Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Integer programming.”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

A Full Demand Response Model in Co-Optimized Energy and

It has been widely accepted that demand response will play an important role in reliable and economic operation of future power systems and electricity markets. Demand response can not only influence the prices in the energy market by demand shifting, but also participate in the reserve market. In this paper, we propose a full model of demand response in which demand flexibility is fully utilized by price responsive shiftable demand bids in energy market as well as spinning reserve bids in reserve market. A co-optimized day-ahead energy and spinning reserve market is proposed to minimize the expected net cost under all credible system states, i.e., expected total cost of operation minus total benefit of demand, and solved by mixed integer linear programming. Numerical simulation results on the IEEE Reliability Test System show effectiveness of this model. Compared to conventional demand shifting bids, the proposed full demand response model can further reduce committed capacity from generators, starting up and shutting down of units and the overall system operating costs.

bidding mechanism↗

A two-phase investment model for optimal allocation of phasor measurement units considering transmission switching

Ensuring the reliability of an electrical power system requires a wide-area monitoring and full observability of the state variables. Phasor measurement units (PMUs) collect in real time synchronized phasors of voltages and currents which are used for the observability of the power grid. Due to the considerable cost of installing PMUs, it is not possible to equip all buses with PMUs. In this paper, we propose an integer linear programming model to determine the optimal PMU placement plan in two investment phases. In the first phase, PMUs are installed to achieve full observability of the power grid whereas additional PMUs are installed in the second phase to guarantee the N - 1 observability of the power grid. The proposed model also accounts for transmission switching and single contingencies such as failure of a PMU or a transmission line. Results are provided on several IEEE test systems which show that our proposed approach is a promising enhancement to the methods available for the optimal placement of PMUs.

Phasor measurement unit↗

Toward a scalable robust security-constrained optimal power flow using a proximal projection bundle method

Robust security-constrained optimal power flow (rSCOPF) aims to find the worst-case contingencies of alternating current optimal power flow (ACOPF) in power systems. With the rise of GPU architectures on the upcoming supercomputer architectures, optimization algorithms that rely on sparse linear algebra and indefinite linear systems are becoming increasingly hard to solve efficiently (e.g. interior-point method). To address this we revisit a maximin optimization formulation of the rSCOPF and the single-level mixed-integer semidefinite programming (MISDP) reformulation, which is obtained by taking the Lagrangian relaxation of the inner minimization ACOPF problem. In this paper, we focus on the development of a proximal projection bundle method (PPBM) for solving continuous relaxation node subproblems of the MISDP problem, based primarily on the well-known alternating direction method of multipliers. Cutting planes reminiscent of bundle method ideas are also applied in coordination with updates of the proximal parameter. The cutting-plane method can generate a large number of linear inequalities, leading to a large scale but decomposable quadratic programming (QP) subproblem that is amenable to GPUs. We present the numerical results on the IEEE 30, 57, 118, and 300-bus systems by using our PBMM method. We discuss the main computational bottleneck of our method, which is the time taken to solve each iteration of a QP subproblem instance of the PPBM, and how GPU architectures can accelerate this solution process.

bundle method↗

Feedback Control Approaches for Restoration of Power Grids from Blackouts

The automated restoration of power systems with variable energy resources is a timely problem to tackle. Automated restoration advice can support operators in deciding on strategic actions to restore power grids from a blackout with a mix of conventional and renewable generation resources. To this end, this paper frames the restoration process of power grids with solar resources as a nonlinear dynamic model with algebraic constraints in discrete time which is steered by feedback control loops. We discuss two feedback-control strategies based on greedy and reinforcement learning algorithms, and contrast their performance with restoration plans generated by a mixed-integer linear program. We found that the reinforcement learning algorithm infers restoration actions faster than the greedy one. However, the tuning process of the reinforcement learning parameters is slower than for the greedy one.

machine learning↗

Nodal capacity expansion planning with flexible large-scale load siting

We propose explicitly incorporating large-scale load siting into a stochastic nodal power system capacity expansion planning model that concurrently co-optimizes generation, transmission, and storage expansion. The potential operational flexibility of some of these large loads is also taken into account by considering them as consisting of a set of tranches with different reliability requirements, which are modeled as a constraint on expected served energy across operational scenarios. We implement our model as a two-stage stochastic mixed-integer optimization problem with cross-scenario expectation constraints. To overcome the challenge of scalability, we build upon existing work to implement this model on a high performance computing platform and exploit scenario parallelization using an augmented Progressive Hedging Algorithm. The algorithm is implemented using the bounding features of mpisppy, which have shown to provide satisfactory provable optimality gaps despite the absence of theoretical guarantees of convergence. We test our approach and assess the value of this proactive planning framework on total system cost and reliability metrics using realistic testcases geographically assigned to San Diego and South Carolina, with datacenter and direct air capture facilities as large loads.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cost-optimal evaluation of centralized and distributed microgrid topologies considering voltage constraints

Optimal design of hybrid renewable mini-grids requires both economic and power quality considerations. Existing modeling approaches address these considerations via separate or loosely coupled models. Here, we extend REopt—a techno-economic optimization model developed at the National Renewable Energy Laboratory—to consider both within a single model. REopt formulates the design problem as a mixed-integer linear program that solves for a site's optimal technology mix, sizing, and operation to minimize life cycle cost. REopt has traditionally assumed a single node system. In the work presented here, we expand the REopt platform to consider multiple connected nodes with associated voltage constraints. In order to do this, we model power flow using a fixed-point linear approximation method. Additionally, we then use the model to explore design considerations of mini-grids in Sub-Saharan Africa. Specifically, we evaluate under what combinations of transmission line distance and capacity it is technically viable and economically preferable to build multiple isolated mini-grids versus an interconnected, centralized system.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Revenue prediction for integrated renewable energy and energy storage system using machine learning techniques

Revenue estimation for integrated renewable energy and energy storage systems is important to support plant owners or operators’ decisions in battery sizing selection that leads to maximized financial performances. A common approach to optimizing revenues of a hybrid hydro and energy storage system is using mixed-integer linear programming (MILP). Although MILP models can provide accurate production cost estimations, they are typically very computationally expensive. To provide a fast yet accurate first-step information to hydropower plant owners or operators who consider integrating energy storage systems, we propose an innovative approach to predicting optimal revenues of an integrated energy generation and storage system. In this study, we examined the performance of two prediction techniques: Generalized Additive Models (GAMs) and machine learning (ML) models developed based on artificial neural networks (ANN). Predictive equations and models are generated based on optimized solutions from a market participation optimization model, the Conventional Hydropower Energy and Environmental Resource System (CHEERS) model. The two predicting techniques reduce the computational time to evaluate annual revenue for one set of battery configurations from 3 h to 1 to 4 min per run while also being implementable with significantly less data. The model validation prediction errors of developed GAMs and ML models are generally below 5%; for model testing predictions, the ML models consistently outperform the regression equations in terms of root mean square errors. This new approach allows plant owners, operators, or potential investors to quickly access multiple battery configurations under different energy generation and market scenarios. This new revenue prediction method will therefore help reduce the barriers, and thereby promoting the deployment of battery hybridization with existing renewable energy sources.

13 HYDRO ENERGY↗

QoS-aware edge AI placement and scheduling with multiple implementations in FaaS-based edge computing

Resource constraints on the computing continuum require that we make smart decisions for serving AI-based services at the network edge. AI-based services typically have multiple implementations (e.g., image classification implementations include SqueezeNet, DenseNet, and others) with varying trade-offs (e.g., latency and accuracy). The question then is how should AI-based services be placed across Function-as-a-Service (FaaS) based edge computing systems in order to maximize total Quality-of-Service (QoS). To address this question, we propose a problem that jointly aims to solve (i) edge AI service placement and (ii) request scheduling. These are done across two time-scales (one for placement and one for scheduling). Here we first cast the problem as an integer linear program. We then decompose the problem into separate placement and scheduling subproblems and prove that both are NP-hard. We then propose a novel placement algorithm that places services while considering device-to-device communication across edge clouds to offload requests to one another. Our results show that the proposed placement algorithm is able to outperform a state-of-the-art placement algorithm for AI-based services, and other baseline heuristics, with regard to maximizing total QoS. Additionally, we present a federated learning-based framework, FLIES, to predict the future incoming service requests and their QoS requirements. Our results also show that our FLIES algorithm is able to outperform a standard decentralized learning baseline for predicting incoming requests and show comparable predictive performance when compared to centralized training.

97 MATHEMATICS AND COMPUTING↗

Rolling Optimization of Transmission Network Recovery and Load Restoration Considering Hybrid Wind-Storage System and Cold Load Pickup

A common solution to deal with the stochasticity introduced by fast-ramping wind power integration is to equip wind farms (WFs) with energy storage systems (ESSs) to formulate hybrid WF-ESSs. In addition to leveling off wind power fluctuations during normal operations, a hybrid WF-ESS can be a flexible power source to accumulate the power system restoration. In this paper, we propose a rolling optimization model for transmission network recovery and load restoration considering the contributions of WF-ESSs. The proposed model is formulated as a mixed integer linear programming problem that simultaneously optimizes the amount and location of restorable load blocks as well as the restoration lines. The cold load pickup features of interrupted loads considering the outage duration are modeled in detail. A chance-constrained method is employed to deal with the uncertainty of wind power, and a rolling horizon-based framework is adopted to reduce the influence of forecast error. Case studies are conducted on both New England 39-bus system and part of a provincial power system in China. The results show that the load restoration process can be significantly accelerated by employing the proposed method and contributions of hybrid WF-ESSs to power system restoration are validated.

chance-constrained optimization↗

A scalable planning framework of energy storage systems under frequency dynamics constraints

As the penetration of renewables increases in power systems, the declining system inertia can cause frequency stability issues. Battery energy storage systems (BESSs) respond fast and therefore can relieve the low inertia difficulty but need to be appropriately sized considering the associated cost. This paper presents a novel stochastic optimization model for economically planning BESS capacity while considering the spatial–temporal correlation of wind generation and generator outages under frequency stability constraints, which include the rate-of-change of frequency (RoCoF), frequency nadir (FN), and quasi-steady-state (QSS) frequency. A set of new FN constraints that can be easily linearized is developed. To account for renewable uncertainties, a realistic uncertainty modeling approach, Random Field, is adopted to generate wind generation scenarios by considering both spatial and temporal evolutions of wind speed profiles. The ESS sizing is formulated as a mixed-integer linear programming problem and solved by using a scalable decomposition-and-coordination approach, Surrogate Absolute Value Lagrangian Relaxation (SAVLR). To further improve the scalability and reduce computational burdens, a rolling-horizon-based update is developed and incorporated into SAVLR for providing a practical solution to the long-term planning of very large-scale power systems. Finally, a modified IEEE 118-bus system and the Polish system are used to validate the effectiveness and scalability of the model and solution methodology.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Joint scheduling of energy, fast and primary frequency response reserves in integrated transmission–distribution networks

Inverter-based distributed energy resources (DERs) connected to distribution networks (DNs) can provide fast frequency support, but their reserve deliverability depends on feeder constraints and differs from synchronous primary frequency response (PFR). Existing transmission–distribution coordination studies usually treat reserve generically or neglect feeder-level feasibility, while frequency-security scheduling studies rarely represent distribution feeders explicitly. This paper develops a bi-level day-ahead scheduling framework for integrated transmission–distribution networks that jointly clears energy, transmission-side PFR, and distribution-side fast frequency response (FFR) under exogenous hourly inertia and largest-loss inputs from an external unit commitment (UC) schedule. The transmission problem is modeled with DC-optimal power flow (OPF) and closed-form second-order cone (SOC) frequency-security constraints, whereas each DN is represented by a reserve-aware branch-flow AC-OPF so that scheduled fast reserves remain deliverable during activation. The bi-level problem is reformulated through Karush–Kuhn–Tucker (KKT) conditions into a mixed-integer SOC program, and a penalty term is used to tighten the distribution-network relaxation. In the reduced test system, lower exogenous inertia increased the required primary response from 179.64 MW to 191.08 MW, distribution-side fast response reduced total frequency-response procurement by up to 4.9%, and neglecting distribution constraints overstated the combined distribution-side energy and reserve award by up to 18%. In the expanded study, the largest case was solved in 2.02 s with a 0.00% optimality gap. Time-domain simulations kept the frequency nadir above 59.0 Hz in all tested hours. These results demonstrate the value of fast-response modeling and distribution-feasible reserve delivery in coordinated market clearing.

Noh, Seung-Gil↗

A dynamic control approach for energy-efficient production scheduling on a single machine under time-varying electricity pricing

This paper proposes a dynamic control algorithm to enable an energy-aware single machine scheduling under the time-varying electricity pricing policy, in which price rates remain fixed day-to-day over the season. The key issue is to assign a set of jobs to available time periods where different electricity prices are assigned, while considering requested due dates of jobs so as to minimize total penalty costs for earliness and tardiness of jobs and total energy consumption costs, simultaneously. As the first contribution of this study, we develop a new mixed integer nonlinear programming (MINLP) model that aims at determining job arrival times and resulting earliness and tardiness of jobs and energy consumption costs for machine idle and normal processing. Second, an efficient heuristic approach based on continuous-time variable control models and algorithm is developed. The proposed heuristic adaptively changes job arrival times and due dates, which finally determine production sequence over the time periods of different electricity prices, machine turn-off, and machine idle with minimum energy consumption costs and just-in-time (JIT) penalty. Energy and JIT performance of the proposed approach is examined using real energy and machining parameters of a HAAS machine and compared to those of the metaheuristic approach. For relatively large size data groups, the proposed approach incurs about higher energy consumption costs on average, which are offset by up to lower JIT costs, resulting in lower total costs on average compared to the metaheuristic approach. Further, the proposed time-scaled heuristic algorithm yields extremely short computational time, which enables production managers to flexibly select proper production strategies and to implement them for different production environments.

42 ENGINEERING↗

Exploring the benefits of utilizing small modular device for sustainable and flexible shale gas water management

Growing shale gas extraction in recent years has triggered wide discussions on the associated freshwater requirement and wastewater management. Many optimization approaches have been developed for shale gas water management; however, most of the studies assumed permanent utilization of wastewater treatment facilities with fixed capacities. Considering the rapidly declining characteristics of shale gas wastewater production, these treatment facilities could remain largely underutilized after the first few months/years of production, making them less economically attractive. To maximize the capacity utilization of treatment facilities and further improve the economic performance of shale gas development, this study develops a systematic optimization framework, where the capacity strategy of conventional treatment facilities and utilization of the recent concept of modular manufacturing are both considered for flexible shale gas water management. The proposed mixed-integer linear programming (MILP) model simultaneously optimizes the design and planning of integrated shale gas and water supply chain, with a focus on capacity planning for both large-scale conventional treatment facilities and small-scale modular devices. A series of Marcellus-based case studies are performed to illustrate the applicability of the proposed model and provide general insights into the trade-offs between the multiple types of treatment facilities. The optimization results reveal that the combinatorial utilization of conventional facilities and modular devices for wastewater treatment (66% by conventional facilities and 34% by modular devices) brings 9.3% more reused water for other well development and 6.2% savings in water-related costs, compared to flexible management of only conventional facilities. Furthermore, this work suggests that taking modular device as auxiliary equipment for shale gas water management is most beneficial to increase the capacity utilization of treatment facilities and achieve a more economic and sustainable shale gas production system.

04 OIL SHALES AND TAR SANDS↗

A scalable design of experiments framework for optimal sensor placement

Here, we present a scalable design of an experiments framework for sensor placement in systems described by partial differential equations (PDEs). In particular, we aim to compute optimal sensor locations by minimizing the uncertainty of parameters estimated from Bayesian inverse problems and where the system. The resulting problem is a computationally intractable mixed-integer nonlinear program constrained by PDEs. We approach this problem with two heuristics used in compressed sensing and optimal control literature: a sparsity-inducing approach and a sum-up rounding approach. We also investigate metrics to guide the design of experiments (the total flow variance and the A-optimal design criterion) and analyze the effect of different noise structures (white and colored). Using an application in natural gas pipelines, we conclude that the sum-up rounding approach approach gives the best results and produces shrinking gaps with increasing mesh resolution. We also observe that convergence for the white noise measurement error case is slower than for the colored noise case. For A-optimal design, the solution is close to a uniform distribution of sensors along the pipeline while for the flow variance design the distribution is unstructured.

42 ENGINEERING↗

Piecewise polyhedral formulations for a multilinear term

Herein, we present a mixed-integer linear programming (MILP) formulation of a piecewise, polyhedral relaxation (PPR) of a multilinear term using its convex-hull representation. Based on the PPR’s solution, we also present a MILP formulation whose solutions are feasible for nonconvex, multilinear equations. We then present computational results showing the effectiveness of proposed formulations on standard benchmark nonlinear programs (NLPs) with multilinear terms and compare with a traditional formulation that is built using recursive bilinear groupings of multilinear terms.

42 ENGINEERING↗

An analysis of physics limited dispatch of nuclear renewable integrated energy systems using deep reinforcement learning and dynamic modeling

Previous approaches to dispatching nuclear integrated energy systems (NIES) have focused on the profitability and flexibility of these systems to operate on energy grids with highly variable pricing. However, due to the complexity involved in modeling and designing these systems, there has been less emphasis on ensuring that these dispatch strategies are physically achievable. It is imperative to develop methods that allow the system to remain within the desired NIES operating conditions and perform this based on realistic limited forecasted information. This research employs next generation artificial intelligence, namely deep reinforcement learning (DRL), and a dynamic system model written in Modelica to find a safe and profitable dispatch strategy for a solar nuclear hybrid design. The DRL agent is shown to find a novel dispatch strategy that manages both power ramping and power levels while respecting operational limits. This DRL-based dispatch is compared to other dispatching strategies including an optimal design solution from mixed integer linear programming (MILP). It is found that incorporating the physics of such a tightly coupled NIES limits the profitability of the MILP-based dispatch strategy. As a result, the MILP solution overestimates the design’s generated revenue. In contrast, DRL significantly reduces the number of breaches of safe operational conditions during energy arbitrage while maintaining profitability. Furthermore, this work paves the way for a more detailed assessment of NIES profitability and could be used to aid operator decisions on future NIES projects.

14 - SOLAR ENERGY↗

Battery asset management with cycle life prognosis

We report Battery Asset Management problem determines the minimum cost replacement schedules for each individual asset in a group of battery assets that operate in parallel. Battery cycle life varies under different operating conditions including temperature, depth of discharge (DOD), charge rate, etc., and a battery deteriorates due to usage, which cannot be handled by current asset management models. This paper presents a new battery asset management methodology where battery cycle life prognosis is integrated with parallel asset management to reduce lifecycle cost of the Battery Energy Storage Systems (BESS). For the battery failure time prognosis, a nonlinear physics-based battery capacity fade model is developed and incorporated in parallel asset management model to update battery capacity over time. Experiment results have shown that the developed battery asset management methodology can be conveniently used to facilitate BESS asset management decision making thereby decreasing asset lifecycle costs.

25 ENERGY STORAGE↗

Stochastic pre-event preparation for enhancing resilience of distribution systems

Extreme weather events are the common causes for power supply interruptions and power outages in electrical distribution systems. Improving the distribution system and enhancing its resilience is becoming crucial due to the increased frequency of extreme weather events. Preparation and allocation of multiple flexible resources, such as mobile resources, fuel resources, and labor resources before extreme weather events can mitigate the effects of extreme weather events and enhance the resilience of power distribution systems. Here, in this paper, a two-stage stochastic mixed-integer linear programming (SMILP) is proposed to optimize the preparation and resource allocation process for upcoming extreme weather events, which leads to faster and more efficient post-event restoration. The objective of the proposed two-stage SMILP is to maximize the served load and minimize the operating cost of flexible resources. The first stage in the optimization problem selects the amounts and locations of different resources. The second stage considers the operational constraints of the distribution system and repair crew scheduling constraints. The proposed stochastic pre-event preparation model is solved by a scenario decomposition method, Progressive Hedging (PH), to ease the computational complexity introduced by a large number of scenarios. Furthermore, to show the impact of solar photovoltaic (PV) generation on system resilience, three types of PV systems are considered during a power outage and the resilience improvements with different PV penetration levels are compared. Numerical results from simulations on a large-scale (more than 10,000 nodes) distribution feeder have been used to validate the effectiveness and scalability of the proposed method.

24 POWER TRANSMISSION AND DISTRIBUTION↗