Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “S-BAND”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

White-light and radio sounding observations of coronal transients

A concerted search for coronal transients was conducted with the 'Solwind' coronagraph during the solar occultations of the two Helios spacecraft in October/November 1979. The polarization angle and bandwidth of the linearly polarized S-band downlink signal were monitored at the three 64-m tracking stations of the NASA Deep Space Network to determine coronal Faraday rotation and spectral broadening. A one-to-one correspondence could be established between abrupt disturbances in the two signal parameters and the passage of a white-light transient through the signal ray path from spacecraft to earth. The white-light morphology and the additional information provided by the radio sounding coverage are presented for each of the five distinct events recorded. Although no specific example could be observed in sufficient detail in both white light and Faraday rotation to derive the small-scale magnetic structure, some qualitative descriptions of the orientation and rough estimates of the magnitude of the transient magnetic field could be made.

Bird, M. K.↗

Designing Delta-DOR acquisition strategies to determine highly elliptical earth orbits

Delta-DOR acquisition strategies are designed for use in determining highly elliptical earth orbits. The requirements for a possible flight demonstration are evaluated for the Charged Composition Explorer spacecraft of the Active Magnetospheric Particle Tracer Explorers. The best-performing strategy uses data spanning the view periods of two orthogonal baselines near the same orbit periapse. The rapidly changing viewing geometry yields both angular position and velocity information, but each observation may require a different reference quasar. The Delta-DOR data noise is highly dependent on acquisition geometry, varying several orders of magnitude across the baseline view periods. Strategies are selected to minimize the measurement noise predicted by a theoretical model. Although the CCE transponder is limited by S-band and a small bandwidth, the addition of Delta-DOR to coherent Doppler and range improves the one-sigma apogee position accuracy by more than an order of magnitude. Additional Delta-DOR accuracy improvements possible using dual-frequency (S/X) calibration, increased spanned bandwidth, and water-vapor radiometry are presented for comparison. With these benefits, the residual Delta-DOR data noise is primarily due to quasar position uncertainties.

Frauenholz, R. B.↗

The Venus radar mapper spacecraft design

This paper discusses the driving mission requirements on the VRM spacecraft, the resulting design, and the spacecraft performance capabilities. The spacecraft design is driven by fine pointing requirements for radar mapping resolution, by extremes of thermal environment in the Venus orbit, and by high instrument power requirements. The spacecraft design emphasized use of as much existing hardware and software as possible to meet the cost constraints. Existing design was used where hardware was not already available. The VRM spacecraft utilizes the spare Voyager High Gain Antenna (HGA) and equipment bus, the Galileo computers and power conditioning equipment, and Mariner Medium Gain Antenna (MGA). Further cost savings were possible by using the HGA for both radar mapping at S-band frequency and high rate data playback at X-band frequency. The use of the Star 48 B solid rocket motor for VOI reduced propulsion system cost and complexity. The design tradeoffs that led to the VRM spacecraft configuration and the performance capabilities of the spacecraft are summarized for each subsystem.

Gamber, T.↗

Investigations of the lower and middle atmosphere at the Arecibo Observatory and a description of the new VHF radar project

The atmospheric science research at the Arecibo Observatory is performed by means of (active) radar methods and (passive) optical methods. The active methods utilize the 430 NHz radar, the S-band radar on 2380 MHz, and a recently constructed Very High Frequency (VHF) radar. The passive methods include measurements of the mesopause temperature by observing the rotational emissions from OH-bands. The VHF radar design is discussed.

Rottger, J.↗

DSS 13 frequency stability tests performed during May 1985 through March 1986

Results of station frequency stability testing performed at DSS 13 (Deep Space Station) during May 1985 through March 1986 are presented. The testing was done on X-band uplink and X- and S-band downlink subsystems as well as on end-to-end systems. The subsystem test data are useful for assessing the frequency stability of various prototype X-band uplink or downlink subsystems for purposes of making design improvements. Information derived from extensive testing at DSS 13 will be useful in the preparation of an X-band Uplink Demonstration Experiment to be conducted at DSS 13, and will also be valuable in the preparations of gravity wave experiments to be conducted at other DSN stations in the future.

Otoshi, T. Y.↗

ICE navigation support

The International Cometary Explorer (ICE) encounter with Comet Giacobini-Zinner took place 7 years after the spacecraft's original launch on 12 August 1978 as the International Sun Earth Explorer 3 (ISEE-3), part of a three-spacecraft project to study the interaction between the solar wind and the Earth's magnetosphere. Transfer to an interplanetary trajectory was performed via a 119-km-altitute, gravity-assist, lunar swingby on December 1983. Navigation support during interplanetary cruise and comet encounter was provided by orbit determination utilizing radio metric data from the DSN 64-meter antennas in Goldstone, California and Madrid, Spain. Orbit solutions yielding predictions of 50-km geocentric delivery accuracy in the target aim plane were achieved during interplanetary cruise and at comet encounter using 6-to-12-week data arcs between periodic attitude-change maneuvers. One-sigma two-way range and range rate residuals were consistently 40 meters and 0.2 mm/s or better, respectively. Non-gravitational forces affected the comet's motion during late August and early September 1985 and caused a 2300-km shift in the orbit of the comet relative to the spacecraft. This necessitated a final ICE orbit trim maneuver 3 days prior to encounter. Near-real-time assessment of two-way 2-GHz (S-band) Doppler pseudo-residuals during the June and July 1985 trajectory change maneuvers aided in calibration of the spacecraft's thrusters in preparation for this final critical maneuver. Post-flight analysis indicates tail centerline passage was achieved within 10 seconds of the predicted time and geocentric position uncertainty at encounter was less than 40 km.

Efron, L.↗

Long-term amplitude and phase stability of the 400-kW 2.115-GHz transmitter

Results of recent measurements of the long-term phase, amplitude and group delay stability of the 400-kW S-band (2.115-GHz) transmitter are reported. Various control parameters which are responsible for many of the observed instabilities are identified. Further tests to identify the parameters responsible for the remaining instabilities are suggested.

Hoppe, D. J.↗

X-band uplink feedcone capabilities, components, and layout

Two new X-(7.2 GHz up, 8.4 GHz down) and S-band (2.1 to 2.3 Ghz) common aperture (XSC) feedcones are being added to the DSS 45 and DSS 65 34-Meter Efficiency Antennas. These new feedcones are modifications of the existing SXC feedcone design incorporating a new high power (20-kW) X-band transmitter. The modified Antenna Microwave Subsystem design also incorporates two additional X-band low noise amplifiers and greater phase stability performance to meet both the increased stability requirements for Galileo gravity wave experiments and requirements for spacecraft navigation near the Sun. A third XSC will be constructed for DSS 15 later.

Marlin, H.↗

Design and development of a telescopic axial boom

A special telescopic boom has been design-optimized, developed and qualified to carry an S-band antenna for the German Telecommunication Satellite is discussed. The design driver requirements, the alternatives investigated, the final technical solution, the tests performed, and special problem areas encountered during its development are discussed.

Felkai, Roland↗

Trajectory reconstruction and aerodynamic results from the first Discovery flight, STS-14(41-D)

Trajectory reconstruction results for the first Discovery flight are presented. Spacecraft dynamic measurements from IMU2 were utilized in conjunction with the ground based tracking data from two S-band stations, eight C-band, and five cameras at Edwards Air Force Base to determine the spacecraft trajectory from epoch through roll-out on Runway 17. Specifics as to the trajectory reconstruction are discussed in Section 1. The final inertial profile is BT14NO2/UN=169750N. Merging of this file with the final LAIRS atmosphere is discussed in Section 2. The final Extended BET is ST14BET/UN=274885C. Section 3 presents plots of relevant parameters from the AEROBET as well as aerodynamic performance comparison results. High frequency files for maneuver extraction were also generated as discussed in Section 4. Appendices are attached which contain: (1) spacecraft and physical parameters utilized, (2) final residuals obtained from the data fitting process, (3) listing of trajectory parameters, and (4) archival information.

Kelly, G. M.↗

Proposed upgrade of the Deep Space Network research and development station

Continued exploration of the solar system will require continued evolution of capabilities to support deep space communication and navigation. That evolution will rely, as it has in the past, on the development, demonstration, and field testing of communication and navigation technologies. The existing Deep Space Network (DSN) research and development station, DSS 13, at the Venus site, Goldstone, California was instrumental in those prior developments. However, the present antenna is no longer able to provide the necessary support for technology. The 26 meter antenna has good performance at S-band, fair performance at X-band, but is unusable at the anticipated Ka-band. It is not suitable for conversion to beam waveguides, and is not usable as a test bed for demonstrating high efficiency because of structural pliancy. Additionally, its size and age are increasingly a liability in demonstrations. A 34 meter beam waveguide version of the existing DSN high efficiency (HEF) antennas was proposed for FY-88 Construction of Facilities budget. The antenna is to be built at the Venus site, adjacent to the old antenna, and serve as the DSN research and development antenna through the end of the century.

Smith, Joel G.↗

Goldstone radar observations of Mars: The 1986 opposition

Radar echoes from the planet Mars were obtained on 27 S-band (wavelength = 12.5 cm) and 2 X-band (wavelength = 3.5 cm) tracks using the Goldstone Solar System Radar. These observations took advantage of the favorable 1986 opposition since the Earth-Mars distance was 0.40 AU at opposition and radar echo strength is proportional to inverse-fourth-power of the distance to the target. The coverages of the Goldstone observations are summarized. The observations were conducted via the CW-spectra techniques described by Harmon et al. A continuous tone was transmitted at Mars and the radar echo was sampled to obtain a Doppler spread spectrum. Each received event was separated into polarized (opposite sense circular) and depolarized (same sense circular) periods. There was one successful ranging run which had a resolution of 2 microseconds. This should yield surface heights accurate to 300 meters.

Thompson, T. W.↗

DSN 63 64-meter antenna S- and X-band efficiency and system noise temperature calibrations, July 1986

The Deep Space Network (DSN) 64-meter antenna in Spain (DSN 63) has been calibrated prior to its upgrading to a 70-meter high efficiency configuration in preparation for the Voyager Neptune encounter in August 1989. The S-band (2285 MHz) and X-band (8420 MHz) effective area efficiency and system noise temperature calibrations were carried out during July 1986 to establish a baseline system performance for this station. It is expected that the 70-meter will result in at least a 1.9 dB G/T improvement at X-band relative to the 64-meter baseline reference.

Slobin, S. D.↗

DSS 43 64-meter antenna S- and X-band efficiency and system noise temperature calibrations, January 1987

The Deep Space Network (DSN) 64-meter antenna in Australia has been calibrated prior to its upgrading to a 70-meter configuration in preparation for the Voyager Neptune encounter in August 1989. The S-band (2285 MHz) and X-band (8420 MHz) antenna area efficiency and system noise temperature calibrations were carried out during December 1986 and January 1987 to establish a baseline system performance for this station.

Slobin, S. D.↗

X-band uplink ground systems development: Part 2

The prototype X-band exciter testing has been completed. Stability and single-sideband phase noise measurements have been made on the X-band exciter signal (7.145-7.235 GHz) and on the coherent X- and S-band receiver test signals (8.4-8.5 GHz and 2.29-2.3 GHz) generated within the exciter equipment. Outputs are well within error budgets.

Johns, C. E.↗

The atmosphere of Uranus - Results of radio occultation measurements with Voyager 2

The Uranian atmosphere is investigated on the basis of S-band and X-band occultation observations (including measurements of Doppler frequency perturbations) obtained during the Voyager 2 encounter with Uranus in January 1986. The data are presented in extensive tables and graphs and characterized in detail. The atmosphere is assumed to have an H2/He abundance ratio of about 85/15, but also to contain small amounts of CH4 at above-cloud relative humidity 30 percent, cloud-base relative humidity 78 percent, and below-cloud mixing ratio 2.3 percent by number density. Other parameters estimated include magnetic-field rotation period 17.24 h, 1-bar equatorial radius 25,559 + or - 4 km, polar radius 24,973 + or - 20 km, equatorial acceleration of gravity 8.69 + or - 0.01 m/sec sq, and atmospheric temperature 76 + or - 2 K (assuming 85 + or - 3 percent H2).

Lindal, G. F.↗

Magellan Post Launch Mission Operation Report

Magellan was successfully launched by the Space Shuttle Atlantis from the Kennedy Space Center at 2:47 p.m. EDT on May 4, 1989. The Inertial Upper Stage (IUS) booster and attached Magellan Spacecraft were successfully deployed from Atlantis on Rev. 5 as planned, at 06:14 hrs Mission Elapsed Time (MET). The two IUS propulsion burns which began at 07:14 hrs MET and were completed at 07:22 hrs MET, placed the Magellan Spacecraft almost perfectly on its preplanned trajectory to Venus. The IUS was jettisoned at 07:40 hrs MET and Magellan telemetry was immediately acquired by the Deep Space Network (DSN). A spacecraft trajectory correction maneuver was performed on May 21 and the spacecraft is in the planned standard cruise configuration with all systems operating nominally. An initial attempt was made to launch Atlantis on April 28, 1989, but the launch was scrubbed at T-31 sec due to a failure of the liquid hydrogen recirculation pump on Space Shuttle Main Engine #1. The countdown had proceeded smoothly until T-20 min when the Magellan radio receiver "locked-on" the MIL 71 Unified S-Band (USB) transmission as the transmitter power was increased fro 2 kw to 10 kw in support of the orbiter launch. During the planned hold at T-9 min, the USB was confirmed as the source of the receiver "lock" and Magellan's launch readiness was reaffirmed. In addition a five-minute extension of the T-9 hold occurred when a range safety computer went off-line, creating a loss of redundancy in the range safety computer network. Following resumption of the countdown, both the orbiter and Magellan flows proceeded smoothly until the launch was scrubbed at T-31 sec.

Source record↗