Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Task Force”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Blue Ribbon Commission, Yucca Mountain Closure, Court Actions - Future of Decommissioned Reactors, Operating Reactors and Nuclear Power - 13249

Issues related to back-end of the nuclear fuel cycle continue to be difficult for the commercial nuclear power industry and for the decision makers at the national and international level. In the US, the 1982 NWPA required DOE to develop geological repositories for SNF and HLW but in spite of extensive site characterization efforts and over ten billion dollars spent, a repository opening is nowhere in sight. There has been constant litigation against the DOE by the nuclear utilities for breach of the 'standard contract' they signed with the DOE under the NWPA. The SNF inventory continues to rise both in the US and globally and the nuclear industry has turned to dry storage facilities at reactor locations. In US, the Blue Ribbon Commission on America's Nuclear Future issued its report in January 2012 and among other items, it recommends a new, consent-based approach to siting of facilities, prompt efforts to develop one or more geologic disposal facilities, and prompt efforts to develop one or more consolidated storage facilities. In addition, the March 2011 Fukushima Daiichi accident had a severe impact on the future growth of nuclear power. The nuclear industry is focusing on mitigation strategies for beyond design basis events and in the US, the industry is in the process of implementing the recommendations from NRC's Near Term Task Force. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Rinsing Effluent Evaporator for Dismantling Operations - 13271

Between 1958 and 1997, the UP1 plant at Marcoule - located in the south of France - reprocessed and recycled nearly 20,000 MT of used fuel from special defense applications reactors, as well as fuel from the first generation of electricity generating reactors in France (natural uranium fuel, CO{sub 2}-cooled, graphite-moderated). Decommissioning and Dismantling of the UP1 plant and its associated units started in 1998. Since 2005, the UP1 facility has been operated by AREVA as the Marcoule Management and Operation contractor for French Atomic Energy Commission (CEA). An important part of this decommissioning program deals with the vitrification facility of Marcoule. This facility includes 20 tanks devoted to interim storage of highly active solutions, prior to vitrification. In 2006, a rinsing program was defined as part of the tank cleanup strategy. The main objective of the rinsing phases was to decrease activity in order to limit the volume of 'long-life active' waste produced during the decommissioning operations, so the tanks can be dismantled without the need of remote operations. To enable this rinsing program, and anticipating large volumes of generated effluent, the construction of an evaporation unit proved to be essential. The main objective of this unit was to concentrate the effluent produced during tank rinsing operations by a factor of approximately 10, prior to it being treated by vitrification. The evaporator design phase was launched in September 2006. The main challenge for the Project team was the installation of this new unit within a nuclear facility still in operation and in existing compartments not initially designed for this purpose. Cold operating tests were completed in 2008, and in May 2009, the final connections to the process were activated to start the hot test phase. During the first hot test operations performed on the first batches of clean-up effluent, the evaporator had a major operating problem. Extremely large quantities of foam were produced, affecting the evaporator operation, and creating the risk of a reduction in its capacity and throughput performance. A task force of AREVA process, operations, and safety experts from Marcoule and the La Hague reprocessing complex was assembled. New operating parameters were defined and tested to improve the process. Since then, the evaporator has performed very satisfactorily. The foam buildup phenomenon has been brought under complete control. All the different types of effluents produced during cleanup operations have been concentrated, and the results obtained in terms of quality and throughput, have ensured a consistent supply to the vitrification unit. The evaporator was operated until the end of April 2012, and enabled the production of 500 cubic meters of very high activity effluent, concentrating the fission products rinsed from the storage tanks. The evaporator will now be deactivated and decommissioned, with the first rinsing and cleanup operations scheduled to begin in 2014. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

La Hague Legacy Waste Recovery Program: Scope, Progress and Issues -12080

A significant inventory of process waste of varying natures and quantities has been generated during the thirty years of operation of UP2 400 facility on the site of La Hague, France. The retrieval, packaging and final storage of such an inventory has never been achieved before in France and thus requires the design and qualification of new processes, equipment, and waste packages. Following AREVA strategic decisions and French safety authority requirements, the legacy waste program has begun around the year 2000 and is scheduled to be completed around the year 2025. It is under the responsibility of AREVA Site Value Development Project teams. For each category of waste to be recovered, AREVA teams conducted detailed investigations, defined recovery modes, treatment processes, as well as final waste package forms, which they subsequently submitted to French safety and waste management authorities. A Task force initiative was subsequently launched to optimize the program cost and scenario, and lead to an optimization of about 15% of the entire program. The qualification of processes and waste packages required a significant amount of research and development which is now well under way for processes, and scheduled to be completed in 2015. Preparation work has begun on several installations to clear space for the construction of future retrieval facilities, scheduled to begin in the coming three years. La Hague Legacy waste retrieval program represents a significant challenge in the sense that it covers a significant variety and quantity of waste needing recovery and reconditioning, with tight financial objectives and a binding recovery schedule. During the past five years, AREVA SVD successfully conducted design, research, development, and qualification activities which lead to the definition of qualified processes and waste packages for each retrieval program. Preparation work and supplier consultations are now on-going, in order to meet our objectives of beginning retrieval operations in compliance with our commitments to the safety authorities, in 2015 and 2016. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview and History of DOE's Hanford Site - 12502

Hanford's DOE offices are responsible for one of the largest nuclear cleanup efforts in the world, cleaning up the legacy of nearly five decades of nuclear weapons production. Nowhere in the DOE Complex is cleanup more challenging than at the Hanford Site in southeastern Washington. Hanford cleanup entails remediation of hundreds of large complex hazardous waste sites; disposition of nine production reactors and the preservation of one as a National Historic Landmark; demolition of hundreds of contaminated facilities including five enormous process canyons; remediation of billions of gallons of contaminated groundwater; disposition of millions of tons of low-level, mixed low-level, and transuranic waste; disposition of significant quantities of special nuclear material; storage and ultimate disposition of irradiated nuclear fuel; remediation of contamination deep in the soil that could impact groundwater; decontamination and decommissioning of hundreds of buildings and structures; and treatment of 56 million gallons of radioactive waste in 177 large underground tanks through the construction of a first-of-its-kind Waste Treatment Plant. Cleanup of the Hanford Site is a complex and challenging undertaking. The DOE Richland Operations Office has a vision and a strategy for completing Hanford's cleanup including the transition to post-cleanup activities. Information on the strategy is outlined in the Hanford Site Completion Framework. The framework describes three major components of cleanup - River Corridor, Central Plateau, and Tank Waste. It provides the context for individual cleanup actions by describing the key challenges and approaches for the decisions needed to complete cleanup. The U.S. Department of Energy (DOE), as regulated by the U.S. Environmental Protection Agency (EPA) and Washington State Department of Ecology (Ecology), is implementing a strategy to achieve final cleanup decisions for the River Corridor portion of the Hanford Site. The DOE Richland Operations Office (RL) and DOE Office of River Protection (ORP) have prepared this document to describe the strategy and to begin developing the approach for making cleanup decisions for the remainder of the Hanford Site. DOE's intent is that the Completion Framework document will facilitate dialogue among the Tri-Parties and with Hanford's diverse interest groups, including Tribal Nations, State of Oregon, Hanford Advisory Board, Natural Resource Trustees, and the public. Future cleanup decisions will be enhanced by an improved understanding of the challenges facing cleanup and a common understanding of the goals and approaches for cleanup completion. The overarching goals for cleanup are sevenfold. - Goal 1: Protect the Columbia River. - Goal 2: Restore groundwater to its beneficial use to protect human health, the environment, and the Columbia River. - Goal 3: Clean up River Corridor waste sites and facilities to: Protect groundwater and the Columbia River. Shrink the active cleanup footprint to the Central Plateau, and support anticipated future uses of the land. - Goal 4: Clean up Central Plateau waste sites, tank farms, and facilities to: Protect groundwater. Minimize the footprint of areas requiring long-term waste management activities. Support anticipated future uses of the land. - Goal 5: Safely manage and transfer legacy materials scheduled for off-site disposition including special nuclear material (including plutonium), spent nuclear fuel, transuranic waste, and immobilized high-level waste. - Goal 6: Consolidate waste treatment, storage, and disposal operations on the Central Plateau. - Goal 7: Develop and implement institutional controls and long-term stewardship activities that protect human health, the environment, and Hanford's unique cultural, historical and ecological resources after cleanup activities are completed. These goals embody more than 20 years of dialogue among the Tri-Party Agencies, Tribal Nations, State of Oregon, stakeholders, and the public. They carry forward key values captured in forums such as the Hanford Future Site Uses Working Group, Tank Waste Task Force, Hanford Summits, and Hanford Advisory Board Exposure Scenario Workshops, as well as more than 200 advice letters issued by the Hanford Advisory Board (http://www.hanford.gov/page.cfm/hab). These goals help guide all aspects of Hanford Site cleanup. Cleanup activities at various areas of the site support the achievement of one or more of these goals. These goals help set priorities to apply resources and sequence cleanup efforts for the greatest benefit. These goals reflect DOE's recognition that the Columbia River is a critical resource for the people and ecology of the Pacific Northwest. The 50-mile stretch of the river known as the Hanford Reach is home to the last free-flowing section of the river in the U.S. As one of the largest rivers in North America, its waters support a multitude of uses that are vital to the economic and environmental well being of the region and it is particularly important in sustaining the culture of Native Americans. Cleanup actions must protect this river. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GSI 191 Closure Issue for EDF PWR Fleet: The Fuel Assembly Test Results

EDF has re started recirculation studies within the international GSI 191 framework by 2002, when EDF decided to join the NEI sump strainers task force. All the EDF PWR fleet have been upgraded, with major strainer modifications, according to the NEI 04-07 guideline. The so-called chemical effects have been carefully studied by EDF and demonstration have been released that there are no chemical effects on EDF fleet, owing to the nature of our debris. The study of strainer downstream effects started by 2009, with decoupling Downstream Sump Debris Source Term (DST) and by the end of 2016, all the equipment have been successfully qualified. At a previous ANS meeting,it was said that core fuel tests were scheduled. They have started at the beginning of 2014 and they have been closed by mid 2016 for AREVA Fuel type at ERLANGEN facility (Germany). The present presentation is aimed at describing the test facility, the test specifications and the main results. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Decarbonizing Building Thermal Systems: A How-to Guide for Heat Pump Systems and Beyond

Buildings account for a substantial portion of carbon emissions, primarily due to the widespread use of fossil fuels in heating systems. Decarbonization of heating is essential to meet climate targets and reduce the environmental impact of buildings. Heat pumps are capable of leveraging renewable energy sources and can provide heating and cooling in an energy-efficient manner. By leveraging heat pump technology, buildings can significantly reduce their carbon footprint, minimize energy consumption, and decrease their reliance on fossil fuels. The design and construction community plays a pivotal role in facilitating the transition to heat pump systems for heating and cooling. However, this transition requires specialized knowledge and expertise. This resource was developed for architects, engineers, and contractors in response to an industry need for a comprehensive technical resource that guides them through the intricacies of heat pump system design, installation, and maintenance. This resource provides detailed information on system sizing, selection of appropriate heat systems, heat sources, and integration with existing building systems. Moreover, it emphasizes best practices for ensuring operational efficiency, system longevity, and reliability. The development of this recourse was a collaborative effort between NREL/DOE Better Buildings Design and Construction Allies and ASHRAE Task Force for Building Decarbonization. This resource is composed of two complimentary portions that will be completed and released on separate time frames. The first portion will be completed and released in 2023, while the second portion will be released in 2024.

building thermal systems↗

The New Face of Standard 100

In January 2024, ASHRAE published a significant overhaul to ANSI/ASHRAE/IES Standard 100-2018, Energy Efficiency in Existing Buildings. You may almost not recognize it. Standard 100-2024, Energy and Emissions Building Performance Standard for Existing Buildings, now addresses both energy and emissions performance as a model building performance standard (BPS). ASHRAE Standing Standard Project Committee (SSPC) 100, with direction from ASHRAE and its Task Force for Building Decarbonization (TFBD) has been working to update the standard to make it a model for building performance standard adoption across the U.S. and internationally. Here, the new edition of Standard 100 addresses key issues of climate change surrounding building performance, including new metrics for greenhouse gas (GHG) emissions targets, continuing to support the imperative of improving our existing building stock and meeting global climate change commitments.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

CMS Jet and Missing $E_T$ Commissioning

We describe how jets and E{sub T} are defined, reconstructed, and calibrated in CMS, as well as how the CMS detector performs in measuring these physics objects. Performance results are derived from the CMS simulation application, based on Geant4, and also from noise and cosmic commissioning data taken before the first collision event was recorded by CMS in November 2009. A jet and E{sub T} startup plan is in place which includes a data quality monitoring and prompt analysis task force to identify and fix problems as they arise.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Muon Colliders: The Next Frontier

Muon Colliders provide a path to the energy frontier in particle physics but have been regarded to be "at least 20 years away" for 20 years. I will review recent progress in design studies and hardware R&D and show that a Muon Collider can be established as a real option for the post-LHC era if the current vigorous R&D effort revitalized by the Muon Collider Task Force at Fermilab can be supported to its conclusion. All critical technologies are being addressed and no show-stoppers have emerged. Detector backgrounds have been studied in detail and appear to be manageable and the physics can be done with existing detector technology. A muon facility can be built through a staged scenario starting from a low-energy muon source with unprecedented intensity for exquisite reach for rare processes, followed by a Neutrino Factory with ultrapure neutrino beams with unparalleled sensitivity for disentangling neutrino mixing, leading to an energy frontier Muon Collider with excellent energy resolution.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The US Muon Accelerator Program

An accelerator complex that can produce ultra-intense beams of muons presents many opportunities to explore new physics. A facility of this type is unique in that, in a relatively straightforward way, it can present a physics program that can be staged and thus move forward incrementally, addressing exciting new physics at each step. At the request of the US Department of Energy's Office of High Energy Physics, the Neutrino Factory and Muon Collider Collaboration (NFMCC) and the Fermilab Muon Collider Task Force (MCTF) have recently submitted a proposal to create a Muon Accelerator Program that will have, as a primary goal, to deliver a Design Feasibility Study for an energy-frontier Muon Collider by the end of a 7 year R&D program. This paper presents a description of a Muon Collider facility and gives an overview of the proposal.

43 PARTICLE ACCELERATORS↗

Supporting the President's Arms Control and Nonproliferation Agenda: Transparency and Verification for Nuclear Arms Reductions

The President's arms control and nonproliferation agenda is still evolving and the details of initiatives supporting it remain undefined. This means that DOE, NNSA, NA-20, NA-24 and the national laboratories can help define the agenda, and the policies and the initiatives to support it. This will require effective internal and interagency coordination. The arms control and nonproliferation agenda is broad and includes the path-breaking goal of creating conditions for the elimination of nuclear weapons. Responsibility for various elements of the agenda will be widely scattered across the interagency. Therefore an interagency mapping exercise should be performed to identify the key points of engagement within NNSA and other agencies for creating effective policy coordination mechanisms. These can include informal networks, working groups, coordinating committees, interagency task forces, etc. It will be important for NA-20 and NA-24 to get a seat at the table and a functional role in many of these coordinating bodies. The arms control and nonproliferation agenda comprises both mature and developing policy initiatives. The more mature elements such as CTBT ratification and a follow-on strategic nuclear arms treaty with Russia have defined milestones. However, recent press reports indicate that even the START follow-on strategic arms pact that is planned to be complete by the end of 2009 may take significantly longer and be more expansive in scope. The Russians called for proposals to count non-deployed as well as deployed warheads. Other elements of the agenda such as FMCT, future bilateral nuclear arms reductions following a START follow-on treaty, nuclear posture changes, preparations for an international nuclear security summit, strengthened international safeguards and multilateral verification are in much earlier stages of development. For this reason any survey of arms control capabilities within the USG should be structured to address potential needs across the near-term (1-4) years and longer-term (5-10) years planning horizons. Some final observations include acknowledging the enduring nature of several key objectives on the Obama Administration's arms control and nonproliferation agenda. The CTBT, FMCT, bilateral nuclear arms reductions and strengthening the NPT have been sought by successive U.S. Administrations for nearly thirty years. Efforts towards negotiated arms control, although de-emphasized by the G.W. Bush Administration, have remained a pillar of U.S. national security strategy for decades and are likely to be of enduring if not increasing importance for decades to come. Therefore revitalization and expansion of USG capabilities in this area can be a positive legacy no matter what near-term arms control goals are achieved over the next four years. This is why it is important to reconstruct integrated bureaucratic, legislative, budgetary and diplomatic strategies to sustain the arms control and nonproliferation agenda. In this endeavor some past lessons must be taken to heart to avoid bureaucratic overkill and keep interagency policy-making and implementation structures lean and effective. On the Technical side a serious, sustained multilateral program to develop, down select and performance test nuclear weapons dismantlement verification technologies and procedures should be immediately initiated. In order to make this happen the United States and Russia should join with the UK and other interested states in creating a sustained, full-scale research and development program for verification at their respective nuc1ear weapons and defense establishments. The goals include development of effective technologies and procedures for: (1) Attribute measurement systems to certify nuclear warheads and military fissile materials; (2) Chain-of-custody methods to track items after they are authenticated and enter accountability; (3) Transportation monitoring; (4) Storage monitoring; (5) Fissile materials conversion verification. The remainder of this paper focuses on transparency and verification for nuclear arms and fissile material reductions.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Definition of Forces on Turbomachinery Rotors. Task B Report: Dynamic Analysis of Rotors

The rotordynamic characteristics of turbomachinery are known to depend on the forces developed due to relative motion between the rotor and the housing. For example, the critical speed locations generally depend on the bearing stiffnesses, seal dampling influences rotor stability and bearing reaction amplitudes near critical speeds, etc. A systematic examination of the influence of changes in the forces acting on rotors is studied. More specifically, the sensitivity of the rotordynamic characteristics to changes in rotor forces is analyzed. Rotordynamic characteristics of the HPOTP (High Pressure Oxygen Turbopump) and HPFTP (High Pressure Fuel Turbopump) of the SSME (Space Shuttle Main Engine) are investigated. Because of their markedly different rotordynamic characteristics, these units are considered to be representative of a range of possible future liquid rocket engine turbomachinery.

Childs, D. W.↗

Stereo advantage for a peg-in-hole task using a force-feedback manipulator

An improved assessment methodology has been implemented at NOSC and tested using an instrumented peg-in-hole (PiH) taskboard. Several aspects of the methodology are discussed in light of their implications for future studies of manipulator performance. Using a simple (but high-fidelity) force-feedback manipulator, a group of 9 trained operators showed a consistent advantage for stereoscopic TV viewing over monoscopic TV viewing when performing the PiH task. To introduce a controlled element of spatial uncertainty into the testing procedure, taskboard orientation relative to the manipulator and remote video camera head was changed in a randomized order on a trial-by-trial basis. The stereoscopic advantage demonstrated by this study can reasonably be expected to be even more pronounced as the quality of the stereo TV interface is improved and force-feedback provided through the manipulator system is diminished and/or distorted.

Spain, Edward H.↗

Consolidated fuel reprossing program: The implications of force reflection for teleoperation in space

Previous research on teleoperator force feedback is reviewed and results of a testing program which assessed the impact of force reflection on teleoperator task performance are reported. Force relection is a type of force feedback in which the forces acting on the remote portion of the teleoperator are displayed to the operator by back-driving the master controller. The testing program compared three force reflection levels: 4 to 1 (four units of force on the slave produce one unit of force at the master controller), 1 to 1, and infinity to 1 (no force reflection). Time required to complete tasks, rate of occurrence of errors, the maximum force applied to tasks components, and variability in forces applied to components during completion of representative remote handling tasks were used as dependent variables. Operators exhibited lower error rates, lower peak forces, and more consistent application of forces using force relection than they did without it. These data support the hypothesis that force reflection provides useful information for teleoperator users. The earlier literature and the results of the experiment are discussed in terms of their implications for space based teleoperator systems. The discussion described the impact of force reflection on task completion performance and task strategies, as suggested by the literature. It is important to understand the trade-offs involved in using telerobotic systems with and without force reflection.

Draper, John V.↗

Evaluation Of Performance Of A Telerobot

Paper presents evaluation of performance of six-axis telerobot system with shared control and advanced modes of force feedback. Various tasks performed with and without force feedback. Study found force feedback reduces average time required to complete task by about 30 percent. Also reduces sum of squared forces by factor of 7 and errors by 63 percent.

Hannaford, Blake↗

An adaptive model-free robotic force control strategy for hydrodynamic real-time hybrid simulation of floating offshore wind turbines

Real-time hybrid simulation (RTHS) - a cyber-physical testing approach - promises to enhance the simulation fidelity of the model-scale experiments used to prototype floating offshore wind turbines (FOWTs). In hydrodynamic RTHS (hydro-RTHS), actuators emulate aerodynamic forces on model-scale FOWT specimens subjected to physical waves in a hydrodynamic laboratory. Robotic arms are promising candidates for actuation in hydro-RTHS due to their compact multi-degree-of-freedom (DOF) capabilities. Unlike classical RTHS for seismic applications, which typically relies on displacement control, hydro-RTHS requires 6-DOF force control on newly designed floating prototypes in a model-scale setting, which presents significant challenges, including modeling uncertainties, directional asymmetry, configuration drift, bandwidth limitations, and time-varying delays. To mitigate these constraints without extensive pre-test calibration, this study proposes an adaptive model-free robotic force control strategy that combines task-space explicit force control with a secondary joint-space pose-keeping task. The Adaptive Feedforward Compensator (AFC) is integrated into the force control loop to compensate for time-varying delay. Experimental testing was conducted using a Franka Emika Panda robotic arm with a 1:50 scale FOWT specimen under operational wind and wave conditions. Results demonstrate stable and consistent 6-DOF force tracking. Effective delay compensation was observed, with low-frequency delay reductions ranging from 71.4% to 91.8% and improvements in low-frequency surge force tracking of 25.0% to 52.1%. This study enhances robotic actuation performance in hydro-RTHS and introduces a force control strategy that supports reliable robotic operation in uncertain floating environments. Future work will explore disturbance-observer mechanisms to further enhance wave rejection capabilities under extreme wind and wave conditions.

17 WIND ENERGY↗

Study of astronaut restraints and mobility aids in a weightless shirtsleeve environment

A study, established to produce needed information about manual performance limits in intravehicular weightlessness such as the motions induced by the astronaut's direct application of force against the body of the vehicle or an object to be moved, is presented. Using both conventional and water immersion techniques, it was possible to develop realistic time estimates for astronaut station-to-station translation in Skylab, to simulate and analyze specific Skylab tasks involving force application and motion dynamics, and to evaluate certain thresholds of force application in weightlessness. The study was divided into three tasks. The first related to locomotion and verification or modification of present Skylab translation timelines. In all cases, translation times were less than the Skylab timelines indicated. The second task studied mass handling and transfer. Specifically, this involved measurement of the astronaut's ability to relocate the Skylab food lockers to stowage levels of three different heights and his ability to transfer the M509 PSS bottles between the OWS and the recharge station. The third task helped define the physical limits of man's ability to perform Skylab translation tasks under weightless conditions.

Loats, H. L., Jr.↗