Autonomous Energy Management Software System for Small Commercial Buildings in Support of Decarbonization (Abstract)

The primary goal for the project is to develop and validate an autonomous energy management software (AEMS) system that will continuously optimize small commercial building operations by minimizing energy consumption and cost, providing a solution for maximizing decarbonization benefits from electrification of buildings. The work will leverage vast experience of Pacific Northwest National Laboratory (PNNL) research and development staff who have over two decades of experience in developing and successfully transferring software technologies to the private sector. This solution will be jointly developed with Intellimation LLC who plans to use it to scale their building energy efficiency offering. The project plan will include collaboratively working with Intellimation to package a set of solutions into the AEMS system, validate and demonstrate their capability, and value proposition through field demonstrations. If the deployment of the AEMS system optimizes RTUs’ set points, schedules, setbacks and optimal start and results in energy consumption reduction of 20%, the technical potential savings is approximately 675 trillion Btus of site energy savings and 2,000 trillion Btus of source energy. It will also result in carbon reductions of approximately 2.4 MMTCO2 and contribute to the climate change mitigation plans of many cities and states across the United States. Additional cost savings and emissions reduction are possible from management of peak electricity demand. The primary outcome will be an AEMS system that can be deployed at scale on small commercial buildings to improve operating efficiency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

McGrath, Alaska Community Energy Plan [Slides]

The US Department of Energy's Energy Transitions Initiative Partnership Project (ETIPP) works alongside remote and island communities seeking to transform their energy systems and increase energy resilience. The City of McGrath took part in the ETIPP program in 2023-2024. As part of the project, community members formed the McGrath Energy Committee, made up of residents and local stakeholder organizations. The McGrath Energy Committee then worked with technical advisors from regional associations, university programs, and national labs to conduct a baseline energy assessment of the community, organize a community energy education series, identify key focus areas relevant to McGrath, explore funding opportunities, and create the McGrath Community Energy Plan. This plan serves as a foundational guide for future energy projects in the community, aligned with McGrath's long-term energy goal: "to be a catalyst to encourage energy resiliency in our community and the Upper Kuskokwim Region." - November 2024.

14 SOLAR ENERGY↗

Research at UC Berkeley on the SPICE and HeRALD Dark Matter Experiments (Technical Report for DE-SC0022354)

The McKinsey and Pyle groups have taken on the responsibility to complete a number of critical tasks necessary for the successful completion of the TESSERACT project planning phase. In particular: 1) Transition Edge Sensor testing, characterization, and electromagnetic noise mitigation; 2) Design and testing of the athermal phonon detectors along with vibrational noise characterization and mitigation; 3) Testing and characterization of prototype detectors using silica, sapphire, gallium arsenide, and superfluid helium as detector materials. This grant supported efforts of graduate student Roger Romani toward these goals.

47 OTHER INSTRUMENTATION↗

Countrywide LED Lighting Retrofit for Safety, Visibility, and Energy Efficiency (Final Technical Report)

The project supported national clean energy goals by reducing electricity demand and improving energy efficiency in public infrastructure. Tasks defined in the Statement of Project Objectives included site assessments, retrofit planning, lighting design optimization, installation, monitoring, and reporting. All milestones and go/no-go decision points were successfully met.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Technical Assistance for Hui o Hau'ula, Hawaii

Hui o Hau'ula in Hawaii worked with the Energy Technology Innovation Partnership Project (ETIPP) to evaluate technologies and systems that could power the planned Ko'olauloa Community Resilience Hub (KCRH).

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Low-Enriched Uranium (LEU) option for the conversion of FRM II

The Forschungs-Neutronenquelle Heinz Maier-Leibnitz (FRM II) is Germany’s most powerful research reactor and uses Highly Enriched Uranium (HEU) fuel enriched at 93 %. The Technical University of Munich (TUM) operates the reactor and has been mandated to convert the FRM II to a lower-enrichment fuel. In preparation for the lower-enrichment fuel downselection, planned for 2023, TUM is evaluating multiple conversion scenarios. In this paper, it is demonstrated that a conversion of FRM II to Low-Enriched Uranium (LEU) is scientifically possible when using the novel monolithic U-10Mo fuel system, which is currently in the qualification process. As a research reactor, safety criteria, neutron flux distribution and cycle length are key metrics. To begin, neutronic and thermal-hydraulic models were created based on current technical drawings and relevant material properties. Specifically tailored computational methods and coupling schemes have also been developed to properly evaluate all relevant characteristics for the conversion of the FRM II reactor. Using these models and methods, a systematic parameter study was performed to explore the defined design space. The results of that study indicate that many LEU designs using monolithic U-10Mo appear to be viable to convert FRM II to LEU. One example of an LEU solution for the FRM II reactor that fulfills the stated safety, compatibility and scientific performance requirements is discussed in more detail.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Solar Photovoltaics and Land-Based Wind Technical Potential and Supply Curves for the Contiguous United States (2023 Edition)

Estimates of the potential of renewable energy are essential for understanding how we can decarbonize our electric grid and economy. They provide key data for policymakers, land managers, and energy modelers by defining the quantity, quality, and cost of renewable resources. However, estimating renewable energy potential is challenging and requires frequent updates because of rapid advances in technology, cost reductions, and uncertainty about developable land that are due to social, regulatory, and environmental factors. Additionally, the complex processes involved in renewable energy development require regular reviews of methods and assumptions, which can also impact our understanding of renewable potential. In this, the 2023 edition of this annual report, we present new estimates of the technical potential for land-based wind and solar photovoltaics (PV) for the contiguous United States (CONUS). We also provide cost estimates for the available resources, presenting representative supply curves that can be used in downstream modeling and analysis. Additionally, we introduce the new methodologies used to estimate wind capacity, wind energy losses, transmission cost and representation, updated technology cost and design, and scenarios of siting constraints designed to help bound the uncertainty of renewable potential.

14 SOLAR ENERGY↗

Integrated System Planning: Emerging Software Requirements in the Power Industry

Power system planning software remains fragmented across organizational boundaries, with specialized tools for capacity expansion, production cost modeling, power flow, and dynamic analysis operating on incompatible data models and assumptions. This article argues that the fragmentation is not merely a technical problem but a predictable consequence of Conway's law: software architectures mirror the departmental structures within which they are developed. Regulatory milestones like Federal Energy Regulatory Commission (FERC) Order 888 formalized these divisions, but the roots trace back to the distinct engineering disciplines-mechanical, chemical, and electrical-that staffed generation and transmission planning departments in vertically integrated utilities. As the industry moves toward integrated system planning (ISP) that coordinates generation, transmission, and distribution investment decisions, the software ecosystem must evolve accordingly. We identify five categories of software requirements to enable this transition: coherent data inputs decoupled from individual applications, unified and extensible data schemas, modular component representations that support multiple abstraction levels, lifecycle management of planning datasets, and well-defined application programming interface (API) contracts that separate data exchange from algorithmic control. We examine how these requirements interact with three common workflow patterns-serial gate clearing, sequential multiapplication, and convergence oriented-and discuss the interface design principles each demands. We then outline a vision for platform-based planning architectures where specialized analytical services compose through standardized interfaces and where artificial intelligence (AI)/machine learning (ML) tools augment decision support within a disciplined software infrastructure. The practices proposed here offer a path from today's siloed tool collections toward collaborative planning ecosystems capable of handling the complexity of modern power system transformation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

High Performance Alloy Technology to Market Support

The goal of the Technology to Market Assessment for Advanced Alloys is to identify non-technical support needs of research teams that could accelerate a path toward commercialization. The successful adoption of new technology into the market has positive impacts on direct stakeholders, taxpayers, and is important to showcase the strength of the United States (U.S.) Department of Energy (DOE) National Energy Technology Laboratory (NETL) Crosscutting High Performance Materials program. This assessment leverages a series of proven frameworks developed by NETL support contractor innovation specialists to determine which projects within NETL’s Crosscutting Advanced Alloys portfolio are in the best position for commercialization. The projects were then assessed for specific non-technical support needs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Electric Power Industry Challenges Due to Increasing Shares of Inverter-Based Resources in Power Systems

The large-scale integration of variable renewable energy technologies around the world is forcing electric power systems into an unprecedented transition. This paper reports on power grid modernization and reliability issues related to the planning and operation of power systems with high levels of variable renewable energy. The contents of this paper stem from recent qualitative research in the form of a summary of an industry survey. The technical feedback from the interviewed 37 industry experts helped us identify 12 key areas of potential concern, which are discussed throughout this paper.

power system operation↗

XRootD Third Party Copy for the WLCG and HLLHC

A Third Party Copy (TPC) mechanism has existed in the pure XRootD storage environment for many years. However, using the XRootD TPC in the WLCG environment presents additional challenges due to the diversity of the storage systems involved such as EOS, dCache, DPM and ECHO, requiring that we carefully navigate the unique constraints imposed by these storage systems and their site-specific environments through customized configuration and software development. To support multitenant setups seen at many WLCG sites, X509 based authentication and authorization in XRootD was significantly improved to meet both security and functionality requirements. This paper presents architecture of the pull based TPC with optional X509 credential delegation, and how it is implemented in native XRootD and dCache. The paper discusses technical requirements, challenges, design choices and implementation details in the WLCG storage systems, as well as in FTS/gfal2. It also outlines XRootD’s plan to support newer TPC and security models such as token based authorization.

Adye, T.↗

Annual Status Report (FY 2020): Performance Assessment for the Disposal of Low Level Waste in the 200 East Area Burial Grounds

This annual review provides the projected dose estimates of radionuclide inventories disposed in the 200 East Area Low-Level Waste Burial Grounds (LLBGs) since September 26, 1988. These estimates are calculated using the original dose methodology developed in the performance assessment (PA) analysis (WHC-SD-WM-TI-730). The estimates are compared with requirements of DOE O 435.1 Chg 1 and performance objectives defined in companion documents DOE M 435.1-1 Chg 1and DOE-STD-5002-2017). All performance objectives are currently satisfied, and operational waste acceptance criteria (HNF-EP-0063) and waste acceptance practices continue to be sufficient to maintain compliance with performance objectives. Inventory estimates and associated dose estimates from future waste disposal actions are unchanged from previous years’ evaluations that indicate potential impacts well below performance objectives; therefore, future compliance with DOE O 435.1 Chg 1 is expected. A new PA study was initiated in fiscal year (FY) 2019 for evaluation of active disposal sites within the 200 East and 200 West Areas (Trench 94 in 200 East; Trenches 31 and 34 in 200 West) due to extended time elapsing between the current annual status report and the original PA for the active disposal sites. The new PA for the active disposal sites is expected to be completed in FY 2021. Within the active burial grounds in the 200 East Area, low-level waste and mixed low-level waste will continue to be disposed of in the dedicated U.S. Navy reactor compartment trench at the 218-E-12B Burial Ground (Trench 94). During this reporting period (FY 2020, from October 1, 2019, through September 30, 2020), two reactor compartments were disposed in Trench 94. Results from sorption experiments are summarized for this reporting period to quantify the efficacy of concrete waste forms in retaining key radionuclides (e.g., technetium-99 and iodine-129). The test durations ranged from 1 to 3 months. Continued groundwater monitoring of the 200 East Area LLBGs indicates no groundwater contamination due to LLBG waste. Current assumptions about future land use at the Hanford Site are consistent with PA analysis1 assumptions of a post-closure facility that will not be degraded by human activity. The LLBGs are located in an area identified for waste management and containment of residual contamination. This area will remain after final environmental remediation and the proposed shrinkage of Hanford Site boundaries to small sections within the 200 East and 200 West Areas in the Central Plateau (DOE/EIS-0391). The current closure plan for the LLBGs (DOE/RL-2000-707) estimates that the 200 East LLBGs will be closed in the 2050 timeframe. The Disposal Authorization Statement, other technical basis documents, and the radioactive waste management basis are of continued adequacy to meet the performance objectives of DOE O 435.1 Chg 1. Overall, there are no substantive changes to primary PA assumptions nor the PA analysis conclusion; therefore, compliance with DOE O 435.1 Chg 1 and the Disposal Authorization Statement is maintained.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Using Natural Gas Liquids to Recover Unconventional Oil and Gas Resources (Final Report)

This document presents final technical findings for the project Using Natural Gas Liquids to Recover Unconventional Oil and Gas Resources (FE0031782). The project is part of the U.S. Department of Energy Oil and Gas Program to develop and advance technologies that can significantly improve the recovery efficiencies of unconventional oil and gas resources. The overall objective of this project is to improve the ultimate recovery from unconventional oil and gas (UOG) resources in the United States by developing a method for using unrefined natural gas liquids (NGLs) as treatment fluids to improve hydrocarbon production. Horizontal extended-lateral drilling coupled with high volume hydraulic fracturing has significantly increased production from UOG resources in the U.S. However, the recovery efficiency is low compared to the estimated oil and gas in place. Recent data indicate that less than 10% of the oil in the liquid-rich UOG reservoirs is produced. Alternative completion methods using NGLs could increase production (Battelle, 2016; Wan et al., 2013; Wan, 2013; Downey et al, 2021); however, field validation tests are needed to develop an approach that is economical, efficient, and compatible in the UOG setting to advance towards commercial deployment. This project aims to develop and field test a method to improve recovery of oil resources in UOG shale plays by using Y-Grade NGLs, or a similar combination of NGLs, as treatment fluids. Refined NGLs have been used as a hydraulic treatment fluid in UOG plays for decades and are shown to be particularly effective because their miscibility with oil allows oil to flow more freely; however, the use of Y-Grade (unrefined) NGLs has not been studied. The use of Y-Grade NGLs would be advantageous over refined NGLs because Y-Grade NGLs do not require infrastructure or investment in refining and are already being produced from many UOG reservoirs. The concept was tested and monitored in the field at a commercial well site owned by project partner Hopco, Ltd. The project team, which consists of multiple oil and gas operators, Linde Gas North America LLC (Linde) and the Ohio Division of Geological Survey (ODGS), has extensive experience with oil and gas production in the Appalachian basin and the ability to work together quickly to solve technical issues and research needs. A key part of the proposed work was the use of existing wells for field testing and monitoring. A total of four wells (three vertical and one horizontal) were available for this project. One of the vertical wells was utilized as the test well for the NGL treatment test. A nearby vertical well was used for microseismic monitoring. The remaining vertical well and the horizontal well provided a baseline for typical UOG production in the oil window of the Utica/Point Pleasant (UPP). Major technical tasks of the project include characterization of the geotechnical properties of the UPP with an emphasis on the field site; design and planning for the NGLs testing; field testing and monitoring; analysis and integration of field data; and economic and resource/reserve assessment. The Shoman monitoring well and Doughty NGL treatment well were successfully plugged back during September-October 2020 in preparation for treatment and monitoring. A nitrogen diagnostic fracture injection test (DFIT) was completed on the Doughty well on July 22, 2021, consisting of 133,000 scf (91 Bbl.) of nitrogen. A nitrogen foam frac was completed in the Utica-Point Pleasant interval on August 17, 2021 with funding from outside sources. A microseismic monitoring array was installed in the Shoman well and monitored microseismic activity during the Doughty well frac job. Y-Grade NGL injection commenced on August 26, 2021. A total of 215 Bbl. was injected but the job was shut down due to a small leak on the suction hose on the pump truck. The Y-Grade treatment resumed on August 27, 2021 and an additional 726 Bbl. of Y-Grade NGL was injected at a well head pressure of 3850 psi. Total volume of injected Y-Grade over the two days of injection was 941 Bbl. The well was shut-in for 17 days following injection to allow the Y-Grade NGLs to soak on the formation. Y-Grade treatment flow back commenced on 9/13/2021 on a weekly basis. Production data, including surface pressures, oil, nitrogen, natural gas, and flow times was measured and recorded. Periodic gas samples were collected and analyzed to determine composition of flowback gas. As of July 2022, the treatment well had produced 726 Bbl of oil and 2,888 mcf gas. In August 2022, tubing and packer in the well were removed and a pump was installed to enhance oil recovery. Currently, the operator is producing the well about 2 days a week for a few hours. The performance of the NGL treatment test was evaluated based on reservoir simulations of the treatment process, processing of well testing data, analysis of micro seismic monitoring data, and production data analysis. This analysis suggested that oil production in the small test would continue through 2025. Upscaling the treatment to a horizontal Utica Point-Pleasant well would allow more oil recovery, but the process would involve more investment, services, and operational support. An economic analysis was conducted for scenarios aimed at upscaling the NGL treatment process for more typical horizontal UPP wells in the Appalachian Basin.

02 PETROLEUM↗

Performance Assessment for the Disposal of Low-Level Waste in the 200 West Area Burial Grounds (Annual Status Report FY 2022)

This annual review provides the projected dose estimates of radionuclide inventories disposed in the active 200 West Area Low-Level Waste Burial Grounds (LLBGs) since September 26, 1988. These estimates are calculated using the original dose methodology developed in the performance assessment (PA) analysis (WHC-EP-0645). The estimates are compared with the performance objectives defined in U.S. Department of Energy requirements (DOE O 435.1 and its companion documents DOE M 435.1-1 and DOE-STD-5002-2017). All performance objectives are currently satisfied, and operational waste acceptance criteria (HNF-EP-0063) and waste acceptance practices continue to be sufficient to maintain compliance with performance objectives. Inventory estimates and associated dose estimates from future waste disposal actions are unchanged from previous years’ evaluations that indicate potential impacts well below performance objectives; therefore, future compliance with DOE O 435.1 is expected. Within the active burial grounds, low-level and mixed low-level waste currently may be disposed only in two lined trenches in the 218-W-5 Burial Ground (Trenches 31 and 34) until they are either filled or a decision is made to close these trenches. Some mixed low-level waste is also disposed at the Environmental Restoration Disposal Facility in the 200 West Area (which is covered under a separate PA). During this (fiscal year 2022) reporting period (October 1, 2021, through September 30, 2022), waste was disposed to the 200 West Area LLBGs. Continued groundwater monitoring of the 200 West Area LLBGs indicates no groundwater contamination due to LLBG waste. Current assumptions about future land use at the Hanford Site are consistent with PA analysis assumptions of a postclosure facility that will not be degraded by human activity. The LLBGs are in an area identified for waste management and containment of residual contamination (DOE/EIS-0391). The current closure plan for the LLBGs (DOE/RL-2000-70) estimates that the 200 West LLBGs will be closed in the 2050 timeframe. The Disposal Authorization Statement, other technical basis documents, and the radioactive waste management basis are of continued adequacy to meet the performance objectives of DOE O 435.1. Overall, there are no substantive changes to primary PA assumptions and no changes to the PA analysis conclusion; therefore, compliance with DOE O 435.1 and the Disposal Authorization Statement is maintained. A new PA to evaluate the long-term impacts of three disposal trenches that are currently active within the 200 East and 200 West Areas (Trench 94 in the 200 East Area and Trenches 31 and 34 in the 200 West Area) was initiated in fiscal year 2019 and completed in fiscal year 2022. Corrective actions addressing 3 key issues and 31 secondary issues identified during the review process were developed and submitted to the Low-Level Waste Disposal Facility Federal Review Group Co-Chairs for review and approval. This PA provides additional technical basis for the continued adequacy of the existing Operating Disposal Authorization Statement.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Accelerated Energy Storage Deployment in RELAC Countries

"Renewables in Latin America and the Caribbean" or RELAC is a regional initiative across Latin America and the Caribbean (LAC) that was created at the end of 2019, within the framework of the United Nations Climate Action Summit, with the objective of reaching at least 70% of renewable energy installed capacity, and 80% of the region's total electricity generation from renewables by 2030. 16 countries are members (Barbados, Bolivia, Chile, Colombia, Costa Rica, Dominican Republic, Ecuador, El Salvador, Guatemala, Haiti, Honduras, Nicaragua, Panama, Paraguay, Peru, and Uruguay), and others are in discussions to join. RELAC provides these countries with support in addressing technical and financial needs to increase renewable energy penetration, matchmaking with financial resources to support capacity building needs and implementation of RE expansion plans, and knowledge exchange via peer-learning, and best practices in renewable energy integration to the electrical grid.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Implementación acelerada del almacenamiento de energía en los países de RELAC [Accelerated Energy Storage Deployment in RELAC Countries]

"Renewables in Latin America and the Caribbean" or RELAC is a regional initiative across Latin America and the Caribbean (LAC) that was created at the end of 2019, within the framework of the United Nations Climate Action Summit, with the objective of reaching at least 70% of renewable energy installed capacity, and 80% of the region's total electricity generation from renewables by 2030. 16 countries are members (Barbados, Bolivia, Chile, Colombia, Costa Rica, Dominican Republic, Ecuador, El Salvador, Guatemala, Haiti, Honduras, Nicaragua, Panama, Paraguay, Peru, and Uruguay), and others are in discussions to join. RELAC provides these countries with support in addressing technical and financial needs to increase renewable energy penetration, matchmaking with financial resources to support capacity building needs and implementation of RE expansion plans, and knowledge exchange via peer-learning, and best practices in renewable energy integration to the electrical grid. This is the Spanish translation of NREL/TP-7A40-89643.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Plan It Together: Optimizing Across Generation, Transmission, Distribution, and Distributed Energy Resources

Integrated planning holds the promise of unlocking lower total system cost solutions by connecting previously siloed planning processes. This article summarizes the state of bulk and local grid planning today and details multiple new analytical approaches that can enable more holistic planning methods to develop comprehensive solutions to generation, transmission, distribution, and distributed energy resource needs. These include both iterative approaches as well as cooptimization techniques. In addition to the benefits of these methods, the technical and institutional challenges and associated solutions are also discussed.

24 POWER TRANSMISSION AND DISTRIBUTION↗