Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “OPERATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Draft Operating Procedures for a Generic Repository Licensing Organization

This document is milestone M4FT-15SN0826021: Draft Summary of principle operating procedures for a generic repository licensing organization, the result of efforts under work package FT-15SN082602 DOE Managed HLW and SNF Research: Generic Operating Procedures; e.g., Quality Assurance — Sandia National Laboratories (SNL). The objective of this effort was to develop this draft document identifying and summarizing the principle operating procedures for a generic repository licensing organization. The FY16 follow on work package is FT-165N050303: Develop and Implement Operating Procedures — SNL, having a consistent objective to develop a draft document identifying and summarizing the principle operating procedures for a generic repository licensing organization. This document identifies and describes the principle operating procedures for a hypothetical and generic organization with the responsibility to site, characterize, design, license, construct and operate a repository for the disposal of high-level radioactive waste (HLW) and spent nuclear fuel (SNF) managed by the Department of Energy. These principle operating procedures reflect practices that facilitate compliance with U.S. Nuclear Regulatory Commission (NRC) expectations and NQA-1 quality standards.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Demonstration and Evaluation of an Advanced Integrated Operations Concept for Hybrid Control Rooms

The U.S. nuclear industry has an urgent need to reduce operations and maintenance costs to remain economically competitive in today’s energy market. Measures to improve efficiency in operations will need to leverage technology in a way that safely transforms how plants are operated. This work describes the Evaluation of an integrated operations concept that draws together data from existing Instrumentation and Control (I&C) infrastructure, upgraded I&C systems, new sensors, and field technologies such as computer-based procedures to provide operators with centralized, streamlined instructions. The concept was developed to allow for an operator to remotely supervise many plant activities and to dramatically streamline plant operations and maintenance. This describes the methods, results, and design recommendations for the concept based on an operator workshop to evaluate the concept.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Plasma Ignition and Combustion Stabilization Technology to Improve Flexible Operation, Reliability and Economics of an Existing Coal-Fired Boiler

GE Steam Power, Inc. (GE) proposed to improve reliability, flexibility, and economics of an existing coal-fired power plant by applying a new advanced technology developed by GE, a plasma-assisted pulverized fuel firing system. The objective of this program is to demonstrate the achievement of lower load by improved flame stabilization and therefore lower operating costs in a full-scale field installation at coal-fired electric utility. GE’s Plasma Ignition and Combustion Stabilization System is designed to operate continuously to support low load operation. With the plasma on, the flame will be attached and stable, removing the firing system as a limitation to low load operation. In addition, GE’s exclusively from ABENZ company licensed AC based technology has a 90+% system efficiency compared to all other systems at which are DC and operate with ~75% efficiency. Plant operating costs are lowered by eliminating use of expensive support fuel as well as the ability to operate at lower loads. The utilities’ ability to better match the demand curve will result in significant savings. Maintenance is lower for an AC system than a DC system as it operates at lower current. This eliminates the need for a demineralized cooling water system and provides longer electrode life which translates into both material and labor savings. It is the objective of GE to not only demonstrate the additional low load achievable with a plasma system after best achievable tuning, sensor and software approach has been exhausted, but also the increased stability of the flame at all loads with plasma assistance as well as cost savings at all low loads using plasma instead of oil. Upon successful completion of this project, GE will have sufficient field experience to rapidly deploy the Plasma Technology. The project objectives were achieved through the implementation of plasma ignitor technology at PacifiCorp Hunter Station Unit 3. A plasma ignitor system was retrofitted on ten wall-fired burners, Mill 3-4 combustion system. The Plasma Ignitors installed at Hunter proved that this GE technology is a direct and complete replacement for the original oil ignitors. The Hunter Unit 3 burner management system allows the plasma system to be used in all applications that originally required oil to be burned. This includes any time the Mill 3-4 is started or stopped for any reason including boiler starts, load changes, and low load support.

01 COAL, LIGNITE, AND PEAT↗

Introducing the 9500 Node Distribution Test System to Support Advanced Power Applications: An Operations-Focused Approach

The 9500 Node Test System is a representative section of distribution power system model developed as a part of the GridAPPS-D™ project, an effort funded by DOE as a part of the Grid Modernization Lab Consortium (GMLC) program. The test system was developed to fulfill a growing need to represent the rapidly evolving state of electric distribution systems by combining elements of legacy infrastructure systems, modern feeder topologies, and an anticipated future with smart grid technologies. It also provides a network model capable of supporting the simulation of operational scenarios such as the ones in a utility distribution control center. This test system allows the evaluation of the performance of advanced power applications in real-time, such as one that simulates the operations of an Advanced Distribution Management Systems (ADMS), Distributed Energy Resource Management Systems (DERMS), etc. in a Distribution control center. This model is an extension of the widely used IEEE 8500 Node Test Feeder and is currently being validated to become an IEEE test case to help increase adoption and widespread usage among both academia and industry. It is a full-size model representative of a section of a utility’s distribution system with multiple feeders fed from different substations. The model includes multiple distribution circuits, a sub-transmission system, multiple substations, behind the meter customer rooftop photovoltaics (PV), and multiple utility-scale distributed energy resources. To enable accurate simulations of operational scenarios, the 9500 Node Test System is designed to support procedure-based operations, with the ability to realistically demonstrate switching operations, feeder reconfiguration, adjustment of volt-var control equipment, dispatch of distributed generation, and response to planned and unplanned outages. The 9500 Node Test System includes three radial distribution feeders with 12.3 MVA of average load, consisting of both medium voltage and low voltage equipment each supplied by a different distribution substation. The three distribution feeders are connected to each other through Normally-Open switches which can be closed when needed to simulate restoration scenarios due to a fault. One feeder represents today’s grid with low penetration of customer-side renewables. The second represents a potential future grid with microgrids and 100% renewable penetration. The third has no customer generation resources, a district steam plant, and a utility-scale solar farm. The three diverse circuits were created to allow the simulation of both today’s situation as well as potential future scenarios. All three feeders have customers connected by low-voltage secondary triplex lines. This test system meets all requirements outlined in the report for creating a simulation environment that would enable discussion between key technical stakeholders as well as having the potential to accelerate operational application development and their subsequent testing and integration. The new model is a possible representation of what we believe the distribution grid may look like in the future: a high penetration of renewables, reconfigurable radial and mesh topology, numerous DERs, islanded microgrids, and significantly increased data and measurement density. The system supports both the solution of existing and newer algorithms but also enables the evaluation of applications in a realistic operational environment defined by task oriented procedural steps that represent the interaction between the control center operator and field personnel.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Real-Time Operations Manual for the IEEE 118 Bus Transmission Model

This document presents a sample operations manual for the IEEE 118 Bus Model, which is a synthetic test case developed in 1962 from a section of the transmission grid operated by American Electric Power (AEP). The model is one of the most used synthetic test cases for development of power system applications and is referenced by over 9000 papers. However, the model lacks any context for use with real-time energy management system (EMS) applications, including common considerations, such as generator ramp rates, reactive capabilities, operating limits, and other information typically used by power system operators for real-time decision making. This manual divides the IEEE 118 Bus Model into three operating areas, defines various operating limits, and sets recommended operating procedures for responding to a few types of emergency operating conditions. The manual can be used in support of a wide variety of human-in-the-loop evaluation methodologies for new advanced power applications.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Safety Basis Compliant Flexible Operations [Capstone Project]

Compliant nuclear operations must be weighed against the radiological risk to the worker, public, and the environment. This project set out to look at one facility at Los Alamos National Laboratory (LANL or the Laboratory) and compare the risk with the operational restrictions associated with the Technical Safety Requirements (TSRs). The hope was to identify controls that could be reduced or simplified while maintaining compliance with 10 CFR 830, Nuclear Safety Management. This would result in increasing facility operational flexibility and efficiency. Controls were identified to be simplified or eliminated based on risk. This identification was initially envisioned from the perspective of reanalysis of the accident and hazard analysis consequences. Additionally, it was envisioned that fire testing could show that the consequences of a fire are not as dramatic as analyzed. Specific facility controls were identified that cause operational inefficiencies. Based on data collection, two controls were identified for further evaluation. The first control was combustible loading within the waste storage buildings, and the second control is related to the seismic power cutoff switch. In evaluating the combustible loading control, the thought is that the fire suppression system (FSS) provides adequate protection and the combustible loading controls do not need elevation to a TSR control. The FSS, along with the Fire Protection Program, would provide protection to prevent a fire from impacting large amounts of stored waste material. The seismic switch was more of a challenge. When reviewing the facility operation, it was determined that the facility does not operate anywhere near the established material-at-risk (MAR – radioactive material) limits. By adjusting these limits, a reduced consequence could be achieved and hence, a significant risk reduction achieved. A new operating mode would be used to achieve this reduction. A reduced MAR limit was successfully used as a test case for snow removal during this project. This project expands on that trial case as related to combustible loading and the seismic power cutoff switch TSRs. This will increase the efficiency of operations with reduced TSR controls while reducing overall facility risk. This is a win-win situation for Triad National Security, LLC (Triad) and the U.S. Department of Energy (DOE). Due to schedule and budgetary constraints, not all envisioned work scope was accomplished. However, it is maintained in this report for future efforts.

61 RADIATION PROTECTION AND DOSIMETRY↗

Transmission Operator Workflows for Real-Time Reliability Studies: A Review of Control Room Practices and Naturalistic Decision Making

This report provides an overview of real-time reliability study tools and their use by power system operators in the control room environment. After introducing some of the nuances of the control room environment and the differences in perspectives between power system engineers and operators, the roles and responsibilities of key entities involved in RTCA workflows are introduced. These are specifically the transmission system operator (TOP) and reliability coordinator (RC), which are required to run tools such as real-time contingency analysis (RTCA) as part of a real-time reliability assessment every 30 minutes, as dictated by a series of standards issued by the North American Electric Reliability Corporation (NERC). The process by which power systems operators operate the grid is discussed in terms of naturalistic decision making (NDM) and the recognition-primed decision-making (RPD) model. This cognitive model describe how experts working in high-risk, high-stress environments make safety-critical decisions under uncertainty and time pressure. For power system operators, the mental simulations involved in the traditional RPD model are supplemented by physics-based simulations using numerical tools, such as RTCA, to improve situational awareness and effectiveness of control actions. Next, a generic workflow is introduced to describe operator decision making for running RTCA tools and responding to system violations on a pre-contingent basis. The types of analysis performed and control actions chosen by power system operators are described in detail. The overall high-level workflow is then expanded in subsequent sections, with special attention given to high-voltage violations, low-voltage violations, and thermal overloads. Each type of violation is described in detail, with explanations of common causes, impacts on equipment and customers, and mitigation strategies. An additional workflow diagram is provided for each type of violation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Enhancement of operational Flexibility of Power Plants Using IN740

Headers are crucial components within diverse industries, especially in the energy sector, as they enable the efficient transfer of fluids. The selection of materials for headers is determined by their specific applications; for example, Grade 91 and Grade 92 steels are commonly utilized. In our research, we recommend the adoption of INCONEL alloy 740 due to its exceptional robustness and heat-resistant characteristics. One critical parameter in header systems is the heat transfer coefficient, which directly influences the efficiency of heat exchange processes and can thereby impact the structural integrity of the headers. This coefficient is closely linked with factors such as the Nusselt number, which is influenced by fluid flow characteristics and thermal properties. The flow direction within headers, whether unidirectional or multidirectional—significantly affects the overall dynamics of heat transfer. This research focuses on exploring the behavior of headers, a specific pipeline system component, using ANSYS simulation software. The study aims to predict heat transfer and mechanical behavior within headers under various conditions through steady-state and transient simulations (parts 1 and 2 of the report). Key parameters such as heat transfer coefficient, velocity, and temperature are examined with the goal of optimizing header design. Part 3 of the report addresses the critical yet underexplored relationship between pressure drop and heat transfer coefficients in the transient flow regime within headers, specifically focusing on smooth horizontal circular tubes. Limited experimental work has been conducted in this area, prompting the need for comprehensive analysis. By leveraging machine learning techniques, this research aims to establish a correlation between pressure drop and heat transfer across various flow conditions, including laminar, transient, quasi-turbulent, and turbulent regimes. The data utilized for this analysis were meticulously gathered from existing literature, capturing simultaneous measurements of pressure drops and heat transfer. Part 4: In the context of power plants, header pipes are essential components that significantly influence system performance by facilitating the collection and distribution of steam. This report highlights the critical role of header pipes in enhancing reliability, efficiency, and overall power plant performance. A key aspect of this investigation is shape optimization, which aims to maximize performance while minimizing material usage. By focusing on shape optimization, this research contributes to improved efficiency and a reduced environmental footprint for power plant installations. The methodology developed in this study emphasizes optimizing header shapes to decrease reliance on expensive alloy materials and lower maintenance costs. Furthermore, a case study was conducted using a header from an operational power plant to validate the proposed optimization techniques. Finally, part 5 addresses the challenges associated with flexible operations in boiler systems, the study outlines several strategies for enhancing the durability and reliability of steam headers. Key approaches include material selection, which involves utilizing advanced materials with superior high-temperature properties and enhanced fatigue resistance to extend the lifespan of steam headers. Design modifications are also recommended, focusing on implementing changes that mitigate thermal stress and cyclic loading to reduce the likelihood of failures under varying operating conditions. Additionally, the study emphasizes the importance of regular inspection and monitoring by establishing rigorous protocols to detect early signs of damage, allowing for timely maintenance and minimizing the risks of catastrophic failures. Furthermore, operational guidelines are developed to minimize the frequency and severity of thermal transients, ensuring stable and efficient operations. Collectively, these strategies provide a robust framework for overcoming the unique challenges posed by flexible operation in boiler systems, ultimately contributing to improved reliability and performance in power plant operations. Through this comprehensive approach, the study not only enhances the understanding of pressure drop and heat transfer relationships but also promotes advancements in design and operation that will benefit the entire power generation industry.

01 COAL, LIGNITE, AND PEAT↗

Resilient Operation of Networked Community Microgrids with High Solar Penetration

This project, funded by the US Department of Energy’s Solar Energy Technologies Office (SETO), focused on the operation of microgrids as a coordinated network. The primary objective, which was successfully achieved, was to develop both control strategies and hardware solutions to support the resilient and efficient operation of networked microgrids with high solar penetration. The work was structured around the following four main tasks: • Development of distributed and scalable optimization algorithms for AC-coupled networked microgrids. • Design and implementation of a novel DC interconnection hardware to enable precise power exchange between microgrids. • Laboratory operational validation of the developed technologies using 480 V testbeds and commercially available hardware. • Field operational validation of the complete solution in Adjuntas, Puerto Rico, interconnecting two kW-scale, split-phase microgrids of Casa Pueblo’s microgrids. This project addressed multiple technical challenges across the domains of optimization, control, hardware interconnection, and protection. One of its key contributions was delivering tangible, real-world solutions for networking microgrids. In contrast to purely theoretical or simulation-based work, this project included full-scale hardware operational validation both in the lab and in the field. The work conducted as part of this project—in collaboration with the University of Puerto Rico; the University of Tennessee, Knoxville; the University of Central Florida; and Casa Pueblo—has advanced the state of the art in networked microgrids. Key contributions include the development of distributed control strategies, practical solutions for real-world implementation challenges, and the introduction of a novel DC interlink approach for microgrid interconnection. The project featured both laboratory and field validation using commercial off-the-shelf components. The field deployment successfully validated that a group of microgrids can operate in a coordinated manner, enabling precise power flow between systems and mutual support during extreme events. This project resulted in 15 journal publications and 15 conference papers; 5 graduate students and 15 undergraduate students were supported. The codes of distributed optimization and forecasting were made open-source through OSTI.gov for distributed optimization and forecasting. All the publications are available in the ORNL-hosted project landing page. The DC interlink with state-of-charge balancing control was operationally validated in Adjuntas by interconnecting two real-world, 240 V split-phase microgrids. To the best knowledge of the team, this represents the first operational validation of AC microgrids interconnected via DC-interlinks. As a culmination of this project, a follow-on grant was awarded to support the technology transfer of the distributed optimization framework to a commercial microgrid controller, Stellar Edge, developed by the California-based company New Sun Road.

14 SOLAR ENERGY↗

From Modular ADMS to Plug-and-Play Ops: Distribution Grid Operations with Platform-Level Orchestration to Enable Ambitious App Hosting

The core function of the distribution grid is to provide electricity to consumers affordably, reliably, and securely. In pursuing these core objectives, distribution utilities are accountable to customers, regulators, and in some cases, shareholders. Other third parties such as aggregators and microgrids can also have a stake in the smooth operation of the grid. Each of these stakeholders has economic, business, and/or governance objectives that inform their expectations of the distribution grid. This multi-objective, multi-stakeholder environment creates tension that must be reconciled to successfully design and operate the distribution grid. Innovative companies are competing to bring high-tech solutions to electric utilities and their customers that address each of these objectives. Many developers of advanced distribution management systems (ADMS) and distributed energy resource management systems (DERMS) have adopted a modular architecture that allows grid operators to select functions and features according to their individual system needs. A modular platform also allows the solution provider to develop and integrate specific new product modules; however, the need to pursue multiple objectives with a fixed set of controllable devices makes integration expensive whether it is done at the product development stage or the deployment stage. This cost creates a significant barrier to adoption and can lengthen the product to market time of new solutions. To fundamentally address the complexity of system integration for distribution grid operations, the U.S. Department of Energy Office of Electricity has funded the GridAPPS-D project at PNNL, which streamlines integration by contributing to standards development, defining system architecture, applying advanced mathematics, and developing open-source software to demonstrate the concept of an open data-integration platform for distribution operations. The open data-integration platform concept enables system operators and solution providers to deploy ambitious, best-of-breed applications (or apps) without continually reengineering for integration. Ambitious apps developed by different solution providers will inevitably attempt to achieve different control objectives with the same set of controllable devices. If the open platform itself can resolve these conflicts in a way that achieves the best available outcomes for all apps, doesn’t restrict the ambitious design of apps, and ensures safe and secure operations, apps will be able to plug-and-play with the platform at the same time as other ambitious apps. In this paper, we describe a framework called App Deconfliction that empowers a platform to assign setpoints to controllable devices based on the values preferred by different apps (and even external stakeholder entities like customers or aggregators). The App Deconfliction framework is compatible with several methods for determining setpoint values. We present two methods based on game theory that provide a subtle built-in incentive structure for developers to adapt their apps to the fact that they will be operating in a moderated multi-app environment and to favor device setpoints that have the most effect on their objectives over those that have the least effect. Our simulation-based demonstrations have shown that game-theory-based deconfliction can lead to a 7% improvement in control space utilization compared to design-based methods.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Atmospheric Radiation Measurement program climate research facility operations quarterly report July 1 - Sep. 30, 2009.

Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near-real time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 ? 2,208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 ? 2,208) and for the Tropical Western Pacific (TWP) locale is 1,876.8 hours (0.85 ? 2,208). The ARM Mobile Facility (AMF) was officially operational May 1 in Graciosa Island, the Azores, Portugal, so the OPSMAX time this quarter is 2,097.60 hours (0.95 x 2,208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive result from downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period July 1 - September 30, 2009, for the fixed sites. Because the AMF operates episodically, the AMF statistics are reported separately and not included in the aggregate average with the fixed sites. The fourth quarter comprises a total of 2,208 hours for the fixed and mobile sites. The average of the fixed sites well exceeded our goal this quarter. The AMF data statistic requires explanation. Since the AMF radar data ingest software is being modified, the data are being stored in the DMF for data processing. Hence, the data are not at the Archive; they are anticipated to become available by the next report.

54 ENVIRONMENTAL SCIENCES↗

Application for a Permit to Operate a Class III Solid Waste Disposal Site at the Nevada Test Site Area 5 Asbestiform Low-Level Solid Waste Disposal Site

The NTS solid waste disposal sites must be permitted by the state of Nevada Solid Waste Management Authority (SWMA). The SWMA for the NTS is the Nevada Division of Environmental Protection, Bureau of Federal Facilities (NDEP/BFF). The U.S. Department of Energy's National Nuclear Security Administration Nevada Site Office (NNSA/NSO) as land manager (owner), and National Security Technologies (NSTec), as operator, will store, collect, process, and dispose all solid waste by means that do not create a health hazard, a public nuisance, or cause impairment of the environment. NTS disposal sites will not be included in the Nye County Solid Waste Management Plan. The NTS is located approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada (Figure 1). The U.S. Department of Energy (DOE) is the federal lands management authority for the NTS, and NSTec is the Management and Operations contractor. Access on and off the NTS is tightly controlled, restricted, and guarded on a 24-hour basis. The NTS has signs posted along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NTS. The Area 5 RWMS is the location of the permitted facility for the Solid Waste Disposal Site (SWDS). The Area 5 RWMS is located near the eastern edge of the NTS (Figure 2), approximately 26 km (16 mi) north of Mercury, Nevada. The Area 5 RWMS is used for the disposal of low-level waste (LLW) and mixed low-level waste. Many areas surrounding the RWMS have been used in conducting nuclear tests. A Notice of Intent to operate the disposal site as a Class III site was submitted to the state of Nevada on January 28, 1994, and was acknowledged as being received in a letter to the NNSA/NSO on August 30, 1994. Interim approval to operate a Class III SWDS for regulated asbestiform low-level waste (ALLW) was authorized on August 12, 1996 (in letter from Paul Liebendorfer to Runore Wycoff), with operations to be conducted in accordance with the ''Management Plan for the Disposal of Low-Level Waste with Regulated Asbestos Waste.'' A requirement of the authorization was that on or before October 9, 1999, a permit was required to be issued. Because of NDEP and NNSA/NSO review cycles, the final permit was issued on April 5, 2000, for the operation of the Area 5 Low-Level Waste Disposal Site, utilizing Pit 7 (P07) as the designated disposal cell. The original permit applied only to Pit 7, with a total design capacity of 5,831 cubic yards (yd{sup 3}) (157,437 cubic feet [ft{sup 3}]). NNSA/NSO is expanding the SWDS to include the adjacent Upper Cell of Pit 6 (P06), with an additional capacity of 28,037 yd{sup 3} (756,999 ft{sup 3}) (Figure 3). The proposed total capacity of ALLW in Pit 7 and P06 will be approximately 33,870 yd{sup 3} (0.9 million ft{sup 3}). The site will be used for the disposal of regulated ALLW, small quantities of low-level radioactive hydrocarbon-burdened (LLHB) media and debris, LLW, LLW that contains PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, and small quantities of LLHB demolition and construction waste (hereafter called permissible waste). Waste containing free liquids, or waste that is regulated as hazardous waste under the Resource Conservation and Recovery Act (RCRA) or state-of-generation hazardous waste regulations, will not be accepted for disposal at the site. The only waste regulated under the Toxic Substances Control Act (TSCA) that will be accepted at the disposal site is regulated asbestos-containing materials (RACM). The term asbestiform is used throughout this document to describe this waste. Other TSCA waste (i.e., polychlorinated biphenyls [PCBs]) will not be accepted for disposal at the SWDS. The disposal site will be used as a depository of permissible waste generated both on site and off site. All generators designated by NNSA/NSO will be eligible to dispose regulated ALLW at the Asbestiform Low-Level Waste Disposal Site in accordance with the U.S. Department of Energy, Nevada Operations Office (DOE/NV) 325, Nevada Test Site Waste Acceptance Criteria (NTSWAC, current revision). Approval will be given by NNSA/NSO to generators that have successfully demonstrated through process knowledge (PK) and/or sampling and analysis that the waste is low-level, contains asbestiform material, and does not contain prohibited waste materials. Each waste stream will be approved through the Radioactive Waste Acceptance Program (RWAP), which ensures that the waste meets acceptance requirements outlined in the NTS Class III Permit and the NTSWAC.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effects of Ignition and Injection Perturbation under Lean and Dilute GDI Engine Operation

Turbocharged gasoline direct injection (GDI) engines are quickly becoming more prominent in light-duty automotive applications because of their potential improvements in efficiency and fuel economy. While EGR dilute and lean operation serve as potential pathways to further improve efficiencies and emissions in GDI engines, they also pose challenges for stable engine operation. Tests were performed on a single-cylinder research engine that is representative of current automotive-style GDI engines. Baseline cases were performed under steady-state operating conditions where combustion phasing and dilution were varied to determine the effects on indicated efficiency and combustion stability. Sensitivity studies were then carried out by introducing binary low-high perturbation of spark timing and injection duration on a cycle-by-cycle basis under EGR dilute and lean operation to determine dominant feedback mechanisms. Ignition perturbation was phased early/late of MBT timing, and injection perturbation was set fuel rich/lean of the given air-fuel ratio. COVIMEP was used to define acceptable operation limits when comparing different perturbation cases. Overall results suggests that combustion phasing is very important for dilute operation while the impact of perturbation is reduced due to increased burn duration compared to the stoichiometric baseline without EGR. Lean operation was found to be very sensitive to injection perturbation, with the effect of perturbations amplified by next-cycle feedback. Due to the longer timescale EGR operation was shown to be less sensitive to next-cycle changes in fueling.

Wallner, Thomas↗

Determination of the Operating Envelope for a Direct Fired Fuel Cell Turbine Hybrid Using Hardware Based Simulation

The operating range of a direct fired solid oxide fuel cell gas turbine (SOFC/GT) hybrid with bypass control of cathode airflow was determined using a hardware-based simulation facility designed and built by the U.S. Department of Energy, National Energy Technology Laboratory (NETL). Three methods of cathode airflow management using bypass valves in a hybrid power system were evaluated over the maximum range of operation. The cathode air flow was varied independently over the full range of operation of each bypass valve. Each operating point was taken at a steady state condition and was matched to the thermal, pressure and flow output of a corresponding fuel cell operation condition. Turbine electric load was also varied so that the maximum range of fuel cell operation could be studied, and a preliminary operating map could be made. Results are presented to show operating envelopes in terms of cathode air flow, fuel cell and turbine load, and compressor surge margin to be substantial.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-unit Operations in Non-Nuclear Systems: Lessons Learned for Small Modular Reactors

The nuclear-power community has reached the stage of proposing advanced reactor designs to support power generation for decades to come. Small modular reactors (SMRs) are one approach to meet these energy needs. While the power output of individual reactor modules is relatively small, they can be grouped to produce reactor sites with different outputs. Also, they can be designed to generate hydrogen, or to process heat. Many characteristics of SMRs are quite different from those of current plants and may be operated quite differently. One difference is that multiple units may be operated by a single crew (or a single operator) from one control room. The U.S. Nuclear Regulatory Commission (NRC) is examining the human factors engineering (HFE) aspects of SMRs to support licensing reviews. While we reviewed information on SMR designs to obtain information, the designs are not completed and all of the design and operational information is not yet available. Nor is there information on multi-unit operations as envisioned for SMRs available in operating experience. Thus, to gain a better understanding of multi-unit operations we sought the lesson learned from non-nuclear systems that have experience in multi-unit operations, specifically refineries, unmanned aerial vehicles and tele-intensive care units. In this paper we report the lessons learned from these systems and the implications for SMRs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Data-Parallel Halo Finder Operator in PISTON

PISTON is a portable framework which supports the development of visualization and analysis operators using a platform-independent, data-parallel programming model. Operators such as isosurface, cut-surface and threshold have been implemented in this framework, with the exact same operator code achieving good parallel performance on different architectures. An important analysis operator in cosmology is the halo finder. A halo is a cluster of particles and is considered a common feature of interest found in cosmology data. As the number of cosmological simulations carried out in the recent past has increased, the resultant data of these simulations and the required analysis tasks have increased as well. As a consequence, there is a need to develop scalable and efficient tools to carry out the needed analysis. Therefore, we are currently implementing a halo finder operator using PISTON. Researchers have developed a wide variety of techniques to identify halos in raw particle data. The most basic algorithm is the friend-of-friends (FOF) halo finder, where the particles are clustered based on two parameters: linking length and halo size. In a FOF halo finder, all particles which lie within the linking length are considered as one halo and the halos are filtered based on the halo size parameter. A naive implementation of a FOF halo finder compares each and every particle pair, requiring O(n{sup 2}) operations. Our data-parallel halo finder operator uses a balanced k-d tree to reduce this number of operations in the average case, and implements the algorithm using only the data-parallel primitives in order to achieve portability and performance.

79 ASTRONOMY AND ASTROPHYSICS↗

Using an operator training simulator in the undergraduate chemical engineering curriculim

An operator training simulator (OTS) is to the chemical engineer what a flight simulator is to the aerospace engineer. The basis of an OTS is a high-fidelity dynamic model of a chemical process that allows an engineer to simulate start-up, shut-down, and normal operation. It can also be used to test the skill and ability of an engineer or operator to respond and control some unforeseen situation(s) through the use of programmed malfunctions. West Virginia University (WVU) is a member of the National Energy Technology Laboratory’s Regional University Alliance (NETL-RUA). Working through the NETL-RUA, the authors have spent the last four years collaborating on the development of a high-fidelity OTS for an Integrated Gasification Combined Cycle (IGCC) power plant with CO{sub 2} capture that is the cornerstone of the AVESTARTM (Advanced Virtual Energy Simulation Training And Research) Center with sister facilities at NETL and WVU in Morgantown, WV. This OTS is capable of real-time dynamic simulation of IGCC plant operation, including start-up, shut-down, and power demand load following. The dynamic simulator and its human machine interfaces (HMIs) are based on the DYNSIM and InTouch software, respectively, from Invensys Operations Management. The purpose of this presentation is to discuss the authors’ experiences in using this sophisticated dynamic simulation-based OTS as a hands-on teaching tool in the undergraduate chemical engineering curriculum. At present, the OTS has been used in two separate courses: a new process simulation course and a traditional process control course. In the process simulation course, concepts of steady-state and dynamic simulations were covered prior to exposing the students to the OTS. Moreover, digital logic and the concept of equipment requiring one or more permissive states to be enabled prior to successful operation were also covered. Students were briefed about start-up procedures and the importance of following a predetermined sequence of actions in order to start-up the plant successfully. Student experience with the dynamic simulator consisted of a six-hour training session in which the Claus sulfur capture unit of the IGCC plant was started up. The students were able to operate the simulator through the InTouch-based HMI displays and study and understand the underlying dynamic modeling approach used in the DYNSIM-based simulator. The concepts learned during the training sessions were further reinforced when students developed their own DYNSIM models for a chemical process and wrote a detailed start-up procedure. In the process control course, students learned how the plant responds dynamically to changes in the manipulated inputs, as well as how the control system impacts plant performance, stability, robustness and disturbance rejection characteristics. The OTS provided the opportunity to study the dynamics of complicated, “real-life” process plants consisting of hundreds of pieces of equipment. Students implemented ideal forcing functions, tracked the time-delay through the entire plant, studied the response of open-loop unstable systems, and learned “good practices” in control system design by taking into account the real-world events where significant deviations from the “ideal” or “expected” response can occur. The theory of closed-loop stability was reinforced by implementing limiting proportional gain for stability limits of real plants. Finally, students were divided into several groups where each group was tasked to control a section of the plant within a set of operating limits in the face of disturbances and simulated process faults. At the end of this test, they suggested ways to improve the control system performance based on the theory they learned in class and the hands-on experience they earned while working on the OTS.

97 MATHEMATICS AND COMPUTING↗

Optimizing Blocking and Nonblocking Reduction Operations for Multicore Systems: Hierarchical Design and Implementation

Many scientific simulations, using the Message Passing Interface (MPI) programming model, are sensitive to the performance and scalability of reduction collective operations such as MPI Allreduce and MPI Reduce. These operations are the most widely used abstractions to perform mathematical operations over all processes that are part of the simulation. In this work, we propose a hierarchical design to implement the reduction operations on multicore systems. This design aims to improve the efficiency of reductions by 1) tailoring the algorithms and customizing the implementations for various communication mechanisms in the system 2) providing the ability to configure the depth of hierarchy to match the system architecture, and 3) providing the ability to independently progress each of this hierarchy. Using this design, we implement MPI Allreduce and MPI Reduce operations (and its nonblocking variants MPI Iallreduce and MPI Ireduce) for all message sizes, and evaluate on multiple architectures including InfiniBand and Cray XT5. We leverage and enhance our existing infrastructure, Cheetah, which is a framework for implementing hierarchical collective operations to implement these reductions. The experimental results show that the Cheetah reduction operations outperform the production-grade MPI implementations such as Open MPI default, Cray MPI, and MVAPICH2, demonstrating its efficiency, flexibility and portability. On Infini- Band systems, with a microbenchmark, a 512-process Cheetah nonblocking Allreduce and Reduce achieves a speedup of 23x and 10x, respectively, compared to the default Open MPI reductions. The blocking variants of the reduction operations also show similar performance benefits. A 512-process nonblocking Cheetah Allreduce achieves a speedup of 3x, compared to the default MVAPICH2 Allreduce implementation. On a Cray XT5 system, a 6144-process Cheetah Allreduce outperforms the Cray MPI by 145%. The evaluation with an application kernel, Conjugate Gradient solver, shows that the Cheetah reductions speeds up total time to solution by 195%, demonstrating the potential benefits for scientific simulations.

Gorentla Venkata, Manjunath↗