Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Systems Engineering Approach to Technology Integration for NASA's 2nd Generation Reusable Launch Vehicle

The overall goal of the 2nd Generation RLV Program is to substantially reduce technical and business risks associated with developing a new class of reusable launch vehicles. NASA's specific goals are to improve the safety of a 2nd-generation system by 2 orders of magnitude - equivalent to a crew risk of 1-in-10,000 missions - and decrease the cost tenfold, to approximately $1,000 per pound of payload launched. Architecture definition is being conducted in parallel with the maturating of key technologies specifically identified to improve safety and reliability, while reducing operational costs. An architecture broadly includes an Earth-to-orbit reusable launch vehicle, on-orbit transfer vehicles and upper stages, mission planning, ground and flight operations, and support infrastructure, both on the ground and in orbit. The systems engineering approach ensures that the technologies developed - such as lightweight structures, long-life rocket engines, reliable crew escape, and robust thermal protection systems - will synergistically integrate into the optimum vehicle. To best direct technology development decisions, analytical models are employed to accurately predict the benefits of each technology toward potential space transportation architectures as well as the risks associated with each technology. Rigorous systems analysis provides the foundation for assessing progress toward safety and cost goals. The systems engineering review process factors in comprehensive budget estimates, detailed project schedules, and business and performance plans, against the goals of safety, reliability, and cost, in addition to overall technical feasibility. This approach forms the basis for investment decisions in the 2nd Generation RLV Program's risk-reduction activities. Through this process, NASA will continually refine its specialized needs and identify where Defense and commercial requirements overlap those of civil missions.

Thomas, Dale↗

Life Cycle Systems Engineering Approach to NASA's 2nd Generation Reusable Launch Vehicle

The overall goal of the 2nd Generation RLV Program is to substantially reduce technical and business risks associated with developing a new class of reusable launch vehicles. NASA's specific goals are to improve the safety of a 2nd- generation system by 2 orders of magnitude - equivalent to a crew risk of 1 -in- 10,000 missions - and decrease the cost tenfold, to approximately $1,000 per pound of payload launched. Architecture definition is being conducted in parallel with the maturating of key technologies specifically identified to improve safety and reliability, while reducing operational costs. An architecture broadly includes an Earth-to-orbit reusable launch vehicle, on-orbit transfer vehicles and upper stages, mission planning, ground and flight operations, and support infrastructure, both on the ground and in orbit. The systems engineering approach ensures that the technologies developed - such as lightweight structures, long-life rocket engines, reliable crew escape, and robust thermal protection systems - will synergistically integrate into the optimum vehicle. Given a candidate architecture that possesses credible physical processes and realistic technology assumptions, the next set of analyses address the system's functionality across the spread of operational scenarios characterized by the design reference missions. The safety/reliability and cost/economics associated with operating the system will also be modeled and analyzed to answer the questions "How safe is it?" and "How much will it cost to acquire and operate?" The systems engineering review process factors in comprehensive budget estimates, detailed project schedules, and business and performance plans, against the goals of safety, reliability, and cost, in addition to overall technical feasibility. This approach forms the basis for investment decisions in the 2nd Generation RLV Program's risk-reduction activities. Through this process, NASA will continually refine its specialized needs and identify where Defense and commercial requirements overlap those of civil missions.

Thomas, Dale↗

Multivariable control altitude demonstration on the F100 turbofan engine

The F100 Multivariable control synthesis (MVCS) program, was aimed at demonstrating the benefits of LGR synthesis theory in the design of a multivariable engine control system for operation throughout the flight envelope. The advantages of such procedures include: (1) enhanced performance from cross-coupled controls, (2) maximum use of engine variable geometry, and (3) a systematic design procedure that can be applied efficiently to new engine systems. The control system designed, under the MVCS program, for the Pratt & Whitney F100 turbofan engine is described. Basic components of the control include: (1) a reference value generator for deriving a desired equilibrium state and an approximate control vector, (2) a transition model to produce compatible reference point trajectories during gross transients, (3) gain schedules for producing feedback terms appropriate to the flight condition, and (4) integral switching logic to produce acceptable steady-state performance without engine operating limit exceedance.

Lehtinen, B.↗

Documentation of the analysis of the benefits and costs of aeronautical research and technology models, volume 1

The analysis of the benefits and costs of aeronautical research and technology (ABC-ART) models are documented. These models were developed by NASA for use in analyzing the economic feasibility of applying advanced aeronautical technology to future civil aircraft. The methodology is composed of three major modules: fleet accounting module, airframe manufacturing module, and air carrier module. The fleet accounting module is used to estimate the number of new aircraft required as a function of time to meet demand. This estimation is based primarily upon the expected retirement age of existing aircraft and the expected change in revenue passenger miles demanded. Fuel consumption estimates are also generated by this module. The airframe manufacturer module is used to analyze the feasibility of the manufacturing the new aircraft demanded. The module includes logic for production scheduling and estimating manufacturing costs. For a series of aircraft selling prices, a cash flow analysis is performed and a rate of return on investment is calculated. The air carrier module provides a tool for analyzing the financial feasibility of an airline purchasing and operating the new aircraft. This module includes a methodology for computing the air carrier direct and indirect operating costs, performing a cash flow analysis, and estimating the internal rate of return on investment for a set of aircraft purchase prices.

Bobick, J. C.↗

Space shuttle descent design: From development to operations

The descent guidance system, the descent trajectories design, and generating of the associated flight products are discussed. The programs which allow the successful transitions from development to STS operations, resulting in reduced manpower requirements and compressed schedules for flight design cycles are addressed. The topics include: (1) continually upgraded tools for the job, i.e., consolidating tools via electronic data transfers, tailoring general purpose software for needs, easy access to tools through an interactive approach, and appropriate flexibility to allow design changes and provide growth capability; (2) stabilizing the flight profile designs (I-loads) in an uncertain environment; and (3) standardizing external interfaces within performance and subsystems constraints of the Orbiter.

Crull, T. J.↗

A proven approach for more effective software development and maintenance

Modern space flight mission operations and associated ground data systems are increasingly dependent upon reliable, quality software. Critical functions such as command load preparation, health and status monitoring, communications link scheduling and conflict resolution, and transparent gateway protocol conversion are routinely performed by software. Given budget constraints and the ever increasing capabilities of processor technology, the next generation of control centers and data systems will be even more dependent upon software across all aspects of performance. A key challenge now is to implement improved engineering, management, and assurance processes for the development and maintenance of that software; processes that cost less, yield higher quality products, and that self-correct for continual improvement evolution. The NASA Goddard Space Flight Center has a unique experience base that can be readily tapped to help solve the software challenge. Over the past eighteen years, the Software Engineering Laboratory within the code 500 Flight Dynamics Division has evolved a software development and maintenance methodology that accommodates the unique characteristics of an organization while optimizing and continually improving the organization's software capabilities. This methodology relies upon measurement, analysis, and feedback much analogous to that of control loop systems. It is an approach with a time-tested track record proven through repeated applications across a broad range of operational software development and maintenance projects. This paper describes the software improvement methodology employed by the Software Engineering Laboratory, and how it has been exploited within the Flight Dynamics Division with GSFC Code 500. Examples of specific improvement in the software itself and its processes are presented to illustrate the effectiveness of the methodology. Finally, the initial findings are given when this methodology was applied across the mission operations and ground data systems software domains throughout Code 500.

Pajerski, Rose↗

An overview of the GOLD experiment between the ETS-6 satellite and the table mountain facility

The Ground/Orbiter Lasercomm Demonstration (GOLD) is a demonstration of optical communications between the Japanese Engineering Test Satellite (ETS-VI) and an optical ground transmitting and receiving station at the Table Mountain Facility in Wrightwood, California. Laser transmissions to the satellite are performed for approximately 4 hours every third night when the satellite is at apogee above Table Mountain. The experiment requires the coordination of resources at the Communications Research Laboratory (CRL), JPL, the National Aeronautics and Space Development Agency (NASDA) Tsukuba tracking station, and NASA's Deep Space Network at Goldstone, California, to generate and transmit real-time commands and receive telemetry from the ETS-VI. Transmissions to the ETS-VI began in November 1995 and are scheduled to last into the middle of January 1996, when the satellite is expected to be eclipsed by the Earth's shadow for a major part of its orbit. The eclipse is expected to last for about 2 months, and during this period there will be limited electrical power available on board the satellite. NASDA plans to restrict experiments with the ETS-VI during this period, and no laser transmissions are planned. Posteclipse experiments are currently being negotiated. GOLD is a joint NASA-CRL experiment that is being conducted by JPL in coordination with CRL and NASDA.

Wilson, K. E.↗

An Overview of the GOLD Experiment Between the ETS-6 Satellite and the Table Mountain Facility

The Ground/Orbiter Lasercomm Demonstration is a demonstration of optical communications between the Japanese Engineering Test Satellite (ETS-VI) and an optical ground transmitting and receiving station at the Table Mountain Facility in Wrightwood, California. Laser transmissions to the satellite are performed for approximately 4 hours every third night when the satellite is at apogee above Table Mountain. The experiment requires the coordination of resources at the Communications Research Laboratory (CRL), JPL, the National Aeronautics and Space Development Agency (NASDA) Tsukuba tracking station, and NASA's Deep Space Network at Goldstone, California, to generate and transmit real-time commands and receive telemetry from the ETS-VI. Transmissions to the ETS-VI began in November 1995 and are scheduled to last into the middle of January 1996, when the satellite is expected to be eclipsed by the Earth's shadow for a major part of its orbit. The eclipse is expected to last for about 2 months, and during this period there will be limited electrical power available on board the satellite. NASDA plans to restrict experiments with the ETS-VI during this period, and no laser transmissions are planned. Posteclipse experiments are currently being negotiated. GOLD is a joint NASA-CRL experiment that is being conducted by JPL in coordination with CRL and NASDA.

Wilson, K. E.↗

Automating the Processing of Earth Observation Data

NASA s vision for Earth science is to build a "sensor web": an adaptive array of heterogeneous satellites and other sensors that will track important events, such as storms, and provide real-time information about the state of the Earth to a wide variety of customers. Achieving this vision will require automation not only in the scheduling of the observations but also in the processing of the resulting data. To address this need, we are developing a planner-based agent to automatically generate and execute data-flow programs to produce the requested data products.

Golden, Keith↗

Automated Data Processing as an AI Planning Problem

NASA s vision for Earth Science is to build a "sensor web"; an adaptive array of heterogeneous satellites and other sensors that will track important events, such as storms, and provide real-time information about the state of the Earth to a wide variety of customers. Achieving his vision will require automation not only in the scheduling of the observations but also in the processing af tee resulting data. Ta address this need, we have developed a planner-based agent to automatically generate and execute data-flow programs to produce the requested data products. Data processing domains are substantially different from other planning domains that have been explored, and this has led us to substantially different choices in terms of representation and algorithms. We discuss some of these differences and discuss the approach we have adopted.

Golden, Keith↗

The Trick Simulation Toolkit: A NASA/Opensource Framework for Running Time Based Physics Models

The Trick Simulation Toolkit is a simulation development environment used to create high fidelity training and engineering simulations at the NASA Johnson Space Center and many other NASA facilities. Its purpose is to generate a simulation executable from a collection of user-supplied models and a simulation definition file. For each Trick-based simulation, Trick automatically provides job scheduling, numerical integration, the ability to write and restore human readable checkpoints, data recording, interactive variable manipulation, a run-time interpreter, and many other commonly needed capabilities. This allows simulation developers to concentrate on their domain expertise and the algorithms and equations of their models. Also included in Trick are tools for plotting recorded data and various other supporting utilities and libraries. Trick is written in C/C++ and Java and supports both Linux and MacOSX computer operating systems. This paper describes Trick's design and use at NASA Johnson Space Center.

Penn, John M.↗

Mission Operations, Cubed: NASA Marshall Operations Support for SmallSats

SmallSats have come a long way since the Huntsville Operations Support Center (HOSC) at NASA’s Marshall Space Flight Center supported its first “minisatellite” mission in 2010. And just as SmallSats themselves have evolved in those 12 years, so too has the HOSC’s mission support for SmallSats. Marshall Space Flight Center has a long history with payload and mission operations, including support for the Apollo missions to the moon, the Space Shuttle program, and 21 years of continuous around-the-clock science operations support for research aboard the International Space Station. Today, the HOSC is a multi-tenant facility, supporting not only ISS, but also NASA’s Commercial Crew program, the Space Launch System, the Hubble and Chandra observatories and others – including multiple SmallSat missions. Two SmallSat solar sail missions will be among those taking advantage of the HOSC’s resources for planning, training for and executing mission operations – the Near Earth Asteroid (NEA) Scout and Solar Cruiser missions. One of 10 6U CubeSats manifest on the Artemis I launch of NASA’s Space Launch System rocket this year, NEA Scout’s three-year mission will be supported through a more traditional operations concept, with a dedicated Flight Controller staff operating within the HOSC. Scheduled to launch as part of the Interstellar Mapping and Acceleration Probe (IMAP) in February 2025, Solar Cruiser’s 11-month mission will take a next-generation approach to operations by utilizing a multi-mission flight controller concept, as well as Marshall’s Telescience Resource Kit (TreK). TreK provides a suite of software applications and libraries that allow the Mission Operations Center to serve as an in-house ground system which incorporates remote and automation capability options for engineers and scientists. This presentation will compare the approaches the HOSC will use to support these two missions as a way of demonstrating the array of options NASA MSFC offers for operations support for CubeSat and SmallSat missions.

Darren S Wallace↗

Utilization of Ancillary Data Sets for Conceptual SMAP Mission Algorithm Development and Product Generation

The planned Soil Moisture Active Passive (SMAP) mission is one of the first Earth observation satellites being developed by NASA in response to the National Research Council's Decadal Survey, Earth Science and Applications from Space: National Imperatives for the Next Decade and Beyond [1]. Scheduled to launch late in 2014, the proposed SMAP mission would provide high resolution and frequent revisit global mapping of soil moisture and freeze/thaw state, utilizing enhanced Radio Frequency Interference (RFI) mitigation approaches to collect new measurements of the hydrological condition of the Earth's surface. The SMAP instrument design incorporates an L-band radar (3 km) and an L band radiometer (40 km) sharing a single 6-meter rotating mesh antenna to provide measurements of soil moisture and landscape freeze/thaw state [2]. These observations would (1) improve our understanding of linkages between the Earth's water, energy, and carbon cycles, (2) benefit many application areas including numerical weather and climate prediction, flood and drought monitoring, agricultural productivity, human health, and national security, (3) help to address priority questions on climate change, and (4) potentially provide continuity with brightness temperature and soil moisture measurements from ESA's SMOS (Soil Moisture Ocean Salinity) and NASA's Aquarius missions. In the planned SMAP mission prelaunch time frame, baseline algorithms are being developed for generating (1) soil moisture products both from radiometer measurements on a 36 km grid and from combined radar/radiometer measurements on a 9 km grid, and (2) freeze/thaw products from radar measurements on a 3 km grid. These retrieval algorithms need a variety of global ancillary data, both static and dynamic, to run the retrieval models, constrain the retrievals, and provide flags for indicating retrieval quality. The choice of which ancillary dataset to use for a particular SMAP product would be based on a number of factors, including its availability and ease of use, its inherent error and resulting impact on the overall soil moisture or freeze/thaw retrieval accuracy, and its compatibility with similar choices made by the SMOS mission. All decisions regarding SMAP ancillary data sources would be fully documented by the SMAP Project and made available to the user community.

freeze/thaw↗

Design, fabrication, test, qualification and price analysis for third generation design solar cell modules

An updated program plan is presented showing the task descriptions depicting the work, progress, achievements, and the cause of any deviations from the original plan (SC-1), and how this impacted on the original schedule of the program. In addition there is an update documenting all design alterations made during the pre-production phase and a complete up to date set of engineering and manufacturing documentation (CM-1). The purpose of the work in the original plan was to explore, design, develop, test, and deliver 1000 watts of prototype flat plate, photovoltaic modules appropriate for use in applications in the 20 to 500 kilowatt range and which show potential for meeting the 1986 cost goals.

Source record↗

Physics-Guided Deep Learning for Complex System Health Management and Decision Making

The landscape of complex engineered systems is rapidly evolving, from smart manufacturing facilities to next-generation transportation vehicles. As these systems become increasingly sophisticated and interconnected, the need for advanced health management systems grows ever more critical. These systems must go beyond simple monitoring, actively predicting potential failures before they occur. This paradigm shift from fixed maintenance schedules to condition-based predictions is key to optimizing system performance, enhancing safety, and paving the way for autonomous decision-making across various industries. Whether in industrial processes, energy systems, or advanced transportation, the ability to anticipate and prevent failures is becoming a cornerstone of operational excellence. To accurately predict the future health of any complex system, knowledge of its current health state and future operational conditions is essential. Recent advancements in data-driven algorithms have generated growing interest in artificial intelligence for industrial applications. However, the limitations of pure data-driven methods, particularly in industries where data acquisition is costly and limited, have become apparent. This has led to a focus on blending physics with data-driven algorithms, mitigating the drawbacks of both approaches while emphasizing their respective advantages. This research proposes a novel framework for integrating physics-based performance models with deep learning algorithms for the prognostics of complex safety-critical systems. In this approach, physics-based models serve as a blueprint, capturing fundamental system behaviors, while deep learning algorithms, leveraging real-world sensor data, fill in gaps and identify subtle patterns indicative of potential problems. This hybrid methodology, utilizing techniques such as Physics-Informed Neural Networks (PINNs), offers a powerful solution for predicting system health. By fusing domain knowledge with data-driven insights, this approach promises more accurate, adaptable, and reliable models for health prediction. The resulting framework is versatile, applicable across various sectors including aerospace, manufacturing, and energy systems, ultimately contributing to safer, more efficient operations in our increasingly complex technological landscape.

Diagnostics↗

Space station Platform Management System (PMS) replanning using resource envelopes

One of the responsibilities of the Space Station Platform Management System (PMS) is to maintain constraint-free, short-term plans for platform and free-flyer activities. Both the replanning function and the associated constraint-checking function are viewed as potentially requiring expert system assistance. The PMS Resource Envelope Scheduling System (PRESS) expert system, which is currently under development, is described. The PRESS capabilities will include the following: plan, replan, and perform constraint checking using resource envelopes resembling those required for telescience; initialize itself using the results fo a previous run; infer the replanning needs associated with a change in resource availability; allow the user to determine the level of interaction (including an advisory capability) with the system during execution; and generate both a graphic timeline and a report as output. The PRESS is being developed on an IBM PC/AT using TeKnowledge, Inc.'s M.1 expert system shell. The PRESS activity definitions and constraints are based on those defined for the Cosmic Background Explorer (COBE) mission scheduled for launch in early 1989.

Bush, Joy Lee↗

Autonomy Architectures for a Constellation of Spacecraft

Until the past few years, missions typically involved fairly large expensive spacecraft. Such missions have primarily favored using older proven technologies over more recently developed ones, and humans controlled spacecraft by manually generating detailed command sequences with low-level tools and then transmitting the sequences for subsequent execution on a spacecraft controller. This approach toward controlling a spacecraft has worked spectacularly on previous missions, but it has limitations deriving from communications restrictions - scheduling time to communicate with a particular spacecraft involves competing with other projects due to the limited number of deep space network antennae. This implies that a spacecraft can spend a long time just waiting whenever a command sequence fails. This is one reason why the New Millennium program has an objective to migrate parts of mission control tasks onboard a spacecraft to reduce wait time by making spacecraft more robust. The migrated software is called a "remote agent" and has 4 components: a mission manager to generate the high level goals, a planner/scheduler to turn goals into activities while reasoning about future expected situations, an executive/diagnostics engine to initiate and maintain activities while interpreting sensed events by reasoning about past and present situations, and a conventional real-time subsystem to interface with the spacecraft to implement an activity's primitive actions. In addition to needing remote planning and execution for isolated spacecraft, a trend toward multiple-spacecraft missions points to the need for remote distributed planning and execution. The past few years have seen missions with growing numbers of probes. Pathfinder has its rover (Sojourner), Cassini has its lander (Huygens), and the New Millenium Deep Space 3 (DS3) proposal involves a constellation of 3 spacecraft for interferometric mapping. This trend is expected to continue to progressively larger fleets. For example, one mission proposed to succeed DS3 would have 18 spacecraft flying in formation in order to detect earth-sized planets orbiting other stars. A proposed magnetospheric constellation would involve 5 to 500 spacecraft in Earth orbit to measure global phenomena within the magnetosphere. This work describes and compares three autonomy architectures for a system that continuously plans to control a fleet of spacecraft using collective mission goals instead of goals or command sequences for each spacecraft. A fleet of self-commanding spacecraft would autonomously coordinate itself to satisfy high level science and engineering goals in a changing partially-understood environment making feasible the operation of tens or even a hundred spacecraft (such as for interferometry or plasma physics missions). The easiest way to adapt autonomous spacecraft research to controlling constellations involves treating the constellation as a single spacecraft. Here one spacecraft directly controls the others as if they were connected. The controlling "master" spacecraft performs all autonomy reasoning, and the slaves only have real-time subsystems to execute the master's commands and transmit local telemetry/observations. The executive/diagnostics module starts actions and the master's real-time subsystem controls the action either locally or remotely through a slave. While the master/slave approach benefits from conceptual simplicity, it relies on an assumption that the master spacecraft's executive can continuously monitor the slaves' real-time subsystems, and this relies on high-bandwidth highly-reliable communications. Since unintended results occur fairly rarely, one way to relax the bandwidth requirements involves only monitoring unexpected events in spacecraft. Unfortunately, this disables the ability to monitor for unexpected events between spacecraft and leads to a host of coordination problems among the slaves. Also, failures in the communications system can result in losing slaves. The other two architectures improve robustness while reducing communications by progressively distributing more of the other three remote agent components across the constellation. In a teamwork architecture, all spacecraft have executives and real-time subsystems - only the leader has the planner/scheduler and mission manager. Finally, distributing all remote agent components leads to a peer-to-peer approach toward constellation control.

Barrett, Anthony↗