrogate models calibrated to collections of available experimental and physics-based simulation data.

36 MATERIALS SCIENCE↗

Preliminary Environmental and Financial Viability Analysis of Circular Economy Scenarios for Satisfying PV System Service Lifetime

PV deployment has grown rapidly in recent decades, and this growth is expected to continue. At the same time, the rapid increase in PV panel efficiencies offers the opportunity to repower/revamp existing installations - replacing operational, lower-efficiency panels before the end of their 30-year service lifetime with newer, higher-efficiency panels. As a result, an increasing volume of PV panels could be decommissioned well before reaching the end of their 30-year service lifetime. Two broad strategies can be applied to manage the expected increase in decommissioned PV panels: (i) recycle prematurely decommissioned panels, and (ii) prevent recycling of these panels by satisfying the typical service lifetime of 30 years through circular economy strategies such as repair and reuse. Each strategy presents an environmental and economic trade-off. Retaining and satisfying the lifetime of the older, lower-efficiency panels avoids environmental burdens from recycling or landfilling but incurs burdens from additional repair and forgoing the opportunity to install newer panels with greater electricity-generation capabilities. This study assesses whether satisfying the expected service lifetime of a PV system through circular economy scenarios generates a greater environmental and financial benefit than recycling used panels and installing newer panels with higher efficiencies. The circular economy scenarios include repair and reuse of the PV system. Specifically, the study determines whether it is better for the environment to keep a PV panel in use for its 30-year service life after accounting for potential repair and additional transportation, or to replace older panels with more efficient new ones. In addition, we explore whether satisfying the service lifetime of PV panels proves competitive with the recycling route from a financial perspective.

14 SOLAR ENERGY↗

Efficient and choreographed quality-of- service management in dense 6G verticals with high-speed mobility requirements

Future 6G networks are envisioned to support very heterogeneous and extreme applications (known as verticals). Some examples are further-enhanced mobile broadband communications, where bitrates could go above one terabit per second, or extremely reliable and low-latency communications, whose end-to-end delay must be below one hundred microseconds. To achieve that ultra-high Quality-of-Service, 6G networks are commonly provided with redundant resources and intelligent management mechanisms to ensure that all devices get the expected performance. But this approach is not feasible or scalable for all verticals. Specifically, in 6G scenarios, mobile devices are expected to have speeds greater than 500 kilometers per hour, and device density will exceed ten million devices per square kilometer. In those verticals, resources cannot be redundant as, because of such a huge number of devices, Quality-of-Service requirements are pushing the effective performance of technologies at physical level. And, on the other hand, high-speed mobility prevents intelligent mechanisms to be useful, as devices move around and evolve faster than the usual convergence time of those intelligent solutions. New technologies are needed to fill this unexplored gap. Therefore, in this paper we propose a choreographed Quality-of-Service management solution, where 6G base stations predict the evolution of verticals at real-time, and run a lightweight distributed optimization algorithm in advance, so they can manage the resource consumption and ensure all devices get the required Quality-of-Service. Prediction mechanism includes mobility models (Markov, Bayesian, etc.) and models for time-variant communication channels. Besides, a traffic prediction solution is also considered to explore the achieved Quality-of-Service in advance. The optimization algorithm calculates an efficient resource distribution according to the predicted future vertical situation, so devices achieve the expected Quality-of-Service according to the proposed traffic models. An experimental validation based on simulation tools is also provided. Results show that the proposed approach reduces up to 12% of the network resource consumption for a given Quality-of-Service.

42 ENGINEERING↗

Providing Levelized Cost and Waiting Time Inputs for HDV Hydrogen Refueling Station Planning: A Case Study of U.S. I-75 Corridor

Widespread use of diesel fuels in freight transportation leads to greenhouse gas (GHG) emissions that play an important role in air pollution. The air pollution, as well as the energy crisis, drives the transition from diesel fuel to cleaner and more energy-efficient fuels such as hydrogen fuels. With such a transition, the strategic planning and optimization of supporting refueling infrastructure along the national highway for heavy-duty vehicles (HDVs) become a necessity. Cost and service level are two essential factors to be considered in hydrogen refueling station location and capacity optimization. The service level in this study is assessed by the delay (waiting time) at fueling stations as well as the fueling demand fulfilled. To this end, this study presents a methodology to provide waiting time (delay) and levelized hydrogen fuel cost inputs under different station configurations (number of dispensers and fill rates) for hydrogen refueling station planning. Determining the station configurations based on the trade-off between the two inputs is further discussed. Particularly, this study points out that the levelized cost and waiting time are affected by hourly demand patterns and estimates the two inputs under different peak hour fueling demand scenarios. The results suggest that, with the same daily demand, the cost, as well as the waiting time, increases obviously with the peak hour demand. In the case study, the cost grows at least 30% when the peak hour visit frequency of the daily total visits increases from 5% (evenly distributed pattern) to 10% (the most common pattern for existing diesel fueling stations along I-75). Accounting for this peak hour effect in hydrogen refueling station planning is recommended. Overall, the waiting time model and cost analysis provide key inputs for optimizing hydrogen refueling station location and configurations based on anticipated refueling demand patterns. The paper is the second in a series that aims to build a comprehensive modeling plan and optimize hydrogen refueling infrastructure along the Interstate 75 (I-75) corridor for HDVs.

Liu, Yuandong↗

Lifting and Dropping VMs to Dynamically Transition Between Time- and Space-sharing for Large-Scale HPC Systems

As HPC environments increasingly integrate with edge based systems, system architectures will need to handle a broader class of workloads and scheduling requirements. One result of this shift will be the need to simultaneously support bulk-synchronous parallel (BSP) and on-demand service based applications on the same infrastructure. This in turn will require that future resource management approaches utilize both space-shared as well as time-shared resource scheduling strategies. In this work we introduce the concept of "VM-lifting'' (and its inverse "VM-Dropping'') which allows dynamically switching an HPC workload between space-shared and time-shared scheduling regimes. Our work targets co-kernel based HPC system software environments, in which multiple specialized OS kernels execute natively on dedicated physical resource partitions inside a single compute node. With VM-lifting, a native co-kernel can be migrated at runtime to and from locally hosted Virtual Machine Environments due to changing scheduling requirements of the node. This allows an HPC node to be dynamically (re-)configured as either a time-shared Infrastructure-as-a-Service (IaaS) resource or a dedicated space shared resource based on the current workload demands. We have implemented this approach in the context of the Hobbes Exascale System Software stack and have demonstrated that a node can be reconfigured with minimal impact on the running applications.

Gordon, Nick↗

Incentive-Based Control and Coordination of Distributed Energy Resources. Final Report

The rapid growth of low-inertia renewable energy resources represents an immense opportunity for the U.S. to minimize its carbon footprint, while presenting a challenge for system operators as traditional “spinning” generation resources are displaced. This transformation requires solutions to robustly and cost-effectively manage dynamic changes on the grid while ensuring quality of service. There is growing recognition that distributed energy resources (DERs – loads, distributed generation, storage, electric vehicles, etc.) represent a great potential to perform this function. This report details a scalable hierarchical control strategy for coordinating thousands of heterogeneous DERs in order to provide three ancillary gird services: 1) frequency response, a rapid (within 2 seconds) service used to maintain the grid at 60 Hz; 2) regulation response, a larger response used to balance on-going differences in supply and demand on the grid; and, 3) ramping reserve, used to bring on capacity to replace lost generation. The developed control architecture consists of 1) a Distribution Reliability Coordinator (DRC), 2) aggregator controllers, and finally, 3) DER controllers. The DRC coordinates all the flexible loads and distributed energy resources on the distribution system and bids the aggregate flexibility into the wholesale market. The DRC also performs resource allocation (deciding how the flexible devices on the distribution system will be dispatched) to meet the requirements for each of the three ancillary services. The aggregators control a collection of devices that are geographically co-located and provide a platform to aggregate their flexibility and mitigate uncertainty associated with a single flexible load by managing a large aggregation of similar loads (so that any stochastic effects average out). Finally, DER controllers (for example, thermostats for air conditioners, chargers for electric vehicles) adjust the power consumption of individual devices to ensure accurate and reliable delivery of the requested grid services. Evaluation and validation of this approach was conducted with a mixture of simulation and hardware testing for a range of DERs in residential (air conditioners and water heaters), commercial HVAC (ventilation fans and central chiller plants), and micro-grids (battery energy storage, solar PV etc.). This culminated in DER hardware and simulation models operating in conjunction with grid simulations as part of a large scale federated test-bed demonstration. Simulations of over 10,000 controllable residential devices (a combination of air conditioners, water heaters, batteries, and electric vehicles) demonstrated that this advanced control approach could simultaneously meet all three grid services. Furthermore, hardware-in-the-loop testing was performed with operational micro-grid and commercial building HVAC equipment. The micro-grid equipment (representing PV, battery storage, and back-up generators) demonstrated the ability to meet all frequency response requirements (except ramping time). The commercial building HVAC ventilation equipment successfully provided the regulating response service. An Industry Advisory Board (IAB) was formed and engaged throughout the project to get feed-back on project risks and potential commercialization barriers. Their input was invaluable in identify key risks stemming from regulatory and market access challenges, financial risks from under-performance, and competitive threats from utility-scale solutions such as integrated storage. A phased commercialization plan was developed that addresses continued risk reduction (value proposition refinement and performance uncertainty assessments), piloting through field demonstrations with key stakeholders, and finally, deployment as an emerging standard for DER control.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Quantifying the Value of Hydropower in the Electric Grid: Final Report

The report summarizes research to Quantify the Value of Hydropower in the Electric Grid. This 3-year DOE study focused on defining value of hydropower assets in a changing electric grid. Methods are described for valuation and planning of pumped storage and conventional hydropower. The project team conducted plant case studies, electric system modeling, market analysis, cost data gathering, and evaluations of operating strategies and constraints. Five other reports detailing these research results are available a project website, www.epri.com/hydrogrid. With increasing deployment of wind and solar renewable generation, many owners, operators, and developers of hydropower have recognized the opportunity to provide more flexibility and ancillary services to the electric grid. To quantify value of services, this study focused on the Western Electric Coordinating Council region. A security-constrained, unit commitment and economic dispatch model was used to quantify the role of hydropower for several future energy scenarios up to 2020. This hourly production simulation considered transmission requirements to deliver energy, including future expansion plans. Both energy and ancillary service values were considered. Addressing specifically the quantification of pumped storage value, no single value stream dominated predicted plant contributions in various energy futures. Modeling confirmed that service value depends greatly on location and on competition with other available grid support resources. In this summary, ten different value streams related to hydropower are described. These fell into three categories; operational improvements, new technologies, and electricity market opportunities. Of these ten, the study was able to quantify a monetary value in six by applying both present day and future scenarios for operating the electric grid. This study confirmed that hydropower resources across the United States contribute significantly to operation of the grid in terms of energy, capacity, and ancillary services. Many potential improvements to existing hydropower plants were found to be cost-effective. Pumped storage is the most likely form of large new hydro asset expansions in the U.S. however, justifying investments in new pumped storage plants remains very challenging with current electricity market economics. Even over a wide range of possible energy futures, up to 2020, no energy future was found to bring quantifiable revenues sufficient to cover estimated costs of plant construction. Value streams not quantified in this study may provide a different cost-benefit balance and an economic tipping point for hydro. Future studies are essential in the quest to quantify the full potential value. Additional research should consider the value of services provided by advanced storage hydropower and pumped storage at smaller time steps for integration of variable renewable resources, and should include all possible value streams such as capacity value and portfolio benefits i.e.; reducing cycling on traditional generation.

13 HYDRO ENERGY↗

Dynamic Path Scheduling through Extensions to Generalized Multiprotocol Label Switching (GMPLS) (Final Report)

The major accomplishments of the project are the successful software implementation of the Phase I scheduling algorithms for GMPLS Label Switched Paths (LSPs) and the extension of the IETF Path Computation Element (PCE) Protocol to support scheduling extensions. In performing this work, we have demonstrated the theoretical work of Phase I, analyzed key issues, and made relevant extensions. Regarding the software implementation, we developed a proof of concept prototype as part of our Algorithm Evaluation System (AES). This implementation uses the Linux operating system to provide software portability and will be the foundation for our commercial software. To demonstrate proof of concept, we have implemented LSP scheduling algorithms to support two of the key GMPLS switching technologies (Lambda and Packet) and support both Fixed Path (FP) and Switched Path (SP) routing. We chose Lambda and Packet because we felt it was essential to include both circuit and packet switching technologies as well as to address all-optical switching in the study. As conceptualized in Phase I, the FP algorithms use a traditional approach where the LSP uses the same physical path for the entire service duration while the innovative SP algorithms allow the physical path to vary during the service duration. As part of this study, we have used the AES to conduct a performance analysis using metro size networks (up to 32 nodes) that showed that these algorithms are suitable for commercial implementation. Our results showed that the CPU time required to compute an LSP schedule was small compared to expected inter-arrival time between LSP requests. Also, when the network size increased from 7 to 15 to 32 nodes with 10, 26, and 56 TE links, the CPU processing time showed excellent scaling properties. When Fixed Path and Switched Path routing were compared, SP provided only modestly better performance with respect to LSP completion rate, service duration, path length, and start time deviation. In addition, the SP routing required somewhat more CPU time than the FP routing. However, when the allowable range for the start time is increased, the CPU time for SP increased less rapidly than FP such that the CPU processing times became comparable. Therefore, SP routing may scale better than FP routing. The Path Computation Element Working Group is a complementary working group to the GMPLS working group (CCAMP) in the IETF and is developing standards to discover, manage, and access elements that compute routes for GMPLS for LSPs. The algorithms used to compute the routes are not subject to standardization. Since the PCE supports only standard GMPLS LSPs, it does not support scheduled LSPs. Therefore, it is a natural extension of our Phase I work to introduce this enhancement into the PCE. In addition, the PCE adds another dimension to our product line because the PCE by itself may be a product with a standard interface.

97 MATHEMATICS AND COMPUTING↗

QoS-aware edge AI placement and scheduling with multiple implementations in FaaS-based edge computing

Resource constraints on the computing continuum require that we make smart decisions for serving AI-based services at the network edge. AI-based services typically have multiple implementations (e.g., image classification implementations include SqueezeNet, DenseNet, and others) with varying trade-offs (e.g., latency and accuracy). The question then is how should AI-based services be placed across Function-as-a-Service (FaaS) based edge computing systems in order to maximize total Quality-of-Service (QoS). To address this question, we propose a problem that jointly aims to solve (i) edge AI service placement and (ii) request scheduling. These are done across two time-scales (one for placement and one for scheduling). Here we first cast the problem as an integer linear program. We then decompose the problem into separate placement and scheduling subproblems and prove that both are NP-hard. We then propose a novel placement algorithm that places services while considering device-to-device communication across edge clouds to offload requests to one another. Our results show that the proposed placement algorithm is able to outperform a state-of-the-art placement algorithm for AI-based services, and other baseline heuristics, with regard to maximizing total QoS. Additionally, we present a federated learning-based framework, FLIES, to predict the future incoming service requests and their QoS requirements. Our results also show that our FLIES algorithm is able to outperform a standard decentralized learning baseline for predicting incoming requests and show comparable predictive performance when compared to centralized training.

97 MATHEMATICS AND COMPUTING↗

Coal Ash Corrosion Resistant Materials Testing

In April 1999, three identical superheater test sections were installed into the Niles Unit No.1 for the purpose of testing and ranking the coal ash corrosion resistance of candidate superheater alloys. The Niles boiler burns high sulfur coal (3% to 3.5%) that has a moderate alkali content (0.2% sodium equivalents), thus the constituents necessary for coal ash corrosion are present in the ash. The test sections were controlled to operate with an average surface metal temperature from approximately 1060 F to 1210 F which was within the temperature range over which coal ash corrosion occurs. Thus, this combination of aggressive environment and high temperature was appropriate for testing the performance of candidate corrosion-resistant tube materials. Analyses of the deposit and scale confirmed that aggressive alkali sulfate constituents were present at the metal surface and active in tube metal wastage. The test sections were constructed so that the response of twelve different candidate tube and/or coating materials could be studied. The plan was to remove and evaluate one of the three test sections at time intervals of 1 year, 3 years, and 5 years. This would permit an assessment of performance of the candidate materials as a function of time. Test Section A was removed in November 2001 after about 24 months of service at the desired steam temperature set point, with about 15.5 months of exposure at full temperature. A progress report, issued in October 2002, was written to document the performance of the candidate alloys in that test section. The evaluation described the condition of each tube sample after exposure. It involved a determination of the rate of wall thickness loss for these samples. In cases where there was more than one sample of a candidate material in the test section, an assessment was made of the performance of the alloy as a function of temperature. Test Sections B and C were examined during the November 2001 outage, and it was decided that, due to excessive wastage, certain tube samples needed to be removed and replaced in order to ensure that Test Sections B and C would have a chance of remaining in the boiler for their intended exposure period. These suspect tube samples were replaced and the two remaining test sections were put back into service. The tube samples that were removed from Test Sections B and C were set aside for later analysis at the end of the planned exposure period. Test Sections B and C were again examined approximately six months later. At that time, measured wall thickness losses raised concerns about additional tube samples. These suspect samples were also removed, set aside for later analysis, and replaced. The test sections then went back into service until the end of the second exposure period, which was concluded in May 2003 when, due to evidence of excessive wastage, the valves were opened increasing cooling steam flow and thereby effectively stopping corrosion. In August 2003, Test Sections B and C were removed for closer examination. Section C had experienced about 42 months of service at the desired team temperature set point with 28.5 months at temperature at full temperature. Additional suspect samples were removed from Test Section B, then, it was re-installed into the boiler (at the location originally occupied by Section C), where it remained in service until the end of the program. Due to this removal history, the samples from Test Section B had a total service duration that varied from a minimum of 15.5 months (for samples that performed poorly) to 37 months for samples the survived for the full intended service exposure for Section B. The figure below shows a schematic of Test Section B and indicates the length of service exposure for different locations. This report provides the results of the evaluation of Test Section B, including the samples that remained in the Test Section for the full exposure period as well as those that were removed early. This report also is intended to compare and summarize the results for all three test sections. The analysis of Test Section B followed much the same protocol that was employed in the assessment of the other two test sections. The focus was on determining and documenting the relative corrosion rates of the candidate materials; however, additional investigations were undertaken to better understand the wastage mechanism, and to characterize how selected candidate materials performed either well, or poorly, in the severe coal ash corrosion environment in the convection pass of Niles Unit No.1. The detailed results of the investigation are included in this report as a series of twelve appendices. Each appendix is devoted to the performance of one of the candidate alloys. The table below summarizes metal loss rate for the worst case sample of each of the candidate materials in all three test sections. The body of this report compares these for all of the samples in the test section.

01 COAL, LIGNITE, AND PEAT↗

How Improved Forecasting Can Increase the Bulk Power System Value of Price-Responsive Electric Vehicle Managed Charging

Personal light-duty vehicle (LDV) electric vehicle managed charging (EVMC) can reduce power system costs by better aligning electric vehicle (EV) charging with locations and times of low energy cost or infrastructure use. The need to coordinate charging demand across thousands to millions of vehicles while preserving mobility service is a barrier to realizing the value of EVMC. Price-responsive dispatch mechanisms like time-of-use rates (TOU) and hourly real-time prices (RTP) are attractive compared to direct load control (DLC) because they only require one-way communications and local controls. However, increasing participation in price responsive mechanisms can induce costly-to-serve spikes in load and otherwise increase, rather than decrease, production costs. We quantify the ability of improved EVMC forecasting to sustain savings from price responsive mechanisms beyond the limit of 14% of LDVs actively participating observed in previous work. Perfect forecasting of price-responsive EV load makes TOU and RTP value-competitive with a low-error DLC formulation with up to 27% (within-week flexibility) to 45% or more (within-session flexibility) of LDVs participating in EVMC in an envisioned New England power system with 84% clean energy. Additional costs of implementing DLC should be no more than tens of dollars per vehicle-year if DLC is to be value-competitive with accurately forecast price-responsive EVMC for double-digit percentage shares of LDVs participating.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗