Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Groundwater”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Hydrological controls of a riparian wetland based on stable isotope data and model simulations

Isotopic evidence of groundwater and stream water is frequently used to investigate water exchanges with groundwater. Monthly sampling of rain, stream water, and groundwater was conducted at Tims Branch watershed in South Carolina for the oxygen and hydrogen stable isotope (δ 2 H and δ 18 O) measurement, as well as pH and oxidation–reduction potential (ORP). Together with a mass balance perspective, it was determined that it takes a few weeks to one month for groundwater in the hyporheic zone to fully exchange with stream water. From hydrodynamic modelling, we show that substantial (up to 70 %) groundwater exchange occurs at gaining and losing sites. Groundwater exfiltration, i.e. inflow into stream water, contributes up to 4 % to stream water, with the remainder from upstream exfiltration. A 2–4 % per day renewal rate of adjacent groundwater would indirectly indicate a groundwater residence time in the order of half a month to a full month (assuming either a well-mixed case or large dispersion rate in pulse flow case), in agreement with a greatly reduced variability of δ 2 H and δ 18 O of groundwater compared to stream water and rain. This reduced variability of stable isotope signal from groundwater confirms our hypothesis that riparian groundwater mixing at Tims Branch is more of a mixed type rather than a pulse flow type. As a result, a monthly time scale is sufficient for groundwater to become anoxic at exit points into stream water resulting in the episodic production of natural organic matter- and iron-rich flocs upon oxidation.

54 ENVIRONMENTAL SCIENCES↗

(Project 18-15502) Reducing Uncertainty in Radionuclide Transport Prediction Using Multiple Environmental Tracers (Final Report)

In order to successfully site and design a nuclear waste disposal facility, DOE scientists are required to show safe containment of the radioactive waste for up to 1 million years. A significant hurdle to accurately and convincingly demonstrating disposal safety is predicting the fate of radioactive elements once they enter the groundwater system surrounding the repository. These predictions are often made with computer models, which contain accurate physics of groundwater movement and chemical reactions that occur during groundwater flow. As computer power increases, the physics and chemistry of these computer simulators can become more and more realistic and the physically based error decreases. However, the ability of these computer models to provide accurate predictions in a specific place, over long time periods, requires the scientists and engineers to know the subsurface properties of the Earth that control groundwater movement. In particular, groundwater scientists and engineers need to know the groundwater fluid velocity, which can change over time and strongly vary with location within the groundwater system. Because the Earth’s subsurface cannot be directly seen, and can only be sampled at drilling locations, the properties of the groundwater system are never known completely, and computer models of groundwater transport will always have some amount of uncertainty. This project’s principal goal was to use chemicals and isotope “tracers”, which have been introduced to the groundwater system by natural processes over long time periods, to help inform computer models of the groundwater velocity and subsurface properties. The goal was to calculate how much better predictions of groundwater transport were when these “tracers” were used to inform the computer models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Anthropogenic Markers in Alta Irrigation District Water Supply Wells

In July 2016, LLNL produced a report for the Kings River Watershed Coalition Authority (KRWCA) entitled “Groundwater Age and Nitrate Isotopic Composition in Alta Irrigation District Water Supply Wells” (Esser et al., 2016). That report summarized groundwater age and nitrate isotopic composition data produced by LLNL for Alta Irrigation District (AID) groundwater wells sampled by KRWCA in a pilot project to test the utility of advanced isotopic methods for constraining the timing and source of nitrate in groundwater at selected sites in the Kings River service area. One section of that report made recommendations for follow-on study. The first and strongest recommendation was to measure a wider suite of source tracers including co-contaminants such as herbicides, pesticides, pharmaceuticals, personal care products, and food constituents and additives. KRWCA followed up on this recommendation in Phase II of the pilot study by re-sampling the original set of wells and submitting the samples to a commercial laboratory for analysis of a limited range of co-contaminants (including pharmaceuticals, personal care products , and food constituents and additives, but not including herbicides or pesticides). They have asked that LLNL review and interpret these data in the context of previous LLNL analyses and to evaluate the utility of such co-contaminant analyses in providing additional constraints on the source of groundwater nitrate contamination in Alta Irrigation District water supply wells. The goal of the second phase of this pilot project is to evaluate the utility of co-contaminant occurrence for constraining nitrate source in groundwater at selected sites in the Kings River service area, with special reference to the use of such data in conjunction with advanced isotopic methods such as nitrate isotopic composition and groundwater age. Nitrate isotopic composition alone cannot distinguish nitrate derived from animal manure from nitrate derived from human septic waste. The presence or absence of agricultural chemicals (herbicides, pesticides, veterinary pharmaceuticals) or chemicals associated with people (human pharmaceuticals, artificial sweeteners) can help make this distinction. Co-contaminant analyses using multi-analyte LC-MS-MS protocols are now commercially available and reasonably priced. The feasibility and utility of the using co-contaminants for nitrate source attribution can be evaluated by 1) determining the degree to which co-contaminants occur in distinct and easily attributable groupings (e.g. agricultural chemicals vs personal care products and food additives); 2) determining the degree to which co-contaminant occurrence is consistent with nitrate isotopic composition and groundwater age (e.g. no co-contaminant occurrence in very old groundwater; co-contaminants consistent with animal manure or human septic waste occurring in groundwaters having nitrate isotopic composition also consistent with animal manure or human septic waste); and 3) determining the degree to which co-contaminants provide additional constraint on nitrate source over and beyond nitrate isotopic composition and groundwater age (e.g. distinguishing between animal manure and human septic waste).

58 GEOSCIENCES↗

Wilson Corners SWMU 001 2019-2020 Annual Long-Term Monitoring Report Kennedy Space Center, Florida

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2019 and 2020 at Wilson Corners, Solid Waste Management Unit 001, at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program. Adaptive site management is being utilized through ongoing assessment, design, and interim measures. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code. The goal of LTM at this site is threefold: to determine groundwater flow characteristics, monitor the downgradient concentration trends, and monitor select locations internal to the groundwater plume. Every 5 years, upgradient and side-gradient monitoring wells are sampled to verify delineation. The last time this was performed was in 2015. Sampling of these wells in 2020 was replaced with the direct push technology investigations in October 2020 and April 2021. The activities presented in this report include three field events: (1) December 2019 -groundwater gauging of 38 monitoring wells and sampling of 36 monitoring wells; (2) May 2020 - groundwater sampling of 7 monitoring wells; and (3) December 2020 - groundwater gauging of 49 monitoring wells and sampling of 43 monitoring wells. During the December 2019 and May 2020 events, monitoring wells were sampled using passive diffusion bags and were analyzed for a “full list” of volatile organic compounds (VOCs), including Freon 113. During the December 2020 event, the low flow sampling method was used, and samples were analyzed for a “select list” of VOCs, including Freon 113. The following conclusions can be made based on the 2019 and 2020 LTM results: •In December 2019 and December 2020, groundwater flow for the site was generally to the west with the individual zones only varying by occasional northerly and southerly components. This is generally consistent with historical observations at the site. •The GCTL plume continues to extend both horizontally and vertically beyond our current monitoring well network. •The vertical extent of VOCs was historically generally delineated by monitoring wells screened greater than 48 feet bls. The results from the two vertical extent monitoring wells WILC-MW0078 and WILC-MW0130 that were sampled during the 2019 and 2020 LTM indicate that groundwater VOC concentrations in both wells were greater than the GCTL. •Freon 113 was not detected above GCTLs during the 2019 and 2020 LTM events. Based on groundwater sampling activities performed during this reporting period, including recent DPT groundwater sampling conducted for the implementation of an air sparge system, the following recommendations are provided: •Install 10 new monitoring wells, which will be sampled along with 49 existing monitoring wells, to assist with delineation of the low concentration plume. The wells are listed inTable 4-1, and the proposed locations are presented on Figures4 -1 through 4-5. (Figures 4-1, 4-2, 4-3, and 4-5 also show updated plumes and proposed performance monitoring well locations. This information will be discussed and presented under a separate cover.) •Modify the annual LTM sampling plan as presented inTable 4-1. •Sampling for future events at the site will be conducted using low flow pumping methods. The next annual LTM sampling event is currently planned for December 2021. Please note the 10 new monitoring wells will not be installed before this event but will be installed as part of the upcoming IM construction and will be sampled during baseline sampling, along with the 49 existing monitoring wells. Following this sampling event, it is recommended that the Annual LTM be combined with the performance monitoring under the IM implementation, and LTM be temporarily discontinued. Objectives of the 2021 LTM are to: (i) evaluate groundwater gradient and flow direction by collecting depth to water measurements from LTM wells; (ii) continue monitoring the peripheral VOC trends in the northern, southern, and western portions of the site by monitoring existing wells and installing and monitoring new wells as recommended; and (iii) monitor select internal plume wells.

Jennifer Lynn Joyal↗

Contaminant Migration Modeling to Support the In Situ Decommissioning of Hardened Nuclear Facilities - 20215

The decommissioning of hardened nuclear facilities provides a unique challenge in balancing current worker dose with exposure to future receptors and media. In situ decommissioning (ISD) is a cost-effective and safe option for the closure of such facilities but requires a detailed understanding of the threat that radioactive and hazardous constituents remaining in the facilities pose to groundwater and surrounding surface water. The Savannah River Site (SRS) extensively employs contaminant migration models within the decommissioning process to develop site-specific removal, grouting, and monitoring strategies in support of safe and effective final end states of nuclear facilities. This work discusses the use of contaminant migration modeling in the ISD process at SRS, including specific examples from the closure of P-Reactor and R-Reactor, Building 235-F, F-Canyon and F/H Laboratory Complex. Migration models developed during the closure of P-Reactor and R-Reactor were divided into four source areas: the reactor vessel, the process area, the disassembly basin, and the purification wing. Each source area was assigned a specific inventory and migration pathway and was then subject to varying hypothetical removal, capping, and grouting schemes. Modeling indicated that groundwater Maximum Concentration Limits (MCLs) might be exceeded if no action was taken for eleven and ten constituents of concern (COCs) at P-Reactor and R-Reactor, respectively. These exceedances could occur in as few as 200 to 500 years. Alternatively, the migration modeling demonstrated that the selected ISD actions reduced contaminant mobility which allowed for significant radioactive decay and resulted in fewer predicted exceedances of groundwater MCLs (five COCs for P-Reactor; eight COCs for R-Reactor). In response to the modeling results for P-Reactor and R-Reactor, effectiveness monitoring programs were developed to target contaminants, specific to each reactor, that may migrate to groundwater. Contaminant migration modeling also revealed that roof collapse was a large factor in the release of COCs to the environment, giving rise to roof improvements, and an inspection and vegetation control program to ensure roof stability over time. Contaminant migration modeling is also aiding in the closure planning for hardened facilities in F Area. Building 235-F housed the Actinide Billet Line, which produced Np-237 billets for irradiation in SRS reactors, and the Plutonium Fuel Form (PuFF) facility that produced Pu-238 heat sources for the space program. As a result of these missions, areas within Building 235-F contain considerable residual amounts of both Pu-238 and Np-237. Contaminant migration modeling of Building 235-F was originally performed in 2012 to identify the feasibility of ISD and the amount of radioactive material removal required to prevent the exceedance of groundwater MCLs. The original model indicated that a 60% reduction in the PuFF facility Pu-238 inventory could keep groundwater concentrations below standards, while Np-237 did not pose a threat to groundwater. However, updates to the model with an emphasis on source impact pathways revealed that, due to the orientation of the source areas relative to groundwater flow, no amount of reasonable removal of Pu-238 would keep groundwater concentrations below MCLs and that Np-237 could be a large contributor to localized MCL exceedances. With this insight, the refined 2019 model is being used to assist in the development of grouting plans specific to each facility source area, where bentonite may be utilized to slow the migration of Pu-238 and its daughter products from the PuFF facility and a reducing grout may decrease Np-237 transport by ensuring the nuclide remains in the less mobile +IV oxidation state. The beginning phases of contaminant migration modeling are underway for F-Canyon and associated facilities using lessons learned from the Reactors and Building 235-F. A contaminant migration pathway, similar to the pathway used for the reactor vessels, is being developed for the hot and warm canyons. The F-Canyon inventories are being spatially refined to identify specific and localized source zones, comparable to Building 235-F, that may impact groundwater. Contaminant migration modeling provides vital input within the ISD process, from facility investigation to post closure effectiveness monitoring, making it a valuable tool in the development of safe and effective end states for hardened nuclear facilities at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uranium Mill Tailings Radiation Control Act Title II DOE Due Diligence and Lessons Learned from a Previous Site Transfer - 20352

Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) established that a government agency will provide perpetual care for closed uranium and thorium ore-processing sites that were operating under an NRC source material license in 1978 or were licensed thereafter. Commercial owners (licensees) operating under an NRC or agreement state specific license when UMTRCA was passed are responsible for conducting reclamation of any byproduct material remaining from uranium-ore processing operations in accordance with an NRC or agreement state approved reclamation plan. Reclamation includes both surface and groundwater remedies. Upon completion of reclamation and approval by NRC, the site is required to be transferred to either the host state or the DOE for long-term surveillance and maintenance. Since UMTRCA's enactment, six Title II sites have been transferred to DOE; an additional 24 Title II sites are anticipated to be transferred before 2050. DoE's role mandated under UMTRCA Title II as the long-term care custodian is to perform 'monitoring, maintenance, and emergency measures necessary to protect the public health and safety.' UMTRCA requires that the licensee pay a long-term surveillance charge 'sufficient to cover the annual costs of site surveillance.' However, at some sites such as the Bluewater, New Mexico, Disposal Site, this mandate has required additional effort and expense by DOE, beyond the originally anticipated and intended scope within UMTRCA, but within the authority of DOE under UMTRCA. In 1997, the Bluewater site became the second UMTRCA Title II site to be transferred to DOE. The site was the location of a uranium mill operated from 1953 until 1982. The specific licensee began site reclamation in 1991, and by 1995 all tailings and contaminated materials were encapsulated in two tailings disposal cells and other disposal areas. In addition to surface contamination, milling activities impacted groundwater in the two upper aquifers. In 1989, the specific licensee attempted active groundwater remediation; however, no significant reduction in contaminant concentrations was observed. As a result, the specific licensee applied to NRC for alternate concentration limits (ACLs) in 1990, which were approved in 1996 as being protective, after additional corrective actions were performed. Since transfer of the Bluewater site to DOE, unforeseen challenges have occurred, requiring additional actions. The first challenge is the occurrence of surface depressions located on the northern section of the main tailings disposal cell. The depressions were first observed during DoE's initial inspection in 1998; however, evidence of these can be observed on satellite images taken prior to transfer. Since being first observed, the depressions have continued to grow both in depth and areal extent. Due to the design of the main tailings disposal cell, the depressions impede storm water from being effectively shed off the 101- hectare (250-acre) top slope of the main tailings disposal cell. Instead, storm water accumulates in the depressions, forming a large ephemeral pond that has stored up to 16.3 x 10{sup 6} liters (4.3 million gallons) of stormwater. The ponding poses a potential risk to the integrity of the main tailings disposal cell in the case of a large storm event, with the potential to cause the pond to overtop and erode the cover material and underlying waste. DOE has taken a number of short-term actions to monitor, measure, and reduce the ponding and is currently working with the US Army Corps of Engineers to design and construct a repair. Additional challenges are associated with groundwater at the Bluewater site. Nine wells were present on the 1335-hectare (3300-acre) site upon transfer. Groundwater compliance was called into question after the State of New Mexico reduced its uranium groundwater standard from 5.0 to 0.03 milligrams per liter in 2004, and when an ACL for uranium was exceeded in a site monitoring well in 2010. Acquiring historical groundwater data and subsequent evaluations as well as additional DOE groundwater monitoring led to installing 10 new monitoring wells and performing additional site hydrogeology recharacterization. DOE continues to evaluate groundwater conditions at the site and works with the NRC to determine regulatory requirements and a path forward. As a result of lessons learned at the Bluewater site and other Title II sites, improved processes have been implemented at a programmatic level to increase due diligence before site transfer and prevent similar issues from occurring at other UMTRCA Title II sites under long-term management. DoE's due diligence process is documented in the Process for Transition of UMTRCA Title II Disposal Sites to DOE for Long-Term Surveillance and Maintenance and is designed to ensure that DOE has no technical or compliance concerns with regulatory decisions that might compromise protectiveness following site transfer to DOE. Implementation of the due diligence process has increased DoE's role prior to site transfer and has been effective in identifying potential issues. Actions by NRC and specific licensees, in response to enhanced due diligence efforts by DOE, are expected to minimize, if not totally prevent, the need for unanticipated actions by DOE pertaining to the surface and groundwater remedies after site transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydrological and Thermal Dynamics of a Supra‐Permafrost Subterranean Estuary

Subterranean estuaries (STEs), where groundwater interacts with seawater, influence surface and subsurface coastal ecology and biogeochemistry. In Arctic-STEs overlying permafrost, groundwater flow and heat transport determine the fate of organic matter. Yet, direct observations of groundwater flow and heat and solute transport processes in Arctic STEs remain limited. This study characterized groundwater flow paths and fluxes and heat transport within an Arctic-STE along Alaska's Beaufort Sea coast during thawing, summer, and freeze-up. Intertidal seabed temperature-depth profiles collected along a 10-m transect captured the active groundwater flow period, from thaw and flow onset in mid-June to freeze-up in late-September. During this period, aquifer geometry evolved non-uniformly due to spatially varying thaw rates across the STE (mean (m) thaw depths–beach: 0.25 to 0.55–0.6 m on 20 June, 25 July, 1 October; seabed: 0.6–0.9 m from 25 July to 1 October). Groundwater and surface water levels, salinity, and subsurface temperature profiles measured over tidal time scales were interpreted alongside groundwater flow-heat transport numerical simulations. Fresh groundwater discharge was sporadic during thawing (m: 0.32 m 3 /day/m), abundant in summer (m: 0.45 m 3 /day/m), and was largely absent during freeze-up. During freeze-up, groundwater flow was driven exclusively by seawater recirculation via tidal pumping (from thawing to summer to freeze-up: 0.00025–0.15–0.5 m3/day/m) and convection. Heat advection dominated near aquatic interfaces (shaping intertidal ice), and conduction controlled vertical temperature gradients in low-flow and unsaturated sediments. These findings will help predict how prolonged summers will alter Arctic-STE cryo-hydrology and biogeochemistry.

54 ENVIRONMENTAL SCIENCES↗

Null Space Monte Carlo Evaluation of the Plateau to River Model

The Plateau to River Groundwater Model (P2R Model) is a groundwater flow and contaminant fate and transport (F&T) simulation model used to support remedial activities conducted by CH2M HILL Plateau Remediation Company at the Hanford Site in Washington State. Figure 1-1 illustrates the P2R Model extents, discretization, and boundary conditions. The P2R Model provides a computational framework to simulate the F&T of contaminants in groundwater associated with the 200-PO-1, 200-UP-1, 200-BP-5, and 200-ZP-1 Groundwater Operable Units (OUs) in the Hanford Site Central Plateau. In addition, the model includes adjacent areas and facilities (e.g., the State Approved Land Disposal Site). Intended and anticipated uses of the model include calculating water levels, hydraulic gradients, and groundwater flows throughout the model domain (encompassing the 200 West and 200 East Areas) for use in subsequent F&T calculations for contaminants of concern and developing scale-appropriate, telescopic-mesh refinement models for detailed evaluation of areas within the model domain where required. The overall objective of the modeling effort is to provide a basis for making informed remedial action decisions based on descriptions of current and expected future contaminant concentrations in groundwater at decision points within the OU boundaries. The objective for the model development phase is to create a common modeling platform that can be used for investigations of the Central Plateau groundwater OUs and areas downgradient toward the Columbia River. The P2R Model calibration to historical data observed at the Hanford Site is documented in CP-57037, Model Package Report for the Plateau to River Model Version 8.3. The purpose of this environmental calculation is to describe a null space Monte Carlo (NSMC) evaluation was conducted with the historic calibration of the P2R model. Use of numerical groundwater models is always accompanied with uncertainty in the results produced by a model because models are approximations of reality. Thus, by definition, lack the detail to fully represent observed behavior. Use of numerical techniques, such as a NSMC analysis, can help in identifying and quantifying the potential uncertainties associated with a numerical model such as the P2R Model. Use of the NSMC approach results in 100 groundwater flow models that are variants of the calibrated P2R Model. These variant models can be used to evaluate uncertainty in model predictions made by the calibrated P2R Model for other analyses. A secondary purpose of the environmental calculation is to establish these variant models for use with other applications.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

University of Hawai‘i, Shallow Geothermal Resources: Energy Technology Innovation Partnership Project (Final Report)

Scientists at Lawrence Berkeley National Laboratory (Berkeley Lab) have teamed up with the University of Hawai‘i at Manoa (UH Manoa) through the U.S. Department of Energy’s Energy Technology Innovation Partnership Project to evaluate the technological and market feasibility of shallow geothermal heat exchanger (GHE) technology. UH requested this analysis to evaluate opportunities in building cooling, energy efficiency, and emissions reduction applications in Hawai‘i. UH has an abundance of geologic and geothermal data and is looking to the national labs’ expertise to execute this analysis. UH is also interested in investigating policy, regulatory, and business conditions advantageous for implementation of a pilot project and more broad deployment of this technology in Hawai‘i. In many locations around the world, the demands for heating and cooling are roughly balanced over the course of the year, so GHEs do not cause significant long-term changes in subsurface temperature. This is not the case in Hawai’i, where the demand for heating is very small, meaning that, over time, GHEs will add heat to the subsurface. If temperatures increase significantly, GHE systems will not work as designed. Regional groundwater flow has the potential to sweep heated water away from boreholes, thereby maintaining the functionality of the GHE system. Significant regional groundwater flow requires two things: a sufficiently large driving hydraulic head gradient (usually closely related to surface topography), and sufficient porosity and permeability to enable groundwater to flow in large enough quantities to enable near-borehole temperatures to be maintained at ambient values. Hawai‘i’s volcanic terrain offers ample surface topographic variation. The lava itself shows an extremely large range of porosity and permeability, so sites with large enough values of these properties must be selected. Numerical modeling of coupled groundwater and heat flow can be used to determine how large is large enough. Primarily, closed-loop systems have been investigated. Other options considered are open-loop systems and using cool seawater as the chilling source. Project work investigated the feasibility of GHE technology at two scales. At the island scale, GIS layers of various attributes relevant for GHE were combined to develop an overall favorability map for employing GHE in Hawai‘i. At the local scale, a hydrogeologic model for the subsurface component of a closed-loop system was developed for the Stan Sheriff Center at the UH Manoa campus. This site is considered promising because the rock below and immediately downgradient of the borefield is highly permeable, consisting of a subsurface karst system (limestone containing high-permeability open channels), which is underlain by a thick, high-permeability fractured basalt. Moreover, the site is near the base of the Ko‘olau Range, providing a large hydraulic head gradient. Thus, groundwater flow through the site is expected to be large, enabling efficient removal of heated groundwater. A full-GHE-system model of the site was also developed, with a simplified representation of the subsurface, in which groundwater flow is not considered and heat transfer is purely by conduction. Using the building cooling load data provided by UH, simulation results show that with groundwater flow present, a GHE can operate successfully for at least 10 years, but with no groundwater flow, the subsurface begins to heat up after only one year of operation, making the GHE unviable within 2-6 years. The team also developed a techno-economic model for this site to compare the cost of cooling using a GHE system with the costs of operating the current air-conditioning system. The GHE system is advantageous economically if favorable tax incentives and interest rates can be obtained.

15 GEOTHERMAL ENERGY↗

Achieving the End State for the Pahute Mesa Corrective Action Units at the Nevada National Security Site - 20355

Underground nuclear testing at the Nevada National Security Site (NNSS) ended in 1992. To address the impact of radionuclide contamination from underground nuclear testing on the groundwater resources of Nevada, the U.S. Department of Energy (DOE) Environmental Management (EM) Nevada Program created the Underground Test Area (UGTA) activity to characterize the radionuclides in groundwater, understand the nature and extent of radionuclide migration, and forecast the distribution of radionuclides in groundwater for 1,000 years. The UGTA activity is regulated by the Federal Facility Agreement and Consent Order (FFACO), an agreement negotiated between the Nevada Division of Environmental Protection (NDEP), DOE, and the U.S. Department of Defense (DoD). DOE is close to achieving the end state (closure in place with monitoring and institutional control) for three of the five UGTA corrective action units (CAUs) on the NNSS. A number of challenges remain to achieve the end state of the other two CAUs, both located on Pahute Mesa. Pahute Mesa was the location of 82 underground nuclear tests, less than 10% of the total number of tests on the NNSS. Yet, Pahute Mesa contains slightly more than 60% of the total radionuclides (in curies). Based on groundwater sampling in monitoring wells, two radionuclide plumes have migrated several kilometers (km) in groundwater from selected test cavities and have crossed the boundary of the NNSS (yet remain within the boundaries of Federally controlled land). The path to achieve the end state continues to evolve as more data are collected and a better understanding of radionuclide migration in groundwater is developed. DOE has invested in drilling and sampling more than 50 characterization and monitoring groundwater wells over the past 25 years. The data indicate that the primary radionuclide of concern is tritium as it is about 89% of the total radionuclide inventory (in curies). As well, only tritium has been measured in groundwater outside of cavities at concentrations exceeding the Safe Drinking Water Act (SDWA) standard. For one of the tritium plumes that has migrated across the NNSS boundary, the average rate of migration has been measured as about 45 meters (m) per year with the rate of migration at the leading edge of the plume of about 85 meters per year. At that rate of migration, the tritium plume will decay to safe levels and not reach the publicly accessible environment at concentrations above the SDWA standard. Other radionuclides, at concentrations below the SDWA standards, will be monitored to ensure they remain at safe levels. Consequently, the end state path forward for Pahute Mesa has evolved to take full advantage of the data from the monitoring network to constrain uncertainty in model forecasts and to reduce reliance on probabilistic simulations. The focus of the end state approach relies on developing a monitoring well network that is protective of human health by increasing confidence that no radionuclide plume in the groundwater will migrate undetected to the accessible environment, located about 22 km from the nearest up-gradient underground nuclear test. Using the measured data to remove uncertainty, the evaluation of radionuclide migration from Pahute Mesa is directed toward meeting the goals of the end state. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Accounting for uncertainty in complex alluvial aquifer modeling by Bayesian multi-model approach

Alluvial aquifers by nature are complex caused by varied depositional environments. Developing a reliable groundwater model to represent an alluvial aquifer is non-trivial. Also, relying on a single best calibrated model may not be sufficient because of an inadequate choice of model parameter values. To better understand groundwater dynamics and improve model prediction reliability, this study presents a Bayesian multi-model uncertainty quantification (BMMUQ) framework to account for model parameter uncertainty in complex alluvial groundwater modeling. The methodology was applied to the agriculturally intensive Mississippi River alluvial aquifer (MRAA), Northeast Louisiana. An aquifer architecture was first constructed using 7,259 well logs in the MRAA area which covers three fluvial deposits (alluvium, braided-stream terrace, and braided-stream terrace-loess). A 12-layer MODFLOW model was then developed to address the alluvial aquifer complexity and well calibrated through a genetic algorithm. This study quantified model parameter uncertainty in hydraulic conductivity and specific storage of sand facies. Bayesian model averaging (BMA) with the Expectation Maximization (EM) algorithm was adopted to derive posterior model weights and head variances of 50 alternative conceptual groundwater flow models, and thereby obtains BMA ensemble model predictions instead of only relying on the best calibrated conceptual model. Overall, results show that an estimated around 950 million m3 of groundwater storage loss occurs in 2015 with respect to the beginning of 2004, due to high groundwater demand for irrigation in the MRAA area. Explicitly quantifying model uncertainty can produce more reliable groundwater level predictions from BMA ensemble model. The presented groundwater modeling framework improves our understanding of the MRAA and provides a valuable tool to assist agricultural water management.

54 ENVIRONMENTAL SCIENCES↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

Tracking natural CO 2 migration through a sandstone aquifer using Sr, U and C isotopes: Chimayó, New Mexico, USA

The geochemical and isotopic characteristics of groundwaters in Chimayó, New Mexico, reflect processes that affect water quality in the Tesuque Aquifer, which overlies a leaking natural CO 2 source in a structurally complex region. In this study, select isotopes (δ 13 C, 87 Sr/ 86 Sr, 234 U/ 238 U) are applied to groundwaters to better understand CO 2 transport mechanisms and related water-rock interactions that impact Chimayó groundwater. Carbon stable isotope ratios of dissolved inorganic carbon (DIC; δ 13 CDIC = -15.10‰ to 4.50‰) identify a distinct source of upward-migrating CO 2 that interacts with the groundwater. Additionally, groundwater 87 Sr/ 86 Sr compositions (0.7098 to 0.7154) reflect intrusion of varying amounts of saline water associated with the high CO 2 source, while 234 U/ 238 U ratios corroborate presence of deep groundwater and suggest impacts from distinctive natural uranium sources are affecting groundwater. Previous work proposed two CO 2 transport mechanisms at the site: (1) dissolved in deep brine that underlies the aquifer and (2) in the gas phase; this study uses isotope mixing models to identify wells that are affected by these CO 2 transport mechanisms and demonstrates that both transport mechanisms are associated with impaired groundwaters. Overall, this study demonstrates that applying multiple isotope systems (δ 13 CDIC, 87 Sr/ 86 Sr, 234 U/ 238 U) is a dynamic tool for identifying and measuring the impact of CO 2 leakage from a sequestration site.

58 GEOSCIENCES↗

Phase II and III Solid Waste Management Unit Assessment and Confirmatory Sampling Report for Per- and Polyfluorinated Alkyl Substances, Potential Release Location 237, Kennedy Space Center, Florida

Per- and polyfluoroalkyl substances (PFAS) Phase II and III Solid Waste Management Unit (SWMU) Assessment (SA) and Confirmatory Sampling (CS) were conducted at the John F. Kennedy Space Center (KSC), Potential Release Location (PRL) 237, located in Merritt Island, Brevard County, Florida for the National Aeronautics and Space Administration (NASA) under Contract 80KSC019D0010/80KSC019F0289. A Phase I SA and CS Report was previously submitted that identified 33 locations of concern (LOCs) at KSC associated with the storage, use, or release of materials containing PFAS. The objectives of the Phase II and III SA and CS were to: - Complete site and source characterization of identified LOCs; - Identify areas of potential concern (AOPCs) where past or present activities may have resulted in a release of PFAS to the environment; - Qualitatively characterize migration potential of released PFAS to environmental media (primarily soil, groundwater, surface water, and sediment); and - Identify potential receptors for exposure to PFAS-impacted environmental media. Surface water samples were collected from LOCs/AOPCs and locations on the KSC periphery during PFAS CS Phases I, II and III. Including duplicate samples, 143 environmental samples were analyzed for 14 PFAS compounds and 104 environmental samples were analyzed for 18 PFAS compounds. Ten of the analytes on the 14 compound list were detected at least once in surface water at KSC, with a wide range in magnitude of detections. The State of Florida has surface water screening levels (SWSLs) for perfluorooctanoic acid (PFOA) and perfluorooctanesulfonic acid (PFOS) in surface water, both for human and ecological receptors. The human health screening levels are lower than the ecological ones and are used in this report. PFOA was not detected in surface water at concentrations exceeding the SWSL at any LOC or Area of Potential Concern (AOPC). PFOS was detected in surface water at concentrations exceeding the SWSL at 28 LOCs/AOPCs, plus 42 locations on the KSC periphery. The data suggest a wide distribution of PFAS, particularly PFOS, in surface water but the sources of surface water contamination are not yet adequately understood. Sediment samples were collected during Phases II and III but not Phase I. Including duplicate samples, 104 environmental samples were analyzed for 14 PFAS compounds and 10 environmental samples were analyzed for 18 PFAS compounds. Twelve compounds were detected in sediment at KSC, with a wide range in magnitude of detections. There are currently no screening levels or cleanup target levels (CTLs) for sediment. The need to delineate and further characterize PFAS in sediment will be evaluated for those sites that move forward into Site Assessment. Groundwater samples were collected via DPT from LOCs/AOPCs and locations on the KSC periphery during PFAS CS Phases I, II and III. Including duplicate samples, 812 environmental DPT groundwater samples were analyzed for 14 PFAS compounds and 247 environmental samples were analyzed for 18 PFAS compounds. Twelve of the 14 compounds were detected in groundwater at KSC, with a wide range in magnitude of detections. The State of Florida has provisional groundwater cleanup target levels (GCTLs) for PFOA, PFOS and the additive concentration of PFOA+PFOS. PFOA was detected in groundwater at concentrations exceeding its provisional GCTL at 16 LOCs/AOPCs, with no exceedances on the KSC periphery. PFOS was detected in groundwater at concentrations exceeding its provisional GCTL at 30 LOCs/AOPCs, plus two locations on the KSC periphery. PFOA+PFOS was detected in groundwater at concentrations exceeding the provisional GCTL at 31 LOCs/AOPCs, plus two locations on the KSC periphery. Soil samples were collected during Phases II and III but not Phase I. Including duplicate samples, 292 environmental samples were analyzed for 14 PFAS compounds and 80 environmental samples were analyzed for 18 PFAS compounds. Fourteen compounds were detected in soil at KSC, with a wide range in magnitude of detections. The State of Florida has provisional soil cleanup target levels (SCTLs) for PFOA and PFOS. There were no PFOA results above its provisional SCTL. There was one LOC with a result above the provisional SCTL for residential settings. Recommendations are presented for each LOC and AOPC.

PFAS↗

Hydrocarbon Burn Facility, SWMU 007 Per- and Polyfluoroalkyl Substances (PFAS) Assessment Report Addendum

This document discusses the Per-and Polyfluoroalkyl Substances (PFAS) assessment activities performed from May through August 2023 at the Hydrocarbon Burn Facility (HBF) located at Kennedy Space Center (KSC), Florida. HBF was used for firefighting training between 1966 and 1994. Aqueous film-forming foams (AFFFs) that contained PFAS were used as suppressants for fighting petroleum fuel fires during training. PFAS sampling was first completed at HBF in 2015. This PFAS Assessment Report Addendum (ARA) is a continuation of sampling efforts, with an overall objective to further delineate PFAS concentrations in groundwater to the pGCTLs and the United States Environmental Protection Agency (EPA) Tapwater Regional Screening Levels (RSLs) dated November 2023 and better understand groundwater to surface water interaction at the Site. The field activities presented in this PFAS ARA were conducted between May and August 2023 and included the collection of 132 direct push groundwater samples and the collection of five colocated surface water, sediment, and pore water samples from locations south/southeast of HBF in August 2023. Exceedances of the pGCTLs and Tapwater RSLs were observed in the direct push groundwater results; however, groundwater has been delineated to the pGCTLs. Exceedances of the Florida provisional Surface Water Screening Levels (pSWSLs) were observed in surface water and porewater, and concentrations of PFAS in these media confirm PFAS migration within surface channels to the south of the HBF site area. Maximum sediment concentrations, which correlate with the maximum surface water and porewater concentrations, demonstrate that PFAS impacted surface water is the source of sediment impacts. Overall, elevated concentrations of PFAS are centered on the HBF site area that trend north and south along the surface water filled swales and along the edge of Banana River. Based on analytical results, not all surface water features in this area exhibit evidence of transport. PFAS migration/transport appears to be more dominant in surface water features during the wet season. Discharges to the Banana River primarily occur where surface water facilitates transport. In contrast, groundwater transport is more effective during the dry season. During precipitation events in either the dry season or the wet season, there appears to be migration from the intermediate groundwater zone to the shallow zone into the surface water features. Additional sampling and data collection is recommended to support further refinement of PFAS groundwater delineation, a remedial alternative evaluation, and the fate and transport model.

Jennifer Buel↗

Reproducibility of Radiokrypton in Deep Desert Aquifers: Insights from a Decade of Research

Great technical advances have been achieved since the first atom-trap trace analysis (ATTA) -based radiokrypton application in Egypt, where 1 Myr old groundwater was discovered. Beyond advances in ATTA measurement capabilities, including reduction in sample size, analysis duration, and analytical uncertainty, major progress has been achieved over the past two decades in the sample collection and preparation techniques. These advances paved the expansion of ATTA-based noble gas applications to many other aquifers worldwide, illuminating the nature and flow pattern of deep groundwater systems. While the potential of this new analytical technique for old groundwater dating is well recognized, another important aspect yet to be examined is the reproducibility of radiokrypton in aquifers over time, i.e., how representative is a discrete groundwater sample, collected at a specific time and location, for the natural groundwater system? The likelihood of a negative answer is increased by flow-field disturbance in aquifers following massive groundwater abstraction. Here, in this work, we present repeated 81 Kr sampling and measurements in twenty-one sites over Israel, mostly of deep (up to 1 km) wells tapping confined aquifers in the arid to hyperarid Negev desert. The results demonstrate that radiokrypton measurements are indeed reproducible, even in cases where samples were collected as long as nine years apart and from highly productive (∼1 Mm 3 /yr order) pumping wells. Furthermore, many of the repeated measurements in this study (17 out of the 21 sites) were conducted with different ATTA Instruments in two different laboratories using slightly different sampling, preparation, and analysis techniques, yet with an overall good agreement. The consistency in the ATTA-based 81 Kr-dating results over time highlights the robustness of this state-of-the-art technique as a tool to unravel groundwater flow patterns and encourages further applications to many other yet-to-be-explored deep aquifers.

atom-trap trace analysis↗

The Role of Snowmelt and Subsurface Heterogeneity in Headwater Hydrology of a Mountainous Catchment in Colorado: A Model‐Data Integration Approach

Mountainous headwater streams are sustained by both snowmelt‐driven streamflow and groundwater discharge in the Upper Colorado River Basin. However, predicting headwater stream discharge magnitude and peak flow timing is challenging in mountainous terrains, where snowmelt rates vary with vegetation type and elevation, and heterogeneous subsurface physical properties influence groundwater storage and its release. We used a model‐data integration approach to investigate the roles of snowmelt and subsurface structure in stream discharge and groundwater level. We ran an ensemble of 100 integrated surface‐subsurface hydrologic models for a mountainous headwater catchment near Crested Butte, Colorado, USA. We also evaluated and calibrated these models against observed data sets, including snow depth measurements using distributed temperature probes, stream discharge, and groundwater levels. Calibration with multiple data sources using neural density estimators has further constrained uncertainty in subsurface properties and snowmelt rates. Results indicated that observed slower snowmelt rates in evergreen forests delayed the peak flow and baseflow onset. In upstream areas with lower subsurface permeability, water was stored within the subsurface but was not released as interflow or shallow groundwater flow, and thereby not contributing to downstream streamflow during recession limb periods. Double peaks in groundwater occurred in areas with spatial subsurface heterogeneity, in our case due to the contrast between granodiorite and Mancos shale. These process‐based insights into groundwater and snowmelt dynamics in mountainous headwaters will help improve predictions of headwater hydrology.

Wang, Lijing [University of Connecticut, Storrs, C↗

HarDWR - Harmonized Water Rights Records

For a detailed description of the database of which this record is only one part, please see the HarDWR meta-record. Here we present a new dataset of western U.S. water rights records. This dataset provides consistent unique identifiers for each spatial unit of water management across the domain, unique identifiers for each water right record, and a consistent categorization scheme that puts each water right record into one of 7 broad use categories. These data were instrumental in conducting a study of the multi-sector dynamics of intersectoral water allocation changes through water markets (Grogan et al., in review). Specifically, the data were formatted for use as input to a process-based hydrologic model, WBM, with a water rights module (Grogan et al., in review). While this specific study motivated the development of the database presented here, U.S. west water management is a rich area of study (e.g., Anderson and Woosly, 2005; Tidwell, 2014; Null and Prudencio, 2016; Carney et al, 2021) so releasing this database publicly with documentation and usage notes will enable other researchers to do further work on water management in the U.S. west. The raw downloaded data for each state is described in Lisk et al. (in review), as well as here. The dataset is a series of various files organized by state sub-directories. The first two characters of each file name is the abbreviation for the state the in which the file contains data for. After the abbreviation is the text which describes the contents of the file. Here is each file type described in detail: XXFullHarmonizedRights.csv: A file of the combined groundwater and surface water records for each state. Essentially, this file is the merging of XXGroundwaterHarmonizedRights.csv and XXSurfaceWaterHarmonizedRights.csv by state. The column headers for each of this type of file are: state - The name of the state the data comes from. FIPS - The two-digit numeric state ID code. waterRightID - The unique identifying ID of the water right, the same identifier as its state uses. priorityDate - The priority date associated with the right. origWaterUse - The original stated water use(s) from the state. waterUse - The water use category under the unified use categories established here. source - Whether the right is for surface water or groundwater. basinNum - The alpha-numeric identifier of the WMA the record belongs to. CFS - The maximum flow of the allocation in cubic feet per second (ft3s-1). Arizona is unique among the states, as its surface and groundwater resources are managed with two different sets of boundaries. So, for Arizona, the basinNum column is missing and instead there are two columns: surBasinNum - The alpha-numeric identifier of the surface water WMA the record belongs to. grdBasinNum - The alpha-numeric identifier of the groundwater WMA the record belongs to. XXStatePOD.shp: A shapefile which identifies the location of the Points of Diversion for the state's water rights. It should be noted that not all water right records in XXFullHarmonizedRights.csv have coordinates, and therefore may be missing from this file. XXStatePOU.shp: A shapefile which contains the area(s) in which each water right is claimed to be used. Currently, only Idaho and Washington provided valid data to include within this file. XXGroundwaterHarmonizedRights.csv: A file which contains only harmonized groundwater rights collected from each state. See XXFullHarmonizedRights.csv for more details on how the data is formatted. XXSurfaceWaterHarmonizedRights.csv: A file which contains only harmonized surface water rights collected from each state. See XXFullHarmonizedRights.csv for more details on how the data is formatted. Additionally, one file, stateWMALabels.csv, is not stored within a sub-directory. While we have referred to the spatial boundaries that each state uses to manage its water resources as WMAs, this term is not shared across all states. This file lists the proper name for each boundary set, by state. For those whom may be interested in exploring our code more in depth, we are also making available an internal data file for convenience. The file is in .RData format and contains everything described above as well as some minor additional objects used within the code calculating the cumulative curves. For completeness, here is a detailed description of the various objects which can be found within the .RData file: states: A character vector containing the state names for those states in which data was collected for. More importantly, the index of the state name is also the index in which that state's data can be found in the various following list objects. For example, if California is the third index in this object, the data for California will also be in the third index for each accompanying list. rightsByState_ground: A list of data frames with the cleaned ground water rights collected from each state. This object holds the the data that is exported to created the xxGroundwaterHarmonizedRights.csv files. rightsByState_surface: A list of data frames with the cleaned surface water rights collected from each state. This object holds the the data that is exported to created the xxSurfaceWaterHarmonizedRights.csv files. fullRightsRecs: A list of the combined groundwater and surface water records for each state. This object holds the the data that is exported to created the xxFullHarmonizedRights.csv files. projProj: The spatial projection used for map creation in the beginning of the project. Specifically, the World Geodetic System (WGS84) as a coordinate reference system (CRS) string in PROJ.4 format. wmaStateLabel: The name and/or abbreviation for what each state legally calls their WMAs. h2oUseByState: A list of spatial polygon data frames which contain the area(s) in which each water right is claimed to be used. It should be noted that not all water right records have a listed area(s) of use in this object. Currently, only Idaho and Washington provided valid data to be included in this object. h2oDivByState: A list of spatial points data frames which identifies the location of the Point of Diversion for the state's water rights. It should be noted that not all water right records have a listed Point of Diversion in this object. spatialWMAByState: A list of spatial polygon data frames which contain the spatial WMA boundaries for each state. The only data contained within the table are identifiers for each polygon. It is worth reiterating that Arizona is the only state in which the surface and groundwater WMA boundaries are not the same. wmaIDByState: A list which contains the unique ID values of the WMAs for each state. plottingDim: A character vector used to inform mapping functions for internal map making. Each state is classified as either "tall" or "wide", to maximize space on a typical 8x11 page. The code related to the creation of this dataset can be viewed within HarDWR GitHub Repository/dataHarmonization.

Economics↗