SEARCH · Engineering Papers
Results for “Mars Rovers”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Design issues for Mars planetary rovers
The paper presents some of the design issues and vehicle requirements that need to be addressed for the Mars planetary rovers. Some of the designs currently being investigated, including the JPL rover, the Martin Marietta vehicle, and the French Space Agency's VAP project, are examined. The rover must satisfy such mission requirements as surveying the terrain, preparing the landing sites, loading and unloading components for base operations, and aiding in the recovery of in situ materials.
Assessment of Mars Exploration Rover landing site predictions.
Comprehensive analyses of remote sensing data during the three-year effort to select the Mars Exploration Rover landing sites at Gusev crater and at Meridiani Planum correctly predicted the atmospheric density profile during entry and descent and the safe and trafficable surfaces explored by the two rovers. The Gusev crater site was correctly predicted to be a low-relief surface that was less rocky than the Viking landing sites but comparably dusty. A dark, lowalbedo, flat plain composed of basaltic sand and haematite with very few rocks was expected and found at Meridiani Planum. These results argue that future efforts to select safe landing sites based on existing and acquired remote sensing data will be successful. In contrast, geological interpretations of the sites based on remote sensing data were less certain and less successful, which emphasizes the inherent ambiguities in understanding surface geology from remotely sensed data and the uncertainty in predicting exactly what materials will be available for study at a landing site.
The Effects of the Mars Exploration Rovers (MER) Work Schedule Regime on Locomotor Activity Circadian Rhythms, Sleep and Fatigue
This study assessed human adaptation to a Mars sol by evaluating sleep metrics obtained by actigraphy and subjective responses in 22 participants, and circadian rhythmicity in locomotor activity in 9 participants assigned to Mars Exploration Rover (MER) operational work schedules (24.65 hour days) at the Jet Propulsion Laboratory in 2004. During MER operations, increased work shift durations and reduced sleep durations and time in bed were associated with the appearance of pronounced 12-hr (circasemidian) rhythms with reduced activity levels. Sleep duration, workload, and circadian rhythm stability have important implications for adaptability and maintenance of operational performance not only of MER operations personnel but also in space crews exposed to a Mars sol of 24.65 hours during future Mars missions.
Acid Sulfate Weathering on Mars: Results from the Mars Exploration Rover Mission
Sulfur has played a major role in the formation and alteration of outcrops, rocks, and soils at the Mars Exploration Rover landing sites on Meridiani Planum and in Gusev crater. Jarosite, hematite, and evaporite sulfates (e.g., Mg and Ca sulfates) occur along with siliciclastic sediments in outcrops at Meridiani Planum. The occurrence of jarosite is a strong indicator for an acid sulfate weathering environment at Meridiani Planum. Some outcrops and rocks in the Columbia Hills in Gusev crater appear to be extensively altered as suggested by their relative softness as compared to crater floor basalts, high Fe(3+)/FeT, iron mineralogy dominated by nanophase Fe(3+) oxides, hematite and/or goethite, corundum-normative mineralogies, and the presence of Mg- and Casulfates. One scenario for aqueous alteration of these rocks and outcrops is that vapors and/or fluids rich in SO2 (volcanic source) and water interacted with rocks that were basaltic in bulk composition. Ferric-, Mg-, and Ca-sulfates, phosphates, and amorphous Si occur in several high albedo soils disturbed by the rover's wheels in the Columbia Hills. The mineralogy of these materials suggests the movement of liquid water within the host material and the subsequent evaporation of solutions rich in Fe, Mg, Ca, S, P, and Si. The presence of ferric sulfates suggests that these phases precipitated from highly oxidized, low-pH solutions. Several hypotheses that invoke acid sulfate weathering environments have been suggested for the aqueous formation of sulfate-bearing phases on the surface of Mars including (1) the oxidative weathering of ultramafic igneous rocks containing sulfides; (2) sulfuric acid weathering of basaltic materials by solutions enriched by volcanic gases (e.g., SO2); and (3) acid fog (i.e., vapors rich in H2SO4) weathering of basaltic or basaltic-derived materials.
Launch vehicle accident assessment for Mars Exploration Rover missions
This paper presents the methodology used in the launch and space vehicle portion of the nuclear risk assessment for the two Mars Exploration Rover (MER) missions, which includes the assessment of accident scenarios and associated probabilities.
First Landing Site Workshop for the 2003 Mars Exploration Rovers
This volume contains abstracts that have been accepted for presentation at the First Landing Site Workshop for the 2003 Mars Exploration Rovers, January 24-25, 2001.
Downselection of Landing Sites for the Mars Exploration Rovers
Six landing sites that show evidence for processes involving water have been selected from a possible 185 for the Mars Exploration Rovers. These sites are being imaged by orbiting spacecraft and evaluated for science potential and safety before selection of two in May 2002. Additional information is contained in the original extended abstract.
Mars Exploration Rover Operations with the Science Activity Planner
The Science Activity Planner (SAP) is the primary science operations tool for the Mars Exploration Rover mission and NASA's Software of the Year for 2004. SAP utilizes a variety of visualization and planning capabilities to enable the mission operations team to direct the activities of the Spirit and Opportunity rovers. This paper outlines some of the challenging requirements that drove the design of SAP and discusses lessons learned from the development and use of SAP in mission operations.
Middleware and Web Services for the Collaborative Information Portal of NASA's Mars Exploration Rovers Mission
We describe the design and deployment of the middleware for the Collaborative Information Portal (CIP), a mission critical J2EE application developed for NASA's 2003 Mars Exploration Rover mission. CIP enabled mission personnel to access data and images sent back from Mars, staff and event schedules, broadcast messages and clocks displaying various Earth and Mars time zones. We developed the CIP middleware in less than two years time usins cutting-edge technologies, including EJBs, servlets, JDBC, JNDI and JMS. The middleware was designed as a collection of independent, hot-deployable web services, providing secure access to back end file systems and databases. Throughout the middleware we enabled crosscutting capabilities such as runtime service configuration, security, logging and remote monitoring. This paper presents our approach to mitigating the challenges we faced, concluding with a review of the lessons we learned from this project and noting what we'd do differently and why.
Large Dust Aerosol Sizes Seen During the 2018 Martian Global Dust Event by the Curiosity Rover
Mars' atmosphere typically supports dust aerosol with an effective radius near 1.5 μm, varying from ~1 μm during low dust times near northern summer solstice to ~2 μm during higher dust times in southern spring and summer. After global dust events, size variations outside this range have not previously been observed. We report on imaging and spectral observations by the Curiosity rover through the 2018 global dust event. These observations show that the dust effective radius was seasonally normal prior to the local onset of increased opacity, increased rapidly above 4 μm with increasing opacity, remained above 3 μm over a period of ~50 Martian solar days, then returned to seasonal values before the opacity did so. This demonstrates lifting and regional‐scale transport of a dust population ~3 times the size of typical dust aerosol.
Imaging services flight software on the Mars Exploration Rovers
Explore the source record for details and available documents.
Scientific visualization for the Mars Exploration Rovers
We present an account of the scientific visualization techniques that were used to support science planning for NASA's 2003 Mars Exploration Rover Mission.
Verification and validation of Mars exploration Rover Survace capabilities
This paper will discuss the system level verfication and validation test program for the surface capability of the Mars Exploration Rovers (MER).
Ground Processing of Data From the Mars Exploration Rovers
A computer program implements the Earth side of the protocol that governs the transfer of data files generated by the Mars Exploration Rovers. It also provides tools for viewing data in these files and integrating data-product files into automated and manual processes. It reconstitutes files from telemetry data packets. Even if only one packet is received, metadata provide enough information to enable this program to identify and use partial data products. This software can generate commands to acknowledge received files and retransmit missed parts of files, or it can feed a manual process to make decisions about retransmission. The software uses an Extensible Markup Language (XML) data dictionary to provide a generic capability for displaying files of basic types, and uses external "plug-in" application programs to provide more sophisticated displays. This program makes data products available with very low latency, and can trigger automated actions when complete or partial products are received. The software is easy to install and use. The only system requirement for installing the software is a Java J2SE 1.4 platform. Several instances of the software can be executed simultaneously on the same machine.
Making or Breaking a Rover: System Engineering Parameters On-Board the Mars 2020 Perseverance Rover
On February 18, 2021, Perseverance, NASA’s Jet Propulsion Laboratory’s (JPL’s) Mars 2020 Rover, successfully landed on Mars with all systems nominal, despite the risk surrounding the over 200,000 internal flight parameters that had to be properly configured. The Perseverance team defines these parameters as software variables that are configurable, commandable and retrievable from Earth. In 2015, the Mars 2020 project leaders focused on improving systems engineering of parameters based on their experiences from parameter management on previous Mars rovers (Curiosity, Opportunity, Spirit, and Pathfinder) and parameter failures of past missions, such as the mission-ending parameter of the Mars Climate Orbiter. The new rigorous development process allowed for efficient certification and effective implementation of the parameters, allowing the rover to approach and land on the red planet (the most challenging phase of the mission) with zero parameter issues. Although successful, the Perseverance team learned many lessons for how to better manage parameters for the continued surface operations of the Mars 2020 mission and future missions. This paper will discuss eight parameter-management topics for the Perseverance Mission. The first is parameter definition: how we define parameters on our mission, where they are physically located on the vehicle, and why we have so many of them. The second topic is the updated parameter flight software module from Curiosity, including details on the 99% reduction in parameter commands, new bulk configuration capabilities, and improved parameter traceability. The third topic is parameter selection for different mission phases; this includes improving and tweaking our preferred parameter settings until they become certification candidates and managing parameter configurations based on test venue throughout the mission life cycle. The fourth topic is our flight certification process; this includes certification of flight values for four different epochs in the mission: Launch, Entry Decent and Landing (EDL) - 6days, Landing + 5 Sols (Martian Days, still on Cruise Flight Software), and once are on Surface Flight Software (FSW). The fifth topic covers in-flight command implementation, along with details on testing, validation, and verification of those commands. In the sixth section, we will explain our use of open-source management tools, including how we used GitHub for version control and management approvals. The seventh topic will describe the ground tools used in operations, including capabilities of the in-house built tool called Parasol. The eighth and final topic will dig into lessons learned for improving parameter management in the future of this mission and others.
Making or Breaking a Rover- Systems Engineering Parameters On-Board the Mars 2020 Perseverance Rover
On February 18, 2021, Perseverance, NASA’s Jet Propulsion Laboratory’s (JPL’s) Mars 2020 Rover, successfully landed on Mars with all systems nominal, despite the risk surrounding the over 200,000 internal flight parameters that had to be properly configured. The Perseverance team defines these parameters as software variables that are configurable, commandable and retrievable from Earth. In 2015, the Mars 2020 project leaders focused on improving systems engineering of parameters based on their experiences from parameter management on previous Mars rovers (Curiosity, Opportunity, Spirit, and Pathfinder) and parameter failures of past missions, such as the mission-ending parameter of the Mars Climate Orbiter. The new rigorous development process allowed for efficient certification and effective implementation of the parameters, allowing the rover to approach and land on the red planet (the most challenging phase of the mission) with zero parameter issues. Although successful, the Perseverance team learned many lessons for how to better manage parameters for the continued surface operations of the Mars 2020 mission and future missions. This paper will discuss eight parameter-management topics for the Perseverance Mission. The first is parameter definition: how we define parameters on our mission, where they are physically located on the vehicle, and why we have so many of them. The second topic is the updated parameter flight software module from Curiosity, including details on the 99% reduction in parameter commands, new bulk configuration capabilities, and improved parameter traceability. The third topic is parameter selection for different mission phases; this includes improving and tweaking our preferred parameter settings until they become certification candidates and managing parameter configurations based on test venue throughout the mission life cycle. The fourth topic is our flight certification process; this includes certification of flight values for four different epochs in the mission: Launch, Entry Decent and Landing (EDL) - 6days, Landing + 5 Sols (Martian Days, still on Cruise Flight Software), and once are on Surface Flight Software (FSW). The fifth topic covers in-flight command implementation, along with details on testing, validation, and verification of those commands. In the sixth section, we will explain our use of open-source management tools, including how we used GitHub for version control and management approvals. The seventh topic will describe the ground tools used in operations, including capabilities of the in-house built tool called Parasol. The eighth and final topic will dig into lessons learned for improving parameter management in the future of this mission and others.
Mars 2020 Rover Adaptive Caching Assembly: Caching Martian Samples for Potential Earth Return
The Adaptive Caching Assembly, part of the Sampling and Caching System on the Mars 2020 Rover, consists of multiple stations that together process sample tubes containing collected Martian material, either rock cores or soil samples, and prepares hermetically-sealed sample tubes for caching on the surface of Mars. There are 7 active degrees-of-freedom, as well as a large number of passive mechanisms within the Adaptive Caching Assembly that must operate in extreme Mars conditions (i.e., temperature and pressure). Hardware cleanliness requirements significantly drove design, assembly, and test operations of the Adaptive Caching Assembly, and were found to adversely affect hardware in some cases such that late design changes and revised cleanliness operations had to be implemented. While Adaptive Caching Assembly hardware was designed to accommodate dust, testing in a representative environment is important to validate functionality is not compromised.