Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SITE APPROVALS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Demonstration/Validation of Environmentally-Preferable Coatings for Launch Facilities

Kennedy Space Center (KSC) is responsible for a number of facilities/structures with metallic structural and non-structural components in a highly corrosive environment. Metals require periodic maintenance activity to guard against the insidious effects of corrosion and thus ensure that structures meet or exceed design or performance life. The standard practice for protecting metallic substrates in atmospheric environments is the application of an applied coating system. Applied coating systems work via a variety of methods (barrier, galvanic and/or inhibitor) and adhere to the substrate through a combination of chemical and physical bonds. Maintenance at KSC and other NASA Centers is governed by NASA-STD-50088 (Protective Coating of Carbon Steel, Stainless Steel, and Aluminum on Launch Structures, Facilities, and Ground Support Equipment) which establishes practices for the protective coating of ground support equipment and related facilities used by or for NASA programs and projects. The Standard is for the design of non-flight hardware used to support the operations of receiving, transportation, handling, assembly, inspection, test, checkout, service, and launch of space vehicles and payloads at NASA launch, landing, or retrieval sites. These criteria and practices contained within the Standard may be used for items used at the manufacturing, development, and test sites upstream of the launch, landing, or retrieval sites. The objective of this effort is to demonstrate and validate environmentally-preferable alternatives in accordance with NASA-STD-50088 and KSC requirements which can then be added to the Approved Products List. This Test Protocol contains the critical requirements and tests necessary to qualify alternatives for structural steel applications. These tests were derived from engineering, performance, and operational impact (supportability) requirements defined by a consensus of KSC participants. A Test Report will document the results of the testing as well as any test modifications made during the execution of the testing. Users of this Test Protocol should check the project's Test Report for additional test details or minor modifications that may have been necessary in the execution of the testing. The technical stakeholders will have agreed upon test procedures modifications documented in the Test Report.

Lewis, Pattie↗

MP197HB; First licensed transportation package with canistered high burnup fuel after dry storage - 15580

AREVA TN has recently received the NRC 10 CFR Part 71 transportation license CoC 9302 Revision 7 for the MP197HB transportation package that allows transportation of canistered high burnup fuel assemblies. The Nuclear Horizontal Modular Storage (NUHOMS{sup R}) system canisters containing high burnup PWR and BWR fuel assemblies are now licensed for transportation as a payload in MP197HB after these canisters were in dry storage at the utility ISFSIs. Enhancements have been made to the MP197HB transportation package to improve thermal performance and also provide superior shielding capabilities. Design features of existing AREVA TN transportation packages such as radial fins, thermal shield, neutron resin and optimized gamma and neutron shielding were used to accommodate transportation of high burnup fuel assemblies with heat loads up to 32 kW. The transportation package is designed for exclusive use by rail, truck or marine transport. State-of-the-art analyses methodologies were used to demonstrate compliance with regulatory requirements of 10 CFR 71.55 for the high burnup fuel after dry storage at any ISFSI. Some of the issues addressed in the license application related to the transportation of high burnup fuel included potential degradation of fuel cladding, uncertainty associated with high burnup fuel cladding material properties, and larger radiation and thermal sources due to higher burnups. Bounding conservative assumptions were made where limited test data was available. AREVA TN's licensing approach did not rely on the cladding integrity of high burnup fuel cladding. Instead, the criticality, thermal and shielding analyses were carried out assuming high burnup fuel reconfiguration. With the approval of this transportation package for PWR and BWR canistered high burnup fuel from dry storage at ISFSIs, the utilities can now transport these canisters which are in dry storage at their sites. This is also a major step forward for the canistered fuel that is currently in dry storage at the shutdown plants because they can use this AREVA TN MP197HB transportation package to ship that fuel to any interim storage facility (ISF) or to a repository when they become available. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 572: Test Cell C Ancillary Building and Structures - Nevada National Security Site, Nevada with ROTC 1

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 572, Test Cell C Ancillary Building and Structures, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 572 comprises the following corrective action sites (CASs) located in Area 25 of the Nevada National Security Site: CAS 25-33-01, Building 3220, Equipment Building; CAS 25-33-02, Building 3230, Motor Drive Building; CAS 25-33-03, Building 3231, Pump House; CAS 25-33-04, Building 3232, Cryogenic Evaluation Lab; CAS 25-99-22, Ancillary Facilities. This plan provides the methodology for field activities needed to gather the necessary information for closing CAU 572. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 572 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action. It is anticipated that the results of the field investigation and implementation of corrective actions will support a defensible recommendation that no further corrective action is necessary. The purpose of the corrective action investigation (CAI) will be to document and verify the adequacy of existing information; to affirm the decision for either clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. If it is determined that complete clean closure cannot be accomplished during the CAI, then a hold point will have been reached and the Nevada Division of Environmental Protection (NDEP) will be consulted to determine whether the remaining contamination will be closed under the alternative corrective action of closure in place. This will be presented in a closure report that will be prepared and submitted to NDEP for review and approval.

54 ENVIRONMENTAL SCIENCES↗

Utilizing Regional Centers in Sustaining Upgraded Russian Federation Ministry of Defense Sites

Since the mid-1990s the governments of the United States (U.S.) and the Russian Federation (RF) have been collaborating on nonproliferation projects, particularly in the protection of nuclear material through the Department of Energy's (DOE) National Nuclear Security Administration (NNSA). To date, this collaboration has resulted in upgrades to more than 72 RF Ministry of Defense (MOD) sensitive sites and facilities. These upgrades include physical protection systems (PPS), facilities to ensure material remains secure in various configurations, and infrastructure to support, maintain, and sustain upgraded sites. Significant effort on the part of both governments has also been expended to ensure that personnel obtain the necessary skills and training to both operate and maintain the security systems, thereby ensuring long term sustainability. To accomplish this, initial vendor training on physical protection systems was provided to key personnel, and an approved training curriculum was developed to teach the skills of operating, managing, administering, and maintaining the installed physical protection systems. This approach also included documentation of the processes and procedures to support infrastructure, requisite levels of maintenance and testing of systems and equipment, lifecycle management support, inventory systems and spare parts caches. One of the core components in the U.S. exit strategy and full transition to the RF MOD is the development and utilization of regional centers to facilitate centralized training and technical support to upgraded MOD sites in five regions of the RF. To date, two regional centers and one regional classroom facility are functional, and two additional regional centers are currently under construction. This paper will address the process and logistics of regional center establishment and the future vision for integrated regional center support by the RF MOD.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Visual Odometry Thinking While Driving for the Curiosity Mars Rover's Three-Year Test Campaign: Impact of Evolving Constraints on Verification and Validation

Over the first 9 years of the Mars Science Laboratory (MSL) Curiosity rover's surface mission, more than 87\% of its driving has been performed using Visual Odometry (VO). The benefits of using VO during driving are that it minimizes rover position uncertainty and can be used to monitor wheel slip, halting a drive if excessive wheel slip is occurring. The VO implementation on board Curiosity acquires and processes VO images in between drive steps while the rover is stationary. A VO Thinking While Driving (VTWD) flight software capability has been developed which enables the processing of VO images during rover driving, increasing the distance Curiosity can drive with VO in a given time period up to as much as 1.75x total distance. Verification and Validation (V\&V) of the capability has been challenging due to impacts from the COVID-19 pandemic and unavailability of the JPL Mars Yard outdoor test site. The VTWD V\&V test procedures were modified to use a small indoor space with Mars-like terrain. This paper describes the 3 year V\&V effort under challenging conditions to approve the VTWD capability for use on the Curiosity rover.

Rankin, Arturo↗

DEPLOYMENT OF THE BULK TRITIUM SHIPPING PACKAGE

A new Bulk Tritium Shipping Package (BTSP) was designed by the Savannah River National Laboratory to be a replacement for a package that has been used to ship tritium in a variety of content configurations and forms since the early 1970s. The BTSP was certified by the National Nuclear Safety Administration in 2011 for shipments of up to 150 grams of Tritium. Thirty packages were procured and are being delivered to various DOE sites for operational use. This paper summarizes the design features of the BTSP, as well as associated engineered material improvements. Fabrication challenges encountered during production are discussed as well as fielding requirements. Current approved tritium content forms (gas and tritium hydrides), are reviewed, as well as, a new content, tritium contaminated water on molecular sieves. Issues associated with gas generation will also be discussed.

42 ENGINEERING↗

Dismantling of Loop-Type Channel Equipment of MR Reactor in NRC 'Kurchatov Institute' - 13040

In 2009 the project of decommissioning of MR and RTF reactors was developed and approved by the Expert Authority of the Russian Federation (Gosexpertiza). The main objective of the decommissioning works identified in this project: - complete dismantling of reactor equipment and systems; - decontamination of reactor premises and site in accordance with the established sanitary and hygienic standards. At the preparatory stage (2008-2010) of the project the following works were executed: loop-type channels' dismantling in the storage pool; experimental fuel assemblies' removal from spent fuel repositories in the central hall; spent fuel assembly removal from the liquid-metal-cooled loop-type channel of the reactor core and its placement into the SNF repository; and reconstruction of engineering support systems to the extent necessary for reactor decommissioning. The project assumes three main phases of dismantling and decontamination: - dismantling of equipment/pipelines of cooling circuits and loop-type channels, and auxiliary reactor equipment (2011-2012); - dismantling of equipment in underground reactor premises and of both MR and RTF in-vessel devices (2013-2014); - decontamination of reactor premises; rehabilitation of the reactor site; final radiation survey of reactor premises, loop-type channels and site; and issuance of the regulatory authorities' de-registration statement (2015). In 2011 the decommissioning license for the two reactors was received and direct MR decommissioning activities started. MR primary pipelines and loop-type facilities situated in the underground reactor hall were dismantled. Works were also launched to dismantle the loop-type channels' equipment in underground reactor premises; reactor buildings were reconstructed to allow removal of dismantled equipment; and the MR/RTF decommissioning sequence was identified. In autumn 2011 - spring 2012 results of dismantling activities performed are: - equipment from underground rooms (No. 66, 66A, 66B, 72, 64, 63) - as well as from water and gas loop corridors - was dismantled, with the total radwaste weight of 53 tons and the total removed activity of 5,0 x 10{sup 10} Bq; - loop-type channel equipment from underground reactor hall premises was dismantled; - 93 loop-type channels were characterized, chopped and removed, with radwaste of 2.6 x 10{sup 13} Bq ({sup 60}Co) and 1.5 x 10{sup 13} Bq ({sup 137}Cs) total activity removed from the reactor pool, fragmented and packaged. Some of this waste was placed into the high-level waste (HLW) repository of the Center. Dismantling works were executed with application of remotely operated mechanisms, which promoted decrease of radiation impact on the personnel. The average individual dose for the personnel was 1.9 mSv/year in 2011, and the collective dose is estimated as 0.0605 man x Sv/year. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Site Beryllium Program: Past, Present, and Future - 12428

The U.S. Department of Energy (DOE) has a long history of beryllium use because of the element's broad application to many nuclear operations and processes. At the Hanford Site beryllium alloy was used to fabricate parts for reactors, including fuel rods for the N-Reactor during plutonium production. Because of continued confirmed cases of chronic beryllium disease (CBD), and data suggesting CBD occurs at exposures to low-level concentrations, the DOE decided to issue a rule to further protect federal and contractor workers from hazards associated with exposure to beryllium. When the beryllium rule was issued in 1999, each of the Hanford Site contractors developed a Chronic Beryllium Disease Prevention Program (CBDPP) and initial site wide beryllium inventories. A new site-wide CBDPP, applicable to all Hanford contractors, was issued in May, 2009. In the spring of 2010 the DOE Headquarters Office of Health, Safety, and Security (HSS) conducted an independent inspection to evaluate the status of implementation of the Hanford Site Chronic Beryllium Disease Prevention Program (CBDPP). The report identified four Findings and 12 cross-cutting Opportunities for Improvement (OFIs). A corrective action plan (CAP) was developed to address the Findings and crosscutting OFIs. The DOE directed affected site contractors to identify dedicated resources to participate in development of the CAP, along with involving stakeholders. The CAP included general and contractor-specific recommendations. Following initiation of actions to implement the approved CAP, it became apparent that additional definition of product deliverables was necessary to assure that expectations were adequately addressed and CAP actions could be closed. Consequently, a supplement to the original CAP was prepared and transmitted to DOE-HQ for approval. Development of the supplemental CAP was an eight month effort. From the onset a core group of CAP development members were identified to develop a mechanism for assuring that consensus was achieved on products developed as part of the CAP and the closure process. The original CAP was developed based on a large number of actions developed from the HSS report. This was essentially a 'bottoms up' approach. The revised CAP development team concluded that a more holistic, process-based approach was appropriate to assure that the resulting deliverable resulted in a best-in-class product. Consequently, issues and recommendations contained in the HSS report were grouped into 11 program areas, specific product deliverables were identified within each of the program areas, and a work breakdown structure (WBS) was logically applied to number the groupings. While the revised approach to product development utilizes a more holistic, 'top down' approach, the intent was still to incorporate specific recommendations and address specific issues contained in the HSS report. Through implementation of this new approach, a collaborative team has been established that works together using a consensus process for ensuring product completion. Benefits of the new approach include building a level of trust amongst all parties, quality of the products have improved, and acceptance by all parties of what action will truly meet the intent of the deficiency and make the beryllium program stronger. Open dialogue occurs amongst the core Be CAP team members, Hanford contractors, and DOE. It has been a learning process and will continue to be one, but everyone shares the common goal of reducing worker exposure to beryllium. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An overview of the 2014 revision of ANSI/ANS-ANS-8.1-2014, 'Nuclear criticality safety in operations with Fissionable Materials Outside Reactors' - 14577

A revision to the American National Standards Institute (ANSI)/American Nuclear Society (ANS) standard, 'Nuclear Criticality Safety in Operations with Fissionable Materials Outside Reactors' [ANSI/ANS-8.1 (ANS-8.1)], was completed and published in 2014. The approved scope for the 2014 revision included two major efforts: (1) an editorial revision to clarify the meaning of the process analysis requirement (PA) and the double contingency principle recommendation (DCP) and (2) the generation of new subcritical limits for uranium and uranium compounds for enrichments less than 10 wt % {sup 235}U. After a clarification request was submitted regarding the PA and DCP in 2009, the scope of the revision became focused almost entirely on the editorial revision. With approval from the ANS-8 subcommittee chairman, the computational effort was postponed until the editorial revision could be completed. The 2014 revision of ANS-8.1 involved nuclear criticality safety experts from 14 different sites, each with many years of experience, either maintaining the standard as a working group member or as a criticality safety practitioner. Many of the represented sites had implemented the PA with the language of the DCP to ensure that process operations with fissionable materials would be subcritical. However, the early working group deliberations made it clear that the general industry focus was on the DCP rather than the PA, which requires that 'all normal and credible abnormal conditions remain subcritical'. Over the course of the revision, two new definitions and a new appendix (Appendix B) were developed to enhance understanding of the PA and DCP. The emphasis of Appendix B is on the requirement for subcriticality (PA) rather than the DCP. The phrase 'credible abnormal conditions' in the PA is broader in meaning than 'changes in process conditions,' as recommended by the DCP. This is because a single credible abnormal condition can potentially affect multiple independent process conditions, and consequently, multiple process parameters, simultaneously. The DCP is a technical practice meant to support the PA and cannot be applied to all situations. However, when it can be properly applied, the DCP technical practice, in most cases, ensures compliance with the PA because two unlikely, independent, and concurrent changes in process conditions are generally judged not to be a credible abnormal condition, as specified in the PA. This paper elaborates on the intense working group discussions over the course of the ANSI/ANS-8.1 standard revision and summarizes the modifications made to the revised standard. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Evaluation of Uranium Measurements in Water by Various Methods - 13571

In December 2000, EPA amended its drinking water regulations for radionuclides by adding a Maximum Contaminant Level (MCL) for uranium (so called MCL Rule)[1] of 30 micrograms per liter (μg/L). The MCL Rule also included MCL goals of zero for uranium and other radionuclides. Many radioactively contaminated sites must test uranium in wastewater and groundwater to comply with the MCL rule as well as local publicly owned treatment works discharge limitations. This paper addresses the relative sensitivity, accuracy, precision, cost and comparability of two EPA-approved methods for detection of total uranium: inductively plasma/mass spectrometry (ICP-MS) and alpha spectrometry. Both methods are capable of measuring the individual uranium isotopes U-234, U- 235, and U-238 and both methods have been deemed acceptable by EPA. However, the U-238 is by far the primary contributor to the mass-based ICP-MS measurement, especially for naturally-occurring uranium, which contains 99.2745% U-238. An evaluation shall be performed relative to the regulatory requirement promulgated by EPA in December 2000. Data will be garnered from various client sample results measured by ALS Laboratory in Fort Collins, CO. Data shall include method detection limits (MDL), minimum detectable activities (MDA), means and trends in laboratory control sample results, performance evaluation data for all methods, and replicate results. In addition, a comparison will be made of sample analyses results obtained from both alpha spectrometry and the screening method Kinetic Phosphorescence Analysis (KPA) performed at the U.S. Army Corps of Engineers (USACE) FUSRAP Maywood Laboratory (UFML). Many uranium measurements occur in laboratories that only perform radiological analysis. This work is important because it shows that uranium can be measured in radiological as well as stable chemistry laboratories and it provides several criteria as a basis for comparison of two uranium test methods. This data will indicate which test method is the most accurate and most cost effective. This paper provides a benefit to Formerly Utilized Sites Remedial Action Program (FUSRAP) and other Department of Defense (DOD) programs that may be performing uranium measurements. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Panel Session 13: TRU Waste Generator Sites - Implementation of the New US DOE WIPP WAC

This panel focused on the next phase of the US National Transuranic (TRU) Program (NTP) to support shipments to the Waste Isolation Pilot Plant (WIPP: located in Carlsbad, New Mexico, USA). Topics include program changes to increase waste stream approval efficiency, Documented Safety Analysis (DSA)/Waste Acceptance Criteria (WAC), TRUPACT-III and Remote Handled (RH) shipments, lessons learned from NTP waste certification and transportation, and NTP transportation stakeholder engagement and support programs. Presentations proposed include: 1 - National TRU Program Update (Kenneth Princen, US DOE (USA)); 2 - WIPP WAC (Rev 9) Implementation (Mark Pearcy, Nuclear Waste Partnership, LLC (USA)); 3 - Remote-Handled (RH) TRU Waste Update (J.R. Stroble, US DOE (USA)); 4 - National TRU Program Transportation Stakeholder Engagement and Support (James Mason, US DOE (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Regulatory Experiences for the Decommissioning of the Research Reactor in Korea

The first research reactor in Korea (KRR-1, TRIGA Mark-II) has operated since 1962, and the second one (KRR-2, TRIGA Mark-III), since 1972. Both of them were phased out in 1995 due to their lives and the operation of a new research reactor, HANARO (30 MW thermal power) operated by KAERI (Korea Atomic Energy Research Institute). After deciding the shutdown by the Nuclear Development and Utilization Committee in March 1996, KAERI began to prepare the decommissioning plan, including the environmental impact assessment, and submitted the plan to the Ministry of Science and Technology (MOST) in December 1998. Korea Institute of Nuclear Safety (KINS) reviewed document and prepared the review report in 1999. KINS is an organization of technical expertise which performs regulatory functions, entrusted by the MOST in accordance with the Atomic Energy Act and its Enforcement Decree. The review report written by KINS was consulted by the Special Committee on Nuclear Safety in January 2000. The committee submitted their consultation results to the Nuclear Safety Commission for the final approval by the Minister of MOST. The license was issued in November 2000. With the consent of the Korean government to the US Record of Decision, the spent fuel of KRR-1 and 2 was safely transported to the United States in July 1998. The decontamination and dismantling of KRR-2 was completed at the end of 2005 but the decommissioning of KRR-1 has been suspended by the problem for the memorial of the reactor. After the decommissioning of the research reactor is finished, the site will be returned to the site owner, Korea Electric Power Corporation (KEPCO). In this paper, the state-of-art and lessons learnt from recent regulatory activities for decommissioning of KRR- 2 are summarized. In conclusion: since the shutdown of KRR-1 and 2 had been decided, the safe assessment and licensing review were carried out after applying for decommissioning plan of those research reactors by operator. Through the safety assessment and license review, the plan was approved in 2000. The D and D of KRR-2 except Reactor hall of KRR-1 has been performed safely and completed in 2005. On the other hand the integrated safety for the decommissioning has been confirmed by regulatory team inspection. The radioactive waste arising from the dismantling work has been packed mainly in a 4 m{sup 3} containers and stored on site, reactor hall of KRR-2, until the LILW disposal facility is operational. For the whole dismantling work, with respect to the ALARA principle, not only worker protection from radiation and industrial hazard, but also the environment protection should be the first priority. Also much attention has been paid to the record keeping for the future decommissioning of nuclear power plants.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Annual Summary of the Integrated Disposal Facility Performance Assessment 2008

The U.S. Department of Energy (DOE) order on radioactive waste management (DOE 1 999a) as well as the Maintenance Plan for the Hanford Immobilized Low-Activity Tank Waste Performance Assessment (Mann 2004) require an annual summary on the adequacy of the Hanford Immobilized Low-Activity Tank Waste Performance Assessment (RLAW PA) in each year in which a performance assessment is not issued. The most recent approved PA is the Hanford Immobilized Low-Activity Waste Performance Assessment: 2001 Version (Mann et al 2001). The RLAW PA evaluated the adequacy of the ILAW disposal facility, now referred to as the Integrated Disposal Facility (IDF), to safely dispose vitrified Hanford Site tank waste. More recently, a preliminary evaluation for the disposal of offsite low-level and mixed low-level waste was considered in the Integrated Disposal Facility Risk Assessment (Mann et al. 2003a). The first phase of IDF construction was completed on April 28, 2006 and included the installation of the cell liners and leachate collection tanks. The IDF is now in a preoperational maintenance mode and will not receive treated tank waste for several years. In view of these circumstances, the RCRA Part B Permit for the Integrated Disposal Facility has been modified to recognize that the facility will not be receiving waste in the near future. A subsequent modification indicated transfer of the IiDF from the DOE Office of River Protection (DOE/ORP) operation to the DOE Richland Operations Field Office (DOE/RL). This summary is the latest in a succession of sumnmaries that have been published since 2000 (Mann, 2000b, 2002, 2003b, 2004, 2005, 2006 and 2007) and approved by the Field Manager, Office of River Protection (e.g., Schepens 2005c). This annual summary compares new data collected during Fiscal Year 2008 with the Hanford Immobilized Low-Activity Waste Performance Assessment: 2001 Version (Mann et al 2001), which has been approved by DOE (DOE 2003a). Most of the data collected during Fiscal Year 2008 pertained to long-term contaminant release from ILAW packages made at the Waste Treatment Plant. Results of data collection and additional analyses do not change the conclusions of the 2001 ILAW PA as they pertain to RLAW disposal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Adaptive Radiotherapy for Head-and-Neck Cancer: Initial Clinical Outcomes From a Prospective Trial

Purpose: To present pilot toxicity and survival outcomes for a prospective trial investigating adaptive radiotherapy (ART) for oropharyngeal squamous cell carcinoma. Methods and Materials: A total of 24 patients were enrolled in an institutional review board-approved clinical trial; data for 22 of these patients were analyzed. Daily CT-guided setup and deformable image registration permitted serial mapping of clinical target volumes and avoidance structures for ART planning. Primary site was base of tongue in 15 patients, tonsil in 6 patient, and glossopharyngeal sulcus in 1 patient. Twenty patients (91%) had American Joint Committee on Cancer (AJCC) Stage IV disease. T stage distribution was 2 T1, 12 T2, 3 T3, 5 T4. N stage distribution was 1 N0, 2 N1, 5 N2a, 12 N2b, and 2 N2c. Of the patients, 21 (95%) received systemic therapy. Results: With a 31-month median follow-up (range, 13-45 months), there has been no primary site failure and 1 nodal relapse, yielding 100% local and 95% regional disease control at 2 years. Baseline tumor size correlated with absolute volumetric treatment response (p = 0.018). Parotid volumetric change correlated with duration of feeding tube placement (p = 0.025). Acute toxicity was comparable to that observed with conventional intensity-modulated radiotherapy (IMRT). Chronic toxicity and functional outcomes beyond 1 year were tabulated. Conclusion: This is the first prospective evaluation of morbidity and survival outcomes in patients with locally advanced head-and-neck cancer treated with automated adaptive replanning. ART can provide dosimetric benefit with only one or two mid-treatment replanning events. Our preliminary clinical outcomes document functional recovery and preservation of disease control at 1-year follow-up and beyond.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Demonstration Testing of a Thermal Desorption Unit to Receive and Treat Waste with Unlimited Concentration of PCBs - 13437

For the last nine years, EnergySolutions and TD*X Associates LP have teamed up to provide the most comprehensive organic removal treatment process in the radioactive waste industry. The high performance thermal desorption unit (HP-TDU) located at the EnergySolutions Clive facility in Utah has successfully processed over 1,850 tons of organically contaminated radioactive mixed waste. Products from the HP-TDU system include a radioactively contaminated dry solid material that can be disposed in the on-site landfill and an organic condensate with high thermal energy content that is generally below background radiation and capable of free-release to a non-radioactive incinerator. Over the years, Permits and approvals have been obtained through the state of Utah, United States Environmental Protection Agency (USEPA) Region 8, and USEPA headquarters that enable the treatment of several waste categories including volatile and semi-volatile organic compounds, combustion-coded (CMBST) compounds, volatile metals, and polychlorinated biphenyls (PCBs). The unit has recently successfully completed Demonstration Testing for PCB concentrations up to 660,000 ppm (parts per million). Solid processed material from this Demonstration Testing was less than two ppm PCBs in three separate treatment runs; reprocessing or additional treatment was not needed to meet this limit. Through post-demonstration permitting, the system is unlimited in scope as approval has been given to receive and solidify up to pure PCBs down to this processing limit concentration to complete treatment of mixed waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

9975 SHIPPING PACKAGE PERFORMANCE OF ALTERNATE MATERIALS FOR LONG-TERM STORAGE APPLICATION

The Model 9975 shipping package specifies the materials of construction for its various components. With the loss of availability of material for two components (cane fiberboard overpack and Viton{reg_sign} GLT O-rings), alternate materials of construction were identified and approved for use for transport (softwood fiberboard and Viton{reg_sign} GLT-S O-rings). As these shipping packages are part of a long-term storage configuration at the Savannah River Site, additional testing is in progress to verify satisfactory long-term performance of the alternate materials under storage conditions. The test results to date can be compared to comparable results on the original materials of construction to draw preliminary conclusions on the performance of the replacement materials.

42 ENGINEERING↗

A proposed solution to the challenges of disposal of greater than class C low-level radioactive waste - 15172

In 1982, the US Nuclear Regulatory Commission (NRC) adopted rules for the disposal of low-level radioactive waste. These rules established new standards for the siting, construction, operation and closure of low-level radioactive waste disposal facilities. The new rules also set out a classification system for low-level radioactive waste based on half-life and concentration of the radionuclides in the waste stream. The defined classes - Class A, Class B and Class C - were based on increasing toxicity with Class A being the least hazardous and Class C being relatively more hazardous. Radioactive waste that could not fit the classification scheme due to its long half-life or its high concentration of radioactive material was deemed to be greater than Class C low-level radioactive waste, with the ascribed acronym 'GTCC' low-level radioactive waste. Such waste was deemed not suitable for shallow land disposal based on the design standards for low-level radioactive waste landfills in place at that time. This resulted in a radioactive waste stream that had no disposal option. To remedy this problem, the US Congress in 1985 stipulated that the US Department of Energy would be responsible for the disposal of GTCC waste. Subsequently, the NRC amended its regulations to require GTCC low-level waste to be disposed in a geologic repository unless the Commission approved proposals for disposal in a low-level radioactive waste disposal facility. The Commission did not concurrently establish any specific technical requirements for GTCC disposal in a low-level radioactive waste disposal facility, but did infer that a site-specific performance analysis could be conducted in support of any proposal for land disposal of such waste. In light of this, Waste Control Specialists LLC (WCS) has conducted such a site-specific performance analysis that has indicated the disposal facility at Andrews Texas will perform satisfactorily as a disposal facility for certain types and quantities of GTCC waste. Concurrently with this analysis, WCS has submitted to the Texas Commission on Environmental Quality a petition for rulemaking that will permit disposal of GTCC waste in their disposal facility. This paper summarizes the technical and legal analyses that were conducted in support of the proposed rulemaking. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Addendum to: Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for the Subsurface Corrective Action Unit 447 Shoal, Nevada, Site

This document is an addendum to the original CADD/CAP. It includes the summaries of the corrective action activities, numeral model validation results, enhancements made to the monitoring program and monitoring network as implemented through three short-term data acquisition plans and updates made to SCMs since CADD/CAP approval in 2006.The document begins at Section 5.6 as a continuation of the "Implementation of the Corrective Action Plan" of the CADD/CAP. Table and figure numbers are in a sequence with the CADD/CAP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗