Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Solid Waste”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Firex Water Tank, SWMU 069, Confirmatory Sampling Report: Revision 2

The National Aeronautics and Space Administration (NASA) Resource Conservation and Recovery Act (RCRA) permit requires identification and evaluation of known Solid Waste Management Units (SWMU) located at the Kennedy Space Center (KSC). Firex Water Tank (FWT), or the “site,” is designated as SWMU 069 under the NASA RCRA permit. This report summarizes the results of the Confirmatory Sampling (CS) field activities carried out during Fall 2021, at FWT, SWMU 069, KSC, Florida. Three locations of concern (LOCs) were identified by screening historical sample results to current State of Florida soil cleanup target levels (SCTL). A total of 18 soil samples were collected to investigate the historical exceedance locations. Samples at LOC 1 and 2 were analyzed for arsenic and the results for all were below the SCTL. Samples at LOC 3 were analyzed for polynuclear aromatic hydrocarbons and it was determined that certain locations have results that remain above the SCTL. The current land use controls will remain in place at FWT to mitigate potential risks.

Firex↗

KSC Headquarters Building Area SWMU 104 Soil Interim Measure Report for LOC 2D and LOC 2E Kennedy Space Center, Florida

This Interim Measure (IM) Report for Location of Concern (LOC) 2D and LOC 2E summarizes the activities associated with implementation of an IM to address soil and concrete contamination at the Kennedy Space Center (KSC) Headquarters Building Area (KHQA) located at KSC, Florida. KHQA has been designated Solid Waste Management Unit (SWMU) 104 under KSC’s Resource Conservation and Recovery Act Corrective Action Program. The IM consisted of excavating/removing residual polychlorinated biphenyl (PCB) contamination in soil and concrete from two separate areas, LOC 2D and LOC 2E, which were associated with electrical transformer locations. IM activities were conducted in accordance with the Interim Measure Work Plan (IMWP), Revision 1, for KHQA dated June 2018, which was approved by the Florida Department of Environmental Protection in a correspondence letter dated April 2016 and the United States Environmental Protection Agency in a correspondence letter dated August 2018. The objective of the IM was to remove all remaining contaminated media with total PCB concentrations greater than the State of Florida Residential Soil Cleanup Target Level (RSCTL) (0.5 milligrams per kilogram [mg/kg]). This cleanup goal meets unrestrictive re-use conditions in Florida, and is below federal regulations for PCB Bulk Remediation Waste Cleanup of 1 mg/kg for high occupancy, unrestricted use areas, as outlined in 40 Code of Federal Regulations (CFR) 761.61(a). The timeline of the IM was coordinated with demolition of the former KSC Headquarters Building (demolished in 2021) in order to safely remove contaminated media after electrical equipment was de-energized and removed from the site. Excavation activities were conducted between January 10, 2022, and February 8, 2022, and included two waste streams for off-site disposal: (1) PCB-remediation waste greater than or equal to 50 mg/kg, and (2) PCB-remediation waste less than 50 mg/kg. A total of approximately 347 cubic yards (478 tons) of PCB-contaminated soil and concrete was initially removed from the LOC 2D and LOC 2E areas, as defined in the IMWP. An additional 4.35 tons of soil and concrete were removed based on verification sampling, which was conducted until the cleanup goal was achieved. The total area of excavation from both LOC 2D and LOC 2E was approximately 5,186 square feet (0.12 acres), and excavation depths ranged from 0.5 to 4.0 feet below land surface Excavated soils and concrete were stockpiled based on waste stream and subsequently transported and disposed of at Waste Connections of Osceola County, LLC – JED Landfill in St. Cloud, Florida (PCBs less than 50 mg/kg) or the Chemical Waste Management Landfill in Emelle, Alabama (PCBs greater than or equal to 50 mg/kg). Following excavation, clean backfill was brought to the site and provided to the Demolition Contractor to complete backfill and grading in conjunction with their final site restoration activities from building demolition. Post-IM groundwater sampling was conducted in May 2022 at three monitoring wells installed in April 2022 to confirm that PCBs did not leach into groundwater. These wells were installed where the highest PCB concentrations were detected at LOC 2D, LOC 2E, and from the Building Perimeter IM (previously completed in 2020). All PCB results in groundwater were non-detect. Volatile organic compounds were also analyzed based on potential past use of solvents in transformers with PCB-dielectric fluids and the potential release of dielectric fluids containing volatile organic compounds, and all results were non-detect. Based on completion of a successful IM at LOC 2D and LOC 2E, as well as previous remedial actions that have addressed other contamination at KHQA (SWMU 104), No Further Action without controls will be recommended for SWMU 104. NASA will submit separate Site Rehabilitation Completion Order request documentation for SWMU 104 to support an NFA without controls recommendation.

PCB↗

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

Hydrocarbon Burn Facility SWMU 007 Interim Groundwater Monitoring Report Kennedy Space Center, Florida

This Interim Groundwater Monitoring (IGWM) Report presents the findings of IGWM activities completed in November 2021 along with an October 2021 direct push technology (DPT) investigation to confirm plume stability for the Volatile Organic Compound (VOC) Area of the Hydrocarbon Burn Facility (HBF) at Kennedy Space Center (KSC), Florida. HBF has been designated as Solid Waste Management Unit 007 under the KSC Resource Conservation and Recovery Act Corrective Action Program.

Jennifer Buel↗

Base Support Building and Kennedy Athletic, Recreation, and Social Park II, SWMU 014 and SWMU 118, PFAS Site Assessment Progress Report, Kennedy Space Center, Florida

This Perfluoroalkyl and Polyfluoroalkyl Substances (PFAS) Site Assessment Progress Report (SAPR) presents the findings of the 2022 PFAS investigation conducted from February 2022 through June 2022 at the Base Support Building (previously known as the Maintenance and Operation Building), Solid Waste Management Unit (SWMU) 014, and at the Kennedy Athletic, Recreation, and Social (KARS) Park II, (SWMU 118) located within Kennedy Space Center (KSC), Florida. SWMUs 014 and 118 were investigated independently, however, the results of the investigations indicated a single PFAS groundwater plume covering both SWMUs, so the two sites are being reported together.

PFAS↗

Fire Station #1 Area, SWMU 116 Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment Progress Report Kennedy Space Center, Florida

This Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment (SA) Progress Report (SAPR) discusses the investigation activities and findings for the Fire Station #1 (FS1) Area (formerly known as Fire Station #4) located at Kennedy Space Center (KSC), Florida (Figure 1-1). This site has been designated Solid Waste Management Unit (SWMU) 116 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This PFAS SA is being managed under SWMU 116 as the fire station was identified as a potential source of PFAS to the environment. This PFAS SAPR was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011-80KSC019F0070. This is the first progress report to document on-going SA activities; supplemental progress reports will be provided as additional data is collected. During the SA, a total of six soil, 48 groundwater direct push technology (DPT), eight groundwater monitoring well, and one surface water sample were collected between October 2021 and March 2022. The samples were analyzed for 28 PFAS compounds using the Department of Defense Quality Systems Manual-compliant Method. SA sample results were used along with historical results to evaluate the extent of PFAS impacts to the environment in the FS1 Area. Data generated to date and prior results were screened against the United States Environmental Protection Agency (USEPA) May 2022 Tap Water Regional Screening Levels (RSLs) for groundwater and residential RSLs for soil (hazard quotient of 0.1). Surface water results were screened against the State of Florida Human Health Surface Water Screening Levels (SWSLs). Overall, results from the SA showed exceedances of the applicable screening criteria for soil, groundwater and surface water. Considering the current and historical dataset, perfluorooctanesulfonic acid (PFOS) is the prevalent PFAS compound, which is indicative of AFFF releases. Based on results of the SA, additional groundwater DPT and surface water sampling should be considered, focused on evaluating surface water bodies in the southeast portion of the Industrial Area, which discharge into the Banana River. Additionally, installation of monitoring wells should be considered to evaluate the interaction between groundwater and surface water in the FS1 Area.

PFAS↗

Paint and Oil Locker, SWMU 067 Southern Treatment Area Air Sparge System Construction Completion and Performance Monitoring and Paint and Oil Locker, Northern Area (SWMU 067) and Supply Warehouse #3, SWMU 088 Long-Term Monitoring Report Kennedy Space Center, Florida

This Air Sparge (AS) System Construction Completion, Performance Monitoring, and Long-Term Monitoring (LTM) Report presents activities conducted at the Paint and Oil Locker (POL) (Solid Waste Management Unit [SWMU] 067) and Supply Warehouse #3 (SW3) (SWMU 088) sites located at the Kennedy Space Center (KSC), Florida. Activities include implementation and Year 1 (Quarters [Q] 1 through 4) and Q5 operation, maintenance, and monitoring (OM&M) activities and performance monitoring results for the AS Interim Measure (IM) in the POL Southern Treatment Area, LTM results for the POL Northern Area and SW3, and supplemental direct push technology (DPT) sampling at both sites to support the LTM and performance monitoring programs. The timeframe for activities included in this report extends from August 2019 to August 2022. The scope for these sites currently includes two main components, which are documented within this report: (1) LTM at SW3 and POL Northern Area where an AS system began operation at these sites in May 2009 and June 2013, respectively, and subsequently turned off for both sites in March 2018 (during the previous reporting period); and (2) Active AS operations and performance monitoring in the POL Southern Treatment Area where an AS system was installed and began operation in 2021. The AS IM in the POL Southern Treatment Area was implemented between 2019 and 2021 to treat a chlorinated solvent groundwater plume that resulted from historic operations supporting the National Aeronautics and Space Administration’s (NASA) Space Program. The objective of the AS IM is to remediate groundwater within the treatment zone to support transition to monitored natural attenuation (MNA). The overall Corrective Action objective is to reduce concentrations of trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2- dichloroethene (tDCE), and vinyl chloride (VC) present in groundwater to levels below their respective State of Florida Groundwater Cleanup Target Levels (GCTLs). The AS IM was installed in the POL Southern Treatment Area to target the high concentration plume (HCP), which includes a source zone (SZ) area where TCE was found to exceed 11,000 micrograms per liter (µg/L), and extend to a depth of 30 feet below land surface (bls).

TCE↗

Fire Station #2, Former Sewage Treatment Plant #17, and Towway Area-SWMU 114 PFAS Site Assessment Progress Report Kennedy Space Center, Florida

This PFAS Site Assessment Progress Report (SAPR) presents the findings of the 2022 PFAS investigation conducted from November 2021 through August 2022 at Solid Waste Management Unit (SWMU) 114 located within Kennedy Space Center (KSC), Florida. SWMU 114 includes area around Fire Station #2, Former Sewage Treatment Plant #17, the southern portion of the Shuttle Landing Facility Runway, Remote Launch Vehicle Hangar, and the Towway area. Fire Station #2 was constructed in 2008 and is currently active, housing fire station personnel and equipment, including aqueous film forming foam (AFFF). Releases of AFFF has occurred at SWMU 114. Previous environmental assessments have been performed at SWMU 114, including soil, groundwater, and surface water sampling for volatile organic compounds, polycyclic aromatic hydrocarbons, total petroleum hydrocarbons, and metals. No active remediation has been performed at the SWMU 114. PFAS site assessment field activities were conducted at SWMU 114 from November 2021 through August 2022. During the 2021-2022 Site Assessment, 124 direct-push samples were collected from 27 locations, 17 surface water samples were collected from 15 locations, 41 groundwater samples were collected from 37 newly installed monitoring wells, five concrete samples were collected from four locations, and one asphalt sample was collected. Additionally, two soil borings were advanced to 60 feet for lithologic descriptions, ten staff gauges were installed, and one round of water level measurements were collected from monitoring wells and staff gauges for groundwater flow determination. All groundwater and surface water samples were analyzed for 25 PFAS analytes by USEPA Method 537M. Concrete, and asphalt samples were analyzed by synthetic precipitation leaching procedure (SPLP) PFAS analysis by USEPA Modified Method 537M. Groundwater results were compared to the most recent Regional Screening Levels (RSLs) published by USEPA for residential tap water (USEPA, 2022a) to determine the extent of PFAS contamination at SWMU 114 for six PFAS analytes (PFOA, PFNA, PFBS, PFHxS, PFOS, and GenX). Surface water results were compared to the FDEP surface water screening levels (SW SLs) (FDEP, 2020) for PFOA and PFOS. The PFAS investigation concluded that groundwater exceeding RSLs extends east and south to Banana Creek and west to approximately the center of the SLF runway. The extent of PFAS is approximated to the north, to an area between Sharkey Road and Astronaut Road, where samples below the RSLs do not fully bound SWMU 114. At least two distinct PFAS source areas are located near Fire Station #2 and along Towway, at S114-MW0007S, within SWMU 114. Groundwater head measurements indicate that flow at SWMU 114 is generally similar across the shallow and intermediate water tables. A northeast to southwest trending groundwater divide is located near the middle of Towway where groundwater southeast of the divide flows to the south and groundwater northwest of the divide flows to the west. The groundwater divide generally separates the two areas of higher PFAS concentrations. Surface water samples indicated concentrations of PFOS above the SW SLs in surface water bodies across the site. Further assessment and sampling are required to better understand the interaction between groundwater and surface water at SWMU 114. Concrete and asphalt samples collected confirm that a significant release of AFFF occurred near the stormwater pond northwest of Fire Station #2. Additional concrete samples surrounding Fire Station #2 and at the northwest and southeast edges of the SLF tarmac indicate elevated PFOS concentrations. These results indicate that discharges of AFFF in these locations have infiltrated into asphalt and concrete and may act as a continuing source of PFAS to groundwater and surface water after rain events. Additional direct-push samples are required to delineate PFAS at SWMU 114. Samples may need to extend beyond the Former SLF Rescue Building and Morpheous Test Site to delineate PFAS in groundwater. Monitoring wells should be sampled and gauged quarterly to determine if seasonal impacts are observable, especially in shallow wells near surface water features. Furthermore, surface water samples should be collected from additional ditches to further define the extent of surface water impacts at SWMU 114 and extending along the SLF runway. Staff gauges should be gauged quarterly with groundwater gauging to determine surface water flow and interaction with groundwater. The PFAS sampling results and path forward for SWMU 114 were presented to the KSC Remediation Team in October 2022. Once the PFAS SAPR is approved, it will be submitted to the Florida Department of Environmental Protection.

Howard Franklin Fowler↗

Sewage Treatment Plant #1 Area, SWMU 117 Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment Progress Report

This Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment (SA) Progress Report (SAPR) discusses the investigation activities and findings for the Sewage Treatment Plant #1 (STP1) Area located at Kennedy Space Center (KSC), Florida (Figure 1-1). This site has been designated Solid Waste Management Unit (SWMU) 117 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program, as the sewage treatment plant and associated areas were identified as a potential source of PFAS to the environment. This PFAS SAPR was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011-80KSC019F0070. This is the first progress report to document on-going SA activities; supplemental progress reports will be provided as additional data is collected. PFAS SA activities were conducted between April 2020 and March 2022 to collect additional data to supplement the existing datasets to better understand the extent of PFAS impacts to the environment in the STP1 Area. The SA for the STP1 Area covers an approximately 130-acre investigation area with multiple structures and buildings. The focus of the SA is the STP1 Complex and associated structures, including the former Polishing Pond, former Sludge Disposal8 Area, and former Spray Field. The STP1 Complex is located in the KSC Industrial Area, at the southwest corner of 4th Street SE and C Avenue SE. The STP1 Complex is located approximately ¼-mile south and downgradient of the Fire Station #1 site (SWMU 116), which is also currently undergoing a PFAS SA because of potential releases of PFAS-containing aqueous film-forming foam (AFFF). During the SA, a total of seven soil, 131 groundwater direct push technology (DPT), 24 groundwater monitoring well, and 11 surface water samples were collected between April 2020 and March 2022. Monitoring well samples were analyzed for 18 PFAS compounds, with all other samples analyzed for 28 PFAS compounds. The SA sample results were used along with historical results to evaluate the extent of PFAS impacts to the environment in the STP1 Area. Data generated to date and prior results were screened against the United States Environmental Protection Agency (USEPA) May 2022 Tap Water Regional Screening Levels (RSL) for groundwater and residential RSLs for soil (hazard quotient of 0.1). Surface water results were screened against the State of Florida Human Health Surface Water Screening Levels (SWSLs). Results from the SA showed exceedances of the applicable screening criteria for groundwater and surface water. Considering the current and historical dataset, PFOS is the prevalent PFAS compound. Based on these results, additional groundwater DPT and surface water sampling should be considered for PFAS analysis, focused on evaluating surface water bodies in the southeast portion of the Industrial Area, which discharge into the Banana River. Additionally, installation of monitoring wells should be considered to evaluate the interaction between the groundwater and surface water at the site. Collection of additional samples for TOC analysis should also be considered from representative groundwater (saturated soils) and surface water locations to further evaluate potential correlations between PFAS and TOC to provide a more comprehensive dataset to assist in fate and transport analyses.

Sewage Treatment Plant↗

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 SWMU #041 Year 3 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 3 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 3 PMR extends from September 2021 through October 2022. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 3 reporting period was approximately 91%, with the majority of downtime attributed to system maintenance and repair. This is generally consistent with Year 1 and Year 2 runtimes of 85% and 92%, respectively. To help reduce downtime, an anti-scaling amendment, Redux 390, has been used to reduce scaling and help maintain system design parameters. Over nine million gallons of groundwater were treated during Year 3 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 97%. This PMR describes the activities that were performed during Year 3 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 3 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 3 plume conditions. Therefore, it can be assumed that the projected path remains valid for transition to MNA in one to two years of continuous HCS operation. The contents of this Year 3 PMR were presented during the February 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Replacement of MW0019 and VMP04 was also recommended, as well as additional direct-push technology sampling to further delineate the downgradient plume and confirm overall site-wide low-concentration plume boundaries. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

Hypergol Maintenance Facility North SWMU 090 Year 2 Air Sparge System Performance Monitoring Report Kennedy Space Center, Florida

This Air Sparge (AS) System Performance Monitoring Report (PMR) presents Year 2 operation, maintenance, and monitoring (OM&M) activities and performance monitoring results for the AS Interim Measure (IM) at the Hypergol Maintenance Facility North (HMFN) at Kennedy Space Center (KSC), Florida. HMFN has been designated Solid Waste Management Unit (SWMU) 090 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities included in this report extends from August 2021 to August 2022.

Christopher Hook↗

Launch Complex 39A, SWMU 008 and Launch Complex 39B, SWMU 009 Performance Monitoring Report Kennedy Space Center, Florida

This Performance Monitoring Report (PMR) presents the findings, observations, and results for Air Sparging (AS) operations and sitewide groundwater monitoring for Launch Complex 39A (LC39A), Solid Waste Management Unit (SWMU) 008, and Launch Complex 39B (LC39B), SWMU 009, at Kennedy Space Center (KSC), Florida. Results from direct push technology (DPT) sampling at LC39B are also included in this report. The reporting period for AS operations covered under this PMR is from January 1, 2022, to December 31, 2022.

groundwater↗

2021-2022 Long-Term Groundwater Monitoring Report Industrial Area Kennedy Space Center, Florida

This report presents the groundwater sampling results from the National Aeronautics and Space Administration (NASA) Industrial Area (IA) 2021-2022 Long-Term Monitoring (LTM) activities and results of the 2023 DPT activities at three of the sites. The NASA IA LTM Program includes the following 14 sites: - Ransom Road Landfill (RRLF) – Solid Waste Management Unit (SWMU) 003 - Orsino Storage Yard (ORSY) – SWMU 004 - Building M7-0505 Treatment Tank Area (M505) – SWMU 039 - Hypergol Maintenance Facility Hazardous Waste South Staging Area (HMF South) – SWMU 070 - Operations and Checkout Building (O&C) – SWMU 076 - Vertical Processing Facility (VPF) – SWMU 077 - Environmental Health Facility (EHF) – SWMU 079 - Kennedy Athletic, Recreation, and Social Park 1 (KARS Park 1) – SWMU 084 - Engineering Development Laboratory (EDL) – SWMU 085 - Launch Equipment Test Facility (LETF) – SWMU 091 - Mobil Service Station (MOBIL) – SWMU 093 - General Services Administration Seized Property (GSSP) – SWMU 095 - Space Station Processing Facility (SSPF) – SWMU 098 - Fuel Storage Area #1 Underground Storage Tank (UST) [Building 1044] (FSA1) – Potential Release Location (PRL) 157 Groundwater levels were gauged at each site during the 2021 and 2022 LTM field activities. Sampling events for the IA LTM Program are conducted seasonally during the dry and wet seasons, which occur in May and November, respectively. The sites in the NASA IA LTM Program are sampled on annual, biennial, or 5-year sampling frequencies based on historical trends. Due to contract transitions and monitoring well installations, 2021 dry season activities were conducted during September 2021, while dry season activities for 2022 resumed in May 2022.

groundwater↗

Contractors Road Heavy Equipment Area (SWMU 055) 2022 Annual Groundwater Monitoring Report

This document presents a summary of activities completed at the Contractors Road Heavy Equipment (CRHE) Area, located at Kennedy Space Center (KSC), Florida, from June through December 2022. The activities conducted at the CRHE Area include: - Annual groundwater sampling activities associated with sitewide plume monitoring and Underground Injection Control (UIC) monitoring in the former bioremediation Interim Measures (IM) Hot Spot 1 (HS1) area; - Direct push technology (DPT) groundwater investigation; - Semiannual vapor intrusion (VI) evaluation activities. This facility is designated Solid Waste Management Unit (SWMU) Number 055 (SWMU 055) under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action program. HydroGeoLogic, Inc. (HGL) prepared this report for the National Aeronautics and Space NASA) under contract number 80KSC019F0096/80KSC019D0012, Technical Directive-03. An Advance Data Package (ADP) presentation of the elements of this report received Team (KSCRT) agreement at the April 5, 2023, KSCRT meeting. The chlorinated volatile organic compound plume appears to be stable vertically and horizontally. Additional DPT groundwater sampling will be completed to support a remedial alternatives evaluation for potential means to expedite groundwater cleanup. There are per- and polyfluorinated alkyl substances in site groundwater, and assessment is planned in the future. Sub-slab soil gas monitoring results do not indicate any concerns with indoor vapor intrusion. Based on the 2022 annual groundwater sampling results, it is recommended that annual sampling continue to alternate with the wet and dry season, with the next sampling event planned for December 2023.

groundwater↗

Launch Complex 39B, SWMU 009 Air Sparging System Expansion Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) for expansion of the Air Sparging (AS) system at Launch Complex 39B (LC39B), presents the design and coordination specifics to expand the existing AS Interim Measure (IM) at LC39B located at Kennedy Space Center (KSC), Florida. The existing AS system at LC39B was installed in 2017 and included 279 AS wells. LC39B has been designated as Solid Waste Management Unit (SWMU) 009 under the KSC Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Expansion of the AS IM will include installation of an additional five AS wells to depths of approximately 13 and 17 feet below land surface (bls) to remediate contaminated groundwater identified northwest of the launch pad, near the liquid oxygen (LOX) tank. The expansion will target concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC) greater than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs) that were identified during direct push technology (DPT) sampling events between 2019-2022 in shallow intervals between 8 and 16 feet bls. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to below NADCs to support transition to monitored natural attenuation (MNA) through a long-term monitoring (LTM) program. This expansion will treat approximately 0.07-acres of residual groundwater contamination. The IWP design for this expansion will utilize the existing AS system trailer that is already onsite and operating. The five new AS expansion wells will be integrated into the existing Zone Z4 distribution manifold to deliver compressed air to the new AS wells. To deliver airflow, three existing lateral lines will be split in the field at a lateral split junction point (using 2-way or 3-way splits). Each split lateral will supply air to AS wells at the same depth interval to minimize preferential pathways. The trenching layout for the new AS wells was developed to minimize ground disturbance due to the amount of utilities in the area. One new monitoring well will also be installed and added to LC39B’s performance monitoring program to evaluate the effectiveness of the AS system expansion. This well will be sampled on a semi-annual basis for volatile organic compounds, with results evaluated to determine if system adjustments may be required. The main components of this IWP were presented to the KSC Remediation Team (KSCRT) at the October 2022 Meeting (Meeting 2210-M05). DPT delineation data from the LOX area were also presented, which included some inferred boundaries due to physical restrictions of the LOX tank and associated concrete pad and infrastructure. Planned monitoring well sampling in this area will help determine if back-diffusion may be occurring from beneath the pad. Additionally, based on potential petroleum odors and staining identified at two DPT locations during the January 2022 DPT event in the 10-16 feet bls range, a KSCRT action item was assigned during the October 2022 meeting to collect soil samples for petroleum compounds if similar odors or staining are identified during IM implementation. Construction completion and performance monitoring will be incorporated into LC39B’s groundwater monitoring reports, which are currently submitted on an annual basis to FDEP to document operation and maintenance activities and results from the AS IM.

Deborah M. Wilson↗

Hydrocarbon Burn Facility SWMU 007 Interim Groundwater Monitoring Report Kennedy Space Center, Florida

This Interim Groundwater Monitoring (IGWM) Report presents the findings of IGWM activities completed in November 2022, and March through May 2023 including results from existing and newly installed groundwater monitoring wells and direct push technology (DPT) groundwater sampling in the Volatile Organic Compound (VOC) Area of the Hydrocarbon Burn Facility (HBF) at Kennedy Space Center (KSC), Florida. HBF has been designated as Solid Waste Management Unit (SWMU) 007 under the KSC Resource Conservation and Recovery Act Corrective Action Program.

Jennifer Buel↗

Shallow Soil Polychlorinated Biphenyl Site Assessment Report

This report presents a summary of the shallow soil polychlorinated biphenyl (PCB) site assessment activities that occurred from December 2020 through July 2022 at General Services Administration Reclamation Yard, Solid Waste Management Unit (SWMU) 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, three separate shallow soil plumes, known as the Northeast Shallow Soil PCB Plume, Southeast Shallow Soil PCB Plume, and West Shallow Soil PCB Plume, were identified for this site. The activities presented in this report include seven field events conducted between December 2020 and July 2022, which include shallow soil sample collection in the Northeast, Southeast, and West Shallow Soil PCB Plumes. AECOM Technical Services, Inc., personnel collected 330 soil samples from 118 boring locations. The samples were collected at 0.5-foot depth intervals to various depths based on analytical results and depth to groundwater. The soil samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. Several soil samples had PCB concentrations above the State of Florida Direct Exposure Residential and Industrial Soil Cleanup Target Levels (SCTLs), and two soil samples had PCB concentrations above the State of Florida Leachability for Groundwater. No soil borings were located beneath impervious surfaces, such as concrete or asphalt. The current Land Use Control Implementation Plan (LUCIP) covers PCBs in soils above the residential SCTL, which includes the paved areas.

PCBs↗

Interim Measure Report South Water Pump Station Potential Release Location 213 – Location of Concern 2 Kennedy Space Center, Florida

This report presents a summary of the polychlorinated biphenyl (PCB) interim measure (IM) activities that occurred in December 2022 and March 2023 at Location of Concern (LOC) 2 – Electrical Equipment Area associated with the South Water Pump Station (SWPS) Potential Release Location (PRL) 213, located at the John F. Kennedy Space Center (KSC), Florida. The SWPS site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. Assessment activities have previously been performed at six SWPS LOCs identified during a Solid Waste Management Unit assessment in 2013. Based on the data collected during these assessments, it was determined that IM activities would be completed at one of the LOCs, LOC 2 – Electrical Equipment Area, and an IM Work Plan was prepared and approved. In 2019, demolition of the SWPS buildings and structures was completed, allowing for additional assessment at LOC 2, and it was determined that soil excavation to remove PCB-impacted soils was no longer required for LOC 2. The IM activities conducted following demolition are presented in this report and include shallow soil sample collection, conducted in December 2022, and monitoring well installation and groundwater sampling, both conducted in March 2023. AECOM Technical Services, Inc. (AECOM) personnel collected two soil samples from two boring locations, SWPS-SB0005 and SWPS-SB0018. The samples were collected at 0 to 0.5 feet below land surface (bls). AECOM also conducted oversight of one monitoring well installation, SWPS-MW0001 screened from 4 to 14 feet bls, and then subsequently collected one groundwater sample from SWPS-MW0001. The samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. There were no detections of PCBs in soil or groundwater during the reporting period.

Chadwick Sloan Lee↗