At least 487 records · Page 27

DOE Award No.: DE-FE0023919 Phase 3 Scientific/Technical Report

This is the Phase 3 Report for the ‘Deepwater Methane Hydrate Characterization and Scientific Assessment or Genesis of Methane Hydrates in the Gulf of Mexico (GOM2)’ research project (DOE Award No. DE-FE0023919). The report summarizes activities from January 16, 2018 to September 30, 2019. The project is led by the University of Texas at Austin (UT). The objective is to gain insight into the nature, formation, occurrence and physical properties of methane hydrate-bearing sediments for the purpose of methane hydrate resource appraisal through the planning and execution of drilling, coring, logging, testing and analytical activities that assess the geologic occurrence, regional context, and characteristics of marine methane hydrate deposits in the Gulf of Mexico outer continental shelf (OCS). We determined that it would not be possible to pursue the project with the International Ocean Discovery Program (IODP) and then developed a revised science and operations plan to maximize the science using a commercial vessel within the budget that is available. We improved the scientific capability of the UT pressure core center by adding the ability to X-ray pressure cores, and the ability to cut and store multiple core samples for experimental analysis. We transferred pressure cores to peer institutions, including the National Energy Technology Lab (NETL) the United States Geological Survey (USGS Woods Hole). We made advances in understanding the composition and source of gasses locked in the methane hydrate from Green Canyon 955 (GC-955). We developed approaches to determine the in-situ salinity of hydrate-bearing samples, revealing that the in situ salinity of the GC 955 reservoir is just above that of seawater. We determined that the GC-955 hydrate reservoir is composed of sandy silt with a high concentration of hydrate interbedded with clayey silt with no hydrate present. We determined that some or all of the intervals bounding the hydrate reservoir are composed of material similar to the reservoir (sandy silt with hydrate and clayey silt with no hydrate), but with a lower net to gross. We determined that the reservoir effective permeability at a hydrate saturation of ~80-90 % is ~0.1 mD (or 1.0×10-16 m2) to ~0.5 mD (or 5.0×10-16 m2) and the intrinsic permeability is ~12 mD (or 1.2×10-14 m2). The GC-955 reservoir in-situ porosity of sandy silt is 0.38 to 0.40 and is largely independent of effective stress, and that the porosity of clayey silt is 0.33 at an in situ effective stress of 3.8 MPa to ~0.37 at zero effective stress. We developed a systematic, repeatable approach to studying hydrate reservoir properties by reconstituting individual lithofacies from dissociated pressure cores. We determined index properties of GC-955 reservoir, including liquid limit and plasticity, porosity, capillary behavior, and particle size distribution. We developed a more robust pressure coring technology. We finalized and published the UT-GOM2-1 Expedition Volume and we finalized a dedicated volume on the UT-GOM2-1 expedition that will be published in the American Association of Petroleum Geologists Bulletin (AAPG) in spring 2020.

03 NATURAL GAS↗

A Vehicle-to-Grid planning framework incorporating electric vehicle user equilibrium and distribution network flexibility enhancement

The rapid surge in electric vehicle (EV) adoption, coupled with advancements in charging technologies, emphasizes the critical necessity for expanding EV recharging infrastructure. Simultaneously, the Distribution Network (DN) encounters escalating challenges in meeting charging demand during peak traffic periods. Consequently, there is a mounting demand for the deployment of innovative Vehicle-to-Grid (V2G) technologies to augment the DN’s flexibility in power dispatch and alleviate travel costs for EV users. Hence, this paper proposes an EV-user-equilibrium-(UE)-constrained V2G planning framework that enhances flexibility in the DN. The framework aims to ascertain the optimal placement and capacity of EV charging stations (EVCSs) and V2G charging piles within the Transportation Network (TN). It takes into account the equilibrium condition stemming from competitive EV charging and routing behaviors alongside the optimal expansion of DN energy resources to accommodate the electricity supplied by the V2G piles. This study commences by analyzing EV drivers’ travel decisions, considering the influence of charging and V2G pile locations and sizes. Subsequently, we tackle the Traffic Assignment Problem with User Equilibrium (TAP-UE) model to characterize the steady-state traffic flow distribution of EVs. Following this, we formulate the optimization model for the Coordinated Power and Transportation Network (CPTN), which encompasses the optimal expansion of DN facilities and traffic flow regulation under UE conditions. To mitigate the computational complexity associated with the V2G planning model, we introduce a series of linearization methods to obtain a manageable Mixed-Integer Linear Programming (MILP) solution. Finally, to validate the efficacy of our proposed planning framework, we apply it to two test systems, including a real-world case study. Through these case studies, we explore the necessity and potential benefits of V2G technologies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Thermal Stimulation and Injectivity Testing at Raft River, ID EGS Site

The Raft River geothermal field is the site of an innovative Department of Energy Enhanced Geothermal System (EGS) project to determine the viability of using combined thermal and hydraulic stimulation techniques to improve energy production. Well RRG-9 is currently undergoing a stimulation program using injectate from the US Geothermal Raft River Power Plant and cold water from a cooling tower make-up water well. The stimulation began on 13 June 2013 with injection from the power plant at a temperature of about 39 °C and a pressure of 275 psig. Next, two positive displacement plunger type pumps were used to increase the injection pressure and flow rate for about one month. The highest rate achieved was 258 gpm at a pressure of 741 psig. During this time, fluid from the cooler water well was injected for about 2 weeks at various pressures. Then, the pumps were removed and plant injection resumed on 25 September. Plant injection will continue until the spring of 2014, when a high pressure hydraulic stimulation will be conducted. A series of seismic monitoring stations deployed around the well are providing data on seismic events occurring at the site. Over the past year, 51 microseismic events have been recorded, all less than Magnitude 1. During injection, several diagnostic tests were conducted to gain a better understanding of the well and reservoir. A step-rate test was performed on 22 August to measure the in-situ stress and aid in modeling in-situ fractures. A tracer was injected into the well on 9 September. No tracer was detected in adjacent production wells after several months. A second borehole televiewer survey was conducted for comparison to pre-stimulation images. Here, a third borehole televiewer survey is planned after the high pressure stimulation. Injection test data is evaluated in real time. A modified Hall plot analysis indicates the effective permeability is increasing. The injectivity index supports the results of the modified Hall plot analysis. As the thermal stimulation has continued, the injectivity index has consistently followed an upward trend from 0.1 gpm/psi to 0.53 gpm/psi.

enhanced geothermal systems↗

Proposed Test of the Two Beam BPM at RHIC

The essence of the ERL operation implies that at least two beams (accelerated and decelerated) are co-propagating in the same vacuum vessel and each beam has its own trajectory. The existing beam position monitors measure only “average” trajectory but not that of an individual beam, unless the time separation between bunches is so large that one can resolve individual bunches. It was proposed to use phase information of the pick-up signal to extract information on the orbit “difference”. We are planning to conduct experiments at RHIC to test the proposed idea. The approach and experiment set-up are described in the paper.

43 PARTICLE ACCELERATORS↗

Lawrence Livermore National Laboratory Experimental Test Site 300 (Site 300): Site 300 Roadway Improvements - Chem Mag Loop Soil Sampling and Analysis Plan (May 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Roadway Improvements Project at the Chem Mag Loop (project). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided to EFA by PMO.

54 ENVIRONMENTAL SCIENCES↗

DOE Award No.: DE-FE0023919 Phase 4 Scientific/Technical Report

This is the Phase 4 Report for the ‘Deepwater Methane Hydrate Characterization and Scientific Assessment or Genesis of Methane Hydrates in the Gulf of Mexico (GOM2)’ research project (DOE Award No. DE-FE0023919). The report summarizes activities from October 1, 2019 to September 30, 2020. The project is led by the University of Texas at Austin (UT). The project objective is to gain insight into the nature, formation, occurrence and physical properties of methane hydrate-bearing sediments for the purpose of methane hydrate resource appraisal through the planning and execution of drilling, coring, logging, testing and analytical activities that assess the geologic occurrence, regional context, and characteristics of marine methane hydrate deposits in the Gulf of Mexico outer continental shelf (OCS). We published a dedicated American Association of Petroleum Geologists Bulletin volume describing initial results from the UT-GOM2-1 expedition in Sept. 2020. This is part 1 of a multi-volume commitment by AAPG to this project. We further confirmed that the natural gas in hydrate at GC-955 was formed by primary microbial processes (>76.1 %). The in-situ effective permeability hydrate-bearing sandy silts at the GC-955 reservoir ranges from 0.1 md (1.0×10-16 m2) to 2.4 md (2.4×10-15m2) in cores with 83% to 93% hydrate saturation. The intrinsic permeability (the single phase permeability) is estimated from reconstituted samples to be ~12 md (1.2×10-14 m2) to ~41 md (4.1×10-14 m2). We used observation and models to interpret that the core degradation that is found in pressure cores is due to dissociation of the methane hydrate in the outer circumference of the core and dissolution of that methane into the fresh pore water that the core is stored with. We are designing approaches to minimize this core loss in the future. We spent an enormous amount of effort to further improve the ability of the pressure coring tool (the PCTB) to pressure seal correctly. We completed upgrading the upper section of the PCTB to address poor pressure. We successful tested the modifications at Geotek’s test facility in Salt Lake City (Bench Test II). We completed a Land Test of the PCTB at the Schlumberger Cameron Test and Training Facility (CTTF). The tool did not seal in 6 out of 7 tests and we clearly demonstrated that cuttings were wedging in the ball valve assembly, keeping the ball valve from sealing. We reproduced the failure mechanism observed during the land test at Salt Lake City and confirmed the sensitivity of the ball valve assembly to grit. Geotek designed and tested 9 modifications to address this issue and the PCTB is now 100% successfully sealing in the presence of grit. Our science expedition is scheduled for spring 2022 and we are fully focused on preparing for this. UT and Ohio State completed a Shallow Hazard Assessment report for each proposed UT-GOM2-2 drilling location, pursuant to 30 CFR 250.214(f) and 250.244 (f). The Shallow Hazard Reports will accompany the UT-GOM2-2 Exploration Plan that is submitted to BOEM, and completes the geological and geophysical analysis for UT-GOM2-2 permitting efforts. We updated the UT-GOM2-2 Operations Plan (Version 1). We completed the UT-GOM2-2 Science and Sample Distribution Plan (Version 1). We evaluated the scope, budget, and schedule that would result from using a commercial vessel. We developed detailed drilling schedule, mud volume, and resource estimates. We developed a vessel specification document and a well plan, and sent these documents to prospective vessel contractors.

03 NATURAL GAS↗

An ERCOT test system for market design studies

An open source test system is developed that permits the dynamic modeling of centrally-managed wholesale power markets operating over highvoltage transmission grids. In default mode, the test system models basic operations in the Electric Reliability Council of Texas (ERCOT): namely, centrally-managed day-ahead and real-time markets operating over successive days, with congestion handled by locational marginal pricing. These basic operational features characterize all seven U.S. energy regions organized as centrally-managed wholesale power markets. Modeled participants include dispatchable generators, load-serving entities, and non-dispatchable generation such as unrmed wind and solar power. Users can congure a broad variety of parameters to study basic market and grid features under alternative system conditions. Users can also easily extend the test system's Java/Python software classes to study modied or newly envisioned market and grid features. Finally, the test system is integrated with a high-level simulation framework that permits it to function as a software component within larger systems, such as multi-country systems or integrated transmission and distribution systems. Finally, detailed test cases with 8-bus and 200-bus transmission grids are reported to illustrate these test system capabilities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Petrophysical and geomechanical properties of gas hydrate-bearing sediments recovered from Alaska North Slope 2018 Hydrate-01 Stratigraphic Test Well

Knowledge of petrophysical and geomechanical properties of gas hydrate-bearing sediments are essential for predicting reservoir response due to gas production from gas hydrate reservoirs. That information will be critical parameters for designing production well completion such as specification of depressurization pump, water storage tank, and mesh size of sand screen. In December 2018, Stratigraphic Test Well Hydrate-01 was drilled in the western part of the Prudhoe Bay Unit, Alaska North Slope as part of the technical planning effort for a future long-term production test by collaborative team of DOE/NETL, USGS, and MH21-S (Boswell et al., 2020, Collett et al., 2020, Okinaka et al., 2020). Data set of logging-while-drilling (LWD) were acquired (Haines et al., 2020, Suzuki et al., 2019) and core sampling depth was determined on-site.Side-wall pressure coring was conducted to recover gas hydrate-bearing sediments from two reservoir sections named Unit-B and Unit-D. A total of 34 cores were successfully recovered by 5 runs of a wire-line deployed pressure corer (CoreVault® System - Halliburton). Core analysis scheme of this project are shown in Figure 1. All cores were quenched in liquid nitrogen while at high pressure in the laboratory of Stratum Reservoir, LLC. at Anchorage (Figure 1, a)). And the cores were removed from the pressure corer autoclave with temperature support of dry ice and stored under liquid nitrogen at atmospheric pressure. 19 damaged cores were processed to index property measurements directly such as grain size, grain density. 4 of another 17 cores were depressurized and trimmed for making a plug to analyze petrophysical properties of host sediments. Unsteady-state permeability test was conducted to obtain relative water permeability to gas and core scale NMR T2 distribution measurement was performed for evaluating pore size distribution at Houston (Figure 1, b)). Remained high quality 13 cores were preserved with gas hydrate for advanced laboratory analysis. National Institute of Advanced Industrial Science and Technology, as a part of the Japanese National Hydrate Research Program (MH21-S, funded by Ministry of Economy, Trade and Industry), received the samples at Sapporo, Japan for advanced core analysis. High-resolution X-ray CT was used to analyze the quality of the samples, which showed undisturbed lithological layers. Cores were lathed into cylindrical shape and distributed for multi property measurements (Figure 1, c)).<p>As a result, sediment from Unit-D is categorized as silty sand at ~37% porosity with ~80% gas hydrate saturation. An average hydration number n = 6.16 was measured by Raman spectroscopy. An average intrinsic permeability of ~400 mD and in situ effective permeability (with hydrate) on the order of ~10 mD. The Unit B recovered cores consisted of well sorted sand at ~40% porosity with ~95% gas hydrate saturation. An average intrinsic permeability of ~1 Darcy and in situ effective permeability on the order of ~30 mD was measured for the Unit B cores. There was a small permeability reduction due to porosity loss with increasing effective stress that simulated consolidation behavior along with depressurization in the highly permeable sandy sediment. The apparent minimum change in porosity and permeability may be caused by the low compressibility of quartz sand grains in the recovered cores. XRD and thermal conductivity analysis also suggested high quartz content. Triaxial compression tests established internal friction angles based on the Mohr-Coulomb's failure criterion, which are 40° for hydrate-bearing sediment and 29.8° for hydrate free sediment.</p>

Yoneda, Jun↗

High-Power Amplifier Considerations for testing the LAMP RFQ and first DTL Cavity

As part of the LANSCE Accelerator Modernization Pro ject (LAMP), critical portions of the proposed accelerator will be tested as proof of concept and aid in planning the installation of LAMP at Los Alamos Neutron Science Cen ter. As part of this demonstration, the radio frequency quadrupole (RFQ) and the first drift-tube linac (DTL) cav ity will be tested with beam. For this purpose, high-power RF amplifiers are being designed to meet the testing de mands. This is a description of the requirements of these amplifiers and how the design is intended to meet them.

42 ENGINEERING↗

Pu-238 Production Calculator and Estimation Tool in the Advanced Test Reactor

A MS Excel tool was created to help track Pu-238 production, Np-237 feedstock use, estimate production scenarios, and coordinate planning for shipments at the Idaho National Laboratory (INL) and Advanced Test Reactor (ATR). As-run estimates were used as a basis for beginning and end of life isotopic concentrations. Multiple target types were created to demonstrate a proof of concept while actual results were not yet available.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Qualification and Commissioning of Helium Flow Loop Experiment for Blanket Design Measurements

Sufficient cooling of plasma-facing materials remains an outstanding challenge in the design of fusion reactor blankets in commercial power demonstration plants. Due to its chemical inertness and low neutron interaction cross section, pressurized helium is a candidate coolant fluid for such systems; however, helium has a small thermal mass compared to liquid coolants, potentially reducing heat removal performance. To address this need, a number of heat transfer enhancements have been proposed to improve the cooling efficiency of such components, thereby decreasing pumping power needs and improving overall plant efficiency. Toward this end, a helium flow loop experiment (HFLE) has been designed and commissioned to test advanced passive heat transfer enhancements in unit-cell test sections, providing necessary data for model validation and subsequent system design. The HFLE is designed to provide flow of pressurized (up to 4 MPa) helium at flow rates up to 80 g/s, enabling heat transfer and pressure drop measurements in test pieces at Reynolds numbers in excess of 180 000. To explore the effects of novel and complex heat transfer enhancements, test sections are produced via additive manufacturing, providing geometries not typically obtainable by conventional machining. Here in this work, we present results from HFLE commissioning and the initial thermal-hydraulic tests of an additively manufactured rifled-rib test section. Results are compared to smooth pipe correlations, and plans are described for future HFLE measurements. These preliminary experiments indicate the utility of the HFLE for heat transfer enhancement testing and simulation validation activities.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Triangulations using Phototheodolites

A year before a nuclear test was performed, EG&G would develop a photo plan in which a bomb’s intended point of detonation and all camera positions would be specified. During some of the earlier Operations at the Nevada Test Site, a large number of the nuclear tests were airdrops. Anticipating that the Air Force might miss the intended ground zeros (GZs), EG&G would setup phototheodolites stations at two or more locations that were ~90 degrees apart. The cameras at these stations were special cameras (referred to as phototheodolites or cinetheodolites) that were aimed at the intended ground zero. The cameras were triggered shortly after the detonation in order to capture the fireball at a very early stage. These photographs were then analyzed using a triangulation method to determine the bomb’s actual location and its height of burst (HOB).

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Installation, commissioning, and testing of the HB650 CM at PIP2IT

The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LINAC) powering the accelerator complex to provide the world’s most intense high-energy neutrino beam. This paper describes the conversion of the PIP-II Injector Test Facility (PIP2IT) cryogenic system into a test stand for PIP-II High-Beta 650 MHz (HB650) cryomodules at Fermilab’s Cryomodule Test Facility (CMTF). A description of the associated mechanical, electrical, and controls modifications necessary for testing HB650 cryomodules are provided. The cooldown and warmup requirements, procedures and associated controls logic is described.

43 PARTICLE ACCELERATORS↗

Feasibility of Power Ramp Testing in the Advanced Test Reactor

For decades, the Halden Boiling Water Reactor (HBWR) in Norway was an international resource for assessing nuclear fuels and materials behavior and its unexpected shutdown in 2018 represented a significant loss in experimental capability for prototypical irradiation testing. In the aftermath of the closure, a study was performed to assess capability gaps related to the Accident Tolerant Fuels (ATF) program. It was concluded that the primary capability gaps left by the closure of the HBWR were the loss of prototypic in-pile Light Water Reactor (LWR) loops that provide operational transient testing and in-pile Loss-of-Coolant Accident (LOCA) testing capabilities. The study also concluded that the Advanced Test Reactor (ATR) and Transient Reactor Test Facility (TREAT) likely have the necessary key capabilities to absorb the breadth of the HBWR mission gaps related to the ATF program, but additional investments in experimental infrastructure were needed. One such investment is the design and installation of additional pressurized water loops in the medium-I positions of the ATR, hereafter referred to as I-Loops, to support power ramp testing and testing in Boiling Water Reactor (BWR) conditions. This paper gives an overview of the planned ATR I-Loops and assesses the feasibility of performing power ramp testing inside such a loop.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Load Composition Analysis in Support of the NERC Load Modeling Task Force. 2019-2020 Field Test of the Composite Load Model

In 2015, NERC’s reliability standards were revised to require the use of dynamic load models in transmission planning studies. To comply with the standards, planners must use load models that explicitly represent the dynamic behavior of the different constituents of load at each load bus within their transmission planning models. The most important of these constituents are motor-driven and power electronics-based loads. Collectively, these representations are known as composite load models. In anticipation of the compliance date for the new standards, NERC’s Load Modeling Task Force (LMTF), in 2019, initiated a field test of composite load models involving the regional reliability planning entities. In support of the field test, DOE and BPA researchers developed region-specific composite load models that could be assigned to each non-industrial load bus in the planning models for each of the North American interconnections. Separate models were developed for each hour of a summer peak day, a winter peak day, and a spring light-load day. This report is the technical documentation for the load composition analysis that was conducted to develop these non-industrial composite load models.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SHASTA: Task 2.2: Sensor Development for Subsurface Hydrogen Storage Monitoring Technology Maturation and Commercialization Plan (TMCP)

In Task 2.2 under the SHASTA program, NETL is developing in-situ optical fiber sensors for real-time monitoring of hydrogen, methane, and chemical parameters such as pH at subsurface hydrogen storage conditions. This Technology Maturation and Commercialization Plan report will provide the summary of NETL sensor development and test results under the SHASTA program to meet the subsurface application requirements and proposed technology maturation and deployment plan, and commercialization potential.

08 HYDROGEN↗

Multilateral Testing Workshop on Relocatable Portal Monitors

The procurement and deployment of radiation detection equipment is a multi-faceted challenge across the globe. Knowledge sharing of the testing methods used to evaluate equipment for deployment scenarios helps improve the understanding of deployed systems by the global community. The United States Department of Energy’s Nuclear Smuggling Detection and Deterrence Office (NSDD) performed a series of characterization measurements in 2019, focused on radiation detection systems that could function as relocatable portal monitors. The capstone activity for this project was a multilateral and cross-disciplinary workshop demonstrating, performing, and refining the techniques used in the characterization measurements with International Atomic Energy Agency (IAEA) and global partners. A group of technical experts including representatives from nine countries, the IAEA, and NSDD gathered at Sandia National Laboratories in Albuquerque, NM during September of 2019 for the Operational and Performance Testing and Evaluation of Relocatable Portals Workshop. Over the course of a week, the group discussed the necessity for and process of developing operational and performance requirements, challenges related to deploying radiation detection systems for the countries in attendance, use cases for deploying relocatable radiation detection equipment, and considerations related to testing equipment for appropriate deployment scenarios. All participants were given the opportunity to have hands-on experience with eleven relocatable systems in executing a limited scope characterization test comprised of six test scenarios. At the conclusion of testing, participants reviewed and presented their findings, and the group as a whole compared and contrasted their experiences. Suggested revisions to the test methods and ideas for further collaborations were discussed. This report discusses the logistical and planning considerations for bringing together experts across disciplines in a multilateral workshop on testing of radiation detectors, as well as presenting the testing methods performed, results, and paths forward. Success of workshops related to technical knowledge transfer and improvement of test methods is key to global technical and scientific support of radiation detection deployments.

Erchinger, Jennifer L.↗

Advanced Models and Fast Simulation Algorithms for MARS Plants

With the successful commercialization of modular multilevel converters (MMC) and rapid increase in photovoltaic (PV) penetration and energy storage systems (ESS), one of the research areas being explored dynamically is integration of PV systems and ESS systems to MMCs. On this front, an integrated development of PV plants, ESS, and alternating- and direct-current (ac/dc) systems through Multi-Port Autonomous Reconfigurable Solar (MARS) plant is proposed and being researched upon. However, simulation of MARS systems on traditional existing software takes very long time (order of days) due to the presence of a large number of states and non-linear devices. Therefore, development of fast high fidelity models is of paramount importance to test the hardware design, control design and planning of power system expansions. In this context, two research objectives are addressed in this paper: firstly, an ultra fast single- or multi- CPU simulation algorithm to simulate the MARS system based on state-space models, hybrid discretization algorithm with a relaxation technique that reduces the imposed computational burden and a multi-rate method is presented. Secondly, a reduced order model of MARS is also presented. Both the developed techniques are validated with respect to reference PSCAD/EMTDC model.