Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Power distribution systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Solar Power Satellite (SPS) fiber optic link assessment

A feasibility demonstration of a 980 MHz fiber optic link for the Solar Power Satellite (SPS) phase reference distribution system was accomplished. A dual fiber-optic link suitable for a phase distribution frequency of 980 MHz was built and tested. The major link components include single mode injection laser diodes, avalanche photodiodes, and multimode high bandwidth fibers. Signal throughput was demonstrated to be stable and of high quality in all cases. For a typical SPS link length of 200 meters, the transmitted phase at 980 MHz varies approximately 2.5 degrees for every deg C of fiber temperature change. This rate is acceptable because of the link length compensation feature of the phase control design.

Source record↗

Automatic Monitoring Of Complicated Systems

Collection of computer programs developed for expert computer system performing complicated, tedious, and repetitive portions of analysis of telemetry data from spacecraft. Provides nonstop, accurate surveillance of incoming data, also frees operators to concentrate their expertise on unexpected abnormal operating conditions. When unable to explain discrepancies with certainty resulting from data out of synchronization or other falso-alarm conditions, triggers alarm devices to request assistance from designated individuals. Concept useful in such terrestrial systems as production lines, power-distribution networks, chemical processes, large airplanes, and other assemblies of interdependent equipment.

Schwuttke, Ursula M.↗

Independent Orbiter Assessment (IOA): Assessment of the orbital maneuvering system FMEA/CIL, volume 1

The results of the Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL) are presented. The IOA effort first completed an analysis of the Orbital Maneuvering System (OMS) hardware and Electrical Power Distribution and Control (EPD and C), generating draft failure modes and potential critical items. To preserve independence, this analysis was accomplished without reliance upon the results contained within the NASA FMEA/CIL documentation. The IOA results were then compared to the proposed Post 51-L NASA FMEA/CIL baseline. This report documents the results of that comparison for the Orbiter OMS hardware. The IOA analysis defined the OMS as being comprised of the following subsystems: helium pressurization, propellant storage and distribution, Orbital Maneuvering Engine, and EPD and C. The IOA product for the OMS analysis consisted of 284 hardware and 667 EPD and C failure mode worksheets that resulted in 160 hardware and 216 EPD and C potential critical items (PCIs) being identified. A comparison was made of the IOA product to the NASA FMEA/CIL baseline which consisted of 101 hardware and 142 EPD and C CIL items.

Prust, Chet D.↗

Advanced Electrical Materials and Components Development: An Update

The primary means to develop advanced electrical components is to develop new and improved materials for magnetic components (transformers, inductors, etc.), capacitors, and semiconductor switches and diodes. This paper will give an update of the Advanced Power Electronics and Components Technology being developed by the NASA Glenn Research Center for use in future Power Management and Distribution subsystems used in space power systems for spacecraft and lunar and planetary surface power. The initial description and status of this technology program was presented two years ago at the First International Energy Conversion Engineering Conference held at Portsmouth, Virginia, August 2003. The present paper will give a brief background of the previous work reported and a summary of research performed the past several years on soft magnetic materials characterization, dielectric materials and capacitor developments, high quality silicon carbide atomically smooth substrates, and SiC static and dynamic device characterization under elevated temperature conditions. The rationale for and the benefits of developing advanced electrical materials and components for the PMAD subsystem and also for the total power system will also be briefly discussed.

Schwarze, Gene E.↗

Computational Analysis of Powered Lift Augmentation for the LEAPTech Distributed Electric Propulsion Wing

A computational study of a distributed electric propulsion wing with a 40deg flap deflection has been completed using FUN3D. Two lift-augmentation power conditions were compared with the power-off configuration on the high-lift wing (40deg flap) at a 73 mph freestream flow and for a range of angles of attack from -5 degrees to 14 degrees. The computational study also included investigating the benefit of corotating versus counter-rotating propeller spin direction to powered-lift performance. The results indicate a large benefit in lift coefficient, over the entire range of angle of attack studied, by using corotating propellers that all spin counter to the wingtip vortex. For the landing condition, 73 mph, the unpowered 40deg flap configuration achieved a maximum lift coefficient of 2.3. With high-lift blowing the maximum lift coefficient increased to 5.61. Therefore, the lift augmentation is a factor of 2.4. Taking advantage of the fullspan lift augmentation at similar performance means that a wing powered with the distributed electric propulsion system requires only 42 percent of the wing area of the unpowered wing. This technology will allow wings to be 'cruise optimized', meaning that they will be able to fly closer to maximum lift over drag conditions at the design cruise speed of the aircraft.

Deere, Karen A.↗

A modular Space Station/Base electrical power system - Requirements and design study.

The requirements and procedures necessary for definition and specification of an electrical power system (EPS) for the future space station are discussed herein. The considered space station EPS consists of a replaceable main power module with self-contained auxiliary power, guidance, control, and communication subsystems. This independent power source may 'plug into' a space station module which has its own electrical distribution, control, power conditioning, and auxiliary power subsystems. Integration problems are discussed, and a transmission system selected with local floor-by-floor power conditioning and distribution in the station module. This technique eliminates the need for an immediate long range decision on the ultimate space base power sources by providing capability for almost any currently considered option.

Eliason, J. T.↗

Communications and control for electric power systems

The first section of the report describes the AbNET system, a hardware and software communications system designed for distribution automation (it can also find application in substation monitoring and control). The topology of the power system fixes the topology of the communications network, which can therefore be expected to include a larger number of branch points, tap points, and interconnections. These features make this communications network unlike any other. The network operating software has to solve the problem of communicating to all the nodes of a very complex network in as reliable a way as possible even if the network is damaged, and it has to do so with minimum transmission delays and at minimum cost. The design of the operating protocols is described within the framework of the seven-layer Open System Interconnection hierarchy of the International Standards Organization. Section 2 of the report describes the development and testing of a high voltage sensor based on an electro-optic polymer. The theory of operation is reviewed. Bulk fabrication of the polymer is discussed, as well as results of testing of the electro-optic coefficient of the material. Fabrication of a complete prototype sensor suitable for use in the range 1-20 kV is described. The electro-optic polymer is shown to be an important material for fiber optic sensing applications. Appendix A is theoretical support for this work. The third section of the report presents the application of an artificial neural network, Kohonen's self-organizing feature map, for the classification of power system states. This classifier maps vectors of an N-dimensional space to a 2-dimensional neural net in a nonlinear way preserving the topological order of the input vectors. These mappings are studied using a nonlinear power system model.

Kirkham, H.↗

Network, system, and status software enhancements for the autonomously managed electrical power system breadboard. Volume 2: Protocol specification

This volume (2 of 4) contains the specification, structured flow charts, and code listing for the protocol. The purpose of an autonomous power system on a spacecraft is to relieve humans from having to continuously monitor and control the generation, storage, and distribution of power in the craft. This implies that algorithms will have been developed to monitor and control the power system. The power system will contain computers on which the algorithms run. There should be one control computer system that makes the high level decisions and sends commands to and receive data from the other distributed computers. This will require a communications network and an efficient protocol by which the computers will communicate. One of the major requirements on the protocol is that it be real time because of the need to control the power elements.

Mckee, James W.↗

Real-time contingency handling in MAESTRO

A scheduling and resource management system named MAESTRO was interfaced with a Space Station Module Power Management and Distribution (SSM/PMAD) breadboard at MSFC. The combined system serves to illustrate the integration of planning, scheduling, and control in a realistic, complex domain. This paper briefly describes the functional elements of the combined system, including normal and contingency operational scenarios, then focusses on the method used by the scheduler to handle real-time contingencies.

Britt, Daniel L.↗

Uncrewed Lunar Surface Operations and Support Activities

Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.

Mark E Lewis↗

Conceptual Design of a Counter-Rotating Fan System for Distributed Boundary Layer Ingesting Propulsion

The present paper details the design of the counter rotating fans for a Turboelectric Distributed Propulsion (TeDP) system. Sixteen propulsors installed in mail-slot-shape nacelles are embedded on an aerodynamically optimized hybrid wing-body configuration. The hybrid-wing/body (HWB) configuration which was previously designed to satisfy the conditions of trim, longitudinally static stability and specific cargo space is employed as the baseline configuration in pursuing an optimal distributed propulsion system. A set of distributed propulsors is conceptually designed and the collective performance is evaluated against the target thrust mandated by the mission requirements. The concept of the distributed propulsion allows the fan pressure ratio to be around 1.27~1.32 for the target thrust. In addition, further splitting of the fan pressure ratio by using the counter-rotating fans for each slot realizes the target pressure ratio with low tip speed. In the distributed propulsion system, the nature of the flow conditions and/or the thickness of the ingested boundary layer may differ and result in different propulsive reaction of each individual propulsor. The optimization is, thus, approached from both the propulsion system and individual propulsor perspectives. An optimal distribution of the thrust and power output is determined by how the system utilizes each passage's propulsive characteristics and its interaction with the airframe. These system level analysis and optimization are conducted using an actuator disk model to account for the propulsion-airframe integration numerically. With respect to the propulsor level, aerodynamic shape optimizations of the fan blades are performed in a sequential multi-objective optimization process for various design objectives, such as mass flow rate condition, fan pressure ratio, efficiency and the exit flow angle of the fan stage by using a genetic algorithm, NSGA-II. The radial chord distribution, and meanline distribution of the rotors are designed on the circumferentially averaged axi-symmetric inlet profiles and tested on the six inlet profiles from six divided sectors to reckon flow distortion. The performances of the counter rotating fans are, thus, evaluated accordingly for obtaining distortion tolerant fan. The performance of the distributed propulsion system is evaluated by two CFD tools, i.e., a multi-stage turbo-machinery CFD code and one propulsion-airframe integration flow solver coupled with a body-force model. The optimized boundary layer ingestion propulsion system of 16 distributed slots not only reaches the system target thrust, but also delivers a close to 20% fuel saving benefit against its counterpart 12 distributed clean inlet propulsion system.

Boundary-Layer-Ingestion Propulsion↗

Marshall Amateur Club experiment (MARCE)

The integration of the Get Away Special (GAS) payload for the space shuttle is discussed in terms of systems design. In addition to the primary power, control, and distribution networks to electrically integrate the spaceborne experiments, an instrument measuring system, a data system, and a radio frequency downlink system were designed. A brief review of these systems is given.

Stluka, E. F.↗

The International Space Station (ISS) Port 1 (P1) External Active Thermal Control System (EATCS) Ammonia Leak

Ammonia is used in the Starboard 1 (S1) and Port 1 (P1) External Active Thermal Control System (EATCS) to cool the pressurized modules, and some of the external electrical power distribution hardware. Leaks that develop in these critical cooling systems that deplete in-line tanks can ultimately result in loss of cooling, which can have devastating impacts to the mission, science and crew onboard the ISS. A slow ammonia leak was initially observed from the P1 EATCS in 2011, but later in 2013 the leak rate began to accelerate. The ammonia inventory eventually began to decay exponentially, raising concerns that the inventory could drop to levels where the system would not be operational.The Robotic External Leak Locator (RELL) was built and launched to the ISS to detect and help locate ammonia leaks using the ISS Robotic Arm and remote ground operator control without constant crew involvement. RELL pinpointed the ammonia leak to the two flexible jumper hose assemblies connecting one of two fluid loops in one of the three deployable radiators to the P1 EATCS. The ammonia inside the two hose assemblies and that radiator fluid loop was isolated and vented to space in 2017. This stopped the leak and an Extravehicular Activity was conducted to remove the two hose assemblies so they could be returned to ground for further Test, Teardown and Evaluation (TT&E). The purpose of this presentation is to discuss this leakage scenario and the TT&E efforts.

Cowan, Darnell T.↗

SPS phase control system performance via analytical simulation

A solar power satellite transmission system which incorporates automatic beam forming, steering, and phase control is discussed. The phase control concept centers around the notation of an active retrodirective phased array as a means of pointing the beam to the appropriate spot on Earth. The transmitting antenna (spacetenna) directs the high power beam so that it focuses on the ground-based receiving antenna (rectenna). A combination of analysis and computerized simulation was conducted to determine the far field performance of the reference distribution system, and the beam forming and microwave power generating systems.

Lindsey, W. C.↗

V/STOL flying qualities research using the X-22A

The X-22A has four ducted propellers and four engines. The engines are connected to a common system of rotating shafts which distribute propulsive power to the four propellers. Changes in the direction of the thrust vector are accomplished by rotating the ducts, which are interconnected so that all rotate through the same angle. Thrust magnitude is determined by a collective pitch lever, very similar to a helicopter. There are four variable stability system (VSS) controllers: thrust, pitch, roll, and yaw, and three artificial feel servos for the evaluation pilot cockpit controls, each employing electrohydraulic servos. Longitudinal flying qualities for STOL landing approach, and lateral-directional flying qualities and control power requirements for STOL landing approach are discussed. Attention is given to the data acquisition and processing system.

Smith, R. E.↗

Control of multiple resonant power processors in a multi-source system

Analysis and test results show that phasor-regulated, Mapham-derived resonant inverters can be paralleled to provide standardizing interfaces for multiple sources on a utility-type, aerospace power distribution bus. The basic sources do not require matching in any way, and may have grossly different characteristics. Fully stable system architectures with multiple sources, parallel/redundant distribution buses, and a wide variety of loads can be easily constructed and controlled. The commands and parameters available for system control allow for tight tolerance bus voltage control, and absolute power-sharing control from the various sources over the full range of possible source and load variations. That level of control enables simplified load power processing hardware and the distribution of losses to optimally load the source thermal control system. Positive control of all system performance and allocation of losses are not required by all missions or vehicles, and overall vehicle considerations do not always require the loads on vehicle energy sources and thermal control systems to be balanced. In those cases, power system control can be simplified, and a hierarchical set of defaults can be substituted for computer-generated or supervisory input commands to allow for stable, fully autonomous system operation.

Mildice, James↗

Evolution of the 1-mlb mercury ion thruster subsystem

A general description and review of the auxiliary Electric Propulsion program, which led to the present 1-mlb (4.5 mN) thruster system, is presented. The developmental history, performance, and major lifetests of each component of the system are traced over the past 10 years. Major components include the 8-cm diameter ion thruster, the power processor, and the propellant reservoir and distribution system.

Kerslake, W. R.↗