Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Buy versus build: a survey of state policies

Integrated resource planning has reemerged as the primary means through which new generation will be developed in much of the U.S. Where this is the case, regulators will need to address the manner and extent to which independent power producers are allowed to compete to supply a utility's incremental resource needs. This article reports the results of a survey of state policies with respect to competitive procurement. (author)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The enduring role of contracts for difference in risk management and market creation for renewables

Governments procure renewables through a variety of mechanisms. Contracts for difference (CfDs) have been used for more than 50% of the global offshore wind supply. The payments awarded through CfDs are sometimes labelled subsidies, suggesting that they support uneconomic activity. Here, in this study, we argue that the primary role of CfDs is rather risk management by creating a market for electricity supply at stable long-term prices. Similar to its use in other sectors of the economy, this contract type transforms a variable to a fixed price to reallocate volatility risks. Such long-term contracts are often necessary for renewables financing due to limited hedging options in existing markets. Our perspective could imply a shift in perception towards CfDs as a fundamental and lasting market feature. We hope to stimulate a timely discussion about the impact of greater CfD diffusion on electricity market mechanisms, risk allocation and the potential for combining fragmented streams of energy finance, market and policy research.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ITER Construction--Plant System Integration

This brief paper introduces how the ITER will be built in the international collaboration. The ITER Organization plays a central role in constructing ITER and leading it into operation. Since most of the ITER components are to be provided in-kind from the member countries, integral project management should be scoped in advance of real work. Those include design, procurement, system assembly, testing, licensing and commissioning of ITER.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

The ESIF-HPC-2 Benchmark Suite

We describe the development of the ESIF-HPC-2 benchmark suite, a collection of kernel and application benchmark codes for measuring computational and I/O performance from single nodes to full HPC systems that was used for acceptance testing in our recent HPC procurement. The configurations of the benchmarks used for our system is presented. We also describe a set of "dimensions" that can be used to classify benchmarks and assess coverage of a suite systematically. The collection is offered cost-free as a GitHub repository for general usage and further development.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Development of New Transportation/Storage Cask System for Use by DOE Russian Research Reactor Fuel Return Program

The United States, the Russian Federation, and the International Atomic Energy Agency (IAEA) have been working together on a program called the Russian Research Reactor Fuel Return (RRRFR) Program. The purpose of this program is to return Soviet or Russian supplied high-enriched uranium (HEU) fuel currently stored at Russian-designed research reactors throughout the world to Russia. To accommodate transport of the HEU spent nuclear fuel (SNF), a new large-capacity transport/storage cask system was specially designed for handling and operations under the unique conditions for these research reactor facilities. This new cask system is named the ŠKODA VPVR/M cask. The design, licensing, testing, and delivery of this new cask system are the results of a significant international cooperative effort by several countries and involved numerous private and governmental organizations. This paper contains the following sections: (1) Introduction/Background; (2) VPVR/M Cask Description; (3) Ancillary Equipment, (4) Cask Licensing; (5) Cask Demonstration and Operations; (6) IAEA Procurement, Quality Assurance Inspections, Fabrication, and Delivery; and, (7) Summary and Conclusions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Office of the Chief Financial Officer Annual Report 2010

In March, a review team consisting of CFOs from other national laboratories, industry, and members of the University of California Office of the President (UCOP) convened for three days to conduct a comprehensive peer review of the OCFO. This was the first time in almost a decade that the financial operations of the Laboratory had been reviewed. The Committee relayed their observations on our strengths, and their very thoughtful recommendations for improvement, which we are actively pursuing. These improvements, when implemented, will benefit the entire Laboratory for many years to come. The complete report is available on the OCFO website (www.lbl.gov/Workplace/CFO). In August, the senior management team of the OCFO participated in a strategic planning retreat. The purpose of the two and a half day exercise was, of course, to update our strategic plan, but instead of spending days developing a written document, we enlisted the expertise of a seasoned journalist who also happens to be a very talented graphic artist. He listened carefully to our ideas and committed them to a visual roadmap. All members of the OCFO, Business Managers, and the Laboratory Leadership Team reviewed this draft roadmap. By having a completely visual strategic plan that is posted widely throughout the OCFO, all employees can easily see and identify with the goals that we are all working towards. FY2010 was an extraordinary year. The Laboratory welcomed its seventh Director, Dr. Paul Alivisatos, who wasted no time communicating his vision and priorities for Berkeley Lab. They include five very ambitious initiatives: Carbon Cycle 2.0, The Next Generation Light Source, a Safe and Efficient Lab, Building Community, and Space. In response, the Office of the Chief Financial Officer (OCFO) developed twelve specific initiatives that align completely with these five priorities. We will be very focused on these in the coming fiscal year, but for now, let's review what happened in FY2010. FY2010 was a pivotal year for the Procurement and Property Department. A provision of the management contract that was signed fives years ago required us to achieve cost savings of $30M. I am proud to announce that this last fiscal year we reached that goal, in large part due to the implementation of eBuy, and the negotiation of strategic sourcing contracts. Our last wall-to-wall inventory exceeded all the Department of Energy's (DOE) national targets and DOE approved the LBNL property system unconditionally. Of the total inventory, 92.3% or 25,601 assets were accounted for using barcode scanning that made the inventory process much more efficient. The effective management of the American Recovery and Reinvestment Act (ARRA) funds was strengthened by the continued successful partnership that LBNL shares with our DOE Site Office. They provided authority, support and clarity to this very complex task. The Laboratory's ARRA Stimulus Committee played a critical role in assuring internal controls, compliance with DOE regulations and quality financial management. The LBNL Budget Officer led a DOE complex-wide effort to identify and share how various DOE facilities track and report ARRA-funded projects, share best practices, evaluate issues and discuss solutions. LBNL has been recognized as a leader in this process and will continue to share knowledge and best practices with other DOE laboratories. Continuous education of our staff as well as the greater Laboratory population was still a major focus of the OCFO. With the help of many OCFO senior managers and staff that acted as subject-matter experts, the Core Financial Management Program was completely re-engineered and resulted in a revised classroom and web-based curriculum that will be formally rolled out Lab-wide in early FY2011. The Office of Sponsored Projects and Industry Partnerships (OSPIP) led the effort to select and purchase four Click Commerce software modules for the LBNL electronic Scientific Research Administration (eSRA) project. In early FY2010, the implementation of the Institutional Review Board (IRB) module, responsible for the human subjects review process, began and should be completed in early FY2011. OSPIP also began implementation of the grants and contracts module and we expect an early go-live of 'Grants Express' in mid-FY2011 with a full completion date in FY2012. The peer review's most substantial recommendation for improvement involved the Laboratory's central financial systems. To quote: 'financial reporting system is outdated and inadequate. There is an inability to easily extract data; the field has little confidence in data; people spend more time mining data than analyzing data; requires field users to create & rely upon shadow systems; causes proliferation of program administrators and resource analysts. These issues impact the quality & execution of research; and the data warehouse lacks understanding & ownership.'

99 GENERAL AND MISCELLANEOUS↗

Installation and Testing of a Jorin Visual Process Analyzer

The Jorin Visual Process Analyzer (ViPA) is an on-line instrument that uses video microscope imaging to detect and measure the physical characteristics of dispersed objects within a process stream or laboratory sample. Object analysis is performed by capturing an on-going sequence of single frames from the video feed and relaying the images in real time to a nearby control computer where the ViPA software then processes and transfigures the information from the images into meaningful process data. The ViPA captures and analyzes approximately 15 images per second and continuously records 17 material parameters including size, shape and optical density. The ViPA software uses the measured parameters to differentiate between different classes of objects including organic droplets, gas bubbles, and solid particles. Procurement of this instrument provides a unique capability to support predictive modeling and further understanding of mass transfer during solvent extraction processes. Organic droplet data collected using the ViPA can be used to develop dispersion profiles of the liquid-liquid mixing and disengagements sections for each type of process equipment. These profiles will provide insight into mixing dynamics and will guide the prevention of emulsion formation that leads to system losses. Additionally, the measurement capabilities of the ViPA will provide the input needed to create new two-phase Computational Fluid Dynamics (CFD) models that characterize both mixing and separation operations in the various types of equipment. These models can then be used to improve process efficiency by optimizing operation parameters for each proposed extraction cycle.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Results of Aging Tests of Vendor-Produced Blended Feed Simulant

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is procuring through Pacific Northwest National Laboratory (PNNL) a minimum of five 3,500 gallon batches of waste simulant for Phase 1 testing in the Pretreatment Engineering Platform (PEP). To make sure that the quality of the simulant is acceptable, the production method was scaled up starting from laboratory-prepared simulant through 15-gallon vendor prepared simulant and 250-gallon vendor prepared simulant before embarking on the production of the 3500-gallon simulant batch by the vendor. The 3500-gallon PEP simulant batches were packaged in 250-gallon high molecular weight polyethylene totes at NOAH Technologies. The simulant was stored in an environmentally controlled environment at NOAH Technologies within their warehouse before blending or shipping. For the 15-gallon, 250-gallon, and 3500-gallon batch 0, the simulant was shipped in ambient temperature trucks with shipment requiring nominally 3 days. The 3500-gallon batch 1 traveled in a 70-75°F temperature controlled truck. Typically the simulant was uploaded in a PEP receiving tank within 24-hours of receipt. The first uploading required longer with it stored outside. Physical and chemical characterization of the 250-gallon batch was necessary to determine the effect of aging on the simulant in transit from the vendor and in storage before its use in the PEP. Therefore, aging tests were conducted on the 250-gallon batch of the vendor-produced PEP blended feed simulant to identify and determine any changes to the physical characteristics of the simulant when in storage. The supernate was also chemically characterized. Four aging scenarios for the vendor-produced blended simulant were studied: 1) stored outside in a 250-gallon tote, 2) stored inside in a gallon plastic bottle, 3) stored inside in a well mixed 5-L tank, and 4) subject to extended temperature cycling under summer temperature conditions in a gallon plastic bottle. The following series of aging tests were conducted to accomplish these objectives.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sandia National Laboratories, California Pollution Prevention Program annual report.

The annual program report provides detailed information about all aspects of the SNL/CA Pollution Prevention Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Pollution Prevention Program, one of six programs that supports environmental management at SNL/CA. Pollution Prevention supports the goals and objectives to increase the procurement and use of environmentally friendly products and materials and minimize the generation of waste (nonhazardous, hazardous, radiological, wastewater). Through participation on the Interdisciplinary Team P2 provides guidance for integration of environmentally friendly purchasing and waste minimization requirements into projects during the planning phase. Table 7 presents SNL's corporate objectives and targets that support the elements of the Pollution Prevention program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Drilling and Production Testing the Methane Hydrate Resource Potential Associated with the Barrow Gas Fields

In November of 2008, the Department of Energy (DOE) and the North Slope Borough (NSB) committed funding to develop a drilling plan to test the presence of hydrates in the producing formation of at least one of the Barrow Gas Fields, and to develop a production surveillance plan to monitor the behavior of hydrates as dissociation occurs. This drilling and surveillance plan was supported by earlier studies in Phase 1 of the project, including hydrate stability zone modeling, material balance modeling, and full-field history-matched reservoir simulation, all of which support the presence of methane hydrate in association with the Barrow Gas Fields. This Phase 2 of the project, conducted over the past twelve months focused on selecting an optimal location for a hydrate test well; design of a logistics, drilling, completion and testing plan; and estimating costs for the activities. As originally proposed, the project was anticipated to benefit from industry activity in northwest Alaska, with opportunities to share equipment, personnel, services and mobilization and demobilization costs with one of the then-active exploration operators. The activity level dropped off, and this benefit evaporated, although plans for drilling of development wells in the BGF's matured, offering significant synergies and cost savings over a remote stand-alone drilling project. An optimal well location was chosen at the East Barrow No.18 well pad, and a vertical pilot/monitoring well and horizontal production test/surveillance well were engineered for drilling from this location. Both wells were designed with Distributed Temperature Survey (DTS) apparatus for monitoring of the hydrate-free gas interface. Once project scope was developed, a procurement process was implemented to engage the necessary service and equipment providers, and finalize project cost estimates. Based on cost proposals from vendors, total project estimated cost is $17.88 million dollars, inclusive of design work, permitting, barging, ice road/pad construction, drilling, completion, tie-in, long-term production testing and surveillance, data analysis and technology transfer. The PRA project team and North Slope have recommended moving forward to the execution phase of this project.

03 NATURAL GAS↗

DEGRADATION EVALUATION OF HEAVY WATER DRUMS AND TANKS

Heavy water with varying chemistries is currently being stored in over 6700 drums in L- and K-areas and in seven tanks in L-, K-, and C-areas. A detailed evaluation of the potential degradation of the drums and tanks, specific to their design and service conditions, has been performed to support the demonstration of their integrity throughout the desired storage period. The 55-gallon drums are of several designs with Type 304 stainless steel as the material of construction. The tanks have capacities ranging from 8000 to 45600 gallons and are made of Type 304 stainless steel. The drums and tanks were designed and fabricated to national regulations, codes and standards per procurement specifications for the Savannah River Site. The drums have had approximately 25 leakage failures over their 50+ years of use with the last drum failure occurring in 2003. The tanks have experienced no leaks to date. The failures in the drums have occurred principally near the bottom weld, which attaches the bottom to the drum sidewall. Failures have occurred by pitting, crevice and stress corrosion cracking and are attributable, in part, to the presence of chloride ions in the heavy water. Probable degradation mechanisms for the continued storage of heavy water were evaluated that could lead to future failures in the drum or tanks. This evaluation will be used to support establishment of an inspection plan which will include susceptible locations, methods, and frequencies for the drums and tanks to avoid future leakage failures.

36 MATERIALS SCIENCE↗

Quality Assurance Protocol for AFCI Advanced Structural Materials Testing

The objective of this letter is to inform you of recent progress on the development of advanced structural materials in support of advanced fast reactors and AFCI. As you know, the alloy development effort has been initiated in recent months with the procurement of adequate quantities of the NF616 and HT-UPS alloys. As the test alloys become available in the coming days, mechanical testing, evaluation of optimizing treatments, and screening of environmental effects will be possible at a larger scale. It is therefore important to establish proper quality assurance protocols for this testing effort in a timely manner to ensure high technical quality throughout testing. A properly implemented quality assurance effort will also enable preliminary data taken in this effort to be qualified as NQA-1 during any subsequent licensing discussions for an advanced design or actual prototype. The objective of this report is to describe the quality assurance protocols that will be used for this effort. An essential first step in evaluating quality protocols is assessing the end use of the data. Currently, the advanced structural materials effort is part of a long-range, basic research and development effort and not, as yet, involved in licensing discussions for a specific reactor design. After consultation with Mark Vance (an ORNL QA expert) and based on the recently-issued AFCI QA requirements, the application of NQA-1 quality requirements will follow the guidance provided in Part IV, Subpart 4.2 of the NQA-1 standard (Guidance on Graded Application of QA for Nuclear-Related Research and Development). This guidance mandates the application of sound scientific methodology and a robust peer review process in all phases, allowing for the data to be qualified for use even if the programmatic mission changes to include licensing discussions of a specific design or prototype. ORNL has previously implemented a QA program dedicated to GNEP activities and based on an appropriately graded application of NQA-1 requirements at the site. The current program is being revised to incorporate changes imposed through the recently revised AFCI Technical Integration Office QA requirements. Testing conducted under the AFCI QA program for the advanced structural materials effort shall incorporate the following quality assurance expectations: (1) personnel are adequately trained to perform assigned work; (2) activities are controlled to ensure consistency of results; (3) records necessary to substantiate how the work was performed are maintained (dedicated laboratory notebooks will be used); (4) the pedigree and traceability of the various tested materials are maintained throughout the described processes using consistent sample numbering and adequate record keeping; (5) equipment with the potential to affect the quality of the planned work is calibrated and maintained in accordance with applicable operating requirements. In addition, all reporting or related dissemination by ORNL personnel of the results of the work described in this subcontract shall be conducted in accordance with the requirements described or referenced in the ORNL Standards Based Management System subject area entitled Scientific and Technical Information. Reporting or publications at other institutions will be conducted in accordance with the requirements of that institution. Successful implementation of these protocols will provide a sound basis for future decisions and research. In addition, these steps will also help ensure that results can also be applied to licensing discussions at a future date.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Utility-Scale Parabolic Trough Solar Systems: Performance Acceptance Test Guidelines, April 2009 - December 2010

Prior to commercial operation, large solar systems in utility-size power plants need to pass a performance acceptance test conducted by the engineering, procurement, and construction (EPC) contractor or owners. In lieu of the present absence of ASME or other international test codes developed for this purpose, the National Renewable Energy Laboratory has undertaken the development of interimguidelines to provide recommendations for test procedures that can yield results of a high level of accuracy consistent with good engineering knowledge and practice. The Guidelines contained here are specifically written for parabolic trough collector systems with a heat-transport system using a high-temperature synthetic oil, but the basic principles are relevant to other CSP systems.

14 SOLAR ENERGY↗

Covered Product Categories (Fact Sheet)

Overview of the U.S. Department of Energy Federal Energy Management Program Energy-Efficient Product Procurement Program and its designated product category list.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Improved Performance of an Air Cooled Condenser (ACC) Using SPX Wind Guide Technology at Coal-Based Thermoelectric Power Plants

This project added a new airflow enhancement technology to an existing ACC cooling process at a selected coal power plant. Airflow parameters and efficiency improvement for the main plant cooling process using the applied technology were determined and compared with the capabilities of existing systems. The project required significant planning and pre-test execution in order to reach the required Air Cooled Condenser system configuration for evaluation. A host Power Plant ACC system had to be identified, agreement finalized, and addition of the SPX ACC Wind Guide Technology completed on that site. Design of the modification, along with procurement, fabrication, instrumentation, and installation of the new airflow enhancement technology were executed. Baseline and post-modification cooling system data was collected and evaluated. The improvement of ACC thermal performance after SPX wind guide installation was clear. Testing of the improvement indicates there is a 5% improvement in heat transfer coefficient in high wind conditions and 1% improvement at low wind speed. The benefit increased with increasing wind speed. This project was completed on schedule and within budget.

01 COAL, LIGNITE, AND PEAT↗

Noise Performance Evaluation of the Candidate Digitizers for the MAJORANA DEMONSTRATOR

The noise performance evaluation of the two digitizer cards being considered for the MAJORANA DEMONSTRATOR (MJD) is presented in this document. The procurement of the data acquisition electronics for the MJD is scheduled to happen this year. At the time of writing this document, there are two candidate digitizer electronic boards. One aspect that is being considered by the collaboration is the feasibility of using the MJD for dark matter searches. The feasibility of using the MJD for this application is going to be dictated by the ability of the demonstrator to reach sub-keV energy resolution. One of the potential sources of noise in the MJD is the data acquisition system. This document will is concluded with a recommendation for the final digitizer board by comparing the noise performance of the two electronics systems. Noise parameters such as the effective number of bits, input range linearity and signal to noise ratio are experimentally determined. The two digitizer cards feature different on-board digital signal processing and these features are compared. The experimental set-up was also used to identify sources of noise. This paper describes these sources of noise in the data acquisition system, along with mitigation strategies. Issues such as grounding and wiring scheme have an impact in the overall data acquisition system performance and are discussed in detail. As a conclusion, the suitability of each one of the cards to become the back bone of the data acquisition system of the MJD is discussed.

99 GENERAL AND MISCELLANEOUS↗

Solar-Assisted Electric Vehicle Charging Station Interim Report

Oak Ridge National Laboratory (ORNL) has been awarded $6.8 million in the Department of Energy (DOE) American Recovery and Reinvestment Act (ARRA) funds as part of an overall $114.8 million ECOtality grant with matching funds from regional partners to install 125 solar-assisted Electric Vehicle (EV) charging stations across Knoxville, Nashville, Chattanooga, and Memphis. Significant progress has been made toward completing the scope with the installation of 25 solar-assisted charging stations at ORNL; six stations at Electric Power Research Institute (EPRI); and 27 stations at Nissan's Smyrna and Franklin sites, with three more stations under construction at Nissan's new lithium-ion battery plant. Additionally, the procurement process for contracting the installation of 34 stations at Knoxville, the University of Tennessee Knoxville (UTK), and Nashville sites is underway with completion of installation scheduled for early 2012. Progress is also being made on finalizing sites and beginning installations of 30 stations in Nashville, Chattanooga, and Memphis by EPRI and Tennessee Valley Authority (TVA). The solar-assisted EV charging station project has made great strides in fiscal year 2011. A total of 58 solar-assisted EV parking spaces have been commissioned in East and Middle Tennessee, and progress on installing the remaining 67 spaces is well underway. The contract for the 34 stations planned for Knoxville, UTK, and Nashville should be underway in October with completion scheduled for the end of March 2012; the remaining three Nissan stations are under construction and scheduled to be complete in November; and the EPRI/TVA stations for Chattanooga, Vanderbilt, and Memphis are underway and should be complete by the end of March 2012. As additional Nissan LEAFs are being delivered, usage of the charging stations has increased substantially. The project is on course to complete all 125 solar-assisted EV charging stations in time to collect meaningful data by the end of government fiscal year 2012. Lessons learned from the sites completed thus far are being incorporated and are proving to be invaluable in completion of the remaining sites.

14 SOLAR ENERGY↗