Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “REFINERY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Cameco Corporation's Approach to Legacy and Ongoing Waste Management Within the Fuel Services Division - 19124

Since 2011, a Fuel Services Division (FSD) employee has been dedicated to oversee divisional waste management with the goal of accelerating the recycle/disposal of accumulated legacy radioactive wastes stored at its Ontario operations in Blind River and Port Hope. The Blind River Refinery (BRR) and Port Hope Conversion Facility (PHCF) were previously owned by the federal Crown Corporation, Eldorado Nuclear, becoming part of Cameco in 1988 and Cameco Fuel Manufacturing (CFM), previously known as Zircatec Precision Industries, becoming part of Cameco in 2006. Accumulated legacy radioactive waste is stored at each of the facilities. This radioactive waste has accumulated from operations beginning in the 1930's in Port Hope and the 1980's in Blind River. Due to minimal commercially available outlets for the disposal and/or treatment of these wastes, the waste was managed onsite by storage in underutilized space in buildings, trailers and/or in the secured yard. This relatively low-cost practice meant that over decades, the inventory increased at an unsustainable rate until available space became a limiting factor. During this time, the labelling, inventory records, characterization details and other history of many of the waste materials was not maintained adequately. Due to the volume of waste that had accumulated, campaigns to address these deficiencies in information were not considered feasible, sustaining the issue of accumulation of low-level radioactive waste. Since 2011, FSD has completed annual campaigns to address the accumulated legacy waste, which has included processing of material for decontamination to meet the unrestricted release criteria under the Canadian Nuclear Substance and Radiation Devices Regulations (NSRDR), disposal of marginally contaminated wastes (<500 ppm uranium) at a permitted landfill in the United States, processing of contaminated materials to reduce the volume of low-level radioactive waste and disposal at a designated facility in Port Hope. In addition FSD has undertaken significant changes to radioactive waste management practices at each of the facilities. Multiple characterization techniques, including visual observation, review of process and other historical records, laboratory analysis and radiation scanning have been utilized in campaign planning to identify the scope and appropriate waste management technique(s) to reduce the inventory of stored material. This divisional waste management program has resulted in a significant change to how radioactive waste is generated, inventoried, characterized and managed within FSD and has increased the visibility within the leadership team of the opportunities and challenges of waste management, such as alignment with decommissioning planning, project planning and budgeting. The heightened awareness has led to better financial and physical resource planning to execute waste projects with a current projected elimination of the legacy waste within FSD by 2025. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cameco Corporation's Vision in Motion Project - 19128

Cameco Corporation is a world leader in uranium production. Cameco is also a major supplier of uranium processing services required to produce fuel for the generation of clean energy. These operations are based in Blind River, Cobourg and Port Hope, Ontario and are collectively referred to as the Fuel Services Division. The Fuel Services Division produces uranium trioxide from uranium ore concentrate at the Blind River Refinery. Cameco produces uranium hexafluoride and uranium dioxide at the Port Hope Conversion Facility. Cameco operates a fuel manufacturing facility in Port Hope, Ontario and a metal fabrication facility located in Cobourg, Ontario. The company manufactures fuel bundles utilized in the Candu reactors. Cameco is undertaking a major site cleanup and renewal of its Port Hope Conversion Facility (PHCF) which is located in the Municipality of Port Hope (MPH). This undertaking is known as the Vision in Motion (VIM) project. This project is unique and timely opportunity that has been made possible because of the Port Hope Area Initiative (PHAI). The PHAI Port Hope project is being undertaken by Canadian Nuclear Laboratories (CNL) and includes the construction of a long-term waste management facility (LTWMF) in the MPH. VIM entails an extensive remediation and redevelopment of much of the PHCF and includes: - the cleanup and demolition of a number of old or underutilized buildings; - the removal of contaminated soils, building materials and stored wastes; and - modifications to existing buildings at the PHCF with associated landscaping and infrastructure. Overall, the VIM project will allow for environmental remediation, improved site operations, enhancement of site safety and security through site design and improved aesthetics. This paper will discuss the status of this project underway at the Port Hope Conversion Facility. After years of community consultation, planning, and a successful environmental assessment and licensing of the project, the VIM project at the PHCF is now underway. Physical transfer of waste materials began in June 2018. Cameco is committed to seeing the project through to completion and is working with CNL to ensure this happens within the operating time frame of the LTWMF. Cameco keeps the CNSC and MPH well informed of all project related activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Removal of Historic Low-Level Radioactive Waste from the Highland Drive South and Alexander Street Ravines - 19155

In Port Hope, the Highland Drive South Ravine (HDSR) is the discharge area for groundwater originating from the closed Highland Drive Landfill site. The presence of low-level radioactive waste (LLRW) in the HDSR is the result of a contaminated groundwater plume flowing from the landfill site. The contaminant plume contains elevated concentrations of uranium and arsenic and extends from the landfill south to discharge groundwater to shallow soils in a wet discharge area within the ravine. The groundwater discharges to Hunt's Ponds and Highland Drive South Creek, which are immediately downstream of the wet discharge area and will be included in the remediation design. Remediation and environmental management plans for HDSR have been developed within the framework of the Port Hope Project. Recent subsurface investigations have identified LLRW at greater depths than previously anticipated. Other investigations of surrounding properties have identified LLRW that is primarily from filling activities in backyards. The steep topography of the site and the presence of the creek and seepage face present remediation challenges. Also in Port Hope, the LLRW in the Alexander Street Ravine Area is the result of end dumping, filling of private backyards and stack deposition from the former refinery. The original site extent was focused on the deeper contamination due to end dumping and included a portion of Alexander Creek. However, recent investigations have confirmed other fill areas and the extent of stack deposition that are generally contiguous with the end dumping area. Restricted access to the site will result in all remediation in this area taking place via a single access point along the narrow existing Hayward Street. While both of these sites are ravines in Port Hope containing LLRW, the origins of contamination and remediation approaches are very different. This paper will compare these two challenging remediation sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Site Characterization and Adaptation - Lessons Learned from the Port Granby LLRW Project in Canada - 19255

The Port Hope Area Initiative (PHAI) is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the Town of Port Hope, Ontario. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in the Town of Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. The Port Granby Project is part of the broader PHAI being completed by Canadian Nuclear Laboratories (CNL). The scope of remediation activities at Port Granby includes: 1) constructing a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and 2) excavating and relocating LLRW and marginally contaminated soil from the Port Granby Waste Management Facility (PGWMF) to the newly constructed LTWMF. Remediation design required extensive site investigations of waste buried in unmarked and unlined trenches across the PGWMF area. Investigations included reviews of historical records, interviews with past staff of Eldorado and Atomic Energy Canada Limited (the entity managing the PHAI cleanup prior to CNL), radiological surveys, and the advancement of boreholes across the site to facilitate the physical sampling of soil and groundwater contaminants indicative of the presence of LLRW. This paper describes the challenges associated with characterizing and quantifying waste prior to remediation and lessons-learned to adjust procedural adaptations during the characterization phase of a project to better anticipate the unanticipated nature and growth of the contamination profile that often occurs during remediation. Despite substantial pre-remediation investigative efforts, current PGWMF remediation activities have resulted in growth of both the areal and vertical extent of contamination. The contamination profile was shown to be dramatically influenced by leaching of contaminants deeper into native soils. In addition, remedial excavation discovered specific waste types such as unidentified compressed gas cylinders outside of the location indicated by historical records, as well as a quantity of unknown liquids and unmarked drums. These discoveries have resulted in higher waste quantity estimates and have required a partial redesign of the LTWMF mound (a higher final elevation and steeper slopes) to accommodate the increased waste volume. In addition, the means and methods necessary to execute the remedial construction had to be modified to account for the new conceptual model developed from the new contamination data. Despite extensive historical review and site characterization to define the nature and extent of LLRW buried at the PGWMF, actual conditions encountered during remediation efforts necessitated taking an adaptive approach to both the design of the LTWMF and the means and methods used for excavation and transport of waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wastewater Treatment at the Fernald Preserve-Past, Present, and Future - 19555

Industrial wastewater treatment at the Fernald Preserve, Ohio, Site has been ongoing since a uranium metals refinery was constructed there at the beginning of the Cold War in 1951. Initially, the primary purpose of treatment was to recover uranium for reuse. Later, when cleanup of the site was progressing in the 1990's, wastewater treatment efforts greatly expanded. Large treatment facilities were constructed to handle contaminated surface water, groundwater, remediation wastewater, and leachate from the on-site disposal facility. These new facilities were designed to reduce uranium concentration to meet the US Environmental Protection Agency (EPA) drinking water standard and not generate large quantities of contaminated waste. Anion-exchange resin was chosen as the treatment media. The centerpiece of these facilities was the Advanced Wastewater Treatment facility, which had a treatment capacity of 10,978 liters per minute (lpm) (2900 gallons per minute [gpm]). Forecasts estimated that with the exception of groundwater the site's remediation would be completed in 2006. In 2003, the US Department of Energy (DOE) Office of Environmental Management began negotiations with the EPA and Ohio Environmental Protection Agency to reduce wastewater treatment capacity at the Fernald Environmental Management Project. These negotiations resulted in the site's treatment capacity being reduced to 6814 lpm (1800 gpm) via the Converted Advanced Wastewater Treatment facility (CAWWT). By 2010, the uranium concentration in the groundwater being pumped had been reduced to the degree that only intermittent treatment for uranium removal was needed. As a result, the CAWWT was considerably oversized. Increased maintenance on the aging CAWWT equipment led the DOE Office of Legacy Management (LM) to commission an assessment of the facility, which was completed in early 2015. The condition assessment identified numerous components at or near the end of their design life. Based on the assessment's findings and the fact that the current facility's treatment capacity was substantially greater than needed, LM began looking at options for an appropriately sized treatment system to handle the site's needs until the groundwater remediation was completed (currently projected for 2039). Options were evaluated in the spring of 2015, and LM presented the recommended changes to regulators and stakeholders. Approvals for a new, smaller system with a 189 lpm (50 gpm) capacity were obtained through a series of meetings in the summer of 2015. After more detailed planning in the fall of 2015, LM initiated the project in 2016. The project comprises the following four phases: (1) Removal and disposal of used media, piping, and tanks to make room for the new system in the existing building (completed in January 2017); (2) design of the new system (completed in April 2017); (3) construction, installation, and startup of the new system (completed in May 2018); and (4) backwash basin refurbishment (yet to be completed). In the late 2030's, when groundwater remediation is projected to be completed at the site, it is anticipated that the only remaining wastewater treatment need will be for small quantities of leachate from the on-site disposal facility. Results of leachate treatment testing in 2003 indicate it may be feasible to utilize a small passive treatment system for this leachate. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Rapid Sequential Separation Method for Determination of Actinides and TENORM in Fracking Wastes - 20223

With recent advances in unconventional drilling technology in the US and around the world, the risks of environmental contamination and exposure due to technologically enhanced naturally occurring radioactive materials (TENORM) from fracking wastes have also surfaced. Although the Permian Basin (southeastern New Mexico, western Texas) has long been a modest producer of oil, the advent of fracking technology a decade ago turned it into hot property for producers. A 2018 assessment of undiscovered, technically recoverable continuous oil and gas resources by the U.S. Geological Survey estimates an average 46.3 billion barrels of oil and 281 trillion cubic feet of gas. This is likely to increase the use of unconventional drilling and TENORM generation. TENORM concentrations in oil and gas exploration and production waste can be several hundred to several thousand times higher than background TENORM concentrations. Both the thorium and uranium decay chains contribute to airborne radionuclides arising from the radon gas escaping the ground and subsequently decaying as airborne particulates. Additionally, radon decay products {sup 210}Pb and {sup 210}Po can build up in scale on the internal surfaces of oil and gas handling pipes and in sludge in refineries, becoming potential inhalation and ingestion hazards for workers. Furthermore, southeastern NM is also home to world's only licensed and operating transuranic nuclear waste repository, the DoE's Waste Isolation Pilot Plant (WIPP). Plutonium isotopes ({sup 239+240}Pu) and {sup 241}Am, are expected to account for more than 99% of the total radioactivity scheduled for disposal in the WIPP repository. Thus, an improved understanding of the environmental fate and transport of TENORM, liberated by unconventional drilling, is essential to assess how best to protect individuals and the environment. In this context, accurate measurement of TENORM and actinides in environmental and biological samples is essential. In this presentation, a new sequential method for the separation and pre-concentration of actinides (Pu, Am, Np) and TENORM (Po, U and Th) derived from oil and gas exploration is proposed. The TEVA method involves a rapid co-precipitation step to remove matrix interferences from the samples, followed by plutonium oxidation state adjustment to Pu (IV) and an incubation period of ∼ 1 hour at 50-60 deg. C to allow the resultant Po (II) to oxidize into Po(IV). The polonium, neptunium, thorium and plutonium are then separated on a TEVA column, while americium and uranium are separated on a TRU column. After separation, the alpha counting source was prepared by micro-precipitation with copper sulfide (CuS) for polonium and neodymium fluoride (NdF{sub 3}) for actinides. The efficiency and reliability of the procedures were tested by analyzing filter, drinking water and frack sand samples. The method is simple, robust and can be performed quickly with excellent removal of interferences, high chemical recovery and very good alpha peak resolution. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Remediation of Temporary Storage Sites in Support of the Port Hope Area Initiative - 20295

The Port Hope Area Initiative is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the Town of Port Hope which is located in Ontario, Canada. The Eldorado refinery, on the north shore of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium. Through the history of the operation, LLRW was deposited throughout the town of Port Hope as a result of fugitive emissions from the plant and/or through the re-use of process residues as building material and backfill. Historical clean-up activities conducted in the late 1970's involved the remediation of approximately 400 properties and the relocation of 100,000 cubic metres of contaminated soil to a disposal facility in Chalk River operated by Atomic Energy of Canada Limited (AECL). Owing to space limitations at that disposal facility, any LLRW identified through construction monitoring since that time has been stored in the community at three temporary storage sites located throughout the town. These include: the Centre Pier mound that contained approximately of 19,800 m{sup 3} of LLRW-impacted soil that originated from the construction of a new water treatment plant; two mounds located at a licensed storage facility containing LLRW obtained from residential clean-up activities (11,000 m{sup 3}); and a small pad adjacent to the municipal sewage treatment plant containing 2200 m{sup 3} of LLRW-containing sludge. With the construction of a new long-term waste management facility (LTWMF) that has been designed to house all of the LLRW identified within Port Hope, the three sites were early candidates for remediation. The clean-up of the three temporary storage sites was a significant milestone for the Port Hope Area Initiative. After a decade of planning and consultation, this work represents the first sites in the municipality to be remediated with the waste being safety removed and transferred to the newly constructed LTWMF. This paper discusses the challenges associated with the clean-up activities for these three sites and the strategies employed to address those challenges. These included weather-related challenges, owing to the seasons over which the work was conducted as well as those associated with working within a closely-knit community. Canadian Nuclear Laboratories (CNL), working on behalf of the federal government, has worked diligently to develop a positive and trusting relationship with the community. Consequently, the successful execution of this project needed to be sensitive to, and respectful of the needs of the community. In addition to the usual Health, Safety and Environment training, project staff received community awareness training that spoke to the history of this community-based initiative and the expected behavior when working within the community. Transportation routes were defined based on safety and the need to minimize disruption to local traffic while haul-times where scheduled around school bus hours to enhance public safety. The successful completion of this first of many remediation projects to be completed under the Port Hope Area Initiative reflected years of careful planning. Nevertheless, there were a number of 'lessons learned' that have been applied on other ongoing projects be completed under the Port Hope Area Initiative. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Port Hope Areas Initiative's Port Granby Project: The Decontamination of Site Equipment from a Low Level Waste Facility - 20330

The Port Hope Area Initiative (PHAI) is the Government of Canada's response to the community recommended solutions for the remediation and safe, long-term management of historic low-level radioactive waste (LLRW) that was the result of uranium and radium processing operations in the Municipality of Port Hope, Ontario from the 1930's to the 1980's. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. The Port Granby Project involves the construction of a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and the excavation and relocation of approximately 1,200,000 m{sup 3} of historic low-level radioactive waste and marginally contaminated soil from the PGWMF to the newly constructed LTWMF. Since the project's inception in 2016, the bulk of the material has since been moved to the final long term storage cell. This has taken over 500,000 person-hours and a large amount of one site heavy equipment to accomplish including excavators, bulldozers, rock trucks, baker tanks and vacuum trucks. While many of the pieces of heavy equipment and water management equipment has further work to do on site, several of the sites larger items have already undergone the decontamination process prior to release from the site. This process has posed a serious challenge as the waste has a caustic nature to it and over the last few years it has had time to work its way into the metallic structures and framework of the equipment. Coupled with the tight work spaces and in some cases confined work areas there have been many issues that needed to be addressed to successfully reach a state where items can be free released to the unrestricted limits of the sites license. This ongoing process has led to a more refined decontamination program at the Port Granby Facility and has had a rather high success rate considering the length of time the equipment has been exposed to the waste materials on site. This paper discusses the varied challenges of decontamination faced at a low-level radioactive waste facility with a focus on the following aspects: - Challenges faced regarding different equipment types and the solutions implemented by Wood to address these challenges; - An examination of various decontamination methods employed throughout the project; and - Lessons learned over three years of remediation work and how they impact the decontamination process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The process heat applications of HTGR in petroleum refining industry: adaptability and economy - 18425

High Temperature Gas Cooled Reactor (HTGR) is considered as a kind of potential heat producer for industry. Since the industrial heat utilization takes 60% of heat supply in China, the process heat of HTGR is more suitable for industrial manufacturing as high temperature heat source. In this article, the adaptabilities of HTGR for heat supply to petroleum refining industry are analyzed and it is found that the joint of process heat of HTGR and chemical industry is most predictable in the near future. For case study, technical and economic analysis of process heat-supply proposal in a typical refinery in China is finished and it is shown that though there is some technical and conceptual challenge, the application of process heat of HTGR in petroleum refining industry is feasible and competitive in economics. (authors)

02 PETROLEUM↗

Control systems for a dynamic multi-physics model of a Nuclear Hybrid Energy System - 198

A Nuclear Hybrid Energy System (NHES) uses a nuclear reactor as the basic power generation unit, and the power generated is used by multiple customers as combinations of thermal power or electrical power. The definition and architecture of a particular NHES can be adapted based on the needs and opportunities of different localities and markets. For example, locations in need of potable water may be best served by coupling a desalination plant to the NHES. Similarly, a location near oil refineries may have a need for emission-free hydrogen production. Using the flexible, multi-domain capabilities of Modelica, Argonne National Laboratory, Idaho National Laboratory, and Oak Ridge National Laboratory are investigating the dynamics (e.g., thermal hydraulics and electrical generation/consumption) and cost of a hybrid system. This paper examines the NHES work underway, emphasizing the control system developed for individual subsystems and the overall supervisory control system. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Using Conductive Firebrick Resistance Heating to Enable Very High-Temperature Heat Storage in Nuclear Gas Turbine Systems

In order to economically deploy renewable energy on large scales, affordable energy storage is a must. While the cost of current work storage technologies are too high to deploy in quantities that satisfy renewable energy deployment, heat storage options hold promise for dramatically cheaper storage, which can be used to (1) couple with industrial furnaces or refineries to provide high temperature heat to industry, or (2) couple with air-Brayton cycles to add heat for electricity production. The design space and preliminary performance evaluation for an affordable heat storage concept, called Firebrick Resistance-heated Energy Storage (FIRES), has shown promise for near-term deployment in industrial processes by using readily available materials: metallic resistance heaters for converting electricity to stored heat, and common ceramic firebricks used in furnaces for storing heat at temperatures as high as 1200 deg. C. There however remains serious interest in replacing traditional resistance heaters with electrically conductive firebricks that may serve as both the heating element and the storage medium. The work underway is the experimental development of a high-temperature low-cost electric resistance heater system using conductive firebrick, with the aims of (1) proving that conductive firebrick can be used to replace separate electrical heating system to reduce costs, increase operating temperatures, and increase reliability, and (2) developing methodology to enable design and prediction of performance of such systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Nuclear-Driven Chemical Conversion Pathways

The purpose of this work is to explore the possibilities of using coal as a carbon resource by converting it to fuels and chemicals with heat from a nuclear power plant. While many previous studies have focused on coal gasification, this process requires combusting a portion of the coal and producing heat. By employing pyrolysis over gasification, the energy content in the coal can be preserved. Pyrolysis of coal also results in a large portion of solid char, which can be converted to activated carbon and sold to various markets. This model uses hydrogen produced by nuclear-supplied heat and electricity to convert the syngas stream to methanol, which has many pathways for further processing into fuels, chemicals, and plastics. Specifically, this project focuses on non-fuel products for methanol pathways. The CO2 captured within the refinery model can also be combined with hydrogen to produce more chemical products and reduce CO2 emissions.

01 COAL, LIGNITE, AND PEAT↗

Towards Net-Zero: Nuclear-Assisted Waste Biomass to Liquid Fuel in Eastern Idaho

A nuclear assisted carbon negative hybrid energy process that enables production of synthetic bio-crude oil and biochar from Eastern Idaho waste biomass is proposed. The process integrates nuclear powered electricity with high temperature steam electrolysis and biomass hydropyrolysis. The bio-crude oil is of sufficient composition and blended with traditional crude oil at a refinery. Hydrogen from the electrolyzer is pressurized and inserted into the pyrolyzer. Non condensable gases generated in the hydropyrolysis process are burned with oxygen from the electrolyzer to produce heat for the electrolyzer, biomass dryer, and pyrolyzer. The biochar is returned to the soil via fertilizer application and remains there for thousands of years. Since the total process uses nuclear generated electricity, the carbon in the biochar is ultimately sequestered from the atmosphere, thus making the process carbon negative. Using Eastern Idaho wheat or barley straw, this hybrid energy process has the potential to provide an alternative petroleum source. Two options exist for the system design: 1) send electricity from the nuclear plant and straw to a chemical processing plant to produce the bio-crude and biochar, 2) construct the biomass processing facility near the nuclear plant to allow use of nuclear-generated process heat to drive the chemical. Process model description and results are discussed. The process is sized to produce gasoline and diesel at the rate that the INL uses every day for fleet usage.

09 BIOMASS FUELS↗

Review of Hazards and Accidentology of an Integrated Energy Systems to Nuclear Power Plant Safety

With the interconnectivity of industrial processes in a nuclear integrated energy system (IES) the primary issue becomes the safety of the nuclear power plant (NPP). The industrial processes being supported are assumed to have been in colocation prior to the addition of an NPP. Do the hazards from each process reach beyond the perimeter of the plant to affect the NPP? This paper reviews hazards and accident statistics from processes in an IES as a first step to answer this question. Hazards and accidentology discussed cover hydrogen, ammonia, syngas, methanol, synthetic fuels, and oil refineries. They include mainly fire, explosion, and toxicity in varying degrees. Historical accident statistics are given whenever available, and accident causes are evaluated and ranked based on their frequencies. Lessons learned from previous accidents are presented. Future work will focus on utilizing the data collected for accidentology of the industrial processes to perform Failure Modes and Effects Analysis and analyze the impacts of additional hazards on the colocated existing nuclear power plant or newly built advanced nuclear reactor. The analysis will provide the frequency and consequence of external events that can affect the NPP.

08 - HYDROGEN↗

Tests gauge LED sensors for fuel-dye measurements

The goal of this work was to develop a low cost, robust sensor to allow direct measurement of Solvent Red 164 dye concentration in off-road fuel at refineries and fuel terminals. Optical absorption sensors based on light emitting diodes (LEDs) are rugged, low-cost, have low power consumption, and can be designed to be intrinsically safe.LED-based systems have been used in a variety of chemical detection applications including heavy metals, pH, CO2, and O2. The approach for this work was to develop a sensor that could be mounted on a pipeline sight glass, precluding the need for direct contact of the sensor with the fuel. Below is described the design and testing of three different LED/photodiode sensors utilizing reflectance spectrometry for the measurement of dye concentration.

02 PETROLEUM↗