Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Human reliability analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

475 records · Page 27

Speech motor control and acute mountain sickness

BACKGROUND: An objective method that accurately quantifies the severity of Acute Mountain Sickness (AMS) symptoms is needed to enable more reliable evaluation of altitude acclimatization and testing of potentially beneficial interventions. HYPOTHESIS: Changes in human articulation, as quantified by timed variations in acoustic waveforms of specific spoken words (voice onset time; VOT), are correlated with the severity of AMS. METHODS: Fifteen volunteers were exposed to a simulated altitude of 4300 m (446 mm Hg) in a hypobaric chamber for 48 h. Speech motor control was determined from digitally recorded and analyzed timing patterns of 30 different monosyllabic words characterized as voiced and unvoiced, and as labial, alveolar, or velar. The Environmental Symptoms Questionnaire (ESQ) was used to assess AMS. RESULTS: Significant AMS symptoms occurred after 4 h, peaked at 16 h, and returned toward baseline after 48 h. Labial VOTs were shorter after 4 and 39 h of exposure; velar VOTs were altered only after 4 h; and there were no changes in alveolar VOTs. The duration of vowel sounds was increased after 4 h of exposure and returned to normal thereafter. Only 1 of 15 subjects did not increase vowel time after 4 h of exposure. The 39-h labial (p = 0.009) and velar (p = 0.037) voiced-unvoiced timed separations consonants and the symptoms of AMS were significantly correlated. CONCLUSIONS: Two objective measures of speech production were affected by exposure to 4300 m altitude and correlated with AMS severity. Alterations in speech production may represent an objective measure of AMS and central vulnerability to hypoxia.

NASA Discipline Space Human Factors↗

How Public Private Partnerships Enable NASA Future Space Communication Needs

The NASA Space Communications and Navigation (SCaN) Program is responsible for providing communication and navigation services to scientific and human space exploration missions. SCaN's current Space Network provides radio frequency (RF) relay services to near Earth space missions via Tracking and Data Relay Satellites (TDRS). SCaN plans to offer a new generation of relay services beginning in 2025, including the addition of optical communications capabilities and enhanced RF capabilities. The primary drivers behind the development of these next generation relay network services are to enhance communication and navigation services with significantly reduced development and operational costs. Several approaches being considered for implementation of these services are through government owned capabilities, through commercial service providers, or a combination of the two. One approach receiving a great deal of attention is the use of Public-Private Partnerships (PPP) to develop and provide capabilities or services. Utilizing Public-Private Partnerships allows NASA and commercial entities to share the investment, standards, and risks of developing and testing new or enhanced capabilities which can benefit both NASA and the commercial space communication industry. The capabilities developed under the PPP can then be used to support the growth of the commercial satellite communications industry while simultaneously being introduced into NASA operations to provide service to future NASA missions as part of the NASA Next Generation Architecture. Partnerships formed for this purpose can also serve as the basis for further NASA acquisition activities where government and industry can continue to share the cost, risk, and benefits of space communications capability development and operations. This objective is consistent with the 2010 National Space Policy stated principles: "The United States is committed to encouraging and facilitating the growth of a U.S. commercial space sector that supports U.S. needs, is globally competitive, and advances U.S. leadership in the generation of new markets and innovation-driven entrepreneurship." [1]NASA has conducted several internal studies as well as externally funded studies with industry to define the next generation space communication architecture. NASA has approached the commercial industry through a Request for Information (RFI) to define further the next generation architecture and has conducted numerous internal and external studies. The results are promising and are shaping the approach to utilize Public Private Partnership to achieve NASA's objectives while reducing costs. The commercial satellite industry has begun to deploy high performance, high throughput global satellite constellations which have the potential to provide communication services to NASA Missions. Commercial satellite manufacturers have advanced their processes to rapidly design, build, and deliver, reliable communication satellites using minimum government oversight. In this paper, we will 1) describe the NASA Next Generation Architecture, Concept of Operations (ConOps), and salient characteristics; 2) Discuss the rational of Public-Private Partnerships to achieve NASA’s next generation communication architecture; and 3) Summarize the preliminary analysis performed to date and describe the path forward.

Stegeman, James↗

Ensuring Safe Exploration: Ares Launch Vehicle Integrated Vehicle Ground Vibration Testing

Integrated vehicle ground vibration testing (IVGVT) will be a vital component for ensuring the safety of NASA's next generation of exploration vehicles to send human beings to the Moon and beyond. A ground vibration test (GVT) measures the fundamental dynamic characteristics of launch vehicles during various phases of flight. The Ares Flight & Integrated Test Office (FITO) will be leading the IVGVT for the Ares I crew launch vehicle at Marshall Space Flight Center (MSFC) from 2012 to 2014 using Test Stand (TS) 4550. MSFC conducted similar GVT for the Saturn V and Space Shuttle vehicles. FITO is responsible for performing the IVGVT on the Ares I crew launch vehicle, which will lift the Orion crew exploration vehicle to low Earth orbit, and the Ares V cargo launch vehicle, which can launch the lunar lander into orbit and send the combined Orionilander vehicles toward the Moon. Ares V consists of a six-engine core stage with two solid rocket boosters and an Earth departure stage (EDS). The same engine will power the EDS and the Ares I second stage. For the Ares IVGVT, the current plan is to test six configurations in three unique test positions inside TS 4550. Position 1 represents the entire launch stack at liftoff (using inert first stage segments). Position 2 consists of the entire launch stack at first stage burn-out (using empty first stage segments). Four Ares I second stage test configurations will be tested in Position 3, consisting of the Upper Stage and Orion crew module in four nominal conditions: J-2X engine ignition, post Launch Abort System (LAS) jettison, critical slosh mass, and J-2X burn-out. Because of long disuse, TS 4550 is being repaired and reactivated to conduct the Ares I IVGVT. The Shuttle-era platforms have been removed and are being replaced with mast climbers that provide ready access to the test articles and can be moved easily to support different positions within the test stand. The electrical power distribution system for TS 4550 was upgraded. Two new cranes will help move test articles at the test stand and at the Redstone Arsenal railhead where first stage segments will be received in 2011. The Hydrodynamic Support systems (HDSs) used for Saturn and Shuttle have been disassembled and evaluated for use during IVGVT. Analyses indicate that the 45-year-old HDSs can be refurbished to support the Ares I IVGVT. An alternate concept for a pneumatic suspension system is also being explored. A decision on which suspension system configuration to use for IVGVT will be made in 2010. In the next three years, the team will complete the updates to TS 4550, upgrade the test and data collection equipment, and finalize the configurations of the test articles to be used in the IVGVT. With NASA's GVT capabilities reestablished, the FITO team will be well positioned to perform similar work on Ares V, the largest exploration launch vehicle NASA has ever built. The GVT effort continues NASA's 50-year commitment to using testing and data analysis for safer, more reliable launch vehicles.

Tuma, M. L.↗

Large Vehicle Lunar Landing Surface Interaction and In-Situ Resource Based Risk Mitigation: Landing & Launch Pads

A key capability required for the exploration of planetary bodies is the ability to land on the surface. Previous work performed by NASA and other institutions has primarily focused on landing small spacecraft on planetary surfaces and the associated small-to-medium thrusters required for the soft landing. In the case of human exploration—particularly the establishment of long duration exploration and habitation outposts—the ability to land large landers, such as the SpaceX Starship, is necessary. These larger landing systems require the use of more powerful engines, with higher engine exhaust temperatures and higher landing loads. Understanding the excavation of material by the engines, as well as the potential for the landing legs to sink into the subsurface, is key in ensuring reliable and safe landings. A further improvement in landing reliability can be achieved by constructing landing / launch pads, especially with in-situ resources. Some material excavation by the plume is inevitable, leaving at least a portion of the surface scoured and uneven under the lander and ejecting regolith particles and rocks at very high velocities. One possible solution would be to robotically build landing / launch pads (ideally autonomously) at the destination using in-situ materials. In this case, the first one or few landers will need to land on unimproved surfaces at higher risk; however, they would bring the required equipment to build the landing pads with mostly local resources, thus increasing the reliability of safe landing for subsequent larger landers. A number of methods to build in-situ landing and launch pads have already been developed. These methods include no or some addition of required binder additives to the local regolith material, different processing approaches and result in varying landing pad strengths. A sub-scale rocket engine plume, was used to simulate some of the conditions of a landing on the Moon to assess the effectiveness of various materials for an in-situ built landing pad, The GO2/GCH4 rocket engine fired on 1m2 area coupons of representative pad materials. The results will allow continued development towards materials that satisfy the landing pad properties required for the effective risk reduction and increased reliability for landing people and equipment on the lunar surface. This work contained two parts: (1) computer modeling of a large rocket engine plume interacting with regolith on the Moon, using the Granular Gas Flow Solver (GGFS) provided by CFD Research Corporation as well as other computational fluid dynamics codes (CFD) such as Loci/CHEM. (2) Developing landing/launch pad materials that could be used for in-situ construction on the lunar surface in the future, to mitigate the calculated effects of a large vehicle rocket engine landing and launching on the Moon. The resulting computed values of plume impingement surface temperature, stagnation pressure, gas velocity, shear stress and heat flux were then matched as closely as possible in the Earth’s atmosphere in a sub-scale rocket engine GO2/CH4 test which was provided by Masten Space Systems in Mojave, California. The rocket engine was mounted on a test stand with vertical translation capabilities so that the landing operations of a lander could be simulated (Figure 1).The pad materials test coupons were placed at the surface of a large bin containing simulated lunar basalt regolith and subjected to a test firing as shown in Figure 2. The results of this testing will be presented with related findings, analysis and discussion.

Plume Surface Interaction↗

Lander Lighting Solution to Reduce Pilot & Autonomous Approach Errors

The south pole lighting environment will have harsh low inclination sunlight, making overhead judgement of surface features difficult. Autonomous solutions are great, however, the need for visual monitoring and independent go/no-go decisions remain. Our project proposes that lunar landing systems will be better served by including a powerful landing light system that improves visibility of surfaces from overhead by illuminating the ground at critical distances for the crew to make last minute decisions regarding an approach. The project utilized computer-based optical modeling software to predict requirements for a potential landing light system. The analysis based the lamp prediction from commercially available LED chip sets and lamp optics. The goal was to illustrate a method to raise the surface contrast of a landing site within an acceptable contrast threshold for most camera systems and human observers to recognize hazards that would not be noticed with low inclination sunlight alone. The Apollo lunar landings benefitted from overhead sun or dark conditions. The surface lighting at the Lunar South Pole is a harsh environment where surfaces are lit from a low inclination angle by the sun (from the side). This change in lighting condition precipitates a need for updated lunar landing systems that facilitate improved recognition of landing sites, and thereby increase pilot awareness of landing hazards. The reliance on LIDAR and other autonomous mechanisms alone is risky given the known usage of visual monitoring for operator concurrence on current spacecraft programs and present-day autonomous land-based vehicles. Visual monitoring via cameras or windows requires the surface contrast to be within 3 orders of magnitude for reasonable recognition of objects. Artificial overhead illumination, when sufficiently sized, provides a means to even out contrast problems created by low inclination sunlight, potentially reducing piloting errors. Current vehicle requirements do not specify this type of guidance for the purpose of increasing mission success. An optical ray-trace simulation model was developed in Zemax Optics Studio to predict the best combination of LED power, LED optics, lamp quantity, and lamp location to raise the surface contrast to within 2 orders of magnitude from 3 orders required to further increased visibility and reduce risk. The project considered the following design constraints: potential base diameter of lander, approach distance(s) for a go-no-go decision point (200 meter), solar inclination angle (2-7), lunar surface reflectance (10%), LED chip sets, LED focusing optics, LED power, lamp quantity, lamp locations, and illumination diameter of lunar surface landing zone. The results can be used to establish minimum design constraints for vehicle landing light systems. With a solar inclination angle ranging from 2-7 degrees, the horizontal illumination of the lunar surface is attenuated by about 10% when compared to overhead illumination from the Sun. This modifies the sun's maximum of 130,000 lux to 13,000 lux horizontal illuminance. The artificial lighting system was designed to provide an 18-meter-wide illumination zone, to create viewing clearances around a 6-meter-wide lander. The system provides an average illuminance of 300 lux, meeting the 2 orders of magnitude criteria. The solution utilized modern Chip On Board LEDs, that each utilized 17 watts, with focusing Total Internal Reflection (TIR) lenses. A lighting system of 300 LEDs was arrayed along the "bottom" of a “lander”. With 17 watts per LED, the system is estimated to require 5100 watts. This is a large amount of power, but it would only be needed during critical phases during the landing. LED lighting systems can be dimmed, and it is assumed that as the lander arrives closer to the landing site, the lighting system power can be adjusted as needed to produce the necessary surface illuminance. The designed reduction of contrast improves reliability of safety assessments using real time visible light camera systems and out the window viewing by the crew.

T A Clark↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Digitalization mapping and assessment process supporting ION strategic transformation activities

The existing fleet of commercial nuclear power plants (NPPs) are an important asset in the nation’s portfolio of electrical generating resources. Their continued safe and reliable operation are critical to providing a large source of carbon-free electricity to power the nation’s economy. The United States Department of Energy’s (DOE) Light Water Reactor Sustainability (LWRS) Program develops the scientific bases, methods, and tools, for the continued safe and economical operation of the nation's commercial NPPs. The Plant Modernization Pathway within LWRS Program focuses on providing guidance to industry on the full-scale implementation of modernization solutions for NPPs that significantly reduce the technical and financial risks associated with modernization. This research is focused on helping the nuclear industry understand how to digitize and digitalize their NPPs so that they can design their modernization solutions to be scalable, sustainable, and integrated both laterally and horizontally within their organization. That is, this research creates a digital transformation in NPPs by reshaping cultural mindsets and by identifying business efficiencies. In partnership with industry, and using four previously established guiding principles for digitalization, this research supported NPP modernization through assessing readiness for digitalization as a means to achieve integrated operations for nuclear. Specifically, this research created an assessment to review an entire organization’s work processes to gather information about the digitalization health of the plant. The assessment tools were administered to plant employees, and the results were used to develop a digitalization plan. The survey assessment identified the optimal candidate processes that would most benefit from a digitalization initiative which were revealed through analytical frameworks. One analysis calculated mean digitalization health indicator scores for all endorsed activities which allowed the researchers to rank and color code the results for easy identification. Individual health indicator scores are also provided, should our industry partner wish to understand these findings according to their own organizational priorities, business considerations and desired end-state. The results were also analyzed from the perspective that organizations are comprised of different types of innovators (e.g., generators, optimizers, conceptualizers, and implementers), which differentially affects the organization’s ability to comprehend and adapt to change (i.e., opportunities to innovate). Understanding the relative composition of innovator types at an NPP allows them to gather insights into the strengths and weaknesses they have in innovating how work is performed. For the utility that partnered with this research team, the results showed that implementers make up the largest portion of respondents and conceptualizers the smallest portion. Knowing the proportion of innovator types gave this organization insights on how they can effectively implement their innovation solutions. Additionally, the results were analyzed from a technical, economic, and risk perspective to identify and quantify work reduction opportunities (WROs). Recognizing that not all cost-saving opportunities are the same, a Technical, Economic and Risk Assessment (TERA) was performed to evaluate WROs to identify areas of greatest potential and lowest risk. The key results from TERA included a digitalization opportunity score for each activity, and a calculation of potential cost savings. These two outputs formed the bases for calculating a priority index and rank for the activities/processes assessed. From the prioritization calculations, TERA can then help the utility 1) decide what digitalization priorities to invest money in implementing and then 2) calculates how much should be invested in the digitalization initiatives selected to achieve cost savings and/or an acceptable return on investment. Last, onsite interviews revealed several inefficiencies in the standard work processes that occur cross-departmentally that are due to the absence of digitized and digitalized processes. Examples of these include time spent scanning paper documents and then uploading the documents electronically, obtaining signatures, and searching for desired information. This represents a digital but not digitalized process. Over 15 opportunities to improve work processes were identified through this multi-method digitalization assessment. The various analytical assessments used (e.g., TERA, digitalization health indicator scores), as well as discussions with the utility partner, corroborated that all the opportunities identified had a strong potential to make work processes more efficient and to improve overall performance of the NPP.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗